Amd 03 - Submittal Register.pdf

PDF 825 KB Posted

Attached to
Big Bend Powerhouse Elevator No. 2 Rehab Federal contract opportunity
Solicitation number
W9128F24R0023
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This document is a Submittal Register for the Powerhouse Elevator No. 2 Rehab project at the Big Bend Dam. It lists the various submittals required for this construction project, including shop drawings, product data, design data, test reports, certificates, and operation and maintenance data across multiple technical specifications.

The key details are:

  • The work includes demolition and replacement of the elevator equipment, controls, hoist mechanism, and hoisting system to bring the elevator up to code.
  • Potential hazardous materials include lead and asbestos which will require special handling and disposal.
  • A site visit is scheduled for June 18, 2024 for which attendees must provide information by June 17, 2024.
  • The solicitation number is W9128F24R0023 and the procuring agency is the U.S. Army Corps of Engineers, Omaha District.

View the file

Other files for this federal contract opportunity

Other files attached to Big Bend Powerhouse Elevator No. 2 Rehab, newest first.
File Type Posted
Amendment 0005 - W9128F24R0023 - BB Powerhouse Elevator No. 2 Rehab Big Bend.pdf PDF
Amendment 0004 - W9128F24R0023 - BB Powerhouse Elevator No. 2 Rehab Big Bend.pdf PDF
Amd 04 - Specification 01 11 00.pdf PDF
Amd 04 - Specification 14 21 23.pdf PDF
Amendment 0003 - W9128F24R0023 - BB Powerhouse Elevator No. 2 Rehab Big Bend.pdf PDF
Amd 03 - Specification 14 21 23.pdf PDF
Amd 03 - Sheet M-101.pdf PDF
Amendment 0002 - W9128F24R0023 - BB Powerhouse Elevator No. 2 Rehab Big Bend.pdf PDF
ProjNet ID 10886662 Informational Photos.docx DOCX document
Amendment 0001 - W9128F24R0023 - BB Powerhouse Elevator No. 2 Rehab Big Bend.pdf PDF
Amd 01 - Specification 14 21 23.pdf PDF
Amd 01 - Specification 28 31 70.pdf PDF
Amd 01 - Specification 25 05 11.pdf PDF
Amd 01 - Specification 26 20 00.pdf PDF
W9128F24R0023_Site Visit Sign-In_18Jun2024.pdf PDF
Amd 01 - Specification 01 11 00.pdf PDF
Amd 01 - Drawings A-210_M-101_M103.pdf PDF
W9128F24R0023 - BB Powerhouse Elevator No. 2 Rehab Big Bend - Specs 2of3.pdf PDF
W9128F24R0023 - BB Powerhouse Elevator No. 2 Rehab - DRAWINGS 3of3.PDF PDF
W9128F24R0023 - BB Powerhouse Elevator No. 2 Rehab Big Bend - Solicitation 1of3.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 14 PAGES

Powerhouse Elevator No. 2 Rehab - Big Bend Dam

01 12 00 SD-01 Preconstruction Submittals

G AOProposed Methods of Operation

1.9 G AOProgress Charts

1.2Construction Right-of-Way

SD-02 Shop Drawings

1.4 G AOCare of Water

SD-11 Closeout Submittals

1.10Warranty of Construction

01 30 00.24 SD-01 Preconstruction Submittals

AT Level I Training Sign In

Sheets iWATCH and/or CorpsWatch

Training Sign In Sheets

OPSEC Training Sign In Sheets

E-Verify

01 33 00 SD-01 Preconstruction Submittals

1.8 G AOSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7.1 G AOACCIDENT PREVENTION PLAN

(APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 G AOAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Am-0003

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 14 PAGES

01 35 26 1.8Activity Hazard Analysis (AHA)

1.9.1Hot Work Permit

License Certificates

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G AOContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9Verification Statement

01 57 20.00 10 SD-01 Preconstruction Submittals

1.7 GEnvironmental Protection Plan

02 41 00 SD-01 Preconstruction Submittals

1.2.2 G PODemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.7Notification

SD-11 Closeout Submittals

3.3.4Receipts

02 82 00 SD-03 Product Data

1.3.5 G ROSafety Data Sheets (SDS) for All

Materials

SD-06 Test Reports

1.5.3 G ROAir Sampling Results

SD-07 Certificates

1.3.3 G ROEmployee Training

1.3.6 G ROAsbestos Hazard Plan

1.3.7 G ROTesting Laboratory

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 14 PAGES

02 82 00 1.3.8 G ROLandfill Approval

1.3.8 G RODelivery Tickets

1.3.8 G ROWaste Shipment Records

1.5.1 G ROPrivate Qualified Person

Documentation

1.5.2 G ROCompetent Person

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1 G POCompetent Person

1.5.2.4 G POLead Waste Management Plan

3.2.2.1 G POWritten Evidence of TSD

Approval

SD-06 Test Reports

1.3.2 G POSampling and Analysis

SD-11 Closeout Submittals

3.2.2.1 G POHazardous Waste Manifest

3.2.2.1 G POTurn-In Documents or Weight

Tickets

05 50 13 SD-02 Shop Drawings

2.3 G DOAccess Doors And Panels

2.4 G DOAngles and Plates

SD-03 Product Data

2.3 G DOAccess Doors And Panels

07 21 16 SD-03 Product Data

2.1Blanket Insulation

2.3Vapor Retarder

2.4Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 14 PAGES

07 21 16 SD-08 Manufacturer’s Instructions

3.3.1Insulation

07 84 00 SD-02 Shop Drawings

2.1 G POFirestopping System

SD-03 Product Data

2.2 G POFirestopping Materials

SD-06 Test Reports

3.3 G POInspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1 G POInstaller Qualifications

07 92 00 SD-03 Product Data

2.1Sealants

2.4Backstops

SD-07 Certificates

2.1.1 SIndoor Air Quality For Interior

Sealants

08 11 13 SD-02 Shop Drawings

2.1 G DODoors

2.1 G DODoors

2.5 G DOFrames

2.5 G DOFrames

2.3Accessories

SD-03 Product Data

2.1 G DODoors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 14 PAGES

08 11 13 2.5 G DOFrames

2.3Accessories

08 71 00 SD-02 Shop Drawings

1.3 G DOManufacturer's Detail Drawings

1.3 G DOVerification of Existing Conditions

1.5 G POHardware Schedule

2.3.4Keying System

SD-03 Product Data

2.3 G POHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 G POHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

09 22 00 SD-02 Shop Drawings

2.1 G DOMetal Support Systems

09 29 00 SD-03 Product Data

2.1.1Gypsum Board

2.1.2VOC Content of Joint Compound

SD-07 Certificates

2.1 G AOAsbestos Free Materials

SD-08 Manufacturer’s Instructions

2.1Safety Data Sheets

2.1Safety Data Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 14 PAGES

09 29 00 SD-10 Operation and Maintenance

Data

2.1Manufacturer Maintenance

Instructions

09 90 00 SD-03 Product Data

2.1 G POCoating

2.1Product Data Sheets

SD-04 Samples

G DOColor

SD-07 Certificates

1.5.3.2Qualification Testing

SD-08 Manufacturer’s Instructions

3.2.1Application Instructions

2.1Mixing

1.7.1Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1 G POCoatings

14 21 23 SD-02 Shop Drawings

1.2.1 G DOElevator Components

1.2.2 G DOElevator Components

1.2.1 G DOElevator Machine

1.2.1 G DOElevator Controller

1.3.4 G DOWiring Diagrams

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 14 PAGES

14 21 23 1.2.1Elevator Components

1.2.2Elevator Components

1.2.2Data Sheets

2.5.2 G DOElevator Microprocessor

Controller

SD-05 Design Data

1.2.3.2 G POEmergency Power Systems

1.2.3.1 G DOReaction Loads

SD-07 Certificates

1.4 G POWarranty

1.3.1.1Endorsement Letter

1.2.4 G POWelders' Qualifications

2.5.2.3 G POElevator Controller Certification

SD-10 Operation and Maintenance

Data

G POElevator

1.2.5 G POMaintenance Control Program

(MCP)

2.5.2.2 G POSoftware and Documentation

23 30 00 SD-02 Shop Drawings

1.4.3 G DODetail Drawings

SD-03 Product Data

2.8.5 G DOLouvers

2.9.1.2 G DOAxial Flow Fans

2.9.1.3 G DOCentrifugal Type Power Roof

Ventilators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 14 PAGES

23 30 00 G DOTest Procedures

2.8.3 G DOAutomatic Smoke-Fire Dampers

2.9.1.1 G DOCentrifugal Fans

SD-06 Test Reports

3.8 G DOPerformance Tests

3.7 G DODamper Acceptance Test

SD-10 Operation and Maintenance

Data

3.9.1 G POOperation and Maintenance

Manuals

2.9.1.2 G POAxial Flow Fans

2.9.1.3 G POCentrifugal Type Power Roof

Ventilators

3.9.2 G POOperation And Maintenance

Training

25 05 11 SD-01 Preconstruction Submittals

1.8.1 G CSAccount Level Permissions List

(Encrypted)

1.3.1 G CSSensitive Data Protection Plan

(Encrypted)

G CSOperational Technology / Control

Systems Acceptable Use Policy

SD-02 Shop Drawings

2.4 G CSNetwork Diagram (Encrypted)

2.4 G CSSystem Data Flow Diagram

(Encrypted)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 14 PAGES

25 05 11 SD-03 Product Data

2.1 G CSPre-Construction Software List

(Encrypted)

2.2 G CSPre-Construction Hardware List

(Encrypted)

2.1 G CSComplete Software List

(Encrypted)

2.2 G CSComplete Hardware List

(Encrypted)

2.3 G CSPorts, Protocols, and Services

List (Encrypted)

2.3 G CSPorts, Protocols, and Services

List (Encrypted)

1.11 G CSCertificate Protection Status

(Encrypted)

2.7.1 I CSBackup Software (Encrypted)

SD-05 Design Data

G CSNetwork Configuration Files

(Encrypted)

3.2 G CSDeviations List (Encrypted)

SD-06 Test Reports

3.2 G CSSCAP Tool Scan (Encrypted)

G CSSTIG Veiwer Checklists

(Encrypted)

2.1.1 G CSAntivirus/Antimalware Scan

(Encrypted)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 14 PAGES

25 05 11 SD-07 Certificates

1.5 G CSContractor Personnel

Qualifications

SD-11 Closeout Submittals

1.7 G CSVulnerability Resolution Report

(Encrypted)

2.5 G CSComprehensive

Password/Passphrase List

(Encrypted)

2.6 G CSComprehensive Account List

(Encrypted)

2.7 G CSInitial Backups (Encrypted)

G CSBIOS/UEFI Protection

Password/Passphrase List

(Encrypted)

26 20 00 SD-02 Shop Drawings

2.11 G DOPanelboards

2.14 G DOTransformers

G DOBusway

G DOCable Trays

G DOMotor Control Centers

2.23 G DOWireways

3.1.5.1 G DOMarking Strips

SD-03 Product Data

2.10 G DOReceptacles

2.11.3 G DOCircuit Breakers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 14 PAGES

26 20 00 2.8 G DOSwitches

2.14 G DOTransformers

2.16 G DOMotor Controllers

SD-06 Test Reports

3.5.2 G PO600-volt Wiring Test

3.5.3 G POTransformer Tests

3.5.4 G POGround-fault Receptacle Test

SD-07 Certificates

2.9 G POFuses

SD-09 Manufacturer’s Field

Reports

2.25.1Transformer Factory Tests

SD-10 Operation and Maintenance

Data

1.5.1 G POElectrical Systems

26 29 23 SD-02 Shop Drawings

1.5.1 G DOSchematic Diagrams

1.5.2 G DOInterconnecting Diagrams

1.5.3 G DOInstallation Drawings

1.5.3 G POAs-Built Drawings

SD-03 Product Data

2.1 G DOAdjustable Speed Drives

2.3Wires and Cables

1.5.4Equipment Schedule

SD-06 Test Reports

3.3.1ASD Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 14 PAGES

26 29 23 3.3.2Performance Verification Tests

3.3.3Endurance Test

SD-07 Certificates

G POTesting Agency's Field

Supervisor

SD-08 Manufacturer’s Instructions

1.5.5Installation instructions

SD-09 Manufacturer’s Field

Reports

2.5.1 G POASD Test Plan

1.5.6Standard Products

SD-10 Operation and Maintenance

Data

2.1Adjustable Speed Drives

26 51 00 SD-02 Shop Drawings

1.5.1 G DOLuminaire Drawings

SD-03 Product Data

2.2 G DOLuminaires

2.3 G DOLight Sources

2.4 G DOLED Drivers

1.6.1 G DOLuminaire Warranty

2.5.1.1 G DOSwitches

2.6.1 G DOEmergency Drivers

G DOLinear LED Lamps

SD-05 Design Data

1.5.2 G DOLuminaire Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 14 PAGES

26 51 00 G DOPhotometric Plan

SD-10 Operation and Maintenance

Data

1.7.1 GLighting System

3.3.1.1 G POMaintenance Staff Training Plan

3.3.1.2 G POEnd-User Training Plan

28 31 70 SD-01 Preconstruction Submittals

1.3.2 G POQualified Fire Protection Engineer

(QFPE)

1.8.2.1 G POFire alarm system designer

1.8.2.3 G POTechnician

1.8.2.4 G POInstaller

1.8.2.5 G POTest Technician

SD-02 Shop Drawings

1.8.1.2 G DOWiring Diagrams

1.8.1.3 G DOSystem Layout

SD-03 Product Data

2.3 G DOAddressable Interface Devices

2.4 G DOAddressable Control Modules

SD-06 Test Reports

3.5.1 G POTest Procedures

SD-07 Certificates

3.5.2.1 G POVerification of Compliant

Installation

3.5.2.2 G PORequest for Government Final

Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 14 PAGES

28 31 70 SD-11 Closeout Submittals

1.8.1.5As-Built Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS