Questions and Answers for W9128F24Q0072.pdf

PDF 84 KB Posted

Attached to
Chatfield Spillway Sub Surface Drainage Cleaning & Inspection
Solicitation number
W9128F24Q0072
Issued by

About this file

This document contains the Questions and Answers related to Solicitation W9128F24Q0072 for the Chatfield Spillway Inspections project. The key details are:

The solicitation is for a contract to clean and inspect the spillway sub-drains and collector pipes at the Chatfield Spillway in Colorado. The contract has a period of performance of 365 days from date of award. The primary NAICS code is 541990 - All Other Professional, Scientific, and Technical Services, with a size standard for Small Businesses of $19.5M. A site visit is scheduled for August 15, 2024. The solicitation will be posted on SAM.gov and is 100% set-aside for Small Businesses. The government will allow the contractor to use water from the stilling basin for flushing and cleaning, and has identified two disposal sites for the collected material. Contractors must request a previous inspection report and video directly from the government contacts provided. The solicitation documents will not provide any plans or specifications - they must be obtained from SAM.gov.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9128F24Q0072, Chatfield Spillway Inspections

Questions and Answers

21 August 2024

1. Question: Do you have a water source available for use for flushing?

Answer: The Government will allow the Contractor to use water from the stilling basin at the toe of the spillway as the water source for the flushing and cleaning of the underdrain system. The Contractor must provide their own pumps and power source to obtain the water from the basin for their use, at their own cost.

2. Question: Do you have a disposal site?

Answer: The Government has two disposal sites for the Contractor to deposit the material collected from the underdrain system from the flushing and cleaning operation.

Depending on the volume of the material collected and the Contractor’s workflow, the

Contractor will be directed to deposit the material at either, or both locations while work is underway. The Government anticipates that the collected material will be limited to sand, gravel, and sediment. Maps are attached and are described as Disposal Site A, and

Disposal Site B. (See Disposal Site documents uploaded as separate documents)

3. Question: Does the USACE have an estimated value range for this project?

Answer: This project is a commercial service so an estimated range of construction for this project will not be provided.

4. Question: Does the owner have any test reports, video, or other data from past inspections?

Answer: The contractor must request a copy of the report and video from a 2014-2015 inspection of the Chatfield Spillway Sub-Drainage System to Nadine Catania and Wayne

Weidenhamer at Nadine.L.Catania@usace.army.mil and

Wayne.C.Weidenhamer@usace.army.mil, respectively. The report and video will be provided via another platform and the report and video must be deleted before the due date of this solicitation. For clarification, this inspection report and video is for information only and the solicitation for the Chatfield Spillway Inspections will require the system to be cleaned out and obstructions removed so the entire system can be inspected. Since the scope of this project differs from the previous inspection at

Chatfield, the report and video should not be used as templates for this current contract.