This document appears to be technical drawings and profiles related to a federal contract opportunity for the Construct Emergency Power Plant Fuel Storage project at Cavalier Space Force Station in North Dakota.

The drawings provide an overview utility plan, utility profiles, and detailed sheet notes for the construction of the 360,000-gallon fuel storage farm, utility infrastructure, exterior communications, and site preparation. Key details include the location and depth of existing utilities, requirements for contractor coordination and advance notice, and instructions for excavation near existing utilities. The contract opportunity is an unrestricted solicitation open to both large and small businesses under NAICS code 237120. The project will comply with DoD antiterrorism/force protection requirements and DoD, Air Force, and base design standards. Offerors must be registered in the SAM database prior to submitting an offer.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

V

V

E

E

E

E

E

TP

TP

ELEC

ELEC

W

W

W

W

W

W

CSFS 22-06

CSFS 22-05

CSFS 22-07

CSFS 22-03

CSFS 22-04

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

W W

W

WWWWWWW

W W

W W

W W

W

W W

W W

WW

W W

W W

W W

W

W

W

W

W

W

W

W

W

W W

FOS

FOS

FOS

FOS

FOS

FOS

FOS

FOS

N

N

N

N

N

N

N

N

N

FO

S

FO

S

FO

S

N N

FO

S

FO

S

N N

N

FOS

W 0+

0+

.7

POB: 0+00.00

POE: 0+21.75

W 0+

0+

.2

POB: 0+00.00

POE: 0+22.20

W 0+000+16.48

PO

B:

+0

0.

PO

E:

+1

6.

W

0+

0+

.5

POB: 0+00.00

POE: 0+17.59

50.00' - EXTERIOR

DOOR

ACCESS ARC

300.00' - PROPOSED FIRE

HYDRANT COVERAGE ARC

300.00' - EXISTING FIRE HYDRANT COVERAGE ARC

0.

- P R

O

PO

SE

D

F

IR

E H

YD

R

AN

T

C O

VE

R

AG

E

AR

C

M

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

N D

C

U

0.

dw g

S.

T

AY

LO

R

M . R

EI

N

IG

M . R

EI

N

IG

M . R

EI

N

IG

O

VE

R

VI

EW

U

TI

LI

TY

P

LA

N

SI

TE

D

ES

IG

N

CU100

\\N W

O

FP

C

AD

D

\A

EC

_W S\

N W

O _A

EC

_D

W G

_P R

O

JE

C

TS

\E N

G

LI

SH

\N

D

\P

LA

N S

ET

S\

_M

O D

EL

S\

C

IV

IL

D \N

D

C U

0.

D W

G 4:

:5

PM

/2

2/

AE

C _B

&W .S

TB

G

6O D

XD

D

C

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E.

O M

AH

A, N E

AP

R

IL

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

AN

SI

D

W

F2

4R

C

AV

AL

IE

R S

PA

C

E

FO

R C

E

ST

AT

IO

N , N

D

EM

ER

G

EN

C

Y

PO

W

ER

P

LA

N T

FU

EL

S

TO

R

AG

E

PN

E G

YN

AD

VE

R

TI

SE

M

EN

T

SHEET KEYNOTES

GENERAL SHEET NOTES

1. FIRE HYDRANT ASSEMBLY; SEE DETAIL A4 ON SHEET CU501, DONE BY BASE

UTILITIES.

2. HOT TAP EXISTING 8" WATER MAIN WITH 8"x8"x6" TAPPING SLEEVE AND

VALVE, DONE BY BASE UTILITIES.

3. DOMESTIC WATER LINE CONNECTION TO BUILDING; SEE PLUMBING SHEET

MP101 FOR CONTINUATION.

4. FIRE WATER LINE CONNECTION TO BUILDING; SEE FIRE SUPPRESSION PLAN

ON SHEET FX101 FOR CONTINUATION.

5. DOMESTIC WATER LINE 1, DONE BY BASE UTILITIES.

6. FIRE WATER LINE 1, DONE BY BASE UTILITIES;

7. HYDRANT LINE 1, DONE BY BASE UTILITIES;

8. HYDRANT LINE 2, DONE BY BASE UTILITIES;

9. EXISTING 8" WATER MAIN

10. 3

4" CORP. STOP AND SERVICE SADDLE, DONE BY BASE UTILITIES.

11. FIRE SERVICE POST INDICATOR VALVE (PIV), DONE BY BASE UTILITIES.

12. 3

4" SERVICE STOP AND BOX, DONE BY BASE UTILITIES.

13. WATER SERVICE LINE TO BLDG 805

1. BASE UTILITIES WILL PROVIDE ALL WORK ON THE WATER SYSTEM UP TO 5

FEET FROM THE BUILDING, SEE CLIN SCHEDULE FOR BASE UTILITY POC TO

OBTAIN PRICING.

2. CONTRACTOR SHALL POTHOLE AND VERIFY THE LOCATION AND DEPTH OF

EXISTING UTILITIES WITHIN IN THE AREA ASSOCIATED WITH THE WORK TO

BE PERFORMED AND LOCATE ALL UTILITY POINTS OF CONNECTION PRIOR

TO THE START OF CONSTRUCTION.

3. CONTRACTOR SHALL COORDINATE AND PROVIDE ADVANCE NOTICE TO THE

COR PRIOR TO ANY DISRUPTION OF SERVICE.

4. EXCAVATION NEAR EXISTING UTILITIES SHALL BE PERFORMED BY HAND.

EXISTING UTILITIES THAT ARE DAMAGED SHALL BE REPAIRED IMMEDIATELY

UNDER THE UTILITY OWNER'S DIRECTION AND AT THE CONTRACTOR'S

EXPENSE.

5. PROVIDE PIPE BEDDING AND BACKFILL IN ACCORDANCE WITH THE DETAILS

ON SHEET CG501.

6. SEE SPECIFICATION SECTION 33 11 00 FOR ADDITIONAL REQUIREMENTS.

A1 SITE DESIGN - UTILITY PLAN - OVERVIEW

SCALE: 1"=20' 20' 40'0

PLAN

NORTH

1 8

9 10

R

EV

IS

ED

IN

A

C C

O R

D

AN

C E

W

IT

H A

M

EN

D M

EN

T

-0+20 0+00 0+20 0+40

8' M

IN

. C

O

VE

R

8' M

IN

. C

O

VE

R

ST

A.

+0

0.

ST

A.

+2

1.

-0+20 0+00 0+20

8.

5'

M

IN

. C O

VE

R

8.

5'

M

IN

. C O

VE

R

-0+20 0+00 0+20

8.

5'

M

IN

. C O

VE

R

8.

5'

M

IN

. C O

VE

R

-0+20 0+00 0+20 0+40

8.

5'

M

IN

. C O

VE

R

8.

5'

M

IN

. C O

VE

R

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

N D

C

U

0.

dw g

S.

T

AY

LO

R

M . R

EI

N

IG

M . R

EI

N

IG

M . R

EI

N

IG

U

TI

LI

TY

P

R O

FI

LE

S

SI

TE

D

ES

IG

N

CU200

\\N W

O

FP

C

AD

D

\A

EC

_W S\

N W

O _A

EC

_D

W G

_P R

O

JE

C

TS

\E N

G

LI

SH

\N

D

\P

LA

N S

ET

S\

_M

O D

EL

S\

C

IV

IL

D \N

D

C U

0.

D W

G 4:

:0

PM

/2

2/

AE

C _B

&W .S

TB

G

6O D

XD

D

C

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E.

O M

AH

A, N E

AP

R

IL

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

AN

SI

D

W

F2

4R

C

AV

AL

IE

R S

PA

C

E

FO

R C

E

ST

AT

IO

N , N

D

EM

ER

G

EN

C

Y

PO

W

ER

P

LA

N T

FU

EL

S

TO

R

AG

E

PN

E G

YN

AD

VE

R

TI

SE

M

EN

T

GENERAL SHEET NOTES

1. PROFILES ARE FOR INFORMATION ONLY.

2. CONTRACTOR SHALL POTHOLE AND VERIFY THE LOCATION AND DEPTH OF

EXISTING UTILITIES WITHIN THE AREA ASSOCIATED WITH THE WORK TO BE

PERFORMED AND LOCATE ALL UTILITY POINTS OF CONNECTION PRIOR TO

THE START OF CONSTRUCTION.

3. CONTRACTOR SHALL COORDINATE AND PROVIDE ADVANCE NOTICE TO THE

COR PRIOR TO ANY DISRUPTION OF SERVICE.

4. EXCAVATIONS NEAR EXISTING UTILITIES SHALL BE PERFORMED BY HAND.

EXISTING UTILITIES THAT ARE DAMAGED SHALL BE REPAIRED IMMEDIATELY

UNDER THE UTILITY OWNER'S DIRECTION AND AT THE CONTRACTOR'S

EXPENSE.

J1 PROFILE VIEW - DOMESTIC WATER LINE

SCALE: H 1" = 20'; V 1" =5';

B1 PROFILE VIEW - FIRE HYDRANT LINE 1

SCALE: H 1" = 20'; V 1" =5'; B7 PROFILE VIEW - FIRE HYDRANT LINE 2

SCALE: H 1" = 20'; V 1" =5';

J7 PROFILE VIEW - FIREWATER SERVICE LINE

SCALE: H 1" = 20'; V 1" =5';5' 10'0

20' 40'0

5' 10'0

20' 40'0

5' 10'0

20' 40'0

5' 10'0

20' 40'0

PROPOSED

GRADE

EXISTING GRADE

CONNECT

TO EXISTING

8" WATER LINE

4" PVC WATER SERVICE

CONNECT

TO EXISTING

8" WATER LINE

6" WATER LINE

PROPOSED

GRADE

EXISTING GRADE

6" WATER LINE

CONNECT TO

EXISTING 8"

WATER LINE

EXISTING

GRADE

CONNECT TO

EXISTING 8"

WATER LINE

6" WATER LINE

PROPOSED GRADE

EXISTING GRADE

R

EV

IS

ED

IN

A

C C

O R

D

AN

C E

W

IT

H A

M

EN

D M

EN

T

ND45CU100
Sheets and Views
ND45CU100
Sheet 1
ND45CU200
Sheets and Views
ND45CU200
Sheet 1
ND45CU501
ND45MS505

File details come from the government source that posted it. Updated .