This document is an amendment to a Request for Proposal (RFP) for an Indefinite Delivery/Indefinite Quantity (ID/IQ), Multiple Award Task Order Contract (MATOC) for Environmental Remediation Services (ERS). The total contract capacity is estimated at $249 million, with a base ordering period of five years and a two-year optional period. The RFP is a small business set-aside, with the government targeting eight awards. Key details include:

  • The contract will provide both cost reimbursement and firm-fixed-price task orders for ERS, with maximum binding hourly labor rates, indirect rates, profit, and fixed fee established in the RFP.
  • Offerors must submit proposals by October 4, 2024 at 2:00 PM CST, and the contract will be awarded by the U.S. Army Corps of Engineers, Omaha District.
  • The RFP provides detailed instructions for the technical, past performance, and cost/price proposal volumes, including page limitations and requirements for key personnel resumes and accounting system adequacy.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to update Sections B and L (reference changes in red) and add FAR Clause 52.222-43.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 24

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Sep-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128F24R0012

X 9B. DATED (SEE ITEM 11)

22-Aug-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Sep-2024

CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

W9128F 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9128F24R0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

SUPPLIES ORSERVICES AND PRICES

SECTION B - SUPPLIES OR SERVICES AND PRICES

1. CONTRACT DEFINITION

The contract awarded under this solicitation will be an Indefinite Delivery/Indefinite Quantity (ID/IQ), Multiple Award Task Order (MATOC) contract for Environmental Remediation Services (ERS) under NAICS Code 562910, in support of the U.S. Army Corps of Engineers (USACE), Northwestern Division (NWD) Area of Responsibility (AOR) and its approved customers. However, contract capacity may be transferred with other USACE Districts where the principles of the ER-1-10 and Project Management Business Process have been met. Task orders will be issued as the need arises during the ordering period. The contract will include both cost reimbursement and Firm-Fixed Price (FFP) task orders for Environmental Remediation Services as identified in Section C.

The contract is required to be registered under NAICS code 562910 in the System for Award Management (SAM) located at https://www.sam.gov

2. TOTAL AMOUNT OF CONTRACT

The total amount of contract capacity under this solicitation is estimated at $249 Million. There is no limit on the number of task orders that may be executed against this MATOC.

3. MINIMUM GUARANTEE

The minimum guarantee for the contracts is $2,500. A task order will be issued under each contract under the MATOC to meet the requirements of the minimum guarantee. If the cumulative value of any additional task orders issued to the contractor exceeds the minimum guarantee, the minimum guarantee task order will be de-obligated and closed at no additional cost or liability to either party.

4. ORDERING PERIOD

The contract will have a base ordering period of five (5) years with a two (2) year optional ordering period or until the $249M contract capacity is expended, whichever occurs first. The Federal Acquisition Regulations (FAR) Clause 52.217-8, “Option to Extend Service” will be incorporated into the contract and may be exercised at the discretion of the Government. This allows the Government to extend the term of the Contract an additional six (6) months.

5. Firm Fixed Pricing Task Orders

5.1 Maximum Binding Hourly Labor Rates

The Offeror shall provide Maximum Binding Hourly Labor Rates for the labor disciplines listed in Table 1, “Maximum Binding Hourly Labor Rate Schedule.”

5.1.2 The rates proposed in the Maximum Binding Labor Rate Schedule are binding upon contract award for the life of the MATOC, to include all option periods and extensions. These rates are applicable to both task orders and modifications.

5.1.3 Labor rates used in task order proposals shall not exceed the maximum hourly labor rates proposed by the Offeror for those disciplines in Table 1.

https://www.sam.gov/

5.1.4 The Maximum Binding Hourly Labor rates for all years shall be fully-burdened labor rates, including all applied direct and indirect costs, for example, direct labor costs, payroll taxes, insurance, benefits, applied OH, applied G&A, and any applied indirect costs, but shall not include profit, with this exception: Year 1 requires the Offeror to provide both burdened and unburdened rates. The unburdened rates shall exclude profit and indirect costs, for example, payroll taxes, insurance, benefits, applied OH, applied G&A, and any applied indirect costs.

5.1.5 If a discipline is not listed in the contract rate pricing schedule and is required for the contractor to perform a specific task order, the contractor may propose the required labor category and provide the direct and indirect costs which formulate the fully burdened labor rate (exclusive of profit) in the proposal submitted in response to the issued Request for Task Order Proposal (RTOP). The Government will review the proposed fully burdened labor rate to determine whether the rate is considered fair and reasonable and may negotiate the proposed rate if it is not considered fair and reasonable.

5.1.6 If, during the Contract Period of Performance, any of the Offeror’s Government approved personnel (prime or subcontracted) are no longer available, the Offeror shall replace these individuals with personnel whom, at a minimum, have the same qualifications as the personnel being replaced. The Contractor shall submit the replacement personnel’s qualifications to the Contracting Officer for approval. The replacement personnel labor rates shall not exceed the rates provided in Table 1, which are the maximum rates the Government will pay for any labor discipline.

5.1.7 The applicable maximum labor rates shall be governed by the effective date of the Task Order. Task Orders will use the costs/prices for the 12-month period effective on the date the Task Order is issued. Modifications to Task Orders will reflect the rates of the “current 12-month” maximum binding labor rate schedule. For example, if the rate schedule changes over on 1 November of each year, and a Task Order is issue on 1 September 2024 for 12 months work, the maximum rates will be the rates that were effective on 1 November 2023. Under the same assumptions, if a modification to the Task Order is required in December 2023, the labor rates effective on 1 November 2023 will apply.

5.1.8 The Offeror has the responsibility to provide labor rates that comply with all potential Service Contract Act wage determinations and/or Davis Bacon wage decisions for each labor discipline subject to those wage determinations/wage decisions. If, during the performance of the contract, the Service Contract Act and/or Davis Bacon wage determination exceed the maximum proposed wage on the base contract, the wage determination takes precedence and will be determined fair and reasonable at the task order level. The Government will provide the applicable wage determination(s) for the specific geographic location of the task orders in the RTOP.

5.1.9 Provide one (1) rate per labor discipline, regardless of whether the individuals employed for that discipline are directly employed or subcontracted.

5.1.10 The proposal shall include the formula/calculation used to establish the burdened labor rates included in Table 1 as Other than Certified Cost/Price Data.

5.1.11 The Offeror shall include unburdened labor rates for Year 1 proposed in Section B, Table 1 submission.

These rates are discussed in Paragraph 5.3.1 of Section L of the solicitation. The submitted unburdened rate shall be used in the formula provided by the Offeror to establish the maximum burdened hourly labor rate. The unburdened labor rate may be used for cost/price analysis purposes. The unburdened rate is not a binding rate for FFP action.

The unburdened rates will not be included in Table 1 of any awarded contract.

Section B - TABLE 1 – MAXIMUM BINDING HOURLY LABOR RATE SCHEDULE (AMD 02)

Labor Discipline

U nb ur de ne d

L ab or R at e

(B as e

Pe ri od

Y ea r 1)

B ur de ne d L ab or

R e Pe ri od

Y ea de ne d L ab or

R e Pe ri od

Y ea

2) de ne d L ab or

R e Pe ri od

Y ea

3) de ne d L ab or

R e Pe ri od

Y ea

4) de ne d L ab or

R e Pe ri od

Y ea

5) de ne d L ab or

R

(O pt io n

Pe ri od

Y ea de ne d L ab or

R

(O pt io n

Pe ri od

Y ea

2) de ne d L ab or

R

(6 -M on th

E xt en si on

0001 - Program Manager

0002 – Project Manager

0003 – Contractor Quality Control Supervisor (CQCS)

0004 – Safety and Health Manager (SHM)

0005 – Site Safety & Health Officer (SSHO)

0006 – Geologist

0007 – Field/ Junior Geologist

0008 – Hydrologist

0009 – Geotechnical Engineer

0010 - Geophysicist

0011 – Program Chemist

0012 – Chemist

0013 – Risk Assessor / Toxicologist

0014 – Civil Engineer

0015 – Environmental

0016 – Process Engineer

0017 – Engineer-Junior

0018 – Engineering Technician

0019 – Biologist

0020 – Regulatory Specialist

0021 – GIS Specialist

0022 – Estimator

0023 – Site Superintendent/ Construction Manager

0024 – Field Technician

0025 – Hazardous Materials/ Waste Specialist

0026 – CADD Operator

0027 – Word Processor

0028 - Clerical

0029 – Data Processor

0030 – Data Base Administrator

0031 – Community Relations Specialist

0032 – Procurement Specialist

0033 – Specification Writer

0034 – Dive Supervisor

0035 – Senior Contracts Manager

0036 – Senior UXO Supervisor

0037 – UXO Quality Control Supervisor

0038 – UXO Safety Officer

0039 – Cost Tracker (AMD 02)

UXO Tech I, Tech II, Tech III will be based on prevailing wage determination for the specific location, identified in the task order.

5.2 Firm-Fixed Price Escalation Rate and Maximum Profit Rate

5.2.1 Escalation Rate. The escalation rate applied to the labor rate annually shall be provided by the Offeror in Table 2. The proposal should contain a narrative on the basis of the proposed escalation.

Section B - TABLE 2: ESCALATION RATE

Year 1 to Year 2

Year 2 to Year 3

Year 3 to Year 4

Year 4 to Year 5

Year 5 to Year 6

Year 6 to Year 7

Year 7 to 6 Month

Extension

5.2.2 Maximum Binding Profit Rate

The Profit will be negotiated at the task order level. The maximum profit for any Firm Fixed Price project is contained in the table below:

Section B – TABLE 3: MAXIMUM BINDING PROFIT RATE

6. Cost Reimbursable Task Orders

The contractor shall have the ability to support cost reimbursement task orders (for example, an adequate cost accounting system for determining costs applicable to the contract order and an acceptable purchasing system). The Government reserves the right to request a Defense Contract Audit Agency (DCAA) audit prior to or after contract award. Additionally, each cost reimbursable task order issued will be subject to DCAA Audit.

The contractor shall be reimbursed for all allocable, allowable and reasonable costs in accordance with FAR Part 31 up to the "estimated" cost for work specified in the task order scope of work. The Government will not reimburse the contractor for preparation and negotiation of task orders.

6.1. Accounting System

The contractor’s accounting system shall be in compliance with Cost Accounting Standards (CAS) [large business firms only] and Generally Accepted Accounting Principles (GAAP). The indirect cost/price rate(s) applied under this contract shall be compliant with FAR Part 31.

6.2. Fixed Fee

Fixed Fee will be negotiated on each cost reimbursement task order. In no case can the fixed fee exceed the statutory limit of 10% for cost reimbursement task orders, in accordance with Federal Acquisition Regulations 15.404-4.

6.2.1 The Maximum Binding Fixed Fee shall be provided by the Offeror in Table 4, Maximum Binding Fixed Fee, and is binding upon contract award for the life of the MATOC, to include all option periods and extensions. These rates are applicable to both task orders and modifications.

Section B - TABLE 4: MAXIMUM BINDING FIXED FEE RATE

7. Maximum Rates for Firm Fixed and Cost Reimbursable Task Orders

The Maximum Binding Indirect Rate(s) listed in Table 5 represent the firm’s maximum binding indirect cost recovery rate(s) that may be applied to the identified application base(s) that the Contractor may use when responding to a RTOP issued by the Government. These rates are applicable to both Firm Fixed Price and Cost Reimbursable contracts and shall also apply to all modifications. The Offeror may use lower rates in proposals, but not higher.

7.1 The Maximum Binding Indirect Rates listed in Table 5 shall be the firm’s maximum indirect cost recovery rate(s) that may be applied to the identified application base for the duration of the contract. The Maximum Binding Indirect Rate(s) will not be adjusted upward as a result of an audit of the contract or the follow-on task orders. The Contractor should use the actual labor rate(s) paid to the employee(s) for each discipline with the applied Maximum Binding Indirect Rates for the appropriate base. A Contractor can propose lower indirect cost recovery rates for a specific task order; however, those proposed lower rates become the maximum rates for that specific task order. The proposed task order indirect rates will not be adjusted upward as a result of an audit of the contract or the specific task order. The Offeror may propose lower rates on individual task orders, in which case the lower rates shall be the maximum rate on the individual task order.

7.2 The Maximum Binding Indirect Rates for this contract shall be provided by the Offeror in Table 5. The maximum rates provided by the Offeror are the maximum rates upon contract award for the life of the MATOC, to include all option periods and extensions. These rates are applicable to both task orders and modifications, unless adjusted in accordance with paragraph 7.1.

Note: Offeror should submit the Excel file provided in the RFP (completed to include all required information).

Section B - TABLE 5 - MAXIMUM BINDING INDIRECT RATES

Indirect Rate(s) Applicable to Direct Labor Description

(for example Combined Labor

Indirect Rate, Overhead, Fringe, G&A, ect)

Indirect Rate Item

Maximum Rate

- Year 1 (Base Period)

Maximum Rate

- Year 2 (Base Period)

Maximum Rate

- Year 3 (Base Period)

Maximum Rate

- Year 4 (Base Period)

Maximum Rate

- Year 5 (Base Period)

Indirect Rate Item

Maximum Rate

- Year 1 (Option Period)

Maximum Rate

- Year 2 (Option Period)

Maximum Rate

- 6-month extension

Application Base (for example, Direct Labor; DL & Fringe; DL, Fringe & OH)

Indirect Rate(s) Applicable to Other

Direct Costs (ODCs), Travel, and

Subcontracts

Indirect Rate Item

Maximum Rate

- Year 1 (Base Period)

Maximum Rate

- Year 2 (Base Period)

Maximum Rate

- Year 3 (Base Period)

Maximum Rate

- Year 4 (Base Period)

Maximum Rate

- Year 5 (Base Period)

Indirect Rate Item

Maximum Rate

- Year 1 (Option Period)

Maximum Rate

- Year 2 (Option Period)

Maximum Rate

- 6-month extension

Application Base (for example, Total Cost Input; "All ODCs except …"; Subcontract cost, etc.)

NOTE 1: Table shall include ALL indirect rates the Offeror intends to utilize on the potential contract

NOTE 2: Proposed rates shall be supported by Offerors accounting system or a discounted to an indirect rate supported by their accounting system

7. Department of Labor Rates For individual task orders written against the contract, the appropriate Wage Determination/Decision will be provided with the RTOP.

8. Travel The Contractor shall perform all travel and attend all meetings necessary for completion of the work required by the task orders. Per Diem (lodging and MI&E expenses) shall be paid at the current Government rates in accordance with the Federal Travel Regulation (FTR) per person per calendar day spent in travel status. No per diem will be paid for travel less than the number of hours per day stated in the current FTR. Per Diem rate information may be obtained at http://www.defensetravel.dod.mil/. Actual cost of transportation by public conveyance (plane, limited to coach class) shall be paid. Air travel shall (if possible) be planned in advance in order to acquire the best prices available. Privately owned vehicles shall be paid at the current Government mileage rate in accordance with the FTR. The maximum amount paid for an airline ticket shall be the cost of travel via coach class.

(End of Section B)

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

52.222-43 Fair Labor Standards Act And Service Contract Labor

Standards - Price Adjustment (Multiple Year And Option Contracts)

AUG 2018

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

Section L - Instructions, Conditions and Notices to Bidders

INSTRUCTIONS TO OFFERORS

SECTION L- INSTRUCTIONS TO OFFERORS (AMD 01) (AMD 02)

General Information:

1.1. The U.S. Army Corps of Engineers (USACE), Omaha District intends to issue a Small Business Set-Aside solicitation [also known as a Request For Proposal (RFP)] and award an Environmental Remediation Services (ERS) Multiple Award Task Order Contract (MATOC) for shared capacity estimated at $249M to a target of eight (8) contractors. The geographic coverage of this MATOC is primarily within the CENWD area of responsibility (AOR) and may include approved customers that Northwestern Division (NWD) is designated to support through established Memoranda of Agreements (MOAs). Individual Task Orders will be solicited and competed within the MATOC pool.

Task Orders within the MATOC may be Cost-Plus-Fixed-Fee (CPFF) or Firm Fixed Price (FFP) task orders, depending upon project risk.

NOTE: The Government targets 8 awards, however, if the Contracting Officer determines during the source selection process that fewer or more than that number of contracts should be awarded, the Contracting Officer has the discretion of adjusting that number (higher or lower) or awarding none at all. In any case, the Government may not award any contract if the resulting contract would not represent a "best value" to the Government using trade-off selection procedures as required by the Federal Acquisition Regulation (FARS) and other supplementary guidance.

The U.S. Army Corps of Engineers (USACE), Omaha District intends to use Competitive Source Selection Procedures in accordance with the provisions set forth in this RFP, Federal Acquisition Regulation (FAR) Part 15.3, Department of Defense Federal Acquisition Regulation Supplement (DFARS) 215.3, Army Federal Acquisition Regulation Supplement (AFARS) 5115.3, Department of Defense Source Selection Procedures, and the Army Source Selection Supplement (AS3) to the Department of Defense Source Selection Procedures.

The base ordering period for this MATOC is five (5) years. The Request for Proposal (RFP) and resulting contract(s) will include one (1) optional ordering period of two (2) years, with a total ordering period up to seven (7) years from the date of contract award, with an option to extend the MATOC an additional six (6) months in accordance with FAR Clause 52.217-8, Option to Extend Services. The Government’s decision to exercise an option will be contingent upon satisfactory contractor past performance and an informal survey of current market conditions. The decision to exercise the option is at the discretion of the Government. The minimum guarantee amount for this MATOC (to include all option periods) is $2,500.00.

1.2. There are no drawings associated with this RFP. Copies of the RFP and any amendments will be made available by via the System for Award Management (SAM) website (SAM.gov).

1.3. To ensure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein.

Offerors are required to meet all RFP requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors. The Offeror shall submit in the proposal all requested information specified in this section of the RFP no later than the exact date and time specified.

There will be no public opening of the proposals received as a result of this RFP. Failure to meet a requirement may result in an offer being ineligible for award.

1.4. The Contracting Officer has determined there is a high probability of adequate cost/price competition for negotiation and award of the base contract(s). Upon examination of the initial offers, the Contracting Officer will review this determination and if, in the Contracting Officer's opinion, adequate price competition exists, no additional cost information will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition, the Contracting Officer determines that adequate price competition no longer exists, Offerors may be required to submit information to the extent necessary for the Contracting Officer to determine the proposed cost/price is considered fair and reasonable.

1.5. North American Industry Classification System (NAICS): The NAICS code for this acquisition is 562910. The small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 1000 employees (13 CFR Part 121, effective 2 May 2022).

1.6. Bidder Inquiry. Technical inquiries and questions relating to technical requirements, proposal procedures, etc.

are to be submitted via Bidder Inquiry in ProjNet (https://www.projnet.org/projnet/) no later than ten (10) calendar days prior to the date set for receiving proposals, in order that they may be given adequate consideration prior to receipt of offers. The Bidder Inquiry system is to be used by Offerors to make comments and ask non-proprietary questions, and by the Government to review and/or respond to those comments or questions.

To utilize this system, prospective Offerors will need to use the Bidder Inquiry Key and instructions listed below:

Project ID: W9128F-24-R-0012 Project Name: $249M SB ERS MATOC Quick Add Key: NT7BQ6-HP9R2A

A. Registration for ProjNet Bidder Inquiry Access

If you are already registered, go to Entering Bidder Inquiries in ProjNet Bidder Inquiry System (“B,” below).

a) From the ProjNet home page link above, click on Quick Add on the upper right side of the screen.

• Identify the Agency. This should be marked as USACE.

• Key. Enter the Bidder Inquiry Key listed above.

• Email. Enter the email address you would like to use for communication.

b) Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

c) Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Secret Answer as they will be used from this point on to access the ProjNet system.

d) Click Add User. You are now registered within ProjNet and are logged into the system.

B. Entering Bidder Inquiries in ProjNet Bidder Inquiry System

For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

a) From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

b) Identify the Agency. This should be marked as USACE.

c) Key. Enter the Bidder Inquiry Key listed above.

d) Email. Enter the email address you used to register previously in ProjNet.

e) Click Continue. A page will then open asking you to enter the answer to your Secret Question.

f) Enter your Secret Answer and click Login. Once this is completed you will be logged into the system.

g) Follow online screen instructions to enter specific bidder inquiries for the project.

C. Prior to submitting a new inquiry, Offerors are requested to review the RFP in its entirety, and to review any and all existing inquiries and Government responses.

D. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

A prospective Offeror who submits a comment/question will receive an automated acknowledgement of their comment/question via email, typically followed by response by the Government once it has completed its review.

1.7. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will not be available after receipt of proposals.

1.8. If an Offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the Offeror shall immediately notify the Contracting Officer with a copy to the Contract Specialist identified in Paragraph 2.4 of this RFP in writing (email is the preferred method) with supporting rationale. The Offeror is reminded that the Government intends to award the resulting contract based on the initial proposal, as received, without discussions.

2. Specific Proposal Instructions

2.1. Proposal Expenses and Pre-contract Costs.

This RFP does not commit the Government to pay any costs incurred in the preparation and submission of a proposal or for any other costs incurred by any firm submitting a proposal in response to this RFP. The Government also will not be responsible for costs associated with preparing proposals for individual task orders. Finally, the Government will not pay for or subsidize any costs incurred for attendance at the pre-proposal conference or site visits for task orders.

Note specifically that the Offeror will not be participating in a sealed bid procurement process under this acquisition method. Issuance of this RFP does not constitute an award commitment on the part of the Government.

2.2. Discussions.

The Government reserves the right to discuss aspects of proposals with Offerors in the competitive range, which may be limited for efficiency (FAR Part 15.306(c)(2)), and to award a contract to other than the Offeror submitting the lowest cost/priced offer. Offerors are advised that the Government intends to award without discussions; however, clarifications may be necessary without discussions (FAR Part 15.306(a)(2)). Therefore, proposals should be submitted initially on the most favorable terms from a cost/price and technical standpoint. Do not assume that Offerors will be contacted or afforded an opportunity to clarify, discuss or revise their proposals.

2.3. Accuracy.

Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.

2.4. Proposal Submittal Instructions.

In an effort to reduce paper and cost, all proposals shall be submitted electronically. All submissions will be in Adobe PDF format with Optical Character Recognition (OCR) applied to all documents that will enable word searches to be conducted using Adobe-compatible PDF software. The two (2) volumes listed below shall be submitted as SEPARATE files via email. Offerors should follow Controlled Unclassified Information (CUI) guidelines and use proper markings if submitting documents that are considered CUI. Proper markings include the following: banner markings should appear above the email text containing CUI, the email subject line should also indicate the email contains CUI, and file names for any attachments containing CUI. Total size cannot exceed 35MB. If multiple emails are needed, please mark additional emails “1 of 2” and “2 of 2” to go along with the other instructions herein. (AMD

01) Offerors may use compression utilities such as 7-Zip, WinZip or PKZip to reduce file size and facilitate transmission. Offerors are encouraged to send both files in the same email transmission, if possible.

Table 1 – Submittals

Title the single files in the following format:

W9128F24R0012_Company Name_Volume_I_Technical_Proposal W9128F24R0012_Company Name_Volume_II_Required_Docs

*Note: Company Name may be abbreviated.

For this solicitation, the proposal email recipients will be:

Tyler Hegge Tyler.Hegge@usace.army.mil Jen Gilbreath Jennifer.C.Gilbreath@usace.army.mil

Provide the proposal to the emails cited above in the table. (AMD 01)

Offerors should email their proposals directly to the Contract Specialist and the Contracting Officer by using the following link https://piee.eb.mil/ Procurement Integrated Enterprise Environment (PIEE) (eb.mil) (AMD 01)

Please ensure you have registered for an account within PIEE and have knowledge using the system.(AMD 01)

For the purposes of determining whether the proposal was received “late” in accordance with FAR 15.208, the date and time the file(s) are received via PIEE email (AMD 01) will be the time and date the Government received the proposal. Do not assume that electronic communication is instantaneous. Please make allowances for delays in transmittal. The Government is not responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. The Offeror is responsible for ensuring that the proposal is submitted so as to reach the designated recipient and is responsible for allowing sufficient time for the proposal to be received in accordance with the information provided. Failure to submit a complete proposal in accordance with instructions and requirements may result in t he entire offer being rejected.

2.5. Proposal Characteristics.

2.5.1. Each volume shall contain a table of contents which is not included in the page counts listed in Table 2 but is limited to two pages for each volume. In addition, the offeror can provide an acronym list for Volume I, which is not included in the page counts in Table 2 but is limited to 3 pages. All pages of each factor shall be sequentially numbered.

The proposal must also contain an SF 33, completed and signed by a person authorized by the Offeror. (AMD 01)

Title pages, Table of contents, Executive Summaries, and Acronym Lists may be included in the proposal (no page limitations). All pages of each factor shall be sequentially numbered. The proposal must also contain an SF 33, completed and signed by a person authorized by the Offeror. (AMD 01)

2.5.2. Offeror shall submit a one page cover letter in Volume II containing:

• RFP number, W9128F24R0012

• Name, title, address, email, and telephone number of Offeror.

• Names, titles, emails, and telephone numbers of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this RFP.

• Name, title, and signature of the person authorized to sign the proposal.

• A statement specifying agreement with all terms, conditions and provisions included in the RFP.

• If JV – provide the complete names, CAGE code, UEI, (AMD 01) addresses, and phone numbers of the firms comprising the joint venture.

Volume I: Technical Proposal and Past Performance Information Volume II: Cost Information and Representations, Certifications, and Other Statements of Offerors

2.5.3 For the Contractor Team Arrangements. including Joint Ventures, submit the information required in Section L, paragraph 5.5, “Contractual Arrangements.”

3.0 Proposal Requirements and Format

3.1. Offerors shall submit one file labeled as “W9128F24R0012_Company Name_Volume_I_Technical_Proposal” with tabs (electronic bookmarks or equivalent) to identify the factors outlined below. All required information for each identified factor must be contained within that specified Tab. Offerors shall submit one file labeled as “W9128F24R0012_Company Name_Volume_II_Required_Docs” with tabs (electronic bookmarks or equivalent) to identify and contain the required information outline below.

Offerors shall submit acknowledgement of all amendments to the RFP with the proposal submittal.

3.2. Page Limits. Page limits for Factors 1-3 are shown in Table 2, below:

Table 2 - Proposal Format -- Volume I: Technical Proposal and Past Performance

Volume I – Technical Proposal and Past Performance Information (Factors listed in descending order of importance)

EVALUATION

FACTOR

LOCATION

TITLE

PAGE LIMITATION

1 TAB 1 Past Performance (Confidence Assessment of Previous Projects)

• Offeror’s past project example summaries: 2 pages per project. Total page count shall not exceed 6 pages.

• CPARS and PPQ documentation for past project examples: No page limit.

• List of other relevant CPARS entries: 1 page. (AMD 01)

• Disclosure of Termination of Default, Notice of Violations, and/or OSHA Violation -Explanation of violation and correction action(s): 1 page.

2 TAB 2 Organizational

Structure Chart/Management Approach (AMD 01)

• Organizational Chart/Technical Management (AMD 02) Approach

• The organization chart shall not exceed two (2) (AMD 01) pages.

• The narrative of the Offeror’s organizational technical management structure approach shall not exceed 5 seven (7) (AMD 01) pages.

• Total page count for this Factor 2 is nine

(9) pages maximum. (AMD 01)

3 TAB 3 Resumes of Key Management Personnel for this Contract

• Maximum of 2 pages per key management person. Total page count shall not exceed 10 pages. The key management personnel are as follows:

• Program Manager (Resume #1)

• Program Chemist (Resume #2)

• Contractor Quality Control Supervisor

(Resume #3)

• Safety and Health Manager (Resume #4)

• Senior Contracts Manager (Resume #5)

Note: Excess pages will not be read or considered in the evaluation of the proposal.

The volumes are limited to single-spaced typewritten pages using no smaller than 10-point proportional font (Times New Roman) or equivalent as the "normal" size standards. No “condensed” fonts shall be utilized. All text shall be legible and easily read. Font size in tables, charts, graphs and figures shall be no smaller than 10-pt, regardless of font used. Page limitations are per factor, for example, an Offeror may not reduce the page count for one factor in order to submit additional pages for another factor.

3.3. Page Size: Unless otherwise stated, a “page” is defined as being one side of an 8.5” x 11” sheet of paper.

Margins on all four edges of each sheet shall be at least one-half (0.5) inch regardless of paper size. Margins shall be free and clear of any text except for proprietary statements, security markings and page numbers which may fall within the defined margin area. RFP number and company name of Offeror may also be included within the margins. Legible tables, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layouts, implementation schedules, plans, etc. If an offeror utilizes an 11”x 17” page, it shall count and be numbered as two (2) pages,

4.0. Volume Content. Proposals submitted in response to this RFP shall consist of the contents required in the subparagraphs described below:

4.1. Volume 1, Factor 1 – Past Performance (Confidence Assessment of Previous Projects).

4.1.1. A project is defined as: Work performed pursuant to one specific task order of an indefinite delivery/indefinite quantity (IDIQ) type contract or a single stand-alone “C” type contract which has one specific past performance evaluation in CPARS or via completion of a PPQ. Multiple ID/IQ task orders combined together does not meet the definition of a “project.” An ID/IQ type contract or the performance of work pursuant to multiple task orders of an ID/IQ type contract does not represent a "project" within this definition. If the offeror provides a specific task order as its "project," it shall provide the base contract number and the task order number for reference purposes. If the offeror provides a single stand-alone “C” type contract as its "project," it shall provide the contract number for reference purposes. Projects must have been completed within the last five (5) years from the initial proposal due date and at a minimum be 90% financially complete.

4.1.2. Presentation of Previous Experience: The Offeror shall submit three (3) examples of completed projects which demonstrate relatable remedial activity experience as described in Section C of this RFP. The projects selected should show diversity in the types of work accomplished by the firm to accomplish the work identified in Section C of this RFP, including, but not limited to, demonstrated experience executing cost reimbursement projects;

demonstrated experience using teaming partners that will be a part of the contract resulting from this RFP;

demonstrated experience using the offeror’s key personnel that will be directly involved in the contract resulting from this RFP, including their role(s) on the previous experience project(s); and demonstrated experience in remedial activity projects, including significant and complex projects with an explanation why the project(s) are considered complex. The Offeror shall also provide the dollar value of the project, any regulatory oversight, and any distinctive and/or unique features of the project.

Projects which include, but are not limited to, architectural-engineering (A-E) design (AMD 01) services and Advisory and Assistance Services (AAS) support services (AMD 01) are not considered relevant to the Section C, Performance Work Statement.

The Offeror may include both federal government and commercial work. The Offeror must have been the Prime Contractor, or Joint Venture partner on the project. (AMD 02) The Offeror may also use past performance of its first-tier small business subcontractor(s) specifically named in the proposal to the Government responding to this solicitation. Please note that the first-tier small business subcontractor is not the Offeror. (AMD 02) The Offeror shall also describe its primary role/duties in execution of the work (for example, the major components of the project which were completed by the prime’s staff/personnel and major components which were subcontracted out).

Project #1 Remedial Action Construction Project. The Remedial Action project shall each have a minimum contract value equal to or greater than $4,000,000 executed by the offeror with successful outcomes. The projects shall demonstrate the successful performance of a remedial action construction project executed under CERCLA or RCRA authorities.

Project #2 MMRP Project The MMRP project shall demonstrate the Offeror’s capability to successfully perform a complex MMRP project of the type described in Section C of this RFP.

Project #3 ERS Project The selected ERS project shall demonstrate the Offeror’s capability to successfully perform a complex ERS project of the type described in Section C of this RFP.

At least two of the projects submitted shall be for the Federal government.

At least one of the projects submitted shall be cost reimbursement.

Please note that a Time and Materials or a Labor Hour contract is not a cost reimbursement contract.

4.1.3. Information on Previous Experience. The following information shall be included as a minimum in the presentation of previous experience for all projects:

• Project #: Name of project and location (City and State, or Military Installation Name and State, if appropriate)

• General project narrative as described in bullet 15 below.

• List of key personnel and their role on this project. The offeror should indicate which of the key personnel are currently employed by the firm or if they are employed by a subcontractor or teaming partner.

• Project performance issues. Examples include cost/schedule, health and safety issues, regulatory/stakeholder issues and other performance issues and how those issues were resolved.

• Contract Information/Contract Schedule shall include: the outlined information

1. Customer (agency, military branch, state, city, etc.)

2. RFP Number (AMD 01) Explanation of the relationship between the project and the offeror. (AMD 01)

3. Contract and (if applicable) task order number, at award

4. Contract/task order title

5. Contract/task order award date

6. Notice To Proceed (NTP) date (if applicable)

7. Project completion date

8. Project duration (days)

9. Contract/task Order cost at award

10. Final Contract/task order cost to the Government/Customer

11. Location of work (City/Installation, State, Territory, Commonwealth, etc.)

12. Individual Point of contact for the customer/client.

a. Name

b. Title

c. Role (Contracting Officer, Program Manager, etc.)

d. Mailing address

e. Phone number (work)

f. Email address

13. Name of Company awarded the contract. If this differs from the company name of the Offeror for this RFP, explain why (for example, if the current Offeror was then a member of a Joint Venture working under a different company name).

14. Affirmatively state that your firm was the Prime Contractor (either singly or as part of a Joint Venture) for the project

15. Description of the work performed. Issues related to time, scope, or cost encountered and how they were resolved along with any major accomplishments shall described.

• The Offeror is responsible for providing current contact information for the individual listed. The

Government has the option to contact this individual directly to verify past performance.

• Regulatory Involvement. In order to evaluate the offeror’s ability to create and maintain a cooperative working environment with State and/or US Environmental Protection Agency (USEPA) regulators , the offeror should provide information, which demonstrates experience with submitting accurate and timely reporting/regulatory submittals in accordance with regulatory requirements. Offeror shall include, at the minimum:

a. Regulators Name, organization, and contract contact (AMD 01) information

b. Regulatory program (Hazardous Waste & Materials, Title V, National Historic Preservation Act, Endangered Species Act, or other regulatory driver)

• Effective resolution of regulatory issues, expediting regulatory closure, or other information demonstrating ability to work constructively with the regulatory community.

4.1.4. Disclosure of Termination of Default, Notice of Violations, and/or OSHA Violation -Explanation of violation and correction action(s). Provide this information if the default action or violation occurred within the last 5 years of the date of the initial proposal due dure (AMD 01) date.

4.2. Volume 1, Factor 2 – Organization Chart/Technical Management Approach (AMD 01). The Offeror shall provide an organizational chart/technical management (AMD 02) approach that demonstrate the effectiveness of the Offeror’s organizational structure and management approach to adequately perform the requirements of the RFP. The Government seeks a structure and approach that will demonstrate effective project execution and efficient management of cost reimbursement task orders.

4.2.1 The Offeror shall provide an organizational chart with a separate related narrative. Together, the organizational chart and narrative shall describe:

The Offeror’s proposed organizational structure shall be presented in a chart, including key teaming partners/subcontractors and organizational relationships. This organizational structure should be compliant with Section C. Identify personnel necessary for program and project execution and their place in the organization hierarchy (for example Program Manager, Program Chemist, Contractor Quality Control Supervisor, Safety and Health Manager, Senior Contracts Manager, Project Manager(s), Site Superintendent/Construction Manager, Site Safety and Health Officer(s), and Cost Tracker(s), etc.)

The narrative shall describe the levels of authority and communication, both internally and with the Government, that illustrates who will conduct, direct, supervise and control the project. Roles and responsibilities in the management of the contract shall also be clearly described.

4.2.2. The Offeror shall provide a narrative explanation how its organizational technical management approach will ensure successful performance for awarded task orders. At a minimum, the narrative explanation shall address the three areas listed in the table below:

• Contract and Task Order Administration (to include Subcontractor oversight and related contract compliance)

• Cost reimbursement contract oversight/cost control

• Safety, to include compliance with EM 385-1-1 (when construction activities are included in the task order)

4.2.3. If the offeror intends to rely upon experience and past performance of its first-tier small business subcontractor(s), it must submit a written formal team arrangement as described in paragraph 5.5.1. In addition, the offeror must fully explain the relationship by detailing the specific capabilities the first-tier small business subcontract(s) it intends to use for the anticipated contract, the relationship that exists between the offeror and the first-tier small business subcontract(s), and how that relationship will be managed to the benefit of the Government.

(AMD 01)

4.4. Volume 1, Factor 3 - Resumes of Key Management Personnel. The Offeror shall provide the resumes of the key management personnel, as identified in this Section L table above. Specifically, provide a resume for the following personnel:

• Program Manager (Resume #1)

• Program Chemist (Resume #2)

• Contractor Quality Control Supervisor (Resume #3)

• Safety and Health Manager (Resume #4)

• Senior Contracts Manager (Resume #5)

The resumes should clearly display proposed job title, education and training, special qualifications and experience record (including role, duties, and dates), responsibilities and assignments. The resume(s) shall provide sufficient information to demonstrate that the key management person meets the minimum qualifications identified in Section C, paragraph 6. A recommended resume template is included in Section J. Arrange resumes in proposal in the order listed in this RFP.

NOTE: After contract award, the Contracting Officer shall approve replacement of any key personnel after verifying that they meet or exceed the requirements of the RFP.

Note: Resumes of other personnel (for example, project manager, engineers, field and technical staff, etc.) may be required as part of task order proposals to verify that they meet the qualifications of the RFP specified in Section C.

5. Volume II – Cost/Price Information and Representations, Certifications, and Other Statements of Offerors

5.1 Volume II, Tab 1: SF 33, Solicitation, Offer, and Award (Section A).

The Offeror shall complete, in its entirety, all of Section A (SF 33) that applies to the Offeror. The SF 33 shall be signed and dated by an official with the authority to legally bind the company. The Offeror shall also acknowledge all amendments to the RFP in accordance with the instructions on the SF 30, if applicable.

5.2 Volume II, Tab 2: Representations, Certifications and Other Statements of Offerors (Section K).

The Offeror shall fill out in its entirety all of Section K that applies to the Offeror. The Offeror’s responsibility will be reviewed in accordance with FAR Part 9. Annual Representations and Certifications will be obtained through the System for Award Management (SAM.gov) site for contractors who have previously worked with the Government. All Offerors who do not have previous Government experience or are not registered in SAM must submit the information in accordance with FAR clause 52.204-8, Annual Representations and Certifications.

5.3 Volume II, Tab 3: Binding Maximum Hourly Labor Rate Schedule (Section B), Maximum Indirect Rate Schedule, Maximum Profit, and Maximum Fixed Fee

5.3.1 Binding Maximum Hourly Labor Rate Schedule.

The Offeror shall complete the Binding Maximum Hourly Labor Rate Schedule (Section B) in its entirety.

The Offeror shall propose the hourly unburdened and burdened rates for all of the labor categories identified in the Binding Maximum Hourly Labor Rate Schedule. Failure to do so may result in an Offeror being excluded from consideration for award. However, if the proposed rate for a certain labor discipline in Table 1 is included in an Offeror’s overhead rates as part of the Offeror’s standard accounting system, the Offeror shall enter “Not Applicable” and include an explanation below the table regarding how that discipline’s labor rate is accounted for under the Offeror’s standard accounting practices.

Offerors shall…