Bid Abstact W9128F25BA008 - Oahe Spillway Apron Rehab.pdf

PDF 312 KB Posted

Attached to
Oahe Dam Spillway Apron Slab Rehabilitation
Solicitation number
W9128F25BA008
Issued by

About this file

This document is an Abstract of Technical Proposals for the Spillway Apron Rehabilitation Phase 2 project at Ohe Dam in South Dakota, issued by the US Army Corps of Engineers (Solicitation Number W9128F25BA008). The solicitation covers concrete repair work including full-depth concrete repairs, concrete spall repairs, concrete joint repairs, and expansion joint material installation, with a government estimate of $879,791.86. Nine contractors submitted proposals, with total estimated amounts ranging from $659,220.75 to $3,495,550.00. The key dates are an issue date of 24-Jul-25 and a proposal due date of 26-Aug-25. Contractors include Kovilic Construction Co Inc, Reagent World Inc, Morris Inc, Sharpe Enterprises Inc, Beartooth Water Jetting & Video Inspecting LLC, Anderson Contractors Inc, Construction Leaders Company LLC, Gustav & Rudy Contractors Inc, and Northwest Corp. All bidders acknowledged amendments and provided bid bonds, with no SAM exclusions reported.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED 3. DATE DUE

24-Jul-25 26-Aug-25

I CERTIFY THAT I HAVE OPENED, READ AND

AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED

Unique ID: EVBUYJTMKL45 Unique ID: WMD6CT8YXG49

C. REASONABLE CONTRACT

7A 7B 7C D. E. F.

ITEM # DESCRIPTION OF OFFER ITEM EST. QTY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT

Full-depth concrete repairs (Details S02, S03, S04, S06)

229 SF $197.99 $45,339.71 $600.00 $137,400.00 $621.11 $142,234.19

0002 Concrete Spall Repairs 345 SF $315.36 $108,799.20 $500.00 $172,500.00 $549.70 $189,646.50

Concrete Joint Repairs including new waterstop and waterstop splices (Details J01, J04, J05)

858 LF $503.04 $431,608.32 $1,050.00 $900,900.00 $331.55 $284,469.90

Concrete Joint repair including expansion joint material and installation of new expansion joint material Details J02, J03, J06)

577 LF $190.97 $110,189.69 $350.00 $201,950.00 $410.84 $237,054.68

All other work as outlined the drawings and specifications not already included in CLIN 0001 through 0004, including mobilization and demobilization

1 Job $183,854.94 $183,854.94 $195,000.00 $195,000.00 $94,822.60 $94,822.60

$879,791.86 $1,607,750.00 $948,227.87

ABSTRACT OF TECHNICAL PROPOSALS

1. SOLICITATION NUMBER

W9128F25BA008

4. ISSUING OFFICE

8. GOVERNMENT ESTIMATE

(Check A, B or C AND COMPLETE D, E AND F)

5. PROJECT TITLE 9. OFFERS

TO THIS SOLICITATION

SIGNATURE

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

1616 CAPITOL AVENUE

CONTRACTING DIVISION (CENWO-CT)

US ARMY CORPS OF ENGINEERS

l PAGES

Nadine Catania, Contracting officer

28-Aug-25OMAHA, NE 68102-1618

Spillway Apron Rehabilitation Phase 2

NO. 1 NO. 2

Franklin Park, Illinois 60131 Irvine, California 92612

A. HIRED LABOR

IGE - $879,791.86

3721 N. Carnation ST 18401 Von Karman AVE STE 360

Oahe Dam, South Dakota

OFFEROR: KOVILIC CONSTRUCTION CO

INC

OFFEROR: REAGENT WORLD, INC.

C. AMENDMENTS ACKNOWLEDGED: No

Bid Bond: No C. AMENDMENTS ACKNOWLEDGED: Yes

Bid Bond: Yes

CAGE Code: 0RBX9 B. REASONABLE CONTRACT

SAM Exclusion: None

TOTAL

6. AMENDMENTS ISSUED - 2 (Including Profit)

CAGE Code: 6TV08

SAM Exclusion: None (Without Profit)

Unique ID: JCP6F9KM9TN9 Unique ID: CHWKANT8L8N3 Unique ID: NSY8TZHV3165 Unique ID: GP8LCT2WJPS7 Unique ID: LSEVPU78NM71

UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT

$787.00 $180,223.00 $960.00 $219,840.00 $1,000.00 $229,000.00 $108.70 $24,892.30 $312.75 $71,619.75

$679.00 $234,255.00 $1,120.00 $386,400.00 $850.00 $293,250.00 $103.37 $35,662.65 $75.00 $25,875.00

$725.00 $622,050.00 $605.00 $519,090.00 $825.00 $707,850.00 $825.81 $708,544.98 $430.00 $368,940.00

$198.00 $114,246.00 $650.00 $375,050.00 $850.00 $490,450.00 $161.71 $93,306.67 $218.00 $125,786.00

$410,000.00 $410,000.00 $870,000.00 $870,000.00 $1,775,000.00 $1,775,000.00 $438,059.16 $438,059.16 $67,000.00 $67,000.00

$1,560,774.00 $2,370,380.00 $3,495,550.00 $1,300,465.76 $659,220.75

C. AMENDMENTS ACKNOWLEDGED: Yes

Bid Bond: Yes C. AMENDMENTS ACKNOWLEDGED: Yes

SAM Exclusion: None

CAGE Code: 46V78 CAGE Code: 0ELU6

SAM Exclusion: None

NO. 5 NO. 6 NO. 7

Bid Bond: Yes

NO. 4

220 W. Hwy 14/34 Fort Pierre, South Dakota 57532

NO. 3

1908 N Garfield AVE Pierre, South Dakota 57501

OFFEROR: MORRIS INC

OFFEROR: SHARPE ENTERPRISES

INC

OFFEROR: BEARTOOTH WATER

JETTING & VIDEO INSPECTING LLC

OFFEROR: ANDERSON

CONTRACTORS, INC.

OFFEROR: CONSTRUCTION LEADERS

COMPANY, LLC

Bid Bond: Yes C. AMENDMENTS ACKNOWLEDGED: Yes

1713 Midfield St.

Bozeman, Montana 59715 CAGE Code: 57QU1

SAM Exclusion: None.

Bid Bond: Yes C. AMENDMENTS ACKNOWLEDGED: Yes

PO Box 442 Pierre, South Dakota 57501 CAGE Code: 0K4P2

SAM Exclusion: None Bid Bond: Yes C. AMENDMENTS ACKNOWLEDGED: Yes

8401 Dougls Ave. Suite 5 Urbandale, Iowa 50322-2910 CAGE Code: 144N6

SAM Exclusion: None

Unique ID: VK3PRM8JV282 Unique ID: H1SPM51QVSG1

UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT

$690.00 $158,010.00 $798.44 $182,842.76

$600.00 $207,000.00 $511.36 $176,419.20

$356.00 $305,448.00 $1,139.75 $977,905.50

$178.00 $102,706.00 $316.31 $182,510.87

$229,266.00 $229,266.00 $790,323.75 $790,323.75

$1,002,430.00 $2,310,002.08

NO. 8 NO. 9

OFFEROR: GUSTAV & RUDY

CONTRACTORS, INC

OFFEROR: NORTHWEST CORP.

Bid Bond: Yes C. AMENDMENTS ACKNOWLEDGED: Yes

3901 E. Producer Ln Sioux Falls, South Dakota 57104 CAGE Code: 1NC18

SAM Exclusion: None

PO Box 275 Hamel, Minnesota 55340 CAGE Code: 932L6

SAM Exclusion: None Bid Bond: Yes C. AMENDMENTS ACKNOWLEDGED: Yes

File details come from the government source that posted it. Updated .