W9128F23B0001 AM0005.pdf
PDF 495 KB Posted
- Attached to
- Dewatering Sump Piping and Valve Replacement Federal contract opportunity
- Solicitation number
- W9128F23B0001
About this file
This document is an amendment to the solicitation and specifications for a federal contract to replace dewatering sump piping, valves, ladders, and platforms at the Big Bend Dam in South Dakota. The contract period of performance has been increased from 365 to 577 days from notice to proceed. The specifications have been modified such that only the existing 18-inch valves, not the 12-inch valves, have 3:1 gear reducers. Electronic bids are due by 2:00pm local time on January 5, 2023. The solicitation is being conducted by the U.S. Army Corps of Engineers Omaha District for dewatering sump piping and valve replacement work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| KO SIGNED_Bid Abstract W9128F23B0001_BB Unwatering Sump.pdf | ||
| W9128F23B0001 AM0006 - BB Sumps.pdf | ||
| Pre-bid sign-in sheet 12-20-22 Redacted.pdf | ||
| AM0004 - W9128F23B0001 - BB Sumps.pdf | ||
| REGISTER Am0003.pdf | ||
| W9128F-23-B-0001 U00003 Signed.pdf | ||
| 01 30 00.24 Am0003.pdf | ||
| AM0002 - W9128F23B0001 - BB Unwatering Sump_30 Nov 22.pdf | ||
| AM0001_W9128F23B0001_BB Unwatering Sump_28 Nov 22.pdf | ||
| W9128F23B0001 Drawings VOL 3 OF 3.PDF | ||
| W9128F23B0001 Drawings VOL 1 OF 3.pdf | ||
| W9128F23B0001 Powerhouse Sump Pump Controllers Piping _ Ladder Replacement specs.pdf | ||
| W9128F23B0001 Drawings VOL 2 OF 3.PDF | ||
| RELEASED_W9128F22B0019_BB Unwatering Sump_21 Nov 2022.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
21 DEC 22: AMENDMENT: Robert Turner, Contract Specialist
The purpose of this amendment is to change contract duration to 577 days after notice to proceed and to modify the specifications IAW the Narrative Description for AM0005. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Dec-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F23B0001
X 9B. DATED (SEE ITEM 11)
21-Nov-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Dec-2022
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F23B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
NARRATIVE DESCRIPTION AM0005
21 DEC 2022
Solicitation No. W9128F23B0001
Date of Issue: 21 Nov 2022 Date of Opening: 05 JAN 2023
SUBJECT: Amendment No. 0005 to Specifications and Drawings for Construction of Powerhouse Unwatering Sump Valve Actuators, Piping, Ladder, and Platform Replacement Big Bend Dam, SD.
TO: Prospective Bidders and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Section 23 64 26 Page 6, paragraph 2.2
Delete “(note that the existing valves (both 12" and 18")are equipped with 3:1 gear reducers)” and replace with “ (note that the existing 18” valves are equipped with 3:1 gear reducers)”
2. This amendment is a part of the bidding papers and its receipt shall be acknowledged. All other conditions and requirements of the specifications remain unchanged.
a. See Section 00 21 00, Instructions to Bidders, on how to submit electronic bids.
3. Electric bids will be received until 2:00 p.m., local time at place of bid opening, 05 JAN 2023.
Attachments:
none
U.S. Army Engineer District, Omaha Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901
21 DEC 2022
W9128F23B0001
JAC/[2100]
The following have been deleted:
NARRATIVE DESCRIPTION AM003
SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
The contractor period of performance end date has increased by 212 days from 365 days to 577 days.
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 577 calendar days from the notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
(End of Summary of Changes)