Amd 01 W9128F24Q0034 -Oahe Laundry.pdf
PDF 417 KB Posted
- Attached to
- Oahe - Linen and Laundry Services
- Solicitation number
- W9128F24Q0034
About this file
This document contains a solicitation notice and amendment for linen and laundry services. The solicitation seeks a contractor to provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform laundry services for the Oahe Project Office and Powerhouse located approximately 15 minutes outside Pierre, South Dakota. Services include providing clean shop towels, terry towels, wet and dry mop heads, and various sized coveralls on a bi-weekly basis. The base period of performance is from May 1, 2024 to April 30, 2025 with four one-year option periods extending to April 2029. The primary NAICS code is 812332 for Industrial Launderers. The solicitation will be posted on SAM.gov and the point of contact for questions is the listed contracting specialist.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9128F24Q0034 - QA.pdf | ||
| W9128F24Q0034 - QA.pdf | ||
| W9128F24Q0034 - QA.pdf | ||
| W9128F24Q0034 - QA.pdf | ||
| W9128F24Q0034 - Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Oahe Project Office Pierre SD - OA Linen and Laundry Service The purpose of this unilateral modification (P00001) for OA Linen and Laundry Services is as follow s:
1) Correct inconsistencies betw een QASP and PWS by updating the QASP contract description on page one of the QASP (Page 14 of the overall Soliciation). Changes to QASP contract description now conform w ith PWS requirements.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Mar-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F24Q0034
X 9B. DATED (SEE ITEM 11)
28-Feb-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Mar-2024
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F24Q0034
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
QASP
QUALITY ASSURANCE SURVEILLANCE PLAN
For Oahe Laundry Service Contract Number: W9128F24P00XX
Contract Description: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision and other items and non-personal services necessary to perform laundry services as defined in the PWS except for those items specified as government furnished property and services. Items requiring laundering are: terry towels; shop towels; dry mop heads; wet mop heads; and various sized cotton coveralls.
Contractor’s Name: TBD
1. PURPOSE.
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
What will be monitored.
How monitoring will take place.
Who will conduct the monitoring.
How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
This QASP was developed to comply with the Federal Acquisition Regulation (FAR), Subpart 37.6, Performance Based Acquisition and 46.4, Government Contract Quality Assurance. In addition, FAR, Subpart 46.103, Contracting Officer Responsibilities, states that agencies shall develop quality assurance surveillance plans when acquiring services.
2. GOVERNMENT ROLES AND RESPONSIBILITIES.
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (KO) - The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned KO: Constance Ellard Organization or Agency: Omaha District Telephone: 402-995-2726 Email: Constance.r.ellard@usace.army.mil
b. Contract Specialist - The Contract Specialist acts as an acquisition consultant and serves as the liaison between the contractor and the KO.
Assigned Contract Specialist: Erin Patton Telephone: 605-945-3401 Email: erin.m.patton@usace.army.mil
c. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the KO, the COR shall provide documentation to the KO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the KO for action.
Assigned COR: Russell Somsen Telephone: 605-945-3421 Email: russell.a.somsen@usace.army.mil
d. Other Key Government Personnel – Title:
Telephone:
Email:
3. CONTRACTOR REPRESENTATIVES:
The following employees of the contractor serve as the contractor’s Primary and Alternate Point of Contact for this contract.
a. Primary Point of Contact – TBD Telephone: TBD Email: TBD
b. Alternate Point of Contact – TBD Telephone: TBD Email: TBD
4. PERFORMANCE STANDARDS.
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective (The Service required— usually a shall statement)
Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Method of Surveillance
PRS # 1.
The contractor shall pick up soiled laundry and replace with clean items at the Oahe Project per PWS, Para 5.1
Items must be clean and have no indication of contaminants that can transfer to clean equipment and personnel, i.e. no wet oil stains or grease, without impacting maintenance activities.
No more than 1 rework of cleaning per month AND no negative effect on the completion of maintenance duties at the Oahe Project.
Periodic Surveillance
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary Matrix (PRS), Technical Exhibit 1 in the Performance Work Statement includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the PRS thresholds.
5. METHODS OF QA SURVEILLANCE.
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
Regardless of the surveillance method, the COR shall always contact the contractor's primary point of contact when a defect is identified and inform the point of contact of the specifics of the problem. The COR shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard.
a. DIRECT OBSERVATION. 100% of all deliveries and pickups will be inspected by GQA personnel.
Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the KO’s actions.
6. RATINGS.
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given PRS standard. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
GQA will count all items delivered with the exception of shop towels as counts for shop towels have been known to be historically in the high hundreds to over a thousand. GQA will inspect items for cleanliness upon arrival to the Project site. Shop towel bags containing hundreds of clean shop towels will be partially audited for cleanliness by randomly digging into various levels of the bags and pulling out samples. All deliveries and pickups will be monitored by GQA personnel. The front gate Access Control Clerk will contact the GQA prior to the contractor’s delivery driver being admitted to the Powerhouse.
7. DOCUMENTING PERFORMANCE.
a. ACCEPTABLE PERFORMANCE.
The Government shall document positive performance. A report template is attached. Any report may become a part of the supporting documentation for fixed fee payments, award fee payments, or other actions.
b. UNACCEPTABLE PERFORMANCE.
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file and courtesy copy the KO.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's primary or alternate point of contact. A CDR template is attached to this QASP.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other actions deemed necessary by the KO.
8. FREQUENCY OF MEASUREMENT.
a. Frequency of Measurement.
During contract/order performance, the COR shall take conduct visual inspections of all deliveries.
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To Items needed by the Oahe Project as relayed by the Purchasing Agent or their alternate.
The route driver is to stop bi-weekly to pick up the soiled laundry and drop off fresh laundry.
Per Contractor
Route Driver To drop off at the Oahe Project
Invoices for Oahe sent to:
Oahe Project ATTN: Russell Somsen 28563 Powerhouse Road Pierre, SD 57501
Documentation must be accurate and thorough. Completeness, currency, and accuracy support both satisfactory and unsatisfactory performance.
No rating schedule made due to Zero Deviation Performance Threshold. All materials must be delivered in a clean condition or contractor will not be paid for service.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor annually to assess performance and shall provide a written assessment on an annual basis. This applies to the base contract and any awarded option years.
9. DOCUMENTING EVALUATIONS
a. Payment Deductions
Due to the critical nature of the support the Contractor’s performance will be compared to contract requirements on a monthly basis against the Acceptable Quality Levels using this Quality Assurance Surveillance Plan to guide evaluations and the method of surveillance to document findings. If the performance in any required service fails to meet the performance threshold identified in the PWS, payments to the contractor may be reduced by the contracting officer.
The Government’s primary quality assurance procedures are based on validated customer complaints and incidental inspections by the Contracting Officer’s Representative (COR).
b. Deduction Example:
Prepared by: Russell Somsen
Signature – Contracting Officer’s Represenative
(End of Summary of Changes)
N/A - Payment will be made for clean items only
N/A - Payment will be made for clean items only
File details come from the government source that posted it. Updated .