Left Bank Levee Seeding Q_A.pdf

PDF 108 KB Posted

Attached to
Seeding
Solicitation number
W9128F23Q0087
Issued by

About this file

This document contains questions and answers regarding a seeding contract opportunity with the Department of the Army Corps of Engineers Engineering District Omaha. The solicitation number is W9128F23Q0087 and is for seeding services along 215 acres of levee. Bidders should include removal of excess vegetation in their pricing. Erosion control blankets are not required but may be used if approved by the contracting officer. Broadcast seeding can be used in delineated areas where turf reinforcement mats exist. The assumed area for grading of erosion rills is 833 square yards. Clarification is provided that erosion control blankets would be added via contract modification rather than included in initial bids.

View the file

Other files

File Type Posted
Broadcast Seeding Area on 611-614.pdf PDF
QUESTIONS_ANSWERS.pdf PDF
QUESTIONS_ ANSWERS.pdf PDF
L-550 Seeding Locations.pdf PDF
KMZ FILE.pdf PDF
L-594 Seeding Locations.pdf PDF
L-575 Seeding Locations.pdf PDF
L-611-614 Seeding Locations.pdf PDF
Spec 32 92 19 Dwg_Attachments_8.21.23.pdf PDF
Site2reduced.pdf PDF
Site1reducedpdf.pdf PDF
SF1449 W9128F23Q0087.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Left Bank Levee Seeding Questions and Answers

The following document complies questions during the 9/20/23 site visit and submitted to government personal.

Q: Areas where vegetation is too heavy after mowing for seed to germinate, is bid price to include removal of excess vegetation?

A: Yes, include removal of excess vegetation in the bid price.

Q: Erosion Control blanket(ECB) at the walk-through meeting said all disturb areas greater than a 5:1 will need ECB. The bid documents say not needed. Want a clarification on how it will be determined if ECB is needed.

A:ECB is not required as stated in the specifications. The contractor may get approval from the COR to use ECB if they deem it necessary.

Q:On the ECB, if deemed necessary will it be paid as a extra item or is it included in our bid price? Is there a way to bid “X” amount of ECB included? Hard to bid 215 AC that some may or may not need

ECB.

A. Do not include ECB in the quotation. If the contractor and COR agree ECB is necessary, a contract modification will be initiated for the additional cost.

Q: No till drilling would not be possible at 611-614 inlet breach due to the existing turf reinforcement mat.

A: The attached image delineates the area on 611-614 where broadcast seeding can be used.

Q:What is the area of erosion rills? For bidding purposes not having a quantified area for grading of the erosion rills will artificially inflate the bid.

A: Assume an area of 833 square yards of grading of erosion rills.