W9128F24R0004_Amd 0003_Specifications.pdf
PDF 941 KB Posted
- Attached to
- Construct Emergency Power Plant Fuel Storage, Cavalier SFS, ND Federal contract opportunity
- Solicitation number
- W9128F24R0004
About this file
This document is a Request for Proposal (RFP) for the construction of a 360,000-gallon fuel storage farm to operate an emergency power plant for the Perimeter Acquisition Radar Attack Characterization System (PARCS) at Cavalier Space Force Station in North Dakota. The project includes utility infrastructure, exterior communications, and site preparation, and must comply with DoD antiterrorism/force protection requirements as well as all applicable DoD, Air Force, and base design standards. The RFP is an unrestricted solicitation open to both large and small businesses, and the acquisition approach will be a Best Value Tradeoff using FAR Part 15 procedures. Key details include a site visit, NAICS code 237120, and a requirement for contractors to be registered and have an active account in the System for Award Management (SAM) prior to contract award. The solicitation documents will be posted to SAM.gov and interested offerors should direct any procurement questions to the Contracting Specialist.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Emergency Power Plant Fuel Storage ND45
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 29
SUSTAINABILITY REQUIREMENTS AND REPORTING
02/21
PART 1 GENERAL
1.1 REFERENCES
1.2 SUMMARY
1.3 SUBMITTALS
1.4 GUIDING PRINCIPLES VALIDATION (GPV)
1.4.1 Sustainability Action Plan
1.4.2 Calculations
1.5 SUSTAINABILITY SUBMITTALS
1.5.1 High Performance Sustainable Building (HPSB) Checklist(s)
1.5.1.1 HPSB Checklist Submittals
1.6 DOCUMENTATION REQUIREMENTS
1.6.1 Integrated Design Process
1.6.2 Energy Efficient Products
1.6.3 Building-level Power Metering
1.6.3.1 Construction Submittal Documentation
1.6.4 Indoor Water Use
1.6.5 Indoor Water Metering
1.6.5.1 Construction Submittal Documentation
1.6.6 Moisture Control
1.6.6.1 Construction Submittal Documentation
1.6.7 Reduce Volatile Organic Compounds (VOC) (Low-Emitting
Materials)
1.6.8 Indoor Air Quality During Construction
1.6.9 Recycled Content
1.6.9.1 Construction Submittal Documentation
1.6.10 Bio-Based Products
1.6.11 Waste Material Management (Recycling – Construction)
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 SUSTAINABILITY COORDINATION
3.2 TABLE 3-1 VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING
MATERIALS) REQUIREMENTS
-- End of Section Table of Contents --
SECTION 01 33 29 Page 1
Am_0003
SECTION 01 33 29
SUSTAINABILITY REQUIREMENTS AND REPORTING
02/21
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
COUNCIL ON ENVIRONMENTAL QUALITY (CEQ) (WHITE HOUSE)
HPSB Guiding Principles (2016) Guiding Principles for Sustainable Federal Buildings and Determining Compliance with the Guiding Principles for Sustainable Federal Buildings
INTERNATIONAL CODE COUNCIL (ICC)
ICC IgCC (2018) International Green Construction Code
U.S. DEPARTMENT OF AGRICULTURE (USDA)
FSRIA 9002 Farm Security and Rural Investment Act Section 9002 (USDA BioPreferred Program)
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 1-200-02 (2020; with Change 1, 2020; Change 2, 2022) High Performance and Sustainable Building Requirements
UFC 3-600-01 Fire Protection Engineering for Facilities
U.S. DEPARTMENT OF ENERGY (DOE)
Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials
1.2 SUMMARY
This section includes requirements for Sustainability documentation and reporting submittals per the federally mandated High Performance and Sustainable Building (HPSB) or HPSB "Guiding Principles" (GP),in accordance with UFC 1-200-02 High Performance and Sustainable Building Requirements, and other identified requirements. This project is not required to be LEED Certified.
SECTION 01 33 29 Page 2
1.3 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for information only.
When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Preliminary High Performance and Sustainable Building Checklist; G
Sustainability Action Plan; G
SD-05 Design Data
Final Design High Performance and Sustainable Building Checklist;
G-DO
SD-11 Closeout Submittals
Final High Performance and Sustainable Building Checklist; G-DO
Amended Final High Performance and Sustainable Building Checklist;
G-DO
1.4 GUIDING PRINCIPLES VALIDATION (GPV)
Provide the following sustainability activities and documentation to verify achievement of HPSB Guiding Principles Validation (GPV):
a. Analysis of each Guiding Principle Requirement and how project complies. Include final government approved narrative(s) in the HPSB Checklist submittal.
b. No changes to the HPSB Checklist are allowed without approval from the Contracting Officer, in accordance with Section 01 33 00 SUBMITTAL REQUIREMENTS. Immediately bring to the attention of the Contracting Officer any project changes that impact meeting the approved HPSB Guiding Principles Requirements for this project. Demonstrate the change will not increase the life-cycle cost and maintains or improves the building performance.
c. Documentation of all work required to incorporate the applicable HPSB Guiding Principles requirements indicated on the HPSB Checklist and in this contract.
d. Sustainability Action Plan.
e. Construction related documentation for the project and keep updated with regularly-scheduled Construction Quality Control Meetings.
Include construction related documentation containing the following components:
(1) HPSB Checklist(s)
SECTION 01 33 29 Page 3
(2) Sustainability Action Plan
(3) Documentation illustrating HPSB Guiding Principles Requirements compliance.
1.4.1 Sustainability Action Plan
Include the following information in the Sustainability Action Plan:
a. Analysis of each HPSB Guiding Principles Requirement and how project will comply. Final government approved narrative(s) must be included in the HPSB Checklist submittal.
b. Name and contact information for: Contractor's Point of Contact (POC) ensuring sustainability goals are accomplished and documentation is assembled. s.
c. Indoor Air Quality plan.
1.4.2 Calculations
Provide all calculations, product data, labels and product certifications required in this specification to demonstrate compliance with the HPSB Guiding Principles Requirements.
1.5 SUSTAINABILITY SUBMITTALS
Provide HPSB Checklist and other documentation to indicate compliance with the sustainability requirements of the project.
1.5.1 High Performance Sustainable Building (HPSB) Checklist(s)
Provide construction documentation that provides proof of, and supports compliance with, the completed HPSB Checklist.
1.5.1.1 HPSB Checklist Submittals
Submit Preliminary High Performance and Sustainable Building Checklist, Final Design High Performance and Sustainable Building Checklist, and updated Amended Final High Performance and Sustainable Building Checklist with submittal identified herein. Include the amended final HPSB Checklist(s) with the interim DD1354 Real Property Record Submittal.
1.6 DOCUMENTATION REQUIREMENTS
a. Incorporate each of the following HPSB Guiding Principles requirements into project and provide documentation that proves compliance with each listed requirement. Items below are organized by HPSB Guiding Principles . For life-cycle cost analysis requirements, one document with all analyses is acceptable, with Contracting Officer approval.
b. For each of the following paragraphs that require the use of products listed on Government-required websites, provide documentation of the process used to select products, or process used to determine why listed products do not meet project performance requirements.
SECTION 01 33 29 Page 4
1.6.1 Integrated Design Process
For the submittal documentation below, demonstrate compliance with
UFC 1-200-02 .
1.6.2 Energy Efficient Products
Provide only energy-using products that are Energy Star rated or have Federal Energy Management Program (FEMP) recommended efficiency. Where Energy Star or FEMP recommendations have not been established, provide most efficient products that are life-cycle cost-effective. Provide only energy using products that meet FEMP requirements for low standby power consumption. Energy efficient products can be found at:
https://www.energy.gov/eere/femp/federal-energy-management-program and http://www.energystar.gov/ .
For construction submittal documentation, provide proof that product is labeled energy efficient and complies with the cited requirements.
1.6.3 Building-level Power Metering
Provide building-level meters for electricity, natural gas, and steam where applicable.
1.6.3.1 Construction Submittal Documentation
Provide manufacturer's data validating compatibility with base-wide system and component advanced meter requirements.
1.6.4 Indoor Water Use
Provide Construction Documentation proof that fixtures are labeled EPA WaterSense, for products available with EPA WaterSense labeling; for all other fixtures, proof they comply with EPA WaterSense efficiency requirements.
1.6.5 Indoor Water Metering
Provide building-level meters for potable water use. Provide the requirements cited in the following paragraphs:
1.6.5.1 Construction Submittal Documentation
Provide manufacturer's data validating compatibility with base-wide system and component advanced meter requirements.
1.6.6 Moisture Control
Provide the following:
1.6.6.1 Construction Submittal Documentation
Ensure construction materials are separated and protected in accordance with other sections in this contract document, with adequate humidity controls during construction. In accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA, includes plan for ongoing building moisture control.
Coordinate with the moisture control requirements of Section 01 45 00.00 10
SECTION 01 33 29 Page 5
QUALITY CONTROL.
1.6.7 Reduce Volatile Organic Compounds (VOC) (Low-Emitting Materials)
Meet the requirements of Table 3-1 at the end of this specification.
For Construction submittal documentation, provide certifications or labels that demonstrate compliance with cited requirements, based on the attached
TABLE 3-1.
1.6.8 Indoor Air Quality During Construction
Prior to construction, create indoor air quality plan. Develop and implement an IAQ construction management plan during construction and flush building air before occupancy.
For new construction , meet the requirements of ICC IgCC 1001.3.1.5 (10.3.1.4) Indoor Air Quality (IAQ) Construction Management.
Provide documentation showing that after construction ends and prior to occupancy, HVAC filters were replaced and buildingarea air was flushed out in accordance with the cited standard.
1.6.9 Recycled Content
Comply with 40 CFR 247 . Refer to:
https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for assistance identifying products cited in 40 CFR 247 . Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation and must meet performance requirements.
1.6.9.1 Construction Submittal Documentation
a. Provide manufacturers' documents stating the recycled content by material, or written justification for claiming one of the exceptions allowed on the cited website.
b. Substitutions: Submit for Government approval for proposed alternative products or systems that provide equivalent performance and appearance and have greater contribution to project recycled content requirements. For all such proposed substitutions, submit with the Sustainability Action Plan accompanied by product data demonstrating equivalence.
1.6.10 Bio-Based Products
Provide products and materials composed of the highest percentage of bio-based materials (including rapidly renewable resources and certified sustainably harvested products), consistent with FSRIA 9002 USDA BioPreferred Program, to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user and when available at a reasonable cost. Use only supplies and materials of a type and quality that conform to applicable specifications and standards.
Comply with FSRIA 9002 USDA BioPreferred Program. Refer to www.biopreferred.gov for the product categories and BioPreferred Catalog.
Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation and must meet performance requirements.
SECTION 01 33 29 Page 6
Provide the following documentation:
a. USDA BioPreferred label for each product; for bio-based products used on project but not listed with BioPreferred program, provide bio-based content and percentage.
1.6.11 Waste Material Management (Recycling – Construction)
Divert demolition and construction debris in accordance with Section
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 SUSTAINABILITY COORDINATION
Provide sustainability focus and coordination at all meetings to achieve sustainability goals. Coordinate meeting requirements with other UFGS Sections meeting requirements in this project. Ensure the designated sustainability professional responsible for GP documentation participates in these meetings to coordinate documentation completion. Review GP sustainability requirements, HPSB Checklist(s) documentation, and Sustainability Action Plan at the following meetings:
a. Pre-Construction Conference
b. Construction Quality Control Meetings
c. Facility Turnover Meetings
Conduct review no later than 60 days before final turnover and identify any outstanding issues that affect correct completion of all documentation, and actions that will achieve requirements. Conduct corrective actions prior to turnover, to ensure all requirements are achieved.
SECTION 01 33 29 Page 7
3.2 TABLE 3-1 VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING MATERIALS)
REQUIREMENTS
TABLE 3-1 Volatile Organic Compounds (VOC) (Low Emitting Materials) Requirements
Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)
MATERIAL CATEGORY EMISSIONS
REQUIREMENT
MATERIALS WITH
ADDED VOC
REQUIREMENT
EMISSIONS
REQUIREMENTS
Adhesives and Sealants
CDPH/EHLB/Standard method V1.1 (C alifornia Section 01350) (Use "office" or "classroom" space limits fo r all applications) or Adhesives (carpet , resilient, wood flooring; base cove; ceramic tile; drywall and panel; primers) Seala nts (acoustical;
firestop; HVAC Air duct; primers) Caulks
SCAQMD Rule 1168 (Use "other" category for HVAC duc t sealant) (for firestop adhesive, UFC 3-600-01 overrides conflicting requirements)
Aerosol adhesives Section 3 of Green Seal Standard GS-36 (except:
cleaners, solvent cements, and primer s used with plastic piping and conduit in plumbing, fire suppression, and electrical systems; HVAC air duct sealants when the applicatio n space air temp is less than 40 F (4.5 C).
SECTION 01 33 29 Page 8
TABLE 3-1 Volatile Organic Compounds (VOC) (Low Emitting Materials) Requirements
Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)
MATERIAL CATEGORY EMISSIONS
REQUIREMENT
MATERIALS WITH
ADDED VOC
REQUIREMENT
EMISSIONS
REQUIREMENTS
Paints and Coatings
CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom " space limits for all applications) or Flat and nonflat, nonflat high-gloss, specialty, basement specialty, fire-resistive, floor, low-solids, rust preventat ive, wood, reflective wall coatings;
concrete/mason ry sealers; primers;
sealers;
unde rcoaters;
shellacs (clear and opaque);
stains;
varn ishes;
conjugated oil varnish; lac quer;
clear brushing lacquer
Green Seal Standard GS-11
SECTION 01 33 29 Page 9
Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)
MATERIAL CATEGORY EMISSIONS
REQUIREMENT
MATERIALS WITH
ADDED VOC
REQUIREMENT
EMISSIONS
REQUIREMENTS
Paints and Coatings
CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom " space limits for all applications) or Concrete curing compounds; dry fog, faux finishing , graphic arts (sign paints), indu strial maintenance, mastic texture, metallic pigmen ted, multicolor, recycled coatings;
pretreatment wash primers, react ive penetrating sealers;
specialty primers, wood preservatives, and zinc primers
California Air Resources Board (CARB) Suggested Control Measure for Architectural Coatings or SCAQMD Rule 1113r
Paints and Coati ngs
CDPH/EHLB/Standard method V1.1 (C alifornia Section 01350) (Use "office" or "classroom" space limits for all application s) or High-temperature coatings; stone consolidants;
swimming-pool coatings; tub-and tile -refining coatings; and waterproofing membranes
California Air Resources Board (CARB) Suggested Control Measure for Architectural Coatings
SECTION 01 33 29 Page 10
Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)
MATERIAL CATEGORY EMISSIONS
REQUIREMENT
MATERIALS WITH
ADDED VOC
REQUIREMENT
EMISSIONS
REQUIREMENTS
Insulation CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "offi ce" or "classroom" space limits for all application s) none none
SECTION 01 33 29 Page 11
Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)
MATERIAL CATEGORY EMISSIONS
REQUIREMENT
MATERIALS WITH
ADDED VOC
REQUIREMENT
EMISSIONS
REQUIREMENTS
or none CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office " or "classroom" space limits for all applications) (except:
Structural panel componen ts such as plywood, particle board, wafer board, an d oriented strand board identified as "EXPOSURE 1," "EXTERIOR," or
"HUD-APPROVED"
are considered acceptable for interior use.)
none none
SECTION 01 33 29 Page 12
Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)
MATERIAL CATEGORY EMISSIONS
REQUIREMENT
MATERIALS WITH
ADDED VOC
REQUIREMENT
EMISSIONS
REQUIREMENTS
-- End of Section --
SECTION 01 33 29 Page 13
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 41 00
DEMOLITION
08/22
PART 1 GENERAL
1.1 REFERENCES
1.2 PROJECT DESCRIPTION
1.2.1 Definitions
1.2.1.1 Demolition
1.2.1.2 Deconstruction
1.2.1.3 Demolition Plan
1.2.1.4 Deconstruction Plan
1.2.2 Demolition Plan
1.2.3 General Requirements
1.3 ITEMS TO REMAIN IN PLACE
1.3.1 Existing Construction Limits and Protection
1.3.2 Weather Protection
1.3.3 Trees
1.3.4 Utility Service
1.3.5 Facilities
1.4 BURNING
1.5 AVAILABILITY OF WORK AREAS
1.6 SUBMITTALS
1.7 QUALITY ASSURANCE
1.7.1 Dust and Debris Control
1.8 PROTECTION
1.8.1 Traffic Control Signs
1.8.2 Protection of Personnel
1.9 FOREIGN OBJECT DAMAGE (FOD)
1.10 RELOCATIONS
1.11 EXISTING CONDITIONS
PART 2 PRODUCTS
2.1 FILL MATERIAL
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
3.1.1 Structures
3.1.2 Utilities and Related Equipment
3.1.2.1 General Requirements
3.1.2.2 Disconnecting Existing Utilities
3.1.3 Chain Link Fencing
3.1.4 Paving and Slabs
3.1.5 Concrete
3.1.6 Miscellaneous Metal
3.2 CONCURRENT EARTH-MOVING OPERATIONS
3.3 DISPOSITION OF MATERIAL
SECTION 02 41 00 Page 1
3.3.1 Title to Materials
3.3.2 Disposal of Ozone Depleting Substance (ODS)
3.3.2.1 Special Instructions
3.3.2.2 Fire Suppression Containers
3.3.3 Transportation Guidance
3.4 CLEANUP
3.5 DISPOSAL OF REMOVED MATERIALS
3.5.1 Regulation of Removed Materials
3.5.2 Burning on Government Property
3.5.3 Removal to Spoil Areas on Government Property
3.5.4 Removal from Government Property
3.6 REUSE OF SALVAGED ITEMS
-- End of Section Table of Contents --
SECTION 02 41 00 Page 2
SECTION 02 41 00
DEMOLITION
08/22
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
AHRI Guideline K (2009) Guideline for Containers for Recovered Non-Flammable Fluorocarbon Refrigerants
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 145 (1991; R 2012) Standard Specification for Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes
AASHTO T 180 (2017) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop
AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)
ASSP A10.6 (2006) Safety & Health Program Requirements for Demolition Operations - American National Standard for Construction and Demolition Operations
ASTM INTERNATIONAL (ASTM)
ASTM D2487 (2017; E 2020) Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System)
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (20 124) Safety and Health Requirements Manual
U.S. DEFENSE LOGISTICS AGENCY (DLA)
DLA 4145.25 (Jun 2000; Reaffirmed Oct 2010) Storage and Handling of Liquefied and Gaseous Compressed Gases and Their Full and Empty Cylinders;
https://www.dla.mil/Portals/104/Documents/DispositionServices
SECTION 02 41 00 Page 3
/ddsr/docs/cylinderjointpub.pdf
U.S. DEPARTMENT OF DEFENSE (DOD)
DOD 4000.25-1-M (2006) MILSTRIP - Military Standard Requisitioning and Issue Procedures
MIL-STD-129 (2014; Rev R; Change 1 2018; Change 2 2019) Military Marking for Shipment and Storage
U.S. FEDERAL AVIATION ADMINISTRATION (FAA)
FAA AC 70/7460-1 (2016; Rev L; Change 2) Obstruction Marking and Lighting
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 61 National Emission Standards for Hazardous Air Pollutants
40 CFR 82 Protection of Stratospheric Ozone
49 CFR 173.301 Shipment of Compressed Gases in Cylinders and Spherical Pressure Vessels
1.2 PROJECT DESCRIPTION
1.2.1 Definitions
1.2.1.1 Demolition
Demolition is the process of tearing apart and removing any feature of a facility together with any related handling and disposal operations.
1.2.1.2 Deconstruction
Deconstruction is the process of taking apart a facility with the primary goal of preserving the value of all useful building materials.
1.2.1.3 Demolition Plan
Demolition Plan is the planned steps and processes for managing demolition activities and identifying the required sequencing activities and disposal mechanisms.
1.2.1.4 Deconstruction Plan
Deconstruction Plan is the planned steps and processes for dismantling all or portions of a structure or assembly, to include managing sequencing activities, storage, re-installation activities, salvage and disposal mechanisms.
1.2.2 Demolition Plan
Prepare a Demolition Plan and submit proposed demolition and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress and a disconnection
SECTION 02 41 00 Page 4 schedule of utility services and a detailed description of methods and equipment to be used for each operation and of the sequence of operations. Identify components and materials to be salvaged for reuse or recycling with reference to paragraph Existing Facilities to be Removed.
Append tracking forms for all removed materials indicating type, quantities, condition, destination, and end use. Coordinate with Waste Management Plan in accordance with Section 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. Provide procedures for safe conduct of the work in accordance with EM 385-1-1 . Plan must be approved by Contracting Officer prior to work beginning.
1.2.3 General Requirements
Do not begin demolition until authorization is received from the Contracting Officer. The work of this section is to be performed in a manner that maximizes the value derived from the salvage and recycling of materials. Remove rubbish and debris from the project site; do not allow accumulations on airfield pavements.In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1 , Section 23, Demolition, and other applicable Sections.
1.3 ITEMS TO REMAIN IN PLACE
Comply with FAR 52.236-9 to protect existing vegetation, structures, equipment, utilities, and improvements. Coordinate the work of this section with all other work indicated. Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Do not overloadpavements to remain.
Provide new supports and reinforcement for existing construction weakened by demolition, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.
1.3.1 Existing Construction Limits and Protection
Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove snow, dust, dirt, and debris from work areas daily.
1.3.2 Weather Protection
For portions of the building to remain, protect building interior and materials and equipment from the weather at all times. Where removal of existing roofing is necessary to accomplish work, have materials and workmen ready to provide adequate and temporary covering of exposed areas.
1.3.3 Trees
Protect trees within the project site which might be damaged during demolition, and which are indicated to be left in place, by a 6 foot high fence. Erect and secure fence a minimum of 5 feet from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees. Replace any tree designated to remain that is damaged during the work under this contract with like-kind or as approved by the Contracting
SECTION 02 41 00 Page 5
Officer.
1.3.4 Utility Service
Maintain existing utilities indicated to stay in service and protect against damage during demolition operations. Prior to start of work, utilities serving each area of alteration or removal will be shut off by the utility provider and disconnected and sealed by the Contractor.
1.3.5 Facilities
Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished, unless directed otherwise by the Contracting Officer. Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, or demolition work performed under this contract.
1.4 BURNING
The use of burning at the project site for the disposal of refuse and debris will not be permitted. Where burning is permitted, adhere to federal, state, and local regulations.
1.5 AVAILABILITY OF WORK AREAS
Areas in which the work is to be accomplished will be available at contract award.
1.6 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Demolition Plan; G
Existing Conditions
SD-07 Certificates
Notification; G
SD-11 Closeout Submittals
Receipts
1.7 QUALITY ASSURANCE
Submit timely notification of demolition projects to Federal, State, SECTION 02 41 00 Page 6 regional, and local authorities in accordance with 40 CFR 61 , Subpart M.
Notify the local air pollution control district/agency and the Contracting Officer in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61 , Subpart M. Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSP A10.6 . Comply with the Environmental Protection Agency requirements specified. Use of explosives will not be permitted.
1.7.1 Dust and Debris Control
Prevent the spread of dust and debrison airfield pavements and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Sweep pavements as often as necessary to control the spread of debris that may result in foreign object damage potential to aircraft.
1.8 PROTECTION
1.8.1 Traffic Control Signs
a. Where aircraft safety is endangered in the area of removal work, use traffic barricades with flashing lights. Anchor barricades in a manner to prevent displacement by wind, jet or prop blast. Notify the Contracting Officer prior to beginning such work.
Provide a minimum of 2 FAA type L-810 steady burning red obstruction lights on temporary structures (including cranes) over 100 feet, but less than 200 ft, above ground level. The use of LED based obstruction lights are not permitted. For temporary structures (including cranes) over 200 ft above ground level provide obstruction lighting in accordance with FAA AC 70/7460-1 . Perform light construction and installation in compliance with FAA AC 70/7460-1 .
Lights must be operational during periods of reduced visibility, darkness, and as directed by the Contracting Officer. Maintain the temporary services during the period of construction and remove only after permanent services have been installed and tested and are in operation.
1.8.2 Protection of Personnel
Before, during and after the demolition work continuously evaluate the condition of the site specific features being demolished and take immediate action to protect all personnel working in and around the project site. No area, section, or component of floors, roofs, walls, columns, pilasters, or other structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.
1.9 FOREIGN OBJECT DAMAGE (FOD)
Aircraft and aircraft engines are subject to FOD from debris and waste material lying on airfield pavements. Remove all such materials that may appear on operational aircraft pavements due to the Contractor's operations. If necessary, the Contracting Officer may require the Contractor to install a temporary barricade at the Contractor's expense to control the spread of FOD potential debris. Provide a barricade
SECTION 02 41 00 Page 7 consisting of a fence covered with a fabric designed to stop the spread of debris. Anchor the fence and fabric to prevent displacement by winds or jet/prop blasts. Remove barricade when no longer required.
1.10 RELOCATIONS
Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair or replace items to be relocated which are damaged by the Contractor with new undamaged items as approved by the Contracting Officer.
1.11 EXISTING CONDITIONS
Before beginning any demolition work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer or the Contracting Officer's Representative showing the condition of structures and other facilities adjacent to areas of alteration or removal.
Photographs or electronic images with a minimum resolution of 3072 x 2304 pixels, capable of a print resolution of 300 dpi, will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document. Submit survey results to the Contracting Officer or the Contracting Officer's Representative.
PART 2 PRODUCTS
2.1 FILL MATERIAL
a. Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill basements, voids, depressions or excavations resulting from demolition of structures.
b. Provide fill material conforming to the definition of satisfactory soil material as defined in ASTM D2487. In addition, fill material must be free from roots and other organic matter, trash, debris, frozen materials, and stones larger than 2 inches in any dimension.
c. Proposed fill material must be sampled and tested by an approved soil testing laboratory, as follows:
Soil classification AASHTO M 145
Moisture-density relations AASHTO T 180, Method B or D
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
Inspect and evaluate existing structures onsite for reuse. Disassemble existing construction scheduled to be removed for reuse. Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, SECTION 02 41 00 Page 8 remanufacture, recycling, or other disposal, as specified. Designate materials for reuse onsite whenever possible.
3.1.1 Structures
a. Remove existing structures indicated to be removed to full depth.
Remove walls, other than retaining walls and partitions, to full depth below grade or to top of concrete slab on ground. Remove sidewalks, curbs, gutters and street light bases as indicated.
b. Demolish structures in a systematic manner from the top of the structure to the ground. Complete demolition work above each tier before the supporting members on the lower level are disturbed.
Demolish concrete or walls in small sections. Remove structural framing members and lower to ground by means of derricks, platforms hoists, or other suitable methods as approved by the Contracting Officer.
c. Locate demolition equipment throughout the structure and remove materials so as to not impose excessive loads to supporting walls, floors, or framing.
d. Structures, or the remaining portions thereof, not exceeding 80 feet in height may be demolished by the mechanical method of demolition.
3.1.2 Utilities and Related Equipment
3.1.2.1 General Requirements
Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition work until all utility disconnections have been made. Shut off and cap utilities for future use, as indicated.
3.1.2.2 Disconnecting Existing Utilities
Remove existing utilities uncovered by work and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Contracting Officer. When utility lines are encountered but are not indicated on the drawings, notify the Contracting Officer prior to further work in that area. Remove meters and related equipment and deliver to a location in accordance with instructions of the Contracting Officer.
3.1.3 Chain Link Fencing
Remove chain link fencing, gates and other related salvaged items scheduled for removal and transport to designated areas. Remove gates as whole units. Cut chain link fabric to 25 foot lengths and store in rolls off the ground.
3.1.4 Paving and Slabs
Remove sawcut concrete and asphaltic concrete paving and slabs including aggregate base to a depth of 6 inches below new finish grade.Provide neat sawcuts at limits of pavement removal as indicated. Move, grind and store
SECTION 02 41 00 Page 9 pavement and slabs designated to be recycled and utilized in this project as directed by the Contracting Officer. Remove pavement and slabs not to be used in this project from the installation at Contractor's expense.
3.1.5
3.1.5 Concrete
Saw concrete along straight lines to a depth of a minimum 2 inch. Make each cut in walls perpendicular to the face and in alignment with the cut in the opposite face. Break out the remainder of the concrete provided that the broken area is concealed in the finished work, and the remaining concrete is sound. At locations where the broken face cannot be concealed, grind smooth or saw cut entirely through the concrete. Sawcuts in existing concrete pads must be at the nearest existing expansion joint or weakened plane joint and at full depth. 3.1.6
3.1.6 Miscellaneous Metal
Salvage shop-fabricated items such as access doors and frames, steel gratings, metal ladders, wire mesh partitions, metal railings, and similar items as whole units. Salvage light-gage and cold-formed metal framing, such as steel studs, steel trusses, metal gutters, and similar items. Scrap metal is the Contractor's property. Recycle scrap metal as part of demolition operations. Provide separate containers to collect scrap metal and transport to a scrap metal collection or recycling facility, in accordance with the Waste Management Plan.
3.2 CONCURRENT EARTH-MOVING OPERATIONS
Do not begin excavation, filling, and other earth-moving operations that are sequential to demolition work in areas occupied by structures to be demolished until all demolition and in the area has been completed and debris removed. Fill holes, open basements and other hazardous openings.
3.3 DISPOSITION OF MATERIAL
3.3.1 Title to Materials
Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, become the property of the Contractor and must be removed from Government property. Materials approved for storage by the Contracting Officer must be removed before completion of the contract. Title to materials resulting from demolition , and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award.
Showing for sale or selling materials and equipment on site is prohibited.
3.3.2 Disposal of Ozone Depleting Substance (ODS)
Class I and Class II ODS are defined in Section, 602(a) and (b), of The Clean Air Act. Prevent discharge of Class I and Class II ODS to the atmosphere. Place recovered ODS in cylinders meeting AHRI Guideline K suitable for the type ODS (filled to no more than 80 percent capacity) and provide appropriate labeling. Recovered ODS must be Remove recovered ODS from Government property and dispose of in accordance with 40 CFR 82 .
SECTION 02 41 00 Page 10
Dispose products, equipment and appliances containing ODS in a sealed, self-contained system (e.g. residential refrigerators and window air conditioners) in accordance with 40 CFR 82 . Submit Receipts or bills of lading, as specified. Submit a shipping receipt or bill of lading for all containers of ozone depleting substance (ODS) shipped to the Defense Depot, Richmond, Virginia.
3.3.2.1 Special Instructions
No more than one type of ODS is permitted in each container. Apply a warning/hazardous label to the containers in accordance with Department of Transportation regulations. Provide a tag with the following information on all cylinders including but not limited to fire extinguishers, spheres, or canisters containing an ODS:
a. Activity name and unit identification code
b. Activity point of contact and phone number
c. Type of ODS and pounds of ODS contained
d. Date of shipment
e. National stock number (for information, call (804) 279-4525).
3.3.2.2 Fire Suppression Containers
Deactivate fire suppression system cylinders and canisters with electrical charges or initiators prior to shipment. Also, safety caps must be used to cover exposed actuation mechanisms and discharge ports on these special cylinders.
3.3.3 Transportation Guidance
Ship all ODS containers in accordance with MIL-STD-129 , DLA 4145.25 (also referenced one of the following: Army Regulation 700-68, Naval Supply Instruction 4440.128C, Marine Corps Order 10330.2C, and Air Force Regulation 67-12), 49 CFR 173.301 , and DOD 4000.25-1-M .
3.4 CLEANUP
Remove debris and rubbish from project site and similar excavations.
Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.
3.5 DISPOSAL OF REMOVED MATERIALS
3.5.1 Regulation of Removed Materials
Dispose of debris, rubbish, scrap, and other nonsalvageable materials resulting from removal operations with all applicable federal, state and local regulations as contractually specified Storage of removed materials on the project site is prohibited.
3.5.2 Burning on Government Property
Burning of materials removed from demolished structures will not be permitted on Government property.
SECTION 02 41 00 Page 11
3.5.3 Removal to Spoil Areas on Government Property
Transport noncombustible materials removed from demolition structures to designated spoil areas on Government property.
3.5.4 Removal from Government Property
Transport waste materials removed from demolished structures, except waste soil, from Government property for legal disposal. Dispose of waste soil as directed.
3.6 REUSE OF SALVAGED ITEMS
Recondition salvaged materials and equipment designated for reuse before installation. Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.
-- End of Section --
SECTION 02 41 00 Page 12
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 61 13
EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02/10, CHG 1: 02/21
PART 1 GENERAL
1.1 MEASUREMENT AND PAYMENT
1.1.1 Measurement
1.1.2 Payment
1.1.2.1 Excavation and Transportation
1.1.2.2 Backfilling
1.1.2.3 Stockpiling
1.2 REFERENCES
1.3 DESCRIPTION OF WORK
1.3.1 Scheduling
1.3.2 Work Plan
1.3.3 Other Submittal Requirements
1.4 SUBMITTALS
1.5 REGULATORY REQUIREMENTS
1.5.1 Permits and Licenses
1.5.2 Air Emissions
PART 2 PRODUCTS
2.1 SPILL RESPONSE MATERIALS
2.2 BACKFILL
PART 3 EXECUTION
3.1 SURVEYS
3.2 EXISTING STRUCTURES AND UTILITIES
3.3 CONTAMINATED MATERIAL REMOVAL
3.3.1 Excavation
3.3.2 Shoring
3.3.3 Dewatering
3.4 CONFIRMATION SAMPLING AND ANALYSIS
3.5 CONTAMINATED MATERIAL STORAGE
3.5.1 Stockpiles
3.5.2 Roll-Off Units
3.5.3 Liquid Storage
3.6 SAMPLING
3.6.1 Sampling of Stored Material
3.6.2 Sampling Liquid
3.6.3 Sampling Beneath Storage Units
3.7 SPILLS
3.8 BACKFILLING
3.8.1 Confirmation Test Results
3.8.2 Compaction
3.9 CLOSURE REPORT
SECTION 02 61 13 Page 1
-- End of Section Table of Contents --
SECTION 02 61 13 Page 2
SECTION 02 61 13
EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02/10, CHG 1: 02/21
PART 1 GENERAL
1.1 MEASUREMENT AND PAYMENT
1.1.1 Measurement
Base measurement for excavation and onsite transportation on the actual number of cubic yards of contaminated material in-place prior to excavation. Base determination of the volume of contaminated material excavated on cross-sectional volume determination reflecting the differential between the original elevations of the top of the contaminated material and the final elevations after removal of the contaminated material. Base measurement for backfilling of excavated areas on in-place cubic yards of compacted fill. Base measurement for construction of stockpile areas on the number of square yards of stockpile liner constructed.
1.1.2 Payment
1.1.2.1 Excavation and Transportation
Compensation for excavation and onsite transportation of contaminated material will be paid as a unit cost. Include any other items incidental to excavation and handling not defined as having a specific unit cost.
1.1.2.2 Backfilling
Compensation for backfill soil, transportation of backfill, backfill soil conditioning, backfilling, compaction, and geotechnical testing will be paid as a single unit cost.
1.1.2.3 Stockpiling
Compensation for construction of stockpile areas will be paid for as a unit cost. Include all aspects of grading, preparation, handling, placement, maintenance, removal, treatment, and disposal of stockpile cover materials and liner materials and all other items incidental to construction of stockpiles in the unit cost.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D5434 (2012) Field Logging of Subsurface Explorations of Soil and Rock
SECTION 02 61 13 Page 3
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (20 214) Safety -- Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926 Safety and Health Regulations for Construction
40 CFR 302 Designation, Reportable Quantities, and Notification
1.3 DESCRIPTION OF WORK
The work consists of excavation and temporary storage of approximately 2,500 [_____] cubic yards of contaminated material. Approximate locations of contaminated material are shown on the drawings. Characterization data on the nature and extent of the contaminated material is shown in Appendix [_____]. Subsurface conditions are shown [ on the drawings ] [in Appendix [_____]] . Submit a Work Plan as specified below. Notify the Contracting Officer within [ 24] [_____] hours, and before excavation, if contaminated material is discovered that has not been previously identified or if other discrepancies between data provided and actual field conditions are discovered. Backfill material is [ not available onsite ] [available onsite and typically consists of [_____]] . Ground water is approximately 5-7 [_____] feet below pre-excavation ground surface. Conduct required sampling and chemical analysis in accordance with 01 57 19 TEMPORARY
ENVIRONMENTAL CONTROLS[_____] .
1.3.1 Scheduling
Notify the Contracting Officer 15[_____] calendar days prior to the start of excavation of contaminated material. The [Contracting Officer] [ Contractor ] is responsible for contacting regulatory agencies in accordance with the applicable reporting requirements.
1.3.2 Work Plan
Submit a Work Plan within [ 30] [_____] calendar days after notice to proceed. Do not perform work at the site, with the except site inspections and surveys, until the Work Plan is approved. Allow [ 30] [_____] calendar days in the schedule for the Government's review. No adjustment for time or money will be made if resubmittals of the Work Plan are required due to deficiencies in the plan. At a minimum, include the following in the the Work Plan:
a. Schedule of activities.
b. Method of excavation and equipment to be used.
c. Shoring or side-wall slopes proposed.
d. Dewatering plan.
e. Storage methods and locations for liquid and solid contaminated material.
f. Borrow sources and haul routes.
SECTION 02 61 13 Page 4
g. Decontamination procedures.
h. Spill contingency plan.
1.3.3 Other Submittal Requirements
Submit separate cross-sections of each area before and after excavation and after backfilling, test results, and 5[_____] copies of the Closure Report within [ 14] [_____] calendar days of work completion at the site.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are [for Contractor Quality Control approval.][ for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. ] Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Work Plan; G
SD-02 Shop Drawings
Surveys ; G
SD-06 Test Reports
Compaction ; G
Closure Report; G
1.5 REGULATORY REQUIREMENTS
1.5.1 Permits and Licenses
Obtain required federal, state, and local permits for excavation and storage of contaminated material. Obtain permits at no additional cost to the Government.
1.5.2 Air Emissions
Monitor and control air emissions in accordance with Section 01 57 19
TEMPORARY ENVIRONMENTAL CONTROLS.
PART 2 PRODUCTS
2.1 SPILL RESPONSE MATERIALS
Provide appropriate spill response materials including, but not limited to the following: containers, adsorbents, shovels, and personal protective equipment. Make spill response materials available at all times when contaminated materials/wastes are being handled or transported. Provide spill response materials that are compatible with the type of materials and contaminants being handled.
SECTION 02 61 13 Page 5
2.2 BACKFILL
Obtai nb backfill material from [the location indicated on the drawings] [ offsite sources approved by the Contracting Officer ]. , tested and classified in accordance with Section 31 00 00 EARTHWORK. Classify backfill in accordance with ASTM D2487 as GW, GP, GM, GC, SW, SP, SM, SC, ML, MH, CL, or CH. Provide backfill that is free from roots and other organic matter, trash, debris, snow, ice or frozen materials. Test backfill material for the parameters listed below at a frequency of once per [3000] [_____] cubic yards. Perform a minimum of one set of classification tests per borrow source. Also collect and test [one] [_____] backfill sample per borrow source for the chemical parameters listed below.
Physical Parameter Criteria Test Method
Grain Size [_____] ASTM D7928
Compaction [_____] ASTM D698
Chemical Parameter Test Frequency Criteria
Do not use material for backfill until borrow source chemical and physical test results have been submitted and approved.
PART 3 EXECUTION
3.1 SURVEYS
Perform surveys immediately prior to and after excavation of contaminated material to determine the volume of contaminated material removed. Also, perform surveys immediately after backfill of each excavation. Provide cross-sections on [ 25] [_____] foot intervals and at break points for all excavated areas. Survey and show locations of confirmation samples on the drawings. Perform surveys in accordance with Section: [_____].
3.2 EXISTING STRUCTURES AND UTILITIES
Do not perform e excavation until site utilities have been field located.
Take the necessary precautions to ensure no damage occurs to existing structures and utilities. Repair damage to existing structures and utilities resulting from the Contractor's operations at no additional cost to the Government. Do not disturb utilities encountered that were not previously shown or otherwise located without approval from the Contracting Officer.
3.3 CLEARING
Perform clearing to the limits shown on the drawings in accordance with
SECTION 02 61 13 Page 6
Section 31 11 00 CLEARING AND GRUBBING.
3.3 CONTAMINATED MATERIAL REMOVAL
3.3.1 Excavation
Excavate areas of contamination to the depth and extent shown on the drawings and not more than [ 0.2 ] [_____] ft beyond the depth and extent shown on the drawings unless directed by the Contracting Officer.
This is the start of the file's text. The full file is on GovTribe.