B-21: WRSS (Armament Shop), (FY23) - Ellsworth AFB, SD ELA7

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 33 29

SUSTAINABILITY REQUIREMENTS AND REPORTING

02/21

PART 1 GENERAL

1.1 REFERENCES

1.2 SUMMARY

1.3 SUBMITTALS

1.4 GUIDING PRINCIPLES VALIDATION (GPV)

1.4.1 Sustainability Action Plan

1.4.2 Calculations

1.5 SUSTAINABILITY SUBMITTALS

1.5.1 High Performance Sustainable Building (HPSB) Checklist

1.5.1.1 HPSB Checklist Submittals

1.5.2 "S" Submittals for Sustainability Documentation

1.5.3 Sustainability eNotebook

1.5.3.1 Sustainability eNotebook Format

1.5.3.2 Sustainability eNotebook Submittal Schedule

1.6 DOCUMENTATION REQUIREMENTS

1.6.1 Commissioning (Cx)

1.6.2 Energy Efficient Products

1.6.3 Outdoor Water Use

1.6.3.1 Construction Submittal Documentation

1.6.4 Moisture Control

1.6.4.1 Construction Submittal Documentation

1.6.5 Reduce Volatile Organic Compounds (VOC) (Low-Emitting

Materials)

1.6.6 Indoor Air Quality During Construction

1.6.7 Recycled Content

1.6.7.1 Construction Submittal Documentation

1.6.8 Bio-Based Products

1.6.9 Waste Material Management (Recycling – Construction)

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 SUSTAINABILITY COORDINATION

3.2 1-200-02 Compliance Requirements

3.3 TABLE 3-1 VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING

MATERIALS) REQUIREMENTS

-- End of Section Table of Contents --

SECTION 01 33 29 Page 1Am #0002

SECTION 01 33 29

SUSTAINABILITY REQUIREMENTS AND REPORTING

02/21

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

COUNCIL ON ENVIRONMENTAL QUALITY (CEQ) (WHITE HOUSE)

HPSB Guiding Principles (2016) Guiding Principles for Sustainable Federal Buildings and Determining Compliance with the Guiding Principles for Sustainable Federal Buildings

INTERNATIONAL CODE COUNCIL (ICC)

ICC IgCC (2018) International Green Construction Code

SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION

(SMACNA)

ANSI/SMACNA 008 (2007) IAQ Guidelines for Occupied Buildings Under Construction, 2nd Edition

U.S. DEPARTMENT OF AGRICULTURE (USDA)

FSRIA 9002 Farm Security and Rural Investment Act Section 9002 (USDA BioPreferred Program)

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 1-200-02 (2020; with Change 1, 2020) High Performance and Sustainable Building Requirements

UFC 3-600-01 (2016; with Change 6, 2021) Fire Protection Engineering for Facilities

U.S. DEPARTMENT OF ENERGY (DOE)

Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials

SECTION 01 33 29 Page 2Am #0002

1.2 SUMMARY

This section includes requirements for Sustainability documentation and reporting submittals per the federally mandated High Performance and Sustainable Building (HPSB) or HPSB "Guiding Principles" (GP), in accordance with UFC 1-200-02 High Performance and Sustainable Building Requirements, and other identified requirements.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Preliminary High Performance and Sustainable Building Checklist; G, Sustainability Action Plan; G, Preliminary Sustainability eNotebook; G, SD-06 Test Reports

SD-11 Closeout Submittals

Final High Performance and Sustainable Building Checklist; G, Final Sustainability eNotebook; G, The Sustainability eNotebook shall include all relevant documentation pertaining to HPSB and TPC compliance including, but not limited to:

Commissioning Reports Energy Efficient Products Indoor Water Use Low Emitting Materials Bio-Based Products Recycled Content Certification of EPA Designated Items Certification of USDA Designated Items Construction Waste Management Sustainability Submittals

Amended Final Sustainability eNotebook; G, Amended Final High Performance and Sustainable Building Checklist;

G,

1.4 GUIDING PRINCIPLES VALIDATION (GPV)

Provide the following sustainability activities and documentation to verify achievement of HPSB Guiding Principles Validation (GPV):

a. Analysis of each Guiding Principle Requirement and how project

SECTION 01 33 29 Page 3Am #0002 complies. Include final government approved narrative(s) in the HPSB Checklist submittal. Multiple checklists indicate multiple buildings that require individual HPSB Checklist tracking.

b. No changes to the HPSB Checklist are allowed without approval from the Contracting Officer, in accordance with Section 01 33 00 SUBMITTAL REQUIREMENTS. Immediately bring to the attention of the Contracting Officer any project changes that impact meeting the approved HPSB Guiding Principles Requirements for this project. Demonstrate the change will not increase the life-cycle cost and maintains or improves the building performance.

c. Documentation of all work required to incorporate the applicable HPSB Guiding Principles requirements indicated on the HPSB Checklist and in this contract, including all "S" submittals.

d. Sustainability Action Plan.

e. Construction related documentation for the project Sustainability eNotebook and keep updated with regularly-scheduled Construction Quality Control Meetings. Include construction related documentation containing the following components:

(1) HPSB Checklist(s)

(2) Sustainability Action Plan

(3) Documentation illustrating HPSB Guiding Principles Requirements compliance, including "S" submittals

1.4.1 Sustainability Action Plan

Include the following information in the Sustainability Action Plan:

a. Analysis of each HPSB Guiding Principles Requirement and how project will comply. Final government approved narrative(s) must be included in the HPSB Checklist submittal.

b. Name and contact information for: Contractor's Point of Contact (POC) ensuring sustainability goals are accomplished and documentation is assembled.

c. Indoor Air Quality plan.

1.4.2 Calculations

Provide all calculations, product data, labels and product certifications required in this specification to demonstrate compliance with the HPSB Guiding Principles Requirements.

1.5 SUSTAINABILITY SUBMITTALS

Provide HPSB Checklist and other documentation in the Sustainability eNotebook to indicate compliance with the sustainability requirements of the project.

1.5.1 High Performance Sustainable Building (HPSB) Checklist

Provide construction documentation that provides proof of, and supports

SECTION 01 33 29 Page 4Am #0002 compliance with, the completed HPSB Checklist.

1.5.1.1 HPSB Checklist Submittals

Submit updated HPSB Checklist with each Sustainability eNotebook submittal. Include the final HPSB Checklist(s) with the interim DD1354 Real Property Record Submittal.

1.5.2 "S" Submittals for Sustainability Documentation

Various sections of this contract contain submittals they may count towards the sustainability documentation requirements required by this section. Submit the GPV sustainability documentation required in this section as part of the Sustainability eNotebook for all affected UFGS Sections.

a. Highlight GPV compliance data in each sustainability documentation submittal.

b. Bookmark sustainability documentation submittals approval,as required in paragraph SUSTAINABILITY ENOTEBOOK below.

c. Ensure all approved sustainability documentation submittals are included in each Sustainability eNotebook submittal.

1.5.3 Sustainability eNotebook

The Sustainability eNotebook is an electronic organizational file that serves as a repository for all required sustainability submittals. To support documentation of compliance with an approved HPSB checklist, provide and maintain a comprehensive and current Sustainability eNotebook. Include all required data in Sustainability eNotebook, to support full compliance with the HPSB Guiding Principles Requirements, including:

a. HPSB checklist

b. Sustainability Action Plan

c. Calculations

d. Labels

e. Sustainability documentation submittals contained in various UFGS sections of the contract

f. Certifications, assessments, or validations and compliance report

1.5.3.1 Sustainability eNotebook Format

Provide Sustainability eNotebook in the form of an Adobe PDF file;

bookmark each HPSB Guiding Principles Requirement, and sub-bookmark at each document. Match format to HPSB Guiding Principles numbering system indicated herein. Maintain up-to-date information, such as spreadsheets, templates, with each current submittals.

Contracting Officer may deduct from the monthly progress payment accordingly if Sustainability eNotebook information is not current and on track per project goals.

SECTION 01 33 29 Page 5Am #0002

1.5.3.2 Sustainability eNotebook Submittal Schedule

Provide Sustainability eNotebook Submittals at the following milestones of the project:

a. Preliminary Sustainability eNotebook

Submit preliminary Sustainability eNotebook with updated Preliminary High Performance and Sustainable Building Checklist at the first post award meeting in accordance with Section 01 30 00 ADMINISTRATIVE

REQUIREMENTS.

b. Construction Quality Control Meetings.

Provide up-to-date GP documentation in the Sustainability eNotebook for each meeting.

c. Final Sustainability eNotebook

Submit updated Sustainability eNotebook with updated Final High Performance and Sustainable Building Checklist at Beneficial Occupancy Date (BOD). Final progress payment retainage may be held by Contracting Officer until Final Sustainability construction phase documentation is complete.

d. Amended Final Sustainability eNotebook

Amend and resubmit the Amended Final Sustainability eNotebook with Amended Final High Performance and Sustainable Building Checklist, to include post-occupancy corrections, updates, and requirements. Final progress payment retainage may be held by Contracting Officer until amended final sustainability documentation is complete. Submit the Amended Final Sustainability eNotebook Submittal on DVDs to the Contracting Officer no later than 30 days after final GP determination.

1.6 DOCUMENTATION REQUIREMENTS

a. Incorporate each of the following HPSB Guiding Principles requirements into project and provide documentation that proves compliance with each listed requirement. Items below are organized by HPSB Guiding Principles. For life-cycle cost analysis requirements, one document with all analyses is acceptable, with Contracting Officer approval.

b. For each of the following paragraphs that require the use of products listed on Government-required websites, provide documentation of the process used to select products, or process used to determine why listed products do not meet project performance requirements.

1.6.1 Commissioning (Cx)

Develop and incorporate Commissioning requirements into the documents, in accordance with Section 01 91 00.15 10 TOTAL BUILDING COMMISSIONING

1.6.2 Energy Efficient Products

Provide only energy-using products that are Energy Star rated or have Federal Energy Management Program (FEMP) recommended efficiency. Where

SECTION 01 33 29 Page 6Am #0002

Energy Star or FEMP recommendations have not been established, provide most efficient products that are life-cycle cost-effective. Provide only energy using products that meet FEMP requirements for low standby power consumption. Energy efficient products can be found at:

https://www.energy.gov/eere/femp/federal-energy-management-program and http://www.energystar.gov/.

For construction submittal documentation, provide proof that product is labeled energy efficient and complies with the cited requirements.

1.6.3 Outdoor Water Use

Where new irrigation is required, provide only non-potable sources.

Provide the requirements cited in the following paragraphs:

1.6.3.1 Construction Submittal Documentation

Provide manufacturer's data validating compatibility with base-wide system and component advanced meter requirements.

1.6.4 Moisture Control

Provide the following:

1.6.4.1 Construction Submittal Documentation

Ensure construction materials are separated and protected in accordance with other sections in this contract document, with adequate humidity controls during construction. In accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA, includes plan for ongoing building moisture control.

Coordinate with the moisture control requirements of Section 01 45 00.00 10

QUALITY CONTROL.

1.6.5 Reduce Volatile Organic Compounds (VOC) (Low-Emitting Materials)

Meet the requirements of Table 3-1 at the end of this specification.

For Construction submittal documentation, provide certifications or labels that demonstrate compliance with cited requirements, based on the attached

TABLE 3-1.

1.6.6 Indoor Air Quality During Construction

Prior to construction, create indoor air quality plan. Develop and implement an IAQ construction management plan during construction and flush building air before occupancy.

For renovation of occupied existing buildings, meet the requirements of ANSI/SMACNA 008 IAQ Guidelines for Occupied Buildings Under Construction.

Provide documentation showing that after construction ends and prior to occupancy, HVAC filters were replaced and area air was flushed out in accordance with the cited standard.

1.6.7 Recycled Content

Comply with 40 CFR 247. Refer to:

SECTION 01 33 29 Page 7Am #0002 https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for assistance identifying products cited in 40 CFR 247. Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation and must meet performance requirements.

1.6.7.1 Construction Submittal Documentation

a. Provide manufacturers' documents stating the recycled content by material, or written justification for claiming one of the exceptions allowed on the cited website.

b. Substitutions: Submit for Government approval for proposed alternative products or systems that provide equivalent performance and appearance and have greater contribution to project recycled content requirements. For all such proposed substitutions, submit with the Sustainability Action Plan accompanied by product data demonstrating equivalence.

c. In order to complete compliance with FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items,and and FAR 52-223-17 Affirmative Procurement of EPA designated items in Service and Construction Contracts submit the Certification of EPA Designated Items as part of the Final Sustainability eNotebook.

Include on the certification form the following information: project name, project number, Contractor name, license number, Contractor address, and certification. The certification will read as follows and be signed and dated by the Contractor. "I hereby certify the information provided herein is accurate and that the requisition/procurement of all materials listed on this form comply with current EPA standards for recycled/recovered materials content.

The following exemptions may apply to the non-procurement of recycled/recovered content materials:

(1) The product does not meet appropriate performance standards;

(2) The product is not available within a reasonable time frame;

(3) The product is not available competitively (from two or more sources);

(4) The product is only available at an unreasonable price (compared with a comparable non-recycled content product)."

Record each product used in the project that has a requirement or option of containing recycled content, noting total price, total value of post-industrial recycled content, total value of post-consumer recycled content, exemptions (1), (2), (3), or (4), as indicated, and comments.

Recycled content values may be determined by weight or volume percent, but must be consistent throughout.

1.6.8 Bio-Based Products

Provide products and materials composed of the highest percentage of bio-based materials (including rapidly renewable resources and certified sustainably harvested products), consistent with FSRIA 9002 USDA BioPreferred Program, to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user and when available at a reasonable cost. Use only supplies and materials of a type and quality that conform to applicable

SECTION 01 33 29 Page 8Am #0002 specifications and standards.

Comply with FSRIA 9002 USDA BioPreferred Program. Refer to www.biopreferred.gov for the product categories and BioPreferred Catalog.

Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation and must meet performance requirements.

Provide the following documentation:

a. USDA BioPreferred label for each product; for bio-based products used on project but not listed with BioPreferred program, provide bio-based content and percentage.

b. In order to complete compliance with FAR 52.223-1 Biobased Product Certification, refer to submittal requirement for biobased products in

FSRIA 9002.

1.6.9 Waste Material Management (Recycling – Construction)

Divert demolition and construction debris in accordance with Section

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

3.1 SUSTAINABILITY COORDINATION

Provide sustainability focus and coordination at all meetings to achieve sustainability goals. Coordinate meeting requirements with other UFGS Sections meeting requirements in this project. Ensure the designated sustainability professional responsible for GP documentation participates in these meetings to coordinate documentation completion. Review GP sustainability requirements, HPSB Checklist documentation, Sustainability Action Plan, and completeness status of Sustainability eNotebook at the following meetings:

a. Pre-Construction Conference

b. Construction Quality Control Meetings

c. Facility Turnover Meetings

Conduct review no later than 60 days before final turnover and identify any outstanding issues that affect correct completion of all documentation and final assessment or validation, and actions that will achieve requirements. Conduct corrective actions prior to turnover, to ensure all requirements are achieved.

3.2 1-200-02 Compliance Requirements

The following sustainability standards are to be met on this project:

o UFC 1-200-02 High Performance and Sustainable Building Requirements (2020) o Guiding Principles for Sustainable Federal Buildings (2020) o Omaha District Design Guide (2019) o Ellsworth Air Force Installation Facilities Standards (2019)

SECTION 01 33 29 Page 9Am #0002

This building is an existing building. The project will not include comprehensive replacement of systems but will merely be a reconfiguration of spaces within the original building footprint for with similar occu-pancy categories. Design maintains the existing function of the utilities, and MEP infrastructure systems. Adjustments to the space and systems will be made as needed for changing capacity, security, or occupancy requirements and all new or modified elements will comply with all listed standards above. Below are listed specific standards to be followed.

Guiding principles for sustainable federal buildings criteria checklist for Existing Buildings will be imple-mented as required by the scope of work.

EB Criterial 4.6 Indoor Air Quality during construction will be implemented during construction as fol-lows:

Option 1) Implement or verify a policy is in place to protect indoor air quality during operations as well as during any applicable renovations in the existing building. This may include strategies for having permanent entryway systems in place to capture dirt and particulates entering the building and specific proce-dures to protect occupants during renovations.

Option 2) For buildings with renovation projects, conform to 2018 IgCC Sections 1001.3.1.5 (10.3.1.5) IAQ Construction Management, and 1001.3.1.8 (10.3.1.8) Construction Activity Pollution Prevention: Protection of Occupied Areas

EB Criteria 5.6 Solid Waste Management will be implemented as follows:

Option 4) For buildings with renovation projects, develop and implement a construction and demolition waste management plan for construction projects. Where markets exist, divert at least 60 percent of construction and demolition materials from landfill and non-energy generating incineration, in alignment with EPA's Waste Management Hierarchy.

SECTION 01 33 29 Page 10Am #0002

3.3 TABLE 3-1 VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING MATERIALS)

REQUIREMENTS

TABLE 3-1 Volatile Organic Compounds (VOC) (Low Emitting Materials) Requirements

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Adhesives and Sealants

CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Adhesives (carpet, resilient, wood flooring; base cove; ceramic tile; drywall and panel; primers) Sealants (acoustical;

firestop; HVAC Air duct; primers) Caulks

SCAQMD Rule 1168 (Use "other" category for HVAC duct sealant) (for firestop adhesive, UFC 3-600-01 overrides conflicting requirements)

Aerosol adhesives Section 3 of Green Seal Standard

GS-36

(except:

cleaners, solvent cements, and primers used with plastic piping and conduit in plumbing, fire suppression, and electrical systems; HVAC air duct sealants when the application space air temp is less than 40 F (4.5 C).

SECTION 01 33 29 Page 11Am #0002

TABLE 3-1 Volatile Organic Compounds (VOC) (Low Emitting Materials) Requirements

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Paints and Coatings CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Flat and nonflat, nonflat high-gloss, specialty, basement specialty, fire-resistive, floor, low-solids, rust preventative, wood, reflective wall coatings;

concrete/masonry sealers; primers;

sealers;

undercoaters;

shellacs (clear and opaque);

stains; varnishes;

conjugated oil varnish; lacquer;

clear brushing lacquer

Green Seal Standard GS-11

SECTION 01 33 29 Page 12Am #0002

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Paints and Coatings CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Concrete curing compounds; dry fog, faux finishing, graphic arts (sign paints), industrial maintenance, mastic texture, metallic pigmented, multicolor, recycled coatings;

pretreatment wash primers, reactive penetrating sealers; specialty primers, wood preservatives, and zinc primers

California Air Resources Board (CARB) Suggested Control Measure for Architectural Coatings or SCAQMD Rule 1113r

Paints and Coatings CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or High-temperature coatings; stone consolidants;

swimming-pool coatings; tub- and tile-refining coatings; and waterproofing membranes

California Air Resources Board (CARB) Suggested Control Measure for Architectural Coatings

SECTION 01 33 29 Page 13Am #0002

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Floor Covering Materials

For carpet, all locations:

CDPH/EHLB/Standard Method V1.1 (California Section 01350) or label for Section 9 of CDPH/EHLB/Standard Method V1.1 (California Section 01350) none none

Insulation CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) none none

SECTION 01 33 29 Page 14Am #0002

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Composite Wood, Wood Structural Panel, and Agrifiber Products, no added urea-formaldehyde resins including laminating adhesives for composite wood and agrifiber assemblies -particleboard, medium density fiberboard (MDF), wheatboard, strawboard, panel substrates, door cores

Third-party certification (approved by CARB) of California Air Resource Board's (CARB) regulation, Airborne Toxic Control Measure to Reduce Formaldehyde Emissions from Composite Wood Products or none CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) (except:

Structural panel components such as plywood, particle board, wafer board, and oriented strand board identified as "EXPOSURE 1," "EXTERIOR," or

"HUD-APPROVED"

are considered acceptable for interior use.)

Office Furniture Systems and Seating installed prior to occupancy

ANSI/BIFMA X7.1

ANSI/BIFMA X7.1:

(95-percent of installed office furniture system workstations and seating units)

Section 7.6.2 of ANSI/BIFMA e3 (50-percent of office furniture system workstations and seating units) none none

SECTION 01 33 29 Page 15Am #0002

Source: ICC IgCC Chapter 8 (Materials) (Interior Applications Only)

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

EMISSIONS

REQUIREMENTS

Ceiling and Wall assemblies and systems including:

acoustical treatments;

ceiling panels and tiles; tackable wall panels and coverings; wall coverings; wall and ceiling paneling and planking

CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) none none

-- End of Section --

SECTION 01 33 29 Page 16Am #0002

F

J

K

G

D

Q

R

DCX

HA

HB

HC

HD

H

I

FB

B2B1

XC

XB

XA/EA

T-13

F-2 F-1 N

A

1 1.5 2 2.5 3 4 5 6 7 8 9 10 11 12 13

F

E

D.5

D

C.5

C

B

A

FB ISO

IA

IB

IC

ID DC

C

XB

E ZB

XC

DCY

M

L

ZA

XA

O

400 Hz

GEN

62.5 KVA

SECTOR KEY PLAN

A B

C D

B ro ad w ay E xt en si on

, S ui te

O kl ah om a C ity , O

K

-7

5.

0.

fs b-ae .c om

F S

B /P

O N

D J

V

B -2

W e a p o n s R e le a s e S y s te m s

S h o p

E A

F B

D O

C K

A S

N I D

M J T

G

O B

US Army Corps of Engineers

Omaha District

A P

P R

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D R

A W

N B

Y

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

A

B

M A

R K

A P

P R

IS

S

U E

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

D A

T E

SHEET OF

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

Y

O M

A H

A D

IS

T

R

IC

T

E L

L S

W O

R T

H A

F B

R

A P

ID

C

IT

Y

S

D

N

0 8' 16' 32'

1/16" = 1'-0"

C :\U s e rs \J o s e p h .L e F re re

\D o c u m e n ts

\1

B L

D G

B

W R

S S

M

E P v

J o s e p h

.L e

F re re .rv t

/3 /2

:3

:0

A M

ED101

C O

M P

O S

IT

E

E L E

C T

R

IC

A L

D E

M O

L

IT

IO

N

P L A

N J S

T

IT

T

W .D

O B

B

IN

S

W

D O

B B

IN

S

A P

R

IL

9_

B

LD

G

B

W R

S S

_M E

P _V

.R

V T

A. REFER TO E-001 & E-002 FOR ELECTRICAL GENERAL

NOTES, ABBREVIATIONS & LEGEND.

1. EXISTING LUMINAIRES AND CONTROLS TO BE

DEMOLISHED. DEMOLISH CONDUCTORS BACK

NEAREST JUNCTION BOX AND PREPARE FOR

EXTENTION OF CIRCUIT. ALL OTHER EQUIPMENT

AND DEVICES MUST REMAIN OPERATIONAL.

2. DEMOLISH THE STATIC GROUND BARS AROUND

THE ROOM AND DEMOLISH THE GROUND

CONDUCTOR TO THE FURTHEST EXTENT POSSIBLE

WITHIN THE ROOM AND ABANDONED IN PLACE

OUTSIDE OF THE ROOM.

3. IN THE LOCATION OF THE NEW MDP, DEMOLISH THE

SECTION OF THE STATIC GROUND BAR IN CONFLICT

WITH THE PANEL LOCATION.

SCALE: 1/16" = 1'-0"A1

COMPOSITE ELECTRICAL DEMOLITION PLAN

GENERAL NOTES

SHEET KEYNOTES

A

M

E L E

C T

R

IC

A L

R E

V

IS

IO

N

S

-3

-2

B ro ad w ay E xt en si on

, S ui te

O kl ah om a C ity , O

K

-7

5.

0.

fs b-ae .c om

F S

B /P

O N

D J

V

B -2

W e a p o n s R e le a s e S y s te m s

S h o p

E A

F B

D O

C K

A S

N I D

M J T

G

O B

US Army Corps of Engineers

Omaha District

A P

P R

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D R

A W

N B

Y

C H

E C

K E

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

A

B

M A

R K

A P

P R

IS

S

U E

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T

E D

B Y

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T

N O

D A

T E

SHEET OF

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

Y

O M

A H

A D

IS

T

R

IC

T

E L

L S

W O

R T

H A

F B

R

A P

ID

C

IT

Y

S

D

C :\U s e rs \H e n d e rs o n Z

\D o c u m e n ts \1

B

L D

G

B

W R

S S

M

E P v

H e n d e rs o n Z

.rv t

/2

/2

:3

:4

P M

E-601

E L E

C R

IC

A

L F

E E

D E

R S

C H

E D

U L

E S

J S

T

IT

T

W .D

O B

B

IN

S

W

D O

B B

IN

S

A P

R

IL

9_

B

LD

G

B

W R

S S

_M E

P _V

.R

V T

FEEDER SCHEDULE

FEEDER

TAG COPPER FEEDER

20CU 4#12 & 1#12G, 3/4"C.

25CU 4#10 & 1#10G, 3/4"C.

30CU 4#10 & 1#10G, 3/4"C.

35CU 4#8 & 1#10G, 1"C.

40CU 4#8 & 1#10G, 1"C.

45CU 4#6 & 1#10G, 1"C.

50CU 4#6 & 1#10G, 1"C.

60CU 4#4 & 1#10G, 1-1/2"C.

70CU 4#4 & 1#8G, 1-1/2"C.

80CU 4#2 & 1#8G, 1-1/2"C.

90CU 4#2 & 1#8G, 1-1/2"C.

100CU 4#1 & 1#8G, 2"C.

110CU 4#1 & 1#6G, 2"C.

125CU 4#1/0 & 1#6G, 2"C.

150CU 4#1/0 & 1#6G, 2"C.

175CU 4#2/0 & 1#6G, 2"C.

200CU 4#3/0 & 1#6G, 3"C.

225CU 4#4/0 & 1#4G, 3"C.

250CU 4-250 KCMIL & 1#4G, 3"C.

300CU 4-350 KCMIL & 1#4G, 3"C.

350CU 4-500 KCMIL & 1#2G, 4"C.

400CU 4-500 KCMIL & 1#2G, 4"C.

450CU TWO 3-INCH CONDUITS, EACH WITH

FOUR 4/0 AND ONE #2G

500CU TWO 3-INCH CONDUITS, EACH WITH

FOUR 250 KCMIL AND ONE #2G

600CU TWO 3-INCH CONDUITS, EACH WITH

FOUR 350 KCMIL AND ONE #1G

700CU TWO 4-INCH CONDUITS, EACH WITH

FOUR 500 KCMIL AND ONE 1/0G

800CU TWO 4-INCH CONDUITS, EACH WITH

FOUR 500 KCMIL AND ONE 1/0G

1000CU THREE 4-INCH CONDUITS, EACH WITH

FOUR 500 KCMIL AND ONE 2/0G

1200CU FOUR 3-INCH CONDUITS, EACH WITH

FOUR 350 KCMIL AND ONE 3/0G

1600CU FIVE 4-INCH CONDUITS, EACH WITH

FOUR 500 KCMIL AND ONE 4/0G

2000CU SIX 4-INCH CONDUITS, EACH WITH

FOUR 500 KCMIL AND ONE 250KCMIL G

EPO 2#12 & 1#12G, 3/4"C.

MTR1 REFER TO E-611 FOR FEEDER SIZE

RECP1 3#3/0 & 1#6G, 3"C.

SE TWO 4-INCH CONDUITS, EACH WITH

FOUR 350 KCMIL

TRANSFORMER FEEDER SCHEDULE

FEEDER

TAG PRIMARY FEEDER

FEEDER

TAG SECONDARY FEEDER

GROUNDING

ELECTRODE

CONDUCTOR

T15P 3#10 & 1#10G, 3/4"C. T15S 4#6 & 1#8G, 1"C. #8G

T30P 3#6 & 1#10G, 3/4"C. T30S 4#1 & 1#6G, 1-1/2"C. #6G

T45P 3#4 & 1#8G, 1"C. T45S 4-1/0 & 1#4G, 2"C. #4G

T75P 3-1/0 & 1#6G, 1-1/2"C. T75S 4-250 KCMIL & 1#2G, 3"C. #2G

T112.5P 3-2/0 & 1#6G, 2"C. T112.5S 2 SETS (4-3/0 & 1#2G, 2"C) #2G

T150P 3-4/0 & 1#4G, 2"C. T150S 2 SETS (4-250 KCMIL & 1-1/0G, 3"C) 1/0G

T225P 3-500 KCMIL & 1#2G, 3"C. T225S 3 SETS (4-300 KCMIL & 1-2/0G, 3"C) 2/0G

T300P 2 SETS (3-4/0 & 1#2G, 3"C.) T300S 3 SETS (4-500 KCMIL & 1-4/0G, 4"C) 3/0G

T500P 2 SETS (3-500KCMIL & 1-1/0G, 3"C.) T500S 5 SETS (4-500 KCMIL & 1-350 KCMIL G, 4"C) 3/0G

NOTES:

1. FEEDER TAGS WITH A " * " IN THE TAG HAVE BEEN

INCREASED IN SIZE TO ACCOUNT FOR VOLTAGE DROP.

2. COORDINATE PANEL LUG SIZE AND QUANTITIES WITH THE

SPECIFIED CONDUCTOR SIZES AND NUMBER OF PARALLEL

RUNS AS APPLICABLE. LUG SIZES AND QUANTITIES MUST

ACCOUNT FOR CONDUCTORS THAT WERE INCREASED IN

SIZE AND/OR PARALLEL RUNS ADDED TO ACCOUNT FOR

VOLTAGE DROP.

1. REFER TO E-001 & E-002 FOR ELECTRICAL GENERAL

NOTES, ABBREVIATIONS & LEGEND.

GENERAL NOTES

A

M

E L E

C T

R

IC

A L

R E

V

IS

IO

N

S

-3

-2

Specifications (Revised and Reissued)
01 33 29
Drawings (Reissued)
ED101 - COMPOSITE ELECTRICAL DEMOLITION PLAN
E-601 - ELECRICAL FEEDER SCHEDULES

File details come from the government source that posted it. Updated .