Oahe Dam Spillway Apron Slab Rehabilitation
Solicitation number
W9128F25BA008
Issued by

About this file

The document is a Bid Schedule for the Spillway Apron Rehabilitation Phase 2 project at Oahe Dam in South Dakota, solicitation #W9128F25BA008. The bid schedule contains five line items covering concrete repairs and rehabilitation work, including full depth concrete repairs (229 SF), concrete spall repairs (345 SF), concrete joint repairs with waterstop and splices (858 LF), concrete joint repairs with expansion joint material (577 LF), and a comprehensive line item for all other work not already specified, which includes mobilization and demobilization (1 EA).

The bid notes specify that contractors must price all items in the schedule, with unit prices taking precedence in case of discrepancies. Contractors are required to determine their own number of mobilizations and demobilizations, which should be included in line item 0005. All unit and total prices must be entered to two decimal places, providing a detailed pricing structure for the dam rehabilitation project being conducted by the U.S. Army Corps of Engineers Omaha District.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Spillway Apron Rehabilitation Phase 2

Oahe Dam, South Dakota

Solicitation #W9128F25BA008

BID SCHEDULE

LINE

ITEMS

DESCRIPTION QUANTITY UNIT

UNIT

PRICE

AMOUNT

BASE LINE ITEMS (BASIC REQUIREMENTS)

Full Depth Concrete Repairs

(Details S02, S03, S04, S06)

229 SF $_____________

0002 Concrete Spall Repairs 345 SF $_____________

Concrete Joint Repairs including new waterstop and waterstop splices (Details

J01, J04, J05)

858 LF $_____________

Concrete Joint Repairs including expansion joint material (Details J02, J03, J06)

577 LF $_____________

All other work as outlined the drawings and specifications not already included in CLIN 0001 through 0004, including mobilization and demobilization

1 EA $_____________

TOTAL BASE LINE ITEMS $_______________________

NOTES:

1. The Contractor shall bid the entire project to include mobilization(s) and demobilization(s) to be included in line item 0005. The number of mobilization(s) and demobilization(s) submitted in the bid shall be the Contractor’s determination.

2. Prices must be entered for all items of the schedule. In case of variation between the unit price and the total amount, the unit price will be considered the price submitted.

3. Unit and total prices shall not exceed two (2) decimal places.