W9128F24R0012 249M SB ERS SOLICITATION 22 AUG 24.pdf
PDF 2 MB Posted
- Attached to
- $249M IDIQ MATOC for Environmental Remediation Services (ERS) - Small Business (SB) Set-Aside
- Solicitation number
- W9128F24R0012
About this file
This document is a solicitation for a $249 million Indefinite Delivery/Indefinite Quantity (ID/IQ), Multiple Award Task Order Contract (MATOC) for Environmental Remediation Services (ERS) under NAICS code 562910. The contract is a small business set-aside with a 5-year base ordering period, a 2-year option period, and a 6-month extension. Task orders will be issued as needed during the ordering period for a wide range of environmental remediation services at various hazardous, toxic, and radioactive waste (HTRW) or munitions and explosives of concern (MEC) sites. The contract will include both cost reimbursement and firm-fixed price task orders. Proposals are due by 2:00 PM CST on October 4, 2024. The U.S. Army Corps of Engineers (USACE) Omaha District will administer the contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local t ime 09 Oct 2024
X
A X B X C
D
EX
X G F 182 - 214
215 - 232 X H 233 - 241
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 241
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W9128F 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 13
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
14 - 40 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
42 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 43 - 46 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 47 - 49 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
50 - 123
PART II - CO NTRACT CLAUSES
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
124 - 181
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
22 Aug 2024
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W9128F24R0012
Section B - Supplies or Services and Prices
SUPPLIES ORSERVICES AND PRICES
SECTION B - SUPPLIES OR SERVICES AND PRICES
1. CONTRACT DEFINITION
The contract awarded under this solicitation will be an Indefinite Delivery/Indefinite Quantity (ID/IQ), Multiple Award Task Order (MATOC) contract for Environmental Remediation Services (ERS) under NAICS Code 562910, in support of the U.S. Army Corps of Engineers (USACE), Northwestern Division (NWD) Area of Responsibility (AOR) and its approved customers. However, contract capacity may be transferred with other USACE Districts where the principles of the ER-1-10 and Project Management Business Process have been met. Task orders will be issued as the need arises during the ordering period. The contract will include both cost reimbursement and Firm-Fixed Price (FFP) task orders for Environmental Remediation Services as identified in Section C.
The contract is required to be registered under NAICS code 562910 in the System for Award Management (SAM) located at https://www.sam.gov
2. TOTAL AMOUNT OF CONTRACT
The total amount of contract capacity under this solicitation is estimated at $249 Million. There is no limit on the number of task orders that may be executed against this MATOC.
3. MINIMUM GUARANTEE
The minimum guarantee for the contracts is $2,500. A task order will be issued under each contract under the MATOC to meet the requirements of the minimum guarantee. If the cumulative value of any additional task orders issued to the contractor exceeds the minimum guarantee, the minimum guarantee task order will be de-obligated and closed at no additional cost or liability to either party.
4. ORDERING PERIOD
The contract will have a base ordering period of five (5) years with a two (2) year optional ordering period or until the $249M contract capacity is expended, whichever occurs first. The Federal Acquisition Regulations (FAR) Clause 52.217-8, “Option to Extend Service” will be incorporated into the contract and may be exercised at the discretion of the Government. This allows the Government to extend the term of the Contract an additional six (6) months.
5. Firm Fixed Pricing Task Orders
5.1 Maximum Binding Hourly Labor Rates
The Offeror shall provide Maximum Binding Hourly Labor Rates for the labor disciplines listed in Table 1, “Maximum Binding Hourly Labor Rate Schedule.”
5.1.2 The rates proposed in the Maximum Binding Labor Rate Schedule are binding upon contract award for the life of the MATOC, to include all option periods and extensions. These rates are applicable to both task orders and modifications.
5.1.3 Labor rates used in task order proposals shall not exceed the maximum hourly labor rates proposed by the Offeror for those disciplines in Table 1.
5.1.4 The Maximum Binding Hourly Labor rates for all years shall be fully-burdened labor rates, including all applied direct and indirect costs, for example, direct labor costs, payroll taxes, insurance, benefits, applied OH, applied G&A, and any applied indirect costs, but shall not include profit, with this exception: Year 1 requires the Offeror to provide both burdened and unburdened rates. The unburdened rates shall exclude profit and indirect costs, for example, payroll taxes, insurance, benefits, applied OH, applied G&A, and any applied indirect costs.
5.1.5 If a discipline is not listed in the contract rate pricing schedule and is required for the contractor to perform a specific task order, the contractor may propose the required labor category and provide the direct and indirect costs which formulate the fully burdened labor rate (exclusive of profit) in the proposal submitted in response to the issued Request for Task Order Proposal (RTOP). The Government will review the proposed fully burdened labor rate to https://www.sam.gov/ determine whether the rate is considered fair and reasonable and may negotiate the proposed rate if it is not considered fair and reasonable.
5.1.6 If, during the Contract Period of Performance, any of the Offeror’s Government approved personnel (prime or subcontracted) are no longer available, the Offeror shall replace these individuals with personnel whom, at a minimum, have the same qualifications as the personnel being replaced. The Contractor shall submit the replacement personnel’s qualifications to the Contracting Officer for approval. The replacement personnel labor rates shall not exceed the rates provided in Table 1, which are the maximum rates the Government will pay for any labor discipline.
5.1.7 The applicable maximum labor rates shall be governed by the effective date of the Task Order. Task Orders will use the costs/prices for the 12-month period effective on the date the Task Order is issued. Modifications to Task Orders will reflect the rates of the “current 12-month” maximum binding labor rate schedule. For example, if the rate schedule changes over on 1 November of each year, and a Task Order is issue on 1 September 2024 for 12 months work, the maximum rates will be the rates that were effective on 1 November 2023. Under the same assumptions, if a modification to the Task Order is required in December 2023, the labor rates effective on 1 November 2023 will apply.
5.1.8 The Offeror has the responsibility to provide labor rates that comply with all potential Service Contract Act wage determinations and/or Davis Bacon wage decisions for each labor discipline subject to those wage determinations/wage decisions. If, during the performance of the contract, the Service Contract Act and/or Davis Bacon wage determination exceed the maximum proposed wage on the base contract, the wage determination takes precedence and will be determined fair and reasonable at the task order level. The Government will provide the applicable wage determination(s) for the specific geographic location of the task orders in the RTOP.
5.1.9 Provide one (1) rate per labor discipline, regardless of whether the individuals employed for that discipline are directly employed or subcontracted.
5.1.10 The proposal shall include the formula/calculation used to establish the burdened labor rates included in Table 1 as Other than Certified Cost/Price Data.
5.1.11 The Offeror shall include unburdened labor rates for Year 1 proposed in Section B, Table 1 submission.
These rates are discussed in Paragraph 5.3.1 of Section L of the solicitation. The submitted unburdened rate shall be used in the formula provided by the Offeror to establish the maximum burdened hourly labor rate. The unburdened labor rate may be used for cost/price analysis purposes. The unburdened rate is not a binding rate for FFP action.
The unburdened rates will not be included in Table 1 of any awarded contract.
Section B - TABLE 1 – MAXIMUM BINDING HOURLY LABOR RATE SCHEDULE
Labor Discipline
U nb ur de ne d
L ab or R at e
(B as e
Pe ri od
Y ea r 1)
B ur de ne d L ab or
R e Pe ri od
Y ea de ne d L ab or
R e Pe ri od
Y ea
2) de ne d L ab or
R e Pe ri od
Y ea
3) de ne d L ab or
R e Pe ri od
Y ea
4) de ne d L ab or
R e Pe ri od
Y ea
5) de ne d L ab or
R
(O pt io n
Pe ri od
Y ea de ne d L ab or
R
(O pt io n
Pe ri od
Y ea
2) de ne d L ab or
R
(6 -M on th
E xt en si on
0001 - Program Manager
0002 – Project Manager
0003 – Contractor Quality Control Supervisor (CQCS)
0004 – Safety and Health Manager (SHM)
0005 – Site Safety & Health Officer (SSHO)
0006 – Geologist
0007 – Field/ Junior Geologist
0008 – Hydrologist
0009 – Geotechnical Engineer
0010 - Geophysicist
0011 – Program Chemist
0012 – Chemist
0013 – Risk Assessor / Toxicologist
0014 – Civil Engineer
0015 – Environmental
0016 – Process Engineer
0017 – Engineer-Junior
0018 – Engineering Technician
0019 – Biologist
0020 – Regulatory Specialist
0021 – GIS Specialist
0022 – Estimator
0023 – Site Superintendent/ Construction Manager
0024 – Field Technician
0025 – Hazardous Materials/ Waste Specialist
0026 – CADD Operator
0027 – Word Processor
0028 - Clerical
0029 – Data Processor
0030 – Data Base Administrator
0031 – Community Relations Specialist
0032 – Procurement Specialist
0033 – Specification Writer
0034 – Dive Supervisor
0035 – Senior Contracts Manager
0036 – Senior UXO Supervisor
0037 – UXO Quality Control Supervisor
0038 – UXO Safety Officer
UXO Tech I, Tech II, Tech III will be based on prevailing wage determination for the specific location, identified in the task order.
5.2 Firm-Fixed Price Escalation Rate and Maximum Profit Rate
5.2.1 Escalation Rate. The escalation rate applied to the labor rate annually shall be provided by the Offeror in Table 2. The proposal should contain a narrative on the basis of the proposed escalation.
Section B - TABLE 2: ESCALATION RATE
Year 1 to Year 2
Year 2 to Year 3
Year 3 to Year 4
Year 4 to Year 5
Year 5 to Year 6
Year 6 to Year 7
Year 7 to 6 Month
Extension
5.2.2 Maximum Binding Profit Rate
The Profit will be negotiated at the task order level. The maximum profit for any Firm Fixed Price project is contained in the table below:
Section B – TABLE 3: MAXIMUM BINDING PROFIT RATE
6. Cost Reimbursable Task Orders
The contractor shall have the ability to support cost reimbursement task orders (for example, an adequate cost accounting system for determining costs applicable to the contract order and an acceptable purchasing system). The Government reserves the right to request a Defense Contract Audit Agency (DCAA) audit prior to or after contract award. Additionally, each cost reimbursable task order issued will be subject to DCAA Audit.
The contractor shall be reimbursed for all allocable, allowable and reasonable costs in accordance with FAR Part 31 up to the "estimated" cost for work specified in the task order scope of work. The Government will not reimburse the contractor for preparation and negotiation of task orders.
6.1. Accounting System
The contractor’s accounting system shall be in compliance with Cost Accounting Standards (CAS) [large business firms only] and Generally Accepted Accounting Principles (GAAP). The indirect cost/price rate(s) applied under this contract shall be compliant with FAR Part 31.
6.2. Fixed Fee
Fixed Fee will be negotiated on each cost reimbursement task order. In no case can the fixed fee exceed the statutory limit of 10% for cost reimbursement task orders, in accordance with Federal Acquisition Regulations 15.404-4.
6.2.1 The Maximum Binding Fixed Fee shall be provided by the Offeror in Table 4, Maximum Binding Fixed Fee, and is binding upon contract award for the life of the MATOC, to include all option periods and extensions. These rates are applicable to both task orders and modifications.
Section B - TABLE 4: MAXIMUM BINDING FIXED FEE RATE
7. Maximum Rates for Firm Fixed and Cost Reimbursable Task Orders
The Maximum Binding Indirect Rate(s) listed in Table 5 represent the firm’s maximum binding indirect cost recovery rate(s) that may be applied to the identified application base(s) that the Contractor may use when responding to a RTOP issued by the Government. These rates are applicable to both Firm Fixed Price and Cost Reimbursable contracts and shall also apply to all modifications. The Offeror may use lower rates in proposals, but not higher.
7.1 The Maximum Binding Indirect Rates listed in Table 5 shall be the firm’s maximum indirect cost recovery rate(s) that may be applied to the identified application base for the duration of the contract. The Maximum Binding Indirect Rate(s) will not be adjusted upward as a result of an audit of the contract or the follow-on task orders. The Contractor should use the actual labor rate(s) paid to the employee(s) for each discipline with the applied Maximum Binding Indirect Rates for the appropriate base. A Contractor can propose lower indirect cost recovery rates for a specific task order; however, those proposed lower rates become the maximum rates for that specific task order. The proposed task order indirect rates will not be adjusted upward as a result of an audit of the contract or the specific task order. The Offeror may propose lower rates on individual task orders, in which case the lower rates shall be the maximum rate on the individual task order.
7.2 The Maximum Binding Indirect Rates for this contract shall be provided by the Offeror in Table 5. The maximum rates provided by the Offeror are the maximum rates upon contract award for the life of the MATOC, to include all option periods and extensions. These rates are applicable to both task orders and modifications, unless adjusted in accordance with paragraph 7.1.
Note: Offeror should submit the Excel file provided in the RFP (completed to include all required information).
Section B - TABLE 5 - MAXIMUM BINDING INDIRECT RATES
Indirect Rate(s) Applicable to Direct Labor Description
(for example Combined Labor
Indirect Rate, Overhead, Fringe, G&A, ect)
Indirect Rate Item
Maximum Rate
- Year 1 (Base Period)
Maximum Rate
- Year 2 (Base Period)
Maximum Rate
- Year 3 (Base Period)
Maximum Rate
- Year 4 (Base Period)
Maximum Rate
- Year 5 (Base Period)
Indirect Rate Item
Maximum Rate
- Year 1 (Option Period)
Maximum Rate
- Year 2 (Option Period)
Maximum Rate
- 6-month extension
Application Base (for example, Direct Labor; DL & Fringe; DL, Fringe & OH)
Indirect Rate(s) Applicable to Other
Direct Costs (ODCs), Travel, and
Subcontracts
Indirect Rate Item
Maximum Rate
- Year 1 (Base Period)
Maximum Rate
- Year 2 (Base Period)
Maximum Rate
- Year 3 (Base Period)
Maximum Rate
- Year 4 (Base Period)
Maximum Rate
- Year 5 (Base Period)
Indirect Rate Item
Maximum Rate
- Year 1 (Option Period)
Maximum Rate
- Year 2 (Option Period)
Maximum Rate
- 6-month extension
Application Base (for example, Total Cost Input; "All ODCs except …"; Subcontract cost, etc.)
NOTE 1: Table shall include ALL indirect rates the Offeror intends to utilize on the potential contract
NOTE 2: Proposed rates shall be supported by Offerors accounting system or a discounted to an indirect rate supported by their accounting system
7. Department of Labor Rates For individual task orders written against the contract, the appropriate Wage Determination/Decision will be provided with the RTOP.
8. Travel The Contractor shall perform all travel and attend all meetings necessary for completion of the work required by the task orders. Per Diem (lodging and MI&E expenses) shall be paid at the current Government rates in accordance with the Federal Travel Regulation (FTR) per person per calendar day spent in travel status. No per diem will be paid for travel less than the number of hours per day stated in the current FTR. Per Diem rate information may be obtained at http://www.defensetravel.dod.mil/. Actual cost of transportation by public conveyance (plane, limited to coach class) shall be paid. Air travel shall (if possible) be planned in advance in order to acquire the best prices available. Privately owned vehicles shall be paid at the current Government mileage rate in accordance with the FTR. The maximum amount paid for an airline ticket shall be the cost of travel via coach class.
(End of Section B)
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 249,000,000 Job
ID/IQ ERS MATOC - BASE FFP
FFP
Base Ordering Period - SB ID/IQ MATOC for Environmental Remediation Services (ERS) under NAICS Code 562910, in support of the U.S. Army Corps of Engineers (USACE), Northwestern Division (NWD) Area of Responsibility (AOR) and its approved customers. Estimated Contract Capacity $249M. A 5 year Base Ordering Period, one (1) 2 year Option Ordering Period, and one (1) 6-month extension. The Base Ordering Period is five years from date of contract award.
FOB: Destination
PSC CD: F999
MAX
NET AMT
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0002 UNDEFINED Job
ID/IQ ERS MATOC - BASE CPFF
CPFF
Base Period - SB ID/IQ MATOC for Environmental Remediation Services (ERS) under NAICS Code 562910, in support of the U.S. Army Corps of Engineers (USACE), Northwestern Division (NWD) Area of Responsibility (AOR) and its approved customers. Estimated Contract Capacity $249M. A 5 year Base Ordering Period, one (1) 2 year Option Ordering Period, and one (1) 6-month extension. The Base Ordering Period is five years from date of contract award.
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0003 UNDEFINED Job
OPTION ID/IQ ERS MATOC - OPTION FFP
FFP
Optional Ordering Period - SB ID/IQ MATOC for Environmental Remediation Services (ERS) under NAICS Code 562910, in support of the U.S. Army Corps of Engineers (USACE), Northwestern Division (NWD) Area of Responsibility (AOR) and its approved customers. Estimated Contract Capacity $249M. A 5 year Base Ordering Period, one (1) 2 year Option Ordering Period, and one (1) 6-month extension. The Optional Ordering period is five years from date of contract award plus one day to seven years from date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0004 UNDEFINED Job
OPTION ID/IQ ERS MATOC - OPTION CPFF
CPFF
Option Period - SB ID/IQ MATOC for Environmental Remediation Services (ERS) under NAICS Code 562910, in support of the U.S. Army Corps of Engineers (USACE), Northwestern Division (NWD) Area of Responsibility (AOR) and its approved customers. Estimated Contract Capacity $249M. A 5 year Base Ordering Period, one (1) 2 year Option Ordering Period, and one (1) 6-month extension. The Option Ordering Period is five years plus one day from date of contract award to seven years from date of contract award.
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0005 UNDEFINED Job
OPTION ID/IQ ERS MATOC - 6-MO OPTION FFP
FFP
6-Month Extension - SB ID/IQ MATOC for Environmental Remediation Services (ERS) under NAICS Code 562910, in support of the U.S. Army Corps of Engineers (USACE), Northwestern Division (NWD) Area of Responsibility (AOR) and its approved customers. Estimated Contract Capacity $249M. A 5 year Base Ordering Period, one (1) 2 year Option Ordering Period, and one (1) 6-month extension.. The 6-month Extension period is seven years plus one day from date of contract award to seven years plus 6 months from date of contract award.
UNIT UNIT PRICE MAX AMOUNT
0006 UNDEFINED Job
OPTION ID/IQ ERS MATOC - 6 MO OPT CPFF
CPFF
6-Month Extension - SB ID/IQ MATOC for Environmental Remediation Services (ERS) under NAICS Code 562910, in support of the U.S. Army Corps of Engineers (USACE), Northwestern Division (NWD) Area of Responsibility (AOR) and its approved customers. Estimated Contract Capacity $249M. A 5 year Base Ordering Period, one (1) 2 year Option Ordering Period, and one (1) 6-month extension. The 6-month Extension period is seven years plus one day from date of contract award to seven years plus 6 months from date of contract award.
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
2,500.00 $2,500.00 249,000,000.00 $249,000,000.00
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
2,500.00 $2,500.00 249,000,000.00 $249,000,000.00
CLIN MINIMUM/MAXIMUM QUANTITY AND CLIN VALUE
The minimum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not be less than the minimum quantity(s) and CLIN value(s) stated in the following table. The maximum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not exceed the maximum quantity(s) and CLIN value(s) stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
0001 2,500.00 $2,500.00 249,000,000.00 $249,000,000.00 0002 2,500.00 $2,500.00 249,000,000.00 $249,000,000.00 0003 2,500.00 $2,500.00 249,000,000.00 $249,000,000.00 0004 2,500.00 $2,500.00 249,000,000.00 $249,000,000.00 0005 2,500.00 $2,500.00 249,000,000.00 $249,000,000.00 0006 2,500.00 $2,500.00 249,000,000.00 $249,000,000.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
0001 2500.00
$2,500.00
249,000,000.00
$249,000,000.00
0002 2500.00
0003 2500.00
0004 2500.00
0005 2500.00
0006 2500.00
Section C - Descriptions and Specifications
SCOPE OF WORK
SECTION C – DESCRIPTION/SPECIFICATIONS
1. CONTRACT PROCUREMENT OBJECTIVE AND OVERVIEW
The contract awarded under this solicitation will be an ID/IQ, MATOC contract for ERS under NAICS Code 562910, in support of the USACE, NWD AOR and its approved customers. However, contract capacity may be transferred with other USACE Districts where the principles of the ER-1-10 and Project Management Business Process have been met.
Task orders will be issued as the need arises during the ordering period. The contractor shall provide environmental services as requested in the task orders issued under this contract. This contract requires the contractor to perform all work necessary to complete these task orders, to include completing simultaneously executed task orders.
The contractor shall provide services related to all requirements of the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), the Clean Air Act, and other related Federal Programs in addition to State/Local specific regulations/ requirements. Remedial activities may address both regulated and non-regulated toxic substances. In addition, construction activities are included for some ERS task orders, where these requirements are in direct support of specific activities. The contract awarded will include cost reimbursement and FFP for a wide range of environmental remediation services at various known or suspected Hazardous, Toxic, and Radioactive Waste (HTRW) or MMRP sites or Natural Resources area.
Project specific task orders will be issued under the basic contract and any exercised option period thereto. The USACE Contracting Officer (KO) or Contracting Officer’s Representative (COR) will provide the contractor with any site-specific information upon issuance of each task order. Information provided by the USACE on any site will be dependent on the current known status of the site. Each task order will define the performance requirements of the contractor.
The description of work stated herein provides a general understanding of the contractor functions to be performed;
individual task orders will contain the specific performance-based requirements. Technical requirements described herein in no way limit the activities that may be required under the terms of this contract.
Exclusive of the project management functions, the contractor may utilize subcontractors identified in the accepted proposal or subsequently approved by the USACE KO to perform any of the functions required within the specific task orders.
The contractor shall be responsible for acquiring the latest version of all applicable regulatory or agency guidance, including, but not limited to, the referenced documents stated in this Solicitation and/or subsequent task orders issued after award of the contract, unless otherwise specified.
1.1 Contract Requirements
The contractor, operating as an independent contractor and not as an agent of the Government, shall provide all labor, materials, facilities, and equipment to perform all work identified in each individual task order. The contractor may be required to perform work under multiple task orders at different sites simultaneously. The contractor shall be cognizant of all appropriate laws, regulations, and guidance. The contractor shall ensure that all work activities performed by their personnel, subcontractors, and suppliers are completed in accordance with applicable laws and regulations.
Any incident of noncompliance noted by the contractor shall immediately be brought to the attention of the KO and/or the COR by written notice. Nothing in this contract shall relieve the contractor of the responsibility to comply with applicable laws and regulations. Any conflicts between laws/regulations and contract/task order requirements shall be brought to the attention of the KO and/or COR immediately.
1.2 NWD AOR and Approved Customers for Environmental Remediation Services (ERS) Program
Activities include preliminary assessment, site inspections, remedial investigations, feasibility studies, remedial design, and site remediation. The contractor shall provide services related to requirements of the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), and other related Federal Programs in addition to State/Local specific regulations/requirements dealing with hazardous waste management/disposal and with Underground Storage Tanks (USTs), and other fuels related issues. The ERS actions may address both regulated and non-regulated toxic substances. As part of any site remediation activities, construction may also be included in the ERS contracts. The Contractor shall be familiar with, understand, and have prior experience executing projects within the regulatory process (CERCLA/RCRA) and phases normally utilized to perform the above listed actions. The contactor shall be familiar with, understand and have prior experience in performing the specific tasks anticipated to be performed under this contract as stated in Section 2.
STATEMENT OF WORK (SOW)/ PERFORMANCE WORK STATEMENT (PWS)
2. GENERAL
2.1 DESCRIPTION OF WORK
This Environmental Remediation Services (ERS) contract, will support work assigned to the U.S. Army Corps of Engineers (USACE), Northwestern Division and approved customers for hazardous toxic and radioactive waste (HTRW) sites and Munitions and Explosive Concern (MEC) sites. Services may include the assessment, inspection, investigation, study, control, characterization, containment, removal and/or treatment of environmental contamination from pollutants, toxic substances, perfluorinated compounds, radioactive materials, and hazardous materials. ERS projects include both civilian and military agencies of the Federal Government. This contract will include services related to requirements of the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), the Environmental Protection Agency (EPA) Emerging Contaminant Program; the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), Military Munitions Response Program (MMRP), the Clean Water Act, the Clean Air Act, National Environmental Policy Act (NEPA), National Historic Preservation Act, Endangered Species Act and other related Federal Programs in addition to State/Local specific regulations/requirements dealing with hazardous waste management/disposal, radioactive waste/mixed waste management/disposal, and with Underground Storage Tanks (USTs), and other fuels related issues.
The ERS activities include preliminary assessments, site inspections, remedial investigations, feasibility studies, remedial designs, and site remediation including excavation/removal of contaminated soil, off-site disposal of contaminated soil, and installation of treatment systems. The ERS actions may address both regulated and non-regulated toxic substances and emerging contaminants. As part of any site remediation activities, construction (i.e., treatment plant construction, potable water hook-ups, temporary site stabilization, drainage modifications, etc.) may also be included in this contract.
The Contractor shall be responsible for acquiring the latest version of applicable regulator or agency guidance including the referenced documents cited in this Section C of this Solicitation and/or subsequent task orders issued after award of the Contract, unless otherwise specified. In addition, the contractor is still expected to be aware and follow all applicable regulations.
2.2. SCOPE OF WORK
The Contractor shall have the capability and experience to perform or provide a wide range of remedial activity services at hazardous waste sites. These efforts may include environmental investigations, removal actions, remedial actions, and other remedial and related activities necessary to ensure complete and successful remediation. Remedial activities may include excavation, transportation, and disposal of hazardous, toxic, or low level radiological waste;
construction and operation of groundwater treatment plants and extraction systems (pump and treat); perfluorinated alkyl substances (PFAS) treatment systems, military munitions response actions, and demonstration projects (pilot studies); dredging of contaminated sediments; installation and operation of in-situ treatment technologies including air sparging, petroleum, oil, and lubricants (POLs), chemical oxidation, bioremediation, ground-water circulating wells, permeable reactive barriers, soil vapor extraction, and thermal treatment; water line installations/service connections hookups in response to groundwater contamination; and utility line replacement and/or remediation along utility lines; and erosion, sewer, and storm water controls for the purpose of compliance and/or pollution prevention.
Supporting activities include sampling and laboratory analysis of soil, groundwater, surface water, air, and sediments;
monitoring well, extraction well, and injection well installation, monitoring, and maintenance; supporting facilities for construction; work plan preparation; construction completion reports, as-built drawings, periodic monitoring reports, operation and maintenance/repair of remedial systems; monitoring reports, and other documents as needed;
demolition; and public relations activities. Actions may address both regulated and non-regulated toxic substances and emerging contaminants. Specific project requirements and/or activities will be identified in the task order performance work statement.
The Scopes of Services (Chemistry Instructions Scope of Services; Geology Instructions Scope of Services; Health and Safety Requirements for Scope of Services; Investigation Derived Waste Instructions Scope of Services; and PFAS Instructions for Scope of Services) are included in Section J of the RFP for informational purposes, however relevant SOSs will be provided at task order level.
The contractor shall comply with all aspects of 14 CFR Part 107 and USACE Aviation Policy Letter 95-1-1 that are applicable to Civil Aircraft Operators utilizing Small Uncrewed Aircraft Systems (SUAS), commonly referred to as Drones, for the collection of aerial data associated with this project. Further, the contractor shall comply with location-specific requirements for SUAS operations within the confines of a Government facility, lands, or task orders under this IDIQ.
2.3 COST REIMBURSEMENT TASK ORDERS
2.3.1 GENERAL
Cost control is important in cost reimbursement task orders. It is imperative that the Contractor be capable of estimating, budgeting, accounting, and reporting costs by work breakdown structure (WBS) and/or Contract Line Item Number (CLIN). In accordance with FAR 16.104(h), the Contractor must be capable to track costs on cost reimbursement task orders. The Contractor shall make available, upon request, supporting documents and provide for physical inspection or demonstration at the appropriate office, of its accounting system capabilities to support cost reimbursement contract accounting needs.
2.3.2 COST TRACKING ASSOCIATED WITH COST REIMBURSEMENT TASK ORDERS
The Contract’s cost tracking system is considered critical to the success of cost reimbursement task orders. This cost tracking system should integrate cost and schedule information to provide at a minimum: daily tracking of costs incurred, daily tracking of costs scheduled, projection of cost and schedules, earned value, and time phased budget and spending curves. Automated information should be remotely accessible at the work site and other locations to allow for daily cost tracking of actual labor (both on-site and home office), equipment, purchases, subcontracts, other commitments, obligations, and expenditures. This system should be able to be used as a project management tool to capture committed or obligated costs as they occur, not when reconciled at invoice.
As a minimum, the cost tracking system must have the following capabilities to adequately track cost reimbursement task orders.
• The cost tracking system shall be maintained on-site and shall provide real time ability to capture costs and time phased budget and spending curves.
• The cost tracking system shall have the ability to forecast costs.
• The cost tracking system shall provide a daily report for review and approval by the Government.
• The cost tracking system shall allow for active management and budgeting of Task Order costs, including home office costs, direct field costs, indirect costs, subcontractor costs, equipment costs, and other project costs.
• The cost tracking system shall have the ability to provide a weekly cost comparison/cost variance report.
This report shall capture all committed/expended costs and shall allow the comparison of the forecasted total Task Order cost with the budgeted cost. It shall also show the overruns/under runs on the individual Task Order tasks, as defined in the Task Order.
2.3.3 MANAGEMENT ORGANIZATION, RESPONSIBILITIES, AND AUTHORITIES
The objective of cost reimbursement Task Orders is to obtain the specified work or service on time, with quality work, at the lowest possible cost. As such, the Contractor must demonstrate a management team and organization capable of performing its own management and subcontract management effectively and efficiently. Managers identified as key personnel must have the relevant experience and education to perform the possible scope of services. The only Government authority under the cost reimbursement task order is the Contracting Officer (KO).
Representatives of the Contracting Officer appointed in writing as authorized Contracting Officer's Representative (COR) also serve as representatives for the KO. Only the KO may change the scope, change the contract obligation amount or change the schedule.
2.3.4 COST REIMBURSEMENT TASK ORDER CLOSEOUTS
Cost reimbursement task orders may require a final audit by the cognizant audit office of the Federal Government based on the final cost of the Task Order. The Contractor is expected to provide procedures and processes that facilitate quick subcontract and supplier closeout and resolution of disputes.
2.4. PERFORMANCE-BASED TASK ORDERS
All task orders issued under this MATOC shall be performance-based task orders as in Federal Acquisition Regulations (FAR) 37.6. Performance-based task orders, with a tailored task order specific Quality Assurance Surveillance Plan (QASP), will be issued IAW FAR 37.102 against the awarded contract unless the required approval is received in accordance with AFARS 5137.170-2.
2.4.1. Services that may be required in an ERS task order include, but are not limited to: preparation of work plans following the Uniform Federal Policy (UFP) Quality Assurance Project Plan (QAPP) guidelines; studies with associated reports; multiple phases of field investigations; assessments; inspections; Site investigations; alternatives analysis; alternative selection; Engineering Evaluation Cost Analysis (EECA); monitoring well installation and sampling; short and long term monitoring/long term operations (LTM/LTO) or Long Term Response Action (LTRA);
data management; data interpretation; emerging contaminant studies through remediation; engineering evaluation and corrective actions; optimization studies; ground-water modeling; geophysical surveys; remediation cost estimates;
management of non-hazardous and hazardous investigative derived waste (IDW); environmental and human health risk assessments; risk-based remediation; air emission issues including vapor intrusion; surface water discharge, applying for environmental permits, remedial design; well abandonment; meetings; public meeting participation;
preparation of presentation material both written and visual; hydrological, sediment and soil studies; project reports;
engineering support and/or design; value engineering studies; operations and maintenance (O&M) for HTRW sites;
energy evaluations for remediation systems; remedial action plans; remedial designs; remedial actions; removal action plans; removal actions; construction support; range clearance activities; site closeout/decision documents; abandoned mines program support; other military munitions activities; and, future project programming and scheduling support.
2.4.2. Site assessment and inspection activities include activities such as, CERCLA preliminary assessments, CERCLA Site Inspections, RCRA Facility Assessments, Phase I RCRA Facility Investigation, and NEPA scoping as well as support activities such as records document reviews; Site surveys; document research, personnel interviews, sampling. Additional specific requirements may be identified at task order level.
CERCLA Preliminary Assessments performed under this contract at sites shall be in compliance with EPA guidance EPA/540/G-91/013 resulting in a comprehensive evaluation of the potential for contaminated media or hazardous waste to be present on the site. The Preliminary Assessment shall result in identification and documentation of processes carried out on site that may have used contaminants of concern, specific chemicals that would have been utilized for those processes during the time frame in question, identification of areas of concern at the site where contaminants may have been generated, processed, stored, or disposed of by past activities, and identification of areas of specific concern where performance of Site Inspection sampling should be performed to further evaluate potential releases.
CERCLA Site Inspections included under this scope shall be in compliance with EPA guidance EPA/540-R-92-021 and as guided by the CSM developed for the site, to confirm or refute, with a high degree of statistical confidence, the presence of contamination at concentrations posing an unacceptable risk to human health or the environment in all potentially impacted site media and, if possible to identify potential source areas for those contaminants.
2.4.3. Site investigation and remedial alternative analysis include activities such as CERCLA Remedial Investigations, CERCLA Feasibility Studies, RCRA Facility Investigations, RCRA Corrective measures studies, and NEPA Environmental Assessments as well as support activities such as Geographical information system (GIS) support for project activities; visual surveys; preparation of impact analysis, and various agency specific plans for compensatory mitigation projects; field investigations to include soil and groundwater delineations, monitoring well installation and sampling; Life Cost Analysis, including evaluation of available corrective actions and recommendations for the most environmentally sound cost-effective alternatives; environmental and human health assessments; hydrological and soil studies; management of investigative derived waste; well abandonment including all associated piping and accessories; and reconnaissance and site-specific feasibility studies. Additional specific requirements may be identified at task order level.
CERCLA Remedial Investigations (RI) shall be in compliance with EPA guidance EPA/540/G-89/004 that result in the collection, compilation, and evaluation of data necessary to define source areas of contamination, the potential pathways of contaminant migration, and the lateral and vertical extent of contaminant plumes in all site media. The RI shall define the extent of contamination, especially source areas and the plume core, to allow estimation of the volume requiring remediation and determination of remedial costs without excessive cost risk during the RD/RA phase of the project. The RI shall result in development of a comprehensive conceptual site model which identifies migration pathways and fate and transport processes affecting each contaminant, which identifies potential receptors and complete exposure pathways to the extent necessary to determine whether a threat to human health or the environment exists, and to quantify that risk for all receptors. The RI shall include a comprehensive risk assessment for all identified contaminants of concern The RI shall include consideration of applicable general response actions and preliminary remedial alternatives to ensure collection of all pilot study, treatability, or high-resolution site characterization data necessary to develop and evaluate remedial alternatives (including the no-action alternative) in the feasibility study.
CERCLA Feasibility Studies will be in accordance with EPA guidance. The data needs of the feasibility study must be considered during the scoping and execution of the remedial investigation to ensure that appropriate general response actions, representative technologies, and applicable remedial alternatives for the site are identified and evaluated in coordination with the evolution of the conceptual site model as the RI progresses, and that field data needs necessary to confirm the efficacy of the technologies screened as applicable to the site (e.g. contaminant interactions, bioremediation related geochemistry, soil chemistry, high resolution site stratigraphy, injection/extraction radius of influence) are identified and collected.
2.4.4. Alternative selection includes activities such as CERLCA Proposed Plans, CERCLA Records of Decision, RCRA Statement of Basis, RCRA permit modifications, NEPA Finding of No Significant Impact, and NEPA Environmental Impact Statements as well as support activities such as alternative analysis, documenting preferred alternatives, selecting and documenting the final remedy determination, documenting post-ROD changes (e.g., explanation of significant differences or ROD amendment), permit modifications, and public meetings and other community involvement activities,). Additional specific requirements may be identified at task order level.
2.4.5. Remedial activities include CERCLA Remedial Action, and RCRA Corrective Measures Implementation such as excavation, transportation, and disposal of hazardous, toxic, or low level radiological waste; sediment remediation;
incineration of soils; low-temperature thermal desorption; mixed water disposal; solidification of contaminated matter;
soil washing; construction and operation of groundwater treatment plants and injection and extraction systems (pump and treat); perfluorinated alkyl substances (PFAS) treatment systems; military munitions response actions including detection, recovery, and disposal of MEC; demonstration projects (pilot studies); asbestos and lead-based paint remediation; radon abatement; landfill capping and collection systems; dredging of contaminated sediments;
installation and operation of in-situ treatment technologies including but not limited to air sparging, air stripping, soil vapor extraction, petroleum, oil, and lubricants (POLs), chemical oxidation, bioremediation, ground-water circulating wells, permeable reactive barriers, soil vapor extraction, and thermal treatment; water line installations/service connections hookups in response to groundwater contamination; and utility line replacement and/or remediation along utility lines; and erosion, sewer, and storm water controls for the purpose of compliance and/or pollution prevention.
Supporting activities include, but are not limited to, sampling and laboratory analysis of soil, groundwater, surface water, air, and sediments; monitoring well, extraction well, and injection well installation, monitoring, and maintenance; supporting facilities for construction; work plan preparation; remedial design documentation and remedial action plans, construction completion reports, as-built drawings, periodic monitoring reports, operation and maintenance/repair of remedial systems; monitoring reports, and other documents as needed; demolition; and public relations activities. Remedial actions may address both regulated and non-regulated toxic substances. Construction may also be included in the ERS task orders however, construction activities will be in support of the ERS work.
Additional specific requirements may be identified at task order level.
2.4.6. The Contractor may be required to perform both Short- and Long-Term Operation and Maintenance of facilities constructed under this Contract for the period specified (inclusive of facilities constructed through other contracts or under other task orders issued under this contract). Short term O&M is a requirement during initial startup and shakedown of any active treatment or containment system installed by the contractor. Other short-term O&M requirements may be identified associated with short term interim actions. contract gap filling, or other reasons. Long- Term Operations/ Long Term Monitoring (LTO/LTM) activities may include the following: groundwater containment/extraction or amendment recirculation systems, soil vapor extraction systems, air sparging systems, monitoring and optimization of in-situ amendment based remedial actions, monitoring, and revitalization of in-situ permeable barrier walls, and operation of water treatment plants, although additional specific requirements may be identified at a task order level.
2.4.7. Interim Removal Actions (IRAs) activities may be required to quickly address contaminants to prevent, minimize, or mitigate damage to the public health or welfare or to the environment before a final remedy decision is reached..
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .