This document is a Request for Proposals (RFP) for the design and construction of the Aircraft Maintenance Facility Building 649 at Grand Forks Air Force Base in North Dakota. The solicitation is unrestricted and the estimated construction cost is between $25,000,000 and $100,000,000.
The RFP includes detailed requirements for the 65% and 100% design submittals, including drawings, specifications, design analysis, and other design deliverables for civil/site, architecture, interiors, structural, mechanical, electrical, communications, fire protection, environmental protection, and safety disciplines. The RFP also specifies requirements for the design review process, construction submittals, and revisions to the accepted design. The solicitation closes on December 1, 2023 for Phase 1, and contractors must register in the System for Award Management (SAM) database.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Am #0003 - 2
(Continuation SF 30)
10 APR 2024
Solicitation No. W9128F24R0013
Date of Issue: 01 NOV 2023
[New] Date of Receiving Proposals: 15 MAY 2024
SUBJECT: Amendment No. 0003 to Request for Proposal Solicitation Package for Design and Construction of
DISASTER RESILIENCY PROGRAM BUILDING 649
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified by “[*Am-
3]”(underlining of added text and/or strikeout of deleted text).
Pages or Sections Deleted Pages or Sections Substituted or Added
01 33 00.32 01 33 00.32*
01 33 00.36 01 33 00.36*
01 33 00.38 01 33 00.38*
01 33 29 01 33 29*
01 81 00 01 81 00*
01 82 00 01 82 00*
01 83 00 01 83 00*
01 86 10 01 86 10*
01 86 13 01 86 13*
01 86 26 01 86 26*
01 89 00 01 89 00*
APPENDIX A APPENDIX A – REVISING SHEETS
APPENDIX C APPENDIX C – ADDING SHEETS
APPENDIX D APPENDIX D – REVISING APPENDIX, provided under separate cover
APPENDIX I APPENDIX I- ADDING SHEETS
** ** ** APPENDIX N – NEW APPENDIX
** ** ** APPENDIX O – NEW APPENDIX
b. Drawings (Reissued). The following drawings are revised with latest revision date indicated on each sheet and reissued with this amendment.
(1) Sheet CU100, UTILITY PLAN OVERVIEW
(2) Sheet CU101, UTILITY PLAN AREA 1
(3) Sheet CU102, UTILITY PLAN AREA 2
(4) Sheet CU103, UTILITY PLAN AREA 3
(5) Sheet CU104, UTILITY PLAN AREA 4
(6) Sheet CU105, UTILITY PLAN AREA 5
Am #0003 - 3
(Continuation SF 30)
(7) Sheet A-120, COMPOSITE MEZZANINE PLAN
(8) Sheet A-121, AREA “B” MEZZANINE FLOOR PLAN
(9) Sheet A-201, EAST AND WEST ELEVATIONS
(10) Sheet A-202, NORTH ELEVATIONS
(11) Sheet A-203, SOUTH ELEVATIONS
(12) Sheet I-116, AREA “C” FURNITURE PLAN
(13) Sheet F-120, LIFE SAFETY AND BUILDING CODE SECOND FLOOR
COMPOSITE PLAN
(14) Sheet F-121, LIFE SAFETY AND BUILDING CODE SECOND FLOOR PLAN
c. Drawings (New). The following new drawings dated 10 APR 2024 are hereby added to the request for proposal drawings and are issued with this amendment.
(1) SURVEY CAD FILE, provided under separate cover
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.
3. Electronic Proposal/Email. See Section 00 22 00 for how to submit electronic proposals.
4. Electric Offers will be received until 2:00 p.m., local time at place of receiving proposals, 15 MAY 2024, as stated in the Request For Proposal.
Attachments:
Spec Pages listed in 1.a. above
Dwgs. listed in 1.b. and 1.c. above (provided under separate cover)
U.S. Army Corps of Engineers, Omaha District
1616 Capitol Avenue
Omaha, Nebraska 68102-4901
10 APR 2024
jmh/2181
DRP Bldg 649 Renovation PN503729 - Grand Forks AFB, ND GFND00101
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00.32
DESIGN AND CONSTRUCTION DELIVERABLES/PROCEDURES
10/ 06; Rev 03/ 22
PART 1 GENERAL
1.1 SUMMARY
1.2 APPLICABLE REFERENCES
1.2.1 THE CONSTRUCTION SPECIFICATIONS INSTITUTE (CSI)
1.2.2 NATIONAL CAD STANDARDS
1.2.3 WEB SITES
1.3 DEFINITIONS
1.3.1 Contractor
1.3.2 Design
1.3.3 Design Drawings
1.3.4 Designer of Record (DOR)
1.3.5 Request for Proposal (RFP)
1.3.6 Advanced Modeling
1.4 ORDER OF PRECEDENCE
1.5 QUALITY ASSURANCE
1.5.1 Construction Personnel Experience
1.5.2 Designer Qualifications and Experience
1.6 SUBMISSION OF DESIGN DRAWINGS, SPECIFICATIONS AND DESIGN ANALYSES
1.6.1 Design Certification
1.6.2 Deviations
1.6.3 Field Inspection
1.6.4 Drawings
1.6.4.1 Software Requirements
1.6.4.2 RFP Drawings
1.6.5 Design Documents
1.6.6 Post-Award and Initial Design Kickoff Meeting
1.6.7 Meetings During Design
1.6.8 Design Reviews
1.6.9 Document Packaging
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.1 DRAWINGS
3.1.1 Drawings Format
3.1.2 Drawings Sequence
3.1.3 Drawings Required
3.2 SPECIFICATIONS
3.2.1 Project Specifications
3.2.1.1 General Requirements
3.2.1.2 Technical Specifications
3.2.1.3 Editing Technical Specifications (Designated CEGS or UFGS)
3.2.1.4 Developing Additional Project Specifications
3.2.1.5 Division 0 and 1 Sections
3.2.2 Format for Project Specifications
SECTION 01 33 00.32 Page 1
3.2.3 Error Report Submission and Resolution
3.2.4 Construction Submittals
3.2.4.1 Submittals Register (Form)
3.3 DESIGN ANALYSES
3.3.1 Format
3.3.1.1 Part 1 - General Description.
3.3.1.2 Part 2 - Design Requirements and Provisions.
3.3.2 Calculations
3.3.3 Engineering Considerations and Instructions (ECI) for Field
Personnel
3.3.3.1 Separate Appendix
3.3.3.2 Format
3.3.3.3 Distribution of ECI's
3.3.4 Requests for Information, Meeting Minutes and Comments
3.4 DESIGN CERTIFICATION
3.5 REVIEW BY GOVERNMENT AGENCIES
3.5.1 Distribution of Design Documents for Conformance Review
3.5.1.1 Design Submittal Items
3.5.1.2 Activity Distribution Addresses
3.5.1.3 65 Percent Design Distribution
3.5.1.4 100 Percent Design Distribution
3.5.1.5 100 Percent Corrected Design Distribution
3.5.1.6 Construction Set Distribution
3.5.1.7 As-Built Submittals
3.5.2 Review Comments Disposition
3.5.3 Review Comments Resolution
3.5.4 Delays
3.5.5 Reproduction (For Construction):
3.5.6 Government Design Review and Acceptance
3.5.6.1 Design Review Conference and Post-Design Review Conference
Minutes:
3.5.6.2 100% Corrected Design Documents
3.5.6.3 Accuracy and Completeness of Design
3.5.6.4 Responses to Review Comments
3.5.7 DD Form 1354, Transfer and Acceptance of Military Real Property
3.6 REVISIONS TO THE ACCEPTED DESIGN
3.6.1 Minimization of Design Revisions
3.6.2 Supplemental Design Package and Certification
ATTACHMENTS:
Example Drawing Title Block Information Key
-- End of Section Table of Contents --
SECTION 01 33 00.32 Page 2
SECTION 01 33 00.32
DESIGN AND CONSTRUCTION DELIVERABLES/PROCEDURES
10/ 06; Rev 03/ 22
PART 1 GENERAL
Attachments: Attachment A, Design Certification and Transmittal Letter Attachment B, Supplemental Design Certification And Transmittal Form Example Drawing Title Block Information Key
1.1 SUMMARY
a. Design
Develop and submit a design including drawings, specifications, design analysis and any other required design deliverables and distribute design deliverables per the requirments in this section. See Section 01 33 00.36 65 PERCENT DESIGN REQUIREMENTS and Section 01 33 00.38 100 PERCENT DESIGN REQUIREMENTS for specific requirements related to each design discipline.
Use a collaborative, integrated design process for all stages of project delivery with comprehensive performance goals for site development, energy, water, material selection, indoor environmental quality, and waste diversion. Ensure incorporation of these goals in project delivery.
Consider all stages of the project lifecycle, including deconstruction, rehabilitation, re-purposing, or demolition.
b. Construction
Distribute the construction set of design deliverables, DD Form 1354 and as-built drawings as described herein. Edit the technical guide specifications using the construction submittal classifications defined below. As necessary, revise accepted design during construction per the instructions in this section.
1.2 APPLICABLE REFERENCES
The references listed below form a part of this specification to the extent referenced. The design publications listed below shall be used as sources of criteria for the design. The most current edition of the code or standard (with errata and addenda) available at the RFP proposal submission deadline shall be used as criteria for the design - unless noted otherwise. The criteria from these sources may be supplemented, but not supplanted, by applicable criteria contained in nationally recognized codes and standards.
1.2.1 THE CONSTRUCTION SPECIFICATIONS INSTITUTE (CSI)
CSI Masterformat 2016 Master List of Section Titles and Numbers
1.2.2 NATIONAL CAD STANDARDS
The National CAD Standards can be found at:
https://www.nationalcadstandard.org/ncs6/. See Section 01 78 39.00 24 AS-BUILT DRAWINGS and Section 01 33 39.00 10 ADVANCED MODELING
SECTION 01 33 00.32 Page 3
(BIM/CIM/GIS/CAD) REQUIREMENT for a summary of CAD and general guidelines concerning file format and font requirements. Furnish the CAD software for contractor use meeting the requirements of the RFP.
1.2.3 WEB SITES
In addition to the web sites listed in this section, other RFP Sections may list web sites containing design criteria references used in this solicitation package.
NOTE: FOR ITEMS BELOW, REFERENCES TO RECEIVING APPROVAL FROM OTHER
GOVERNMENT AGENCIES FOR ALTERNATIVE DESIGNS ARE NOT APPLICABLE TO THIS
PROJECT. THE CONTRACTOR IS THE DESIGNER WHEN READING THESE DOCUMENTS.
CONSIDER ALL ITEMS LISTED BELOW A PART OF THE RFP
SOLICITATION DOCUMENT (AS APPLICABLE) AND THE RESULTANT CONTRACT.
(a) OBTAIN UNIFIED FACILITIES CRITERIA (UFC), TECHNICAL MANUALS (TM), TECHNICAL INSTRUCTIONS (TI), AIR FORCE MANUALS (AFM), ENGINEERING
TECHNICAL LETTERS (ETL), ARMY ARCHITECTURAL AND ENGINEERING DESIGN
CRITERIA (AEI), SUSTAINABLE DESIGN DOCUMENTS, AND MILITARY HANDBOOKS (MIL
HNDBK) from the following internet addresses:
http://www.publications.usace.army.mil/.
http://www.wbdg.org/
Additional web sites are as follows:
AIR FORCE DESIGN CRITERIA :
http://www.e-publishing.af.mil/
(b) UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS)
This includes UFGS sections referenced, but not provided in the solicitation and other UFGS sections required in developing the project specifications. Unless noted otherwise, download these Guide sections in Specsintact SGML (zipped) file format at the following internet address:
http://www.wbdg.org/ccb/browse_org.php?o=70
Guide specification numbers and titles referenced in the solicitation may vary from the actual specification numbers and titles available at the website listed above.
Download SpecsIntact software at the following internet address:
http://specsintact.ksc.nasa.gov/Software/software.shtml
Use SI Version 5.0 or later. Select the new unified submittal format for file format.
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 1-300-02 (2014, with Change 3, 2021) Unified Facilities Guide Specifications (UFGS) Format Standard
SECTION 01 33 00.32 Page 4
UFC 1-300-08 (2009, with Change 2, 2011) Criteria for Transfer and Acceptance of DoD Real Property
1.3 DEFINITIONS
1.3.1 Contractor
Firm or company awarded the design and construction of Renovation Bldg.
649, located at Grand Forks AFB, North Dakota.
1.3.2 Design
Documents or deliverables, as defined in this section, prepared by or under the direct supervision of registered professional architects and engineers and proposed to meet the requirements of this solicitation.
1.3.3 Design Drawings
Documentation showing in graphic and quantitative form the extent, design, location, relationships, and dimensions of the construction to be provided by the Contractor. (Note: Do not provide Shop Drawings, as defined in Section 01 33 00 , "Submittals Procedures" until after the Government determines that the design drawings are satisfactory for construction.)
1.3.4 Designer of Record (DOR)
Professional Registered members of the Contractor’s Design-Build team that check, approve, sign, date, and certify, prior to submitting the deliverables to the Government, that the D-B design submittals comply with the contract requirements.
[*Am-3] The DOR's stamp, sign, and date each design drawing and other design deliverables under their responsible discipline at construction set distribution [**Am-3] . The DOR(s) are responsible for maintaining the integrity of the design and for compliance with the contract requirements through construction and documentation of the as-built condition by coordination, review and approval of extensions of design, material, equipment and other construction submittals, review and approval or disapproval of requested deviations to the accepted design or to the contract, coordination with the Government of the above activities, and by performing other typical professional design responsibilities.
1.3.5 Request for Proposal (RFP)
Documents furnished to prospective offerors containing proposal information and specifying criteria and project requirements for design and renovation of Bldg. 649 located at Grand Forks AFB, North Dakota. The documents include the RFP specifications, attachments, and the RFP concept drawings.
1.3.6 Advanced Modeling
A subset of geospatial technologies as defined in EM 1110-1-2909 to include BIM, CIM, GIS, and CAD. Advanced Modeling is comprised of models and drawings that form a digital representation of the project, or part thereof, that are comprised of model elements with facility data. See Section 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS.
SECTION 01 33 00.32 Page 5
1.4 ORDER OF PRECEDENCE
See Section 01 30 00.24 OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS, paragraph "DESIGN-BUILD CONSTRUCTION CONTRACTS".
1.5 QUALITY ASSURANCE
If, because of reasons beyond the control of the construction or design firm, the named individuals submitted for approval are unable to fulfill this obligation, present replacement personnel with similar skills and experience for acceptance by the Contracting Officer. Ensure replacement individuals have qualifications and experience meeting or exceeding those identified in the proposal. Obtain the Contracting Officer's written consent before making any substitution for these designated personnel.
1.5.1 Construction Personnel Experience
See Section 01 45 00.00 10 QUALITY CONTROL and Section 00 22 00 PROPOSAL
SUBMISSION REQUIREMENTS, INSTRUCTIONS AND EVALUATION.
1.5.2 Designer Qualifications and Experience
See below for required experience of Design Personnel. Submit resumes and credentials demonstrating compliance with these requirements as part of the Design Quality Control Plan required in Section 01 45 00.00 10 QUALITY
CONTROL.
Project Managers and Lead Designers must be registered/licensed professional architects or engineers with at least ten (10) years experience as a registered/licensed professional in the proposed position/role in the design of similar projects. Required Design personnel are listed below. Ensure designers will be immediately available for design services at the time of Notice to Proceed:
a. Project Design Manager (Registered/licensed Architect or Engineer)(10 years of design experience/5 years of Design Manager experience)
b. Registered/licensed Architect
c. Registered Structural Engineer
d. Registered Mechanical Engineer
e. Registered Fire Protection Engineer
f. Registered Electrical Engineer
g. Registered Communications Engineer (RCDD)
h. Interior Designer (NCIDQ)
i. BIM Manager (certification not required, but submit proof of experience)
j. Registered Civil Engineer
1.6 SUBMISSION OF DESIGN DRAWINGS, SPECIFICATIONS AND DESIGN ANALYSES
1.6.1 Design Certification
Within each design submittal, certify that all design documents (after construction award) comply with this RFP, the Division 1 specifications, and mandatory requirements of the UFGS and designated CEGS (Omaha District Specifications). The criteria specified in this RFP are binding contract criteria and in case of any conflict, after award, between the RFP criteria and Contractor's submittals, the RFP criteria will govern unless there is a written and signed agreement between the Contracting Officer
SECTION 01 33 00.32 Page 6 and the Contractor waiving a specific requirement. See paragraph "ORDER OF PRECEDENCE" above. Include certification similar to Attachment A of this section with the letter of transmittal for each design submittal (including the 100% corrected design (backcheck) submittal) stating that the submittal (plans, specifications, design analysis, etc.) complies with the requirements above.
1.6.2 Deviations
Identify deviations from the RFP technical requirements in the letter of transmittal and design certification letter. The Contracting Office will consider and may approve deviations from the RFP technical requirements if the changes result in a significant improvement to the project or exceed the minimum RFP technical requirements.
1.6.3 Field Inspection
Field verify conditions which are significant to design. Research and obtain all necessary existing facility as-built drawings and reproduce as necessary, and discuss status with knowledgeable personnel. Include this information in the design documents.
1.6.4 Drawings
1.6.4.1 Software Requirements
Develop and maintain Design and As-Built requirements in accordance with Section 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS and Section 01 78 39.00 24 AS-BUILT DRAWINGS, respectively. The Government will provide files developed for the RFP for the designer's optional use.
The files developed for the RFP may not comply with the design requirements listed herein. Use of the concept model does not limit compliance with BIM or As-Built requirements in this contract.
1.6.4.2 RFP Drawings
The Government will furnish files as described in Section 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS. See that specification for caveats and limiatations associated with government-furnished material.
1.6.5 Design Documents
Include construction drawings, specifications, design analysis, and other design deliverables as indicated in Sections 01 33 00.36 65% DESIGN REQUIREMENTS and 01 33 00.38 100% DESIGN REQUIREMENTS. Include sufficient detail in the specifications to fully describe and demonstrate the quality of materials, the installation and performance of equipment, and the quality of workmanship. Comply with the manufacturer's recommendations for detailing and installation of all equipment and materials. Include in the Design Analysis each discipline of work and all features with the necessary calculations, tables, methods and sources used in determining equipment and material sizes and capacities. Provide sufficient information to support the design.
1.6.6 Post-Award and Initial Design Kickoff Meeting
After contract award, coordinate an appropriate time for and conduct a design initiation/kickoff meeting with appropriate Government stakeholders at the project site. Discuss and validate the project scope as defined in
SECTION 01 33 00.32 Page 7 the RFP. Collect information relative to the initiation of the design, current state of the project facility/site, mission requirements, criteria, and stakeholder and project requirements. Ensure all relevant Design-Build designers and construction personnel participate. Document and submit meeting minutes related to the meeting. Submit any variances, deviations, and/or modifications to scope as defined by this RFP must be processed accordingly. The primary purpose of the meeting is to make sure any needs are assigned and due dates established, as well as points of contact identified. Meetings shall be a minimum of two days and shall include walk through of Bldg. 649.
As a minimum, address the following during the conference:
a. The Government will introduce the Government project delivery team members, facility users, facility command representatives, and installation representatives.
b. Introduce key personnel, major subcontractors and other needed staff.
c. Define expectations and duties of each participant.
d. Develop a meeting roster with complete contact information including name, office, project role, phone, mailing and physical address, and e-mail address for distribution to all participants.
Also, provide minutes of the meeting to all participants.
e. Discuss basic contract administration requirements.
f. Discuss expected project progress processes.
g. Coordinate subsequent meetings required by this contract.
h. Agenda with items to be discussed per architectural, interior design, and engineering discipline for clarification and validation of contract requirements.
1.6.7 Meetings During Design
Bi-weekly meetings shall be coordinated by the design-build contractor.
The intent of the meetings is to provide dialogue between the designers of record, the construction contractor, the customer, base CES, and USACE in order to facilitate the design process, answer and resolve questions, and provide a smooth transition into construction. The contractor shall prepare a brief agenda outlining topics for discussion at least two days prior to the meeting. Meetings shall be virtual via MS Teams or WebEx so that government employees can attend and view presentations.
1.6.8 Design Reviews
During the design, conduct a minimum of two design reviews at Grand Forks AFB for the 65 percent and the 100 percent completion stages, unless directed otherwise. A backcheck review will follow the Corrected 100 percent design. Once the Government reviews the Corrected 100 percent design and determines it to be satisfactory for the purpose of beginning construction, prepare and distribute sets of documents for construction.
Attend the design reviews, visit the site, and make other trips as necessary during the design to accomplish the work. Design review conferences shall be a minimum of two days but not exceed three days.
SECTION 01 33 00.32 Page 8
1.6.9 Document Packaging
See Section 01 33 00.36 65 PERCENT DESIGN REQUIREMENTS for the 65 percent design submittal requirements. (See Section 01 30 00.24 OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS, paragraph: Sequence of Design-Construction for optional packaging and submission of design documents). Stamp these documents "For Review Only - 65% Design - Not For Construction"; also include this stamp oneach sheet of the drawings.
See Section 01 33 00.38 100 PERCENT DESIGN REQUIREMENTS for the 100 percent design submittal requirements. Stamp these documents "For Review Only -100% Design - Not For Construction", also inlcude this stamp on each sheet of the drawings.
Stamp the backcheck design submittal(s) after the Government review of the 100 percent complete design "100% Corrected Design - Not For Construction"; also include this stamp on each sheet of the drawings. The 100% Corrected Design submittal is for making corrections resulting from review comments and for preparing the final project documents. The Government will grant no additional time for completion of the contract due to insufficient design submittals. See paragraph "Government Design Review and Acceptance" below for additional requirements.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.1 DRAWINGS
Prepare, organize, and present drawings in the format specified herein.
Provide drawings complete, accurate and explicit enough to show compliance with the RFP requirements and to permit construction. Properly detail systems on drawings proposed to meet RFP performance specifications to ensure appropriate use, proper fit, compatability of components and coordination with the design analysis and specifications. Coordinate drawings to ensure no conflicts exist between design disciplines and between drawings and specifications.
3.1.1 Drawings Format
Full size drawings are 22 inches x 34 inches . Half-size drawings are 11 inches x 17 inches . Ensure title block complies with the USA A/E/C.
Sections 01 33 00.36 65 PERCENT DESIGN REQUIREMENTS and 01 33 00.38 100 PERCENT DESIGN REQUIREMENTS specify recommended drawing scales. Ensure the Cover Sheet of the drawings bears the stamp or seal and signature of the registered architect or appropriate engineer responsible for the work and proposed to meet the RFP requirements. Use the following drawing project code numbers on all border sheets for the design and construction drawings: GFND00101. FILE NUMBER on all border sheets for the design and construction drawings is to be the contract number determined at award and will be verified at the design kickoff meeting.
See attached Example Drawing Title Block Information Key.
3.1.2 Drawings Sequence
Arrange drawings by design discipline in accordance with National CAD Standards.
SECTION 01 33 00.32 Page 9
3.1.3 Drawings Required
Include a title sheet, index of drawings, legend and abbreviations, and soil borings (if applicable). See Sections 01 33 00.36 65 PERCENT DESIGN REQUIREMENTS and 01 33 00.38 100 PERCENT DESIGN REQUIREMENTS for discipline-specific requirements.
3.2 SPECIFICATIONS
3.2.1 Project Specifications
3.2.1.1 General Requirements
Develop project specifications incorporating the Division 1 Specifications furnished with this RFP; unedited Unified Facilities Guide Specifications (UFGS) current at the time of award; designated specification sections furnished with this RFP; and additional project specifications as needed not covered by UFGS. Organize project sections not based on UFGS in accordance with CSI MasterFormat and UFC 1-300-02 .
Edit and process the specification using SpecsIntact software.
3.2.1.2 Technical Specifications
Use unedited UFGS and designated unedited CEGS sections for developing project specifications. Do not rewrite specification paragraphs and subparagraphs to lessen the quality of the original technical specification sections, unless directed otherwise. The technical guide specifications describe the type and quality of material and installation normally acceptable for Corps of Engineers Construction, and often represent specific agreement between the Corps and the applicable industry. Do not change the provisions of the technical guide specifications without justification. Identify in the design analysis under the appropriate design discipline justifications for additional materials. Do not include designer notes in any design submittals. Only delete bracketed choices and inapplicable items. Do not show revisions in the corrected 100 percent specifications submittal. Complete the editing of all options. Where designer notes are provided, edit the choice in accordance with the recommendations and guidance of the Notes, except where the RFP provides specific guidance.
Edit and expand the appropriate specifications to meet all project design requirements, current code requirements, and regulatory requirements.
Provide non-proprietary, descriptive project specifications in compliance with the requirements in UFC 1-300-02 . Do not provide proprietary information in the project specifications unless approved by the Contracting Officer.
3.2.1.3 Editing Technical Specifications (Designated CEGS or UFGS)
(1) Incorporating Established RFP Requirements into Guide Specifications
Where the edited RFP Division 01 and Section 32 13.14 13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS provide specific requirements in regards to materials, methods and end function requirements, edit the UFGS and designated CEGS (Omaha) to reflect these requirements. The Government will not permit variations to
SECTION 01 33 00.32 Page 10 these requirements, unless authorized as a design deviation by the Contracting Officer.
(2) Requirements of Guide Specifications Not Established By RFP Requirements
Where the RFP does not provide specific direction in regards to materials, methods and end function requirements, the final requirements will be a result of the completed design by the Contractor.
(3) ADDITIONS: If the specifications of the UFGS or designated CEGS does not cover a feature that is in the project, insert new sentences and/or paragraphs in the proper locations to adequately cover the feature of work. Do not use additions to lessen the quality of materials indicated by the specifications. If adding a new material, properly reference it in "Applicable Publications", "MATERIALS", "SUBMITTAL", "TESTS", and "INSTALLATION" paragraphs, as applicable.
(4) DELETION OF INAPPLICABLE TEXT MATERIAL, AS NECESSARY, TO TAILOR
THE SPECIFICATIONS TO FIT THE PROJECT: After deleting all inapplicable paragraphs, subparagraphs, choices, and schedules from the body of the specifications (including but not limited to the correction of lists in "Submittals", "Tests", and "Installation" paragraphs), delete all nonapplicable references listed in the preceding "APPLICABLE PUBLICATIONS" and "MATERIALS" paragraphs. Do not use deletions to lessen the quality of materials indicated by the specifications.
(5) Do not remove any special code markings for submittals, references, tests or section references, unless the text is not required.
(6) REFERENCES TO SPECIFICATION SECTIONS. Coordinate section references, along with the technical requirements, to specific specification sections (number and title) within the project specifications. Revise section references (title and number) to reflect the titles and numbers of specification sections used.
(7) REFERENCES. Coordinate references or publications in the text of each specifications with the references listed at the beginning of each section. See paragraph "Error Report Submission and Resolution" below. The SpecsIntact Software removes references or publications not referenced in the text from the Reference Article when printing from the Jobs menu.
(8) SUBMITTALS. Each section of the specifications includes a submittal paragraph which lists all applicable Contractor submittals.
Properly mark submittals as outlined in the SpecsIntact documentation and in this section. SpecsIntact uses these codings for automatic generation of the Submittal Register. Do NOT delete these codings from the text, unless the submittal is not required. Make the Submittal Item text between the coding identical (word for word, including punctuation and spacing) to the paragraph text in the reference paragraph(s). Text may be either upper or lower case letters.
During the design phase, develop a complete list of required construction submittals in each technical specification. The list will become the Submittal Register for approval by the Contracting
SECTION 01 33 00.32 Page 11
Officer Representative (COR). SpecsIntact generated the example Submittal Register in this Solicitation. Replace this example Submittal Register with the actual submittal register developed from the completed design specifications. This list is not all inclusive and additional submittals may be required as directed by the COR.
Both the attached sample and the Contractor-generated submittal registers identify only the submittal section, type of submittal, description of item submitted, paragraph number related to submittal item (section submittal paragraph if none listed), submittal classification (G or FIO), and submittal reviewer identifier.
See Section 01 33 00 SUBMITTAL PROCEDURES, for complete instructions related to submittal descriptions, classifications, numbers, and submittal process.
(9) USE OF UFGS SECTIONS
Unless directed otherwise, use UFGS sections. UFGS sections are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Command (NAVFAC), National Aeronautics and Space Administration (NASA) and the Air Force Civil Engineer Support Agency (AFCESA). In instances where more than one UFGS section addresses the same material or system requirement, as a general rule, use the Section developed by the USACE specification proponent.
Available UFGS sections with the numbers ending ".00 10", ".00 20" or ".00 40" following the section number are sections that have not yet been unified by the different Government design agencies. The ending numbers designate the specification proponent (".00 10" is for USACE, ".00 40" for NASA and ".00 20" is for NAVFAC). Where UFGS sections include tailoring options for both the various proponents (Army, NASA and Navy), use the Army tailoring option. Where conflicts exist that cannot be resolved, contact the Contracting Officer to resolve the issue.
3.2.1.4 Developing Additional Project Specifications
Organize project sections not based on UFGS in accordance with CSI MasterFormat and UFC 1-300-02 . Ensure these specifications conform to the applicable criteria requirements indicated in the solicitation. Write at the Mediumscope level of detail as described in CSI Masterformat. Use Mediumscope level section numbers and titles as identified in CSI Masterformat. Adjust section numbers which conflict with the specifications used in the Project Specifications. Use the same format as the CSI format specifications included in the UFGS (including the submittal paragraph).
Use of commercially-available guide specifications such as "SpecText" published by CSI and "MasterSpec" published by The American Institute of Architects is permissable, subject to the format, coding and submittal paragraph requirements. Change references to the "Architect/Engineer" and the "Owner" to refer to the "Government" or "Contracting Officer," as appropriate. Coordinate references, along with the technical requirements, to specific specification sections (number and title) within the project specifications. Revise section references (title and number) to reflect the titles and numbers of specification sections used.
3.2.1.5 Division 0 and 1 Sections
Include Division 0 and 1 specifications sections contained in the RFP as
SECTION 01 33 00.32 Page 12 part of the project specifications without change, unless directed otherwise:
00 73 00 SPECIAL CONTRACT REQUIREMENTS,
01 30 00.24 OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS,
01 32 01.00 10 PROJECT SCHEDULE,
01 33 00 SUBMITTAL PROCEDURES,
01 33 29 SUSTAINABILITY REQUIREMENTS AND REPORTING,
01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS,
01 35 26 GOVERNMENTAL SAFETY STANDARDS,
01 41 26.06 24 (NORTH DAKOTA) NPDES PERMIT REQUIREMENTS FOR STORM WATER
DISCHARGES
01 45 00.00 10 QUALITY CONTROL,
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 57 20.00 10 ENVIRONMENTAL PROTECTION,
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 62 35 RECYCLED / RECOVERED MATERIALS,
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL,
01 78 23 OPERATION AND MAINTENANCE DATA,
01 78 24.00 10 FACILITY DATA REQUIREMENTS,
01 78 36.00 24 WARRANTY OF CONSTRUCTION AND DESIGN,
01 78 39.00 24 AS-BUILT DRAWINGS, and
01 91 00.15 20 TOTAL BUILDING COMMISSIONING
The Government will furnish copies of these sections and other specifications included with the RFP upon request to the successful offeror in SpecsIntact. Include any amendment revisions issued into these sections. Provide any other Division 1 Specifications required by the Contract, including 01 42 00 SOURCES FOR REFERENCE PUBLICATIONS. Include additional specifications indicated elsewhere in the solicitation or required by the Contractor.
3.2.2 Format for Project Specifications
Submit a bundled specification package, including a cover page and table of contents, in PDF format for each design package. As a minimum, bookmark each specification section in the bundled package. Also, submit the source files, in the processing system format, used to create the PDF.
For the 65 percent and 100 percent design submittals, show specification revisions including text deletions and text insertions (i.e. print the 60% and 100% review specifications showing all insertions and deletions). Do not show revisions for the corrected 100 percent specifications (remove markings for insertion and deletion).
Include a Section Table of Contents within each specification section matching the page numbering of the specification section.
Make the Specifications Cover Page similar to the RFP Cover page and include:
a. Project title, Project Number, activity and location
b. Construction contract number
c. Construction Contractor's name and address
d. Design firm's name and address
SECTION 01 33 00.32 Page 13
e. Names of design team members (Designers of Record) responsible for each Contractor prepared technical discipline of the project specification
f. Name and signature of a Principal of the design firm
Include the appropriate Divisions using CSI format and the specification section numbers and titles contained in the project specifications in the Table of Contents.
3.2.3 Error Report Submission and Resolution
Submit the following SpecsIntact reports with the 100 percent and Corrected 100 percent design submittals: Address Verification, Reference Verification, Section Verification, Bracket Verification, Submittal Verification, Submittal Register and any other reports requested by the Contracting Officer. Reconcile references when printing reports. Submit the reports for review after correcting any errors initially displayed in these reports. In the reference verification reports, only fix errors consisting of a discrepancy with the issue date of a publication (i.e., NFPA 70, revise to the latest code requirement). Complete Address, Reference and Submittal Reconciliation prior to submittal of the 100 percent design.
3.2.4 Construction Submittals
See Section 01 33 00 SUBMITTAL PROCEDURES.
Include construction submittal types and products, including the submittal description numbers and data package numbers. When appropriate, use specific product terms instead of the generic product terms contained in the specifications sections (e.g., asphalt shingles, built-up roofing, EPDM single ply, etc. vs roof covering; concrete masonry units, brick, metal siding, etc. vs exterior skin; mineral fiber board, block, batt or blanket, polystyrene, polyurethane, polyisocyanurate board vs insulation).
3.2.4.1 Submittals Register (Form)
Prepare and maintain a Submittal Register. Prepare the Submittal Register (ENG Form 4025) using SpecsIntact Software.
Fill in columns "c" through "f" and submit with the 100 percent design submittal. The Government will return the Submittal Register to the Contractor along with the reviewed and accepted design.
Resubmit the Submittal Register as a construction submittal as required in Section 01 33 00 SUBMITTAL PROCEDURES. Provide an electronic copy of the accepted submittal register (NAVY4288.txt file), generated by the SpecsIntact software, three (3) working days prior to the pre-construction conference. Appropriate authorities will fill in remaining columns during construction.
3.3 DESIGN ANALYSES
Prepare design analyses (basis of design and calculations) for each design discipline. This section and Sections 01 33 00.36 65 PERCENT DESIGN SUBMITTALS and 01 33 00.38 100 PERCENT DESIGN SUBMITTALS contain specific requirements for technical content. Include a basis of design and calculations, as applicable, for each discipline. Present facts to
SECTION 01 33 00.32 Page 14 demonstrate that the concept of the project is fully understood and that the design is based on sound engineering. For each discipline include:
a. A basis of design consisting of:
(1) An introductory description of the project concept which addresses the salient points of the design;
(2) An orderly and comprehensive documentation of criteria, rationale, assumptions and reasoning for system selection.
b. Calculations required to support the design.
c. Project Engineering Considerations and Instructions (ECI) for Final Design Analysis.
Do not make reference to the RFP solicitation to avoid stating the requirements for the basis for design.
3.3.1 Format
Include a cover page indicating the stage of design "PRELIMINARY DESIGN ANALYSIS" for 65 percent design submittal and "FINAL DESIGN ANALYSIS" for 100 percent design submittal, the project title "DRP Building 649 PN 503729", fiscal year and program funding "FY 24 MCAF", location "Grand Forks AFB, ND", who prepared the design analysis "Prepared By:" followed by Name of AE and Construction Contractor, location of AE and Construction Contractor Office involved with the design, and construction contract number; table of contents; and bookmarks for each part of design analysis for quick reference. Indicate the volume number and total number of volumes for the project on the cover sheet. Provide a cover sheet for each volume. Submit design analyses prepared on 8 1/2 by 11-inch page size.
Include all disciplines in one volume when possible, excluding calculations. Provide multiple volumes for individual disciplines, appropriately numbered, when required.
Use a decimal paragraph numbering system (i.e. 1, 1.1, 1.1.1, 1.1.1.1, etc.) for narratives. Do not copy the text from the RFP document sections, unless directed otherwise. Write in the same tense (Past or Present) for the entire design analysis. Include the part number and page numbering (consecutive page numbering for each part). Organize design analysis narrative into the following parts, as follows:
3.3.1.1 Part 1 - General Description.
Provide statements of purpose, authority and applicable criteria. Provide a description of the project and a summary of the economic factors influencing the choice of the civil, architectural, structural, mechanical, electrical, communications, fire safety, water supply, and airfield safety systems used in the project along with an indication of how initial and life costs were considered.
a. Purpose . Include a statement under the heading of "PURPOSE" that applies to the project
b. Authority . Confirm authorization statement with the USACE project manager after award.
c. Appl i cabl e Cr i t er i a. Provide a list of the general criteria that
SECTION 01 33 00.32 Page 15 pertains to all disciplines used in the design. List specific criteria used in a particular engineering/architectural discipline in the text of the appropriate discipline in Part 2 of the design analysis. Reference such criteria accordingly.
d. Pr oj ect Descr i pt i on. Provide a description of the project and summary of economic factors influencing the choice of materials and systems used in the project.
3.3.1.2 Part 2 - Design Requirements and Provisions.
Provide statements of factors considered in the design along with supporting justification of design decisions and design calculations.
Include narratives for each of the following areas or disciplines. See Sections 01 33 00.36 65 PERCENT DESIGN REQUIREMENTS and 01 33 00.38 100 PERCENT DESIGN REQUIREMENTS for specific requirements.
a. Civil
b. Water Supply and Wastewater
c. Architectural
d. Interior Design
e. Structural
f. Mechanical
g. Electrical
h. Communications
i. Fire Protection
j. Environmental Protection, Compliance and Permits
k. Health and Safety
l. Sustainable Design
3.3.2 Calculations
Place all calculations in separate appendices and volume(s) as needed.
Include a cover page for calculations similar to the design analysis narrative cover page, a table of contents, index page and a summary of criteria for each appendix on the first pages and the project title.
Identify the project and location on every page of the calculations.
Ensure all calculation pages are legible and photo-ready. Consecutively number each discipline (Example: A-1, A-2, A-3 etc. for Water Supply and Wastewater Calculations and B-1, B-2, B-3, etc. for Structural Calculations) and include the date. Cite criteria for calculations, rationale, and formulae by publication number, title, edition and page number. Include the names of the persons originating and checking the calculations on the cover page and each page of the calculations. Ensure a registered professional engineer other than the originator checks the calculations. In addition, include the signature and seal of the appropriate registered professional engineer responsible for the work appears on the cover page of the calculations for each discipline. List
SECTION 01 33 00.32 Page 16 subtopics (e.g. for Structural - Loads, Materials, References, Wind Analysis, Footing Design, Wall Design, Column Design, etc.) on an index page for each appendix with page numbers corresponding to the calculations.
Use consecutive page numbers and identify computer printouts similar to the calculations. Identify the computer program name, source, and version. Provide all schematic models used for computer input.
3.3.3 Engineering Considerations and Instructions (ECI) for Field Personnel
3.3.3.1 Separate Appendix
Under a separate appendix in the Final Design Analysis, include the following items:
a. Features critical to the quality of the final construction product requiring special attention.
b. Submittals requiring special attention during construction.
c. Special user requirements or instructions.
d. Assumed field conditions, pertinent significant aspects, or critical phases of the project used as a basis of project design.
3.3.3.2 Format
Include the following information in a format similar to the below for Engineering Considerations and Instructions (ECI's):
" ENGI NEERI NG CONSI DERATI ONS AND I NSTRUCTI ONS
Project Name:_______________________________________________
Location: _______________________________________________________
Designer Name:______________________ Phone:______________________
Discipline:________________________________
Follow these Engineering Considerations and Instructions (ECI's) during the construction of the above project. If you have any questions, contact the appropriate Design-Build designer."
3.3.3.3 Distribution of ECI's
After acceptance of the 100 percent corrected design and prior to the start of construction, e-mail a copy of the ECI's to the appropriate U.S.
Army Corps of Engineer's Field representative with a copy furnished to the appropriate individuals identified at either the pre-design or pre-construction conference.
3.3.4 Requests for Information, Meeting Minutes and Comments
Include copies of Requests for Information (RFI) as an appendix to the design analysis. Include an index of each RFI documenting the RFI number, the date given to Government, the date answered, and the Action Response provided by the Government.
SECTION 01 33 00.32 Page 17
Include a copy of all meeting minutes and design review comments (if any) with action responses as an appendix to the design analysis.
Include page numbering and formatting in all appendices for RFI's, Meeting Minutes, and design review comments similar to Calculations listed above.
3.4 DESIGN CERTIFICATION
Provide certification signed by an officer of the Contractor's company attesting that the drawings, specifications, and design analyses prepared for the construction of the facility meet the requirements of the RFP.
Include the certification in the submission of the design documents along with names and disciplines for the designers of record. Include a list of deviations (variations) from the solicitation or accepted final design as part of this design certification. Prepare the design certification and transmittal letter in the format shown in Attachment A or Attachment B included at the end of this section.
3.5 REVIEW BY GOVERNMENT AGENCIES
3.5.1 Distribution of Design Documents for Conformance Review
(a) Send review documents to ensure Government receipt thirty (30) days prior to review conferences. The documents will be in their then-present "on-board" design status (except for the 100% design submittal). See below for review agencies and required quantities. Include an index of contents in all documents. Continue work during the review period between the 65% design submission and the 65% design review conference.
Ensure work is 100% complete when the 100% design is submitted. Do not continue design work during the review period between the 100% design submission and the 100% design review conference. Indicate distribution by use of the "ATTN" code shown in the address in the transmittal leter.
Submit a complete package (i.e. drawings, specifications, DA, etc.)
including the items listed below.
(b) If the Government requires more time than the thirty (30) days given, prior to either of the 65% or 100% review conferences, the Government will grant an extension of time equal to the number of calendar days of delay.
(c) The Government requires fourteen (14) days to review 100 Percent Corrected Design submittals af t er r ecei pt of these documents. If the Government requires additional review time, it will grant an extension of time equal to the number of calendar days of delay.
3.5.1.1 Design Submittal Items
Submit electronic copies of the following items as applicable for each design submittal: design analysis, design analysis calculations and appendices, specifications, specification error reports, submittal register, color boards, DD Form 1354, environmental protection plan, backcheck review comments, sustainability tracking report, design certification letter with deviations, and engineering considerations and instructions (ECI) in an Adobe Acrobat XI .pdf format in the quantity indicated by the ' EMedia ' designation. Use bookmarks with titles and ensure the text is searchable. Make each design submittal item and submittal item component easy to find (i.e. each specification section, chapters and appendices of design analysis, each drawing with sheet number
SECTION 01 33 00.32 Page 18 and title as subordinate bookmarks to the discipline primary bookmark, and each submittal item). Ensure submittals are legible and permit ease of design review. Poor quality scans of as-built drawings or other materials are unacceptable. Failure to meet this requirement on one design submittal may result in requiring all future submittals and resubmittals to be hard copy, at no additional cost to the Government.
The submittal items listed below identify the different design submittals required throughout the design process and select submittals required during and at the completion of construction. Each submittal item has an abbreviation as shown below used in conjunction with the number of required copies.
Submit hardcopies of any items identified separately below from the required "Emedia" submittal.
SUBMITTAL ITEM - ABBREVIATION
Drawings (1/2 size) - Dwg-1/2 Electronic Media - EMedia Color Board - ColBd Framed and Matted Renderings - Rend
3.5.1.2 Activity Distribution Addresses
Engineering Division Attn: CENWO-PM-M (Chuck Newman) U.S Army Engineer District, Omaha 1616 Capitol Avenue Omaha, NE 68l02-4901
DAF/RCO
Attn: SAF/AQ (Randy Brown) 272 Luke Avenue Washington DC 20032
319 Civil Engineering Squadron ATTN: 319 CES/CENM (Lance Landon) 525 Tuskegee Airmen Blvd Grand Forks AFB, ND 58205
3.5.1.3 65 Percent Design Distribution
See paragraphs above explaining Submittal Abbreviation Codes and Activity Distribution Addresses.
Activity / Submittal Item CENWO-PM-M DAF/RCO 319 CES
Dwg-1/2 0 0 3
EMedia 1 1 1
ColBd 1 1 1
SECTION 01 33 00.32…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .