REGISTER Am0003.pdf

PDF 690 KB Posted

Attached to
Dewatering Sump Piping and Valve Replacement Federal contract opportunity
Solicitation number
W9128F23B0001
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This submittal register and related solicitation are for a dewatering sump piping and valve replacement project for the Department of the Army Corps of Engineers Engineering District Omaha. The solicitation requests replacement of piping, valves, ladder, and platform at a powerhouse dewatering sump. The submittal register outlines required pre-construction, shop drawing, product data, test and inspection report, certificate, and closeout submittals addressing specifications for accident prevention, safety, hazardous materials abatement, quality control, environmental protection, structural steel, piping, valves, and other items. Key submittal dates are included in the schedule for the contractor to receive approvals on items including accident prevention plans, inspection reports, qualifications, hazardous waste documents, and other materials by the government or their representative.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES

Powerhouse Unwatering Sump Valve Act, Piping, Ladder & Plat Repl

01 12 00 SD-01 Preconstruction Submittals

G AOProposed Methods of Operation

G AOProgress Charts

1.2Construction Right-of-Way

SD-02 Shop Drawings

1.4 G AOCare of Water

SD-11 Closeout Submittals

1.11Warranty of Construction

01 30 00.24 SD-01 Preconstruction Submittals

AT Level I Training Sign In

Sheets

G POSecurity Personnel List

G POPersonnel Risk Assessment iWATCH and/or CorpsWatch

Training Sign In Sheets

E-Verify

SD-02 Shop Drawings

G ROEquipment Room Drawings

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G AOProject Scheduler Qualifications

3.4.1 G AOPreliminary Project Schedule

3.4.2 G AOInitial Project Schedule

3.6.2 G AOPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 G AOSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Am0003

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES

01 35 26 1.7.1 G AOACCIDENT PREVENTION PLAN

(APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 G AOAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.7.3.2 G AOStandard Lift Plan

1.7.3.3 G AOCritical Lift Plan

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

License Certificates

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G AOContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9Verification Statement

01 57 20.00 10 SD-01 Preconstruction Submittals

1.7 GEnvironmental Protection Plan

02 82 00 SD-03 Product Data

1.3.6 G POSafety Data Sheets (SDS) for All

Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES

02 82 00 SD-06 Test Reports

1.5.2 G POAir Sampling Results

SD-07 Certificates

1.3.7 G POAsbestos Hazard Abatement Plan

1.3.8 G POWaste Shipment Records

02 83 00 SD-01 Preconstruction Submittals

1.5.2.4 G POLead Waste Management Plan

1.5.2.2 G POLead Compliance Plan

SD-11 Closeout Submittals

3.4.2.1 G POHazardous Waste Manifest

3.4.2.1 G POTurn-In Documents or Weight

Tickets

05 05 20.00 27 SD-01 Preconstruction Submittals

1.5.1.1 G POInstaller Qualifications

1.5.1.2 G POPost-Installed Anchor Special

Inspector Qualifications

SD-03 Product Data

2.1.1.3 G DOMechanical Anchors in Concrete

3.1.2 G PONon-Shrink, Non-Metallic Grout

SD-06 Test Reports

3.3.3 G POPost-Installed Anchor Special

Inspections Report

SD-07 Certificates

2.1.1.1 G POPost-Installed Anchor

Certification

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES

05 05 20.00 27 2.1.1.2 G POManufacturer's Printed

Installation Instructions

3.1.2 G PONon-Shrink, Non-Metallic Grout

1.5Manufacturer's Material Safety

Data Sheets

05 12 00 SD-01 Preconstruction Submittals

1.3.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.3.2 G DOFabrication Drawings

SD-03 Product Data

2.4.1Welding Electrodes and Rods

2.4.2Non-Shrink Grout

SD-06 Test Reports

2.3Bolts, Nuts, and Washers

Weld Inspection Reports

3.6.2Embrittlement Test Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.3.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.6.1.1Certified Welding Inspector

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES

05 12 00 3.4Welding Procedure Specifications

(WPS)

05 50 13 SD-02 Shop Drawings

G DOFloor Gratings

SD-03 Product Data

G DOFloor Gratings

SD-04 Samples

G POCertificates of Compliance

05 51 33 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

2.3.1Ladder Climbing Devices

05 52 00 SD-02 Shop Drawings

1.2.1 G DOFabrication Drawings

G DOIron and Steel Hardware

G DOSteel Shapes, Plates, Bars and

Strips

2.3 G DOSafety Gates

SD-03 Product Data

2.2.1 G POStructural-Steel Plates, Shapes, and Bars

2.3 G DOSafety Gates

SD-07 Certificates

1.4.1 G POWelding Procedures

1.4.2 G POWelder Qualification

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES

05 52 00 Installation Instructions

22 15 14.00 40 SD-02 Shop Drawings

2.1 G DOInstallation Drawings

SD-03 Product Data

2.3.1 G DOAboveground Piping Materials

2.4.2 G DOSupporting Elements

2.2.1 G DOValves

SD-06 Test Reports

3.2.1.4 G POPiping System Test Report

23 64 26 SD-03 Product Data

G DOValve Actuators

2.3 G DOFloorstand

2.4 G DOValve Extension Stem

Components

2.5.1 G DOCast Iron Tee

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

File details come from the government source that posted it. Updated .