Amd 01 - Drawings A-210_M-101_M103.pdf

PDF 976 KB Posted

Attached to
Big Bend Powerhouse Elevator No. 2 Rehab Federal contract opportunity
Solicitation number
W9128F24R0023
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This document contains drawings and specifications related to the rehabilitation of Powerhouse Elevator No. 2 at the Big Bend Dam in South Dakota. The key details are:

The scope of work includes demolition and replacement of various elevator components, such as the equipment, controls, hoist mechanism, and hoisting system, in order to bring the elevator system up to code. The existing elevator cab and landing doors will be reused, while the cab door will be replaced. The machine room and elevator shaft need to be enclosed with a 2-hour fire-rated wall. Potential hazardous materials, including lead and asbestos, have been identified and will need to be properly addressed. A site visit is scheduled for June 18, 2024, and attendees must provide certain information by June 17, 2024. The solicitation number is W9128F24R0023, and the federal agency is the Department of the Army Corps of Engineers, Engineering District Omaha.

View the file

Other files for this federal contract opportunity

Other files attached to Big Bend Powerhouse Elevator No. 2 Rehab, newest first.
File Type Posted
Amendment 0005 - W9128F24R0023 - BB Powerhouse Elevator No. 2 Rehab Big Bend.pdf PDF
Amd 04 - Specification 14 21 23.pdf PDF
Amendment 0004 - W9128F24R0023 - BB Powerhouse Elevator No. 2 Rehab Big Bend.pdf PDF
Amd 04 - Specification 01 11 00.pdf PDF
Amendment 0003 - W9128F24R0023 - BB Powerhouse Elevator No. 2 Rehab Big Bend.pdf PDF
Amd 03 - Specification 14 21 23.pdf PDF
Amd 03 - Submittal Register.pdf PDF
Amd 03 - Sheet M-101.pdf PDF
ProjNet ID 10886662 Informational Photos.docx DOCX document
Amendment 0002 - W9128F24R0023 - BB Powerhouse Elevator No. 2 Rehab Big Bend.pdf PDF
Amd 01 - Specification 01 11 00.pdf PDF
Amendment 0001 - W9128F24R0023 - BB Powerhouse Elevator No. 2 Rehab Big Bend.pdf PDF
Amd 01 - Specification 14 21 23.pdf PDF
Amd 01 - Specification 28 31 70.pdf PDF
Amd 01 - Specification 25 05 11.pdf PDF
Amd 01 - Specification 26 20 00.pdf PDF
W9128F24R0023_Site Visit Sign-In_18Jun2024.pdf PDF
W9128F24R0023 - BB Powerhouse Elevator No. 2 Rehab Big Bend - Specs 2of3.pdf PDF
W9128F24R0023 - BB Powerhouse Elevator No. 2 Rehab Big Bend - Solicitation 1of3.pdf PDF
W9128F24R0023 - BB Powerhouse Elevator No. 2 Rehab - DRAWINGS 3of3.PDF PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FF LEVEL 1

1363' - 0"

REUSE AND REFURBISH EXIST. LANDING DOORS

AND DOORWAY FRAMES - SEE NOTE 2 AND 3

REPLACE ELEVATOR CAB DOOR - SEE NOTE 2 AND 3

REUSE EXIST. CALL ASSEMBLY

2" M

IN

4'

NEW FLOOR DESIGNATIONS - SEE NOTE 1

REUSE EXIST. HALL SIGNALS

B.O PIT

1357' - 3"

FF LEVEL 1

1363' - 0"

FF LEVEL 2

1383' - 0"

FF LEVEL 3

1403' - 0"

FF LEVEL 4

1429' - 0"

FF LEVEL 5

1440' - 6"

T.O SHAFT

1453' - 9 123/128"

REMOVE EXISTING EMERGENCY/FEO LOCKBOX

FEO DESIGNATED

LANDING

5'

0"

EXHAUST VENTILATOR - SEE MECH

DUCT - SEE MECH

9'

4"

NEW EXISTING EMERGENCY/FEO LOCKBOX

REUSE EXISTING CAR

POSITION INDICATORS

REUSE EXISTING LIGHTING IF COMPLIANT WITH

SPECS,

AND PROVIDE NEW CEILING TO MEET

LIGHTING REQUIREMENTS IN SPECS.

1'

3" M

IN

. 4'

0"

M

AX

REMOVE AND REUSE EXISTING CAR

OPERATING/SERVICE PANEL

NEW LOCATION OF CAR

OPERATING/SERVICE PANELS

NEW TWO-WAY COMMUNICATION SYSTEM (TYP.)

REUSE EXISTING PHONE LINE IN PARALLEL

TO NEW SYSTEM

1 US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

AD

VE

R

TI

SE

M

EN

T

FI

LE

N

AM

E.

A-210

EL

EV

AT

O

R E

LE

VA

TI

O

N S

BI

G

B

EN

D D

AM

, S

O U

TH

D

AK

O

TA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

E.

M

C C

U

LL

O U

G H

E.

M

C C

U

LL

O U

G H

B.

G

O R

U P

/3

1/

W

F2

4R

PO

W

ER

H

O U

SE

E

LE

VA

TO

R

N O

. 2 R

EH

AB

BB

_R

EL

2_ D

M .rv t

1/4" = 1'-0"K2 TYPICAL ELEVATOR LOBBY ELEVATION

1/8" = 1'-0"H9 ELEVATOR LOBBY ELEVATIONS

NOTES:

1. PROVIDE A TACTILE STAR FOLLOWING FLOOR DESIGNATIONS WITH BRAILLE ON BOTH

JAMBS OF ALL ELEVATOR HOISTWAY ENTRANCES, LOCATED 48" MIN. ABOVE THE FINISH FLOOR TO THE BASELINE OF THE LOWEST TACTILE CHARACTER AND 60" MAX. ABOVE THE FINISH FLOOR TO

THE BOTTOM OF THE HIGHEST TACTILE CHARACTER. THESE TACTILE CHARACTERS SHALL BE 2

INCHES IN HEIGHT MIN. AND FOLLOW ABA REQUIREMENTS FOR SIGNS AND BRAILLE.

2. NEW CAB DOOR AND REUSED EXISTING LANDING DOORS MUST OPEN AND CLOSE AUTOMATICALLY.

3. PROVIDE REOPENING DEVICE THAT SHALL STOP AND REOPEN A CAR DOOR AND HOISTWAY

DOOR AUTOMATICALLY IF THE DOOR BECOMES OBSTRUCTED BY AN OBJECT OR PERSON

BETWEEN THE HEIGHT OF 5" TO 29" ABOVE THE FINISH FLOOR. DEVICE SHALL NOT REQUIRE

PHYSICAL CONTACT TO BE ACTIVATED, ALTHOUGH CONTACT IS PERMITTED TO OCCUR BEFORE

THE DOOR REVERSES. DEVICE SHALL REMAIN EFFECTIVE FOR 20 SECONDS MINIMUM.

4. ELEVATOR DOORS SHALL REMAIN FULLY OPEN IN RESPONSE TO A CAR FOR 3 SECONDS MINIMUM.

1/2" = 1'-0"M13 ABA CAR DETAIL

0 1' 2' 4'

0 4' 8' 16'

0 2' 4' 8'

B.

G

O R

U P

AM

G

EN

ER

A L R

EV

IS

IO

N

S

/2 7/

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

AD

VE

R

TI

SE

M

EN

T

FI

LE

N

AM

E.

M-101

EL

EV

AT

O

R M

AC

H

IN

E

D

EM

O / N

EW

P

LA

N

S

BI

G

B

EN

D D

AM

, S

O U

TH

D

AK

O

TA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

K.

PA

R K

K.

PA

R K

J.

SW

ER

C

ZE

K

/3

1/

W

F2

4R

PO

W

ER

H

O U

SE

E

LE

VA

TO

R

N O

. 2 R

EH

AB

BB

_R

EL

2_ D

M .rv t

N.T.S.B1 ELEVATOR MACHINE DEMO/ NEW PLANS

POWERHOUSE KEY PLAN

MECHANICAL KEYNOTES:

REMOVE AND DISPOSE OF THE EXISTING ELEVATOR DRIVE MACHINE AND APPARATUS IN ITS ENTIRETY AND INSTALL NEW MACHINE AND APPARATUS IN THE ELEVATOR MACHINE ROOM AND HOIST WAY. THIS SHALL INCLUDE BUT NOT LIMITED TO

FOLLOWING:

• HOISTING WIRE ROPES (PREFORMED TRACTION STEEL CABLES)

• GEARED DRIVE SYSTEM (MOTOR, ENCODER, BRAKE, TRACTION SHEAVES, SHAFTS, BEARINGS, AND GUARDS, DEFLECTOR SHEAVES, SHAFTS, SELF-LUBRICATED BEARINGS, AND GUARDS (WHERE APPLICABLE), MOUNTING FOR

DEFLECTOR, ETC.)

• WIRE ROPE GRIPPER, PLATE, AND MOUNTING KIT

• ELEVATOR CAB VENTILATOR, MOTOR, POWER AND CONTROL WIRING

• GOVERNOR, ENCODER, TAIL SHEAVE, WIRE ROPE, RETAINER, COUNTERWEIGHT, BUFFERS, PIT CHANNELS, AND ALL

ROLLER GUIDES.

GENERAL NOTES:

NOTE THAT THE EXISTING ELEVATOR HOISTING SYSTEM TO BE REPLACED IS DESIGNED FOR 1,200 LBS CAPACITY WITH 100 FPM TRAVEL SPEED. THE NEW HOISTING SYSTEM TO BE PROVIDED SHALL BE DESIGNED FOR 1,200 LBS CAPACITY WITH 350 FPM IN

ACCORDANCE WITH REQUIREMENTS IN UFC 3-490-06.

PROVIDE ELEVATOR DRIVE MACHINE, HOIST MOTOR, AND MOTOR DRIVE SYSTEM THAT IS DESIGNED TO BE INSTALLED IN AN

ELEVATOR MACHINE ROOM.

THE ELEVATOR MACHINE, MOTOR, AND DRIVE CONFIGURATION AND INSTALLATION DESIGN MUST BE MECHANICALLY AND ELECTRICALLY INTERCHANGEABLE WITH A MINIMUM OF TWO OTHER ELEVATOR MANUFACTURERS' DRIVE MACHINES THAT ARE

READILY AVAILABLE IN THE ELEVATOR INDUSTRY.

IT SHALL BE NOTED THAT NOT ALL ELEVATOR MACHINE COMPONENTS AND APPARATUS SUBJECT TO REPLACEMENT MAY BE SHOWN OR LISTED ON THIS SHEET. CONTRACTOR SHALL FIELD VERIFY THE EXISTING CONDITIONS PRIOR TO COMMENCING WORK

ON SITE.

REFER TO SPECIFICATION SECTION 14 21 23 FOR ADDITIONAL INFORMATION AND REQUIREMENTS FOR ELEVATOR.

1.

2.

3.

4.

5.

PLAN NORTH

J.

SW

ER

C

ZE

K

AM

G

EN

ER

A L R

EV

IS

IO

N

S

/2 7/

B.O PIT

1357' - 3"

FF LEVEL 1

1363' - 0"

FF LEVEL 2

1383' - 0"

FF LEVEL 3

1403' - 0"

FF LEVEL 4

1429' - 0"

FF LEVEL 5

1440' - 6"

T.O SHAFT

1453' - 9 123/128"

FEO DESIGNATED

LANDING

ELEVATOR

MACHINE

ROOM

ELEVATOR

PENTHOUSE

EXISTING LOUVER FOR

MACHINE SHOP

EXHAUST FAN

SF-1

EF-1

TRANSFER

AIR LOUVER

APPROXIMATE LOCATIONS

(MIDPOINTS OF HOISTWAY DOOR OF

EACH FLOOR) OF DIFFERENTIAL

PRESSURE SENSORS. (TYP. OF 5) .

CONTRACTOR SHALL FINALIZE THE

OPTIMAL ROUTING OF POWER AND

SIGNAL WIRING IN RIGID CONDUITS

FOR EACH DP SENSOR TO THE SF-1

FAN CONTROLLER.

MINIMUM 16 GAUGE GALVANIZED STEEL METAL DUCT (20" X 20")

THRU PENTHOUSE WALL AND DOWNSTREAM OF FAN. PROVIDE

TURNING VANE AT DISCHARGE ELBOW.

MOTORIZED DAMPER (D-1) WITH

MESHED SCREEN

SEAL WALL PENETRATION AIRTIGHT

DIRECT DRIVE TUBE

AXIAL TYPE OR

CENTRIFUGAL INLINE FAN

WITH VFD

STAINLESS STEEL WALL BRACING AND HARDWARE.

INSTALL PER SYSTEM MANUFACTURER' S

RECOMMENDATIONS

A1

M-103

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

AD

VE

R

TI

SE

M

EN

T

FI

LE

N

AM

E.

M-103

EL

EV

AT

O

R H

O

IS

TW

AY

P R

ES

SU

R

IZ

AT

IO

N S

YS

TE

M P

LA

N

BI

G

B

EN

D D

AM

, S

O U

TH

D

AK

O

TA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

K.

PA

R K

K.

PA

R K

J.

SW

ER

C

ZE

K

J.

SW

ER

C

ZE

K

/3

1/

W

F2

4R

PO

W

ER

H

O U

SE

E

LE

VA

TO

R

N O

. 2 R

EH

AB

BB

_R

EL

2_ D

M .rv t

3/16" = 1'-0"A1 ENLARGED ELEVATOR LOBBY SECTION

N.T.S.H11 ASSEMBLY BAY SECTION A-A

PLAN NORTH

A

A

ELEVATOR SHAFT PRESSURIZATION FAN SCHEDULE

MARK AIRFLOW (CFM)

MOUNTING

HEIGHT EXT. STATIC

SF-1 4000 MAX. 1.0 IN.WC.MIN. 8 FT

MANUFACTURER

COVERAGE

AREA

ELEVATOR SHAFT

COUNT

REMARKS:

1. MOUNT UNIT ACCORDING TO MANUFACTURER'S RECOMMENDATIONS INCLUDING NECESSARY VIBRATION ISOLATORS INSIDE OF ELEVATOR PENTHOUSE STRUCTURE..

2. PROVIDE SMOKE DETECTOR AT FAN DISCHARGE AIR STREAM WHICH WILL AUTOMATICALLY SHUTDOWN THE FAN SYSTEM WHEN SMOKE IS DETECTED WITHIN THE SYSTEM.

3. PROVIDE MESHED SCREEN AND MOTORIZED DAMPER (NORMALLY CLOSED) AT AIR INTAKE.

4. FAN MOTOR SHALL BE PROVIDED WITH VARIABLE FREQUENCY DRIVE (VFD).

5. PROVIDE ELEVATOR HOISTWAY PRESSURIZATION FAN SYSTEM AND ALL CONTROL APPARATUS REQUIRED TO MEET THE FUNCTIONAL REQUIREMENTS OF THE SMOKE CONTROL SYSTEM IN ACCORDANCE WITH IBC 2021, ASME 17.1-2022, AND APPLICABLE NFPA STANDARDS.

REMARK

1,2,3,4,5

SEQUENCE OF OPERATION (SF-1):

1. ELEVATOR HOISTWAY PRESSURIZATION SYSTEM FAN, SF-1 SHALL BE ACTIVATED UPON ACTIVATION OF EITHER THE BUILDING FIRE

ALARM SYSTEM AND/OR THE ELEVATOR LOBBY SMOKE DETECTORS.

2. SF-1 SPEED SHALL BE CONTROLLED BY THE ASSOCIATED VFD TO POSITIVELY PRESSURIZE THE HOISTWAY RELATIVE TO THE FIRE

FLOOR DURING THE FIRE EVENT.

3. THE SYSTEM FAN (SF-1) AND ITS CONTROL SHALL PRESSURIZE THE ELEVATOR HOISTWAY TO MAINTAIN A MINIMUM POSITIVE PRESSURE OF 0.10 IN.WC AND A MAXIMUM POSITIVE PRESSURE OF 0.25 IN.WC WITH RESPECT TO ADJACENT OCCUPIED SPACE ON

ALL FLOORS IN ACCORDANCE WITH IBC 2021.

POWERHOUSE KEY PLAN

0 2' 4' 8' 12'

NOTE: CONTRACTOR SHALL PROVIDE ALL NECESSARY DIFFERENTIAL PRESSURE (DP) SENSORS AND WIRING IN HOISTWAY AND ELEVATOR LANDING AREA ON EACH FLOOR TO CONTROL SF-1 FAN SPEED TO MAINTAIN ABOVE REFERENCED DIFFERENTIAL PRESSSURE RANGE REQUIRED PER IBC 2021.

CONTRACTOR SHALL DETERMINE THE SUITABLE LOCATIONS FOR DP SENSORS, WIRING ROUTE, AND PRESENT SCHEMATIC DIAGRAM ON SHOP DRAWINGS PER SPECIFICATION SECTION 14 21 23. CONTRACTOR SHALL CLEARLY INDICATE PRESSURIZATION SYSTEM RELATED CONTROL DEVICES AND DETAILED CONTROL SCHEMATIC INCLUDING POINTS SUMMARY (INPUT/OUTPUT) ON SHOP DRAWINGS FOR COMPLETE FUNCTIONAL ELEVATOR

HOISTWAY PRESSURIZATION SYSTEM PER CODE REQUIREMENTS.

AM

G

EN

ER

A L R

EV

IS

IO

N

S

/2 7/

BB97A-210
BB97M-101
Sheets
M-101 - ELEVATOR MACHINE DEMO/ NEW PLANS
M-103 - ELEVATOR HOISTWAY PRESSURIZATION SYSTEM PLAN
BB97M-103
Sheets
M-101 - ELEVATOR MACHINE DEMO/ NEW PLANS
M-103 - ELEVATOR HOISTWAY PRESSURIZATION SYSTEM PLAN

File details come from the government source that posted it. Updated .