REGISTER Am0003.pdf
PDF 690 KB Posted
- Attached to
- Dewatering Sump Piping and Valve Replacement Federal contract opportunity
- Solicitation number
- W9128F23B0001
About this file
This submittal register and related solicitation are for a dewatering sump piping and valve replacement project for the Department of the Army Corps of Engineers Engineering District Omaha. The solicitation requests replacement of piping, valves, ladder, and platform at a powerhouse dewatering sump. The submittal register outlines required pre-construction, shop drawing, product data, test and inspection report, certificate, and closeout submittals addressing specifications for accident prevention, safety, hazardous materials abatement, quality control, environmental protection, structural steel, piping, valves, and other items. Key submittal dates are included in the schedule for the contractor to receive approvals on items including accident prevention plans, inspection reports, qualifications, hazardous waste documents, and other materials by the government or their representative.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| KO SIGNED_Bid Abstract W9128F23B0001_BB Unwatering Sump.pdf | ||
| W9128F23B0001 AM0006 - BB Sumps.pdf | ||
| W9128F23B0001 AM0005.pdf | ||
| Pre-bid sign-in sheet 12-20-22 Redacted.pdf | ||
| AM0004 - W9128F23B0001 - BB Sumps.pdf | ||
| 01 30 00.24 Am0003.pdf | ||
| W9128F-23-B-0001 U00003 Signed.pdf | ||
| AM0002 - W9128F23B0001 - BB Unwatering Sump_30 Nov 22.pdf | ||
| AM0001_W9128F23B0001_BB Unwatering Sump_28 Nov 22.pdf | ||
| RELEASED_W9128F22B0019_BB Unwatering Sump_21 Nov 2022.pdf | ||
| W9128F23B0001 Drawings VOL 3 OF 3.PDF | ||
| W9128F23B0001 Drawings VOL 1 OF 3.pdf | ||
| W9128F23B0001 Powerhouse Sump Pump Controllers Piping _ Ladder Replacement specs.pdf | ||
| W9128F23B0001 Drawings VOL 2 OF 3.PDF |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES
Powerhouse Unwatering Sump Valve Act, Piping, Ladder & Plat Repl
01 12 00 SD-01 Preconstruction Submittals
G AOProposed Methods of Operation
G AOProgress Charts
1.2Construction Right-of-Way
SD-02 Shop Drawings
1.4 G AOCare of Water
SD-11 Closeout Submittals
1.11Warranty of Construction
01 30 00.24 SD-01 Preconstruction Submittals
AT Level I Training Sign In
Sheets
G POSecurity Personnel List
G POPersonnel Risk Assessment iWATCH and/or CorpsWatch
Training Sign In Sheets
E-Verify
SD-02 Shop Drawings
G ROEquipment Room Drawings
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G AOProject Scheduler Qualifications
3.4.1 G AOPreliminary Project Schedule
3.4.2 G AOInitial Project Schedule
3.6.2 G AOPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 G AOSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Am0003
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES
01 35 26 1.7.1 G AOACCIDENT PREVENTION PLAN
(APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 G AOAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.3.2 G AOStandard Lift Plan
1.7.3.3 G AOCritical Lift Plan
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
License Certificates
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G AOContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9Verification Statement
01 57 20.00 10 SD-01 Preconstruction Submittals
1.7 GEnvironmental Protection Plan
02 82 00 SD-03 Product Data
1.3.6 G POSafety Data Sheets (SDS) for All
Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES
02 82 00 SD-06 Test Reports
1.5.2 G POAir Sampling Results
SD-07 Certificates
1.3.7 G POAsbestos Hazard Abatement Plan
1.3.8 G POWaste Shipment Records
02 83 00 SD-01 Preconstruction Submittals
1.5.2.4 G POLead Waste Management Plan
1.5.2.2 G POLead Compliance Plan
SD-11 Closeout Submittals
3.4.2.1 G POHazardous Waste Manifest
3.4.2.1 G POTurn-In Documents or Weight
Tickets
05 05 20.00 27 SD-01 Preconstruction Submittals
1.5.1.1 G POInstaller Qualifications
1.5.1.2 G POPost-Installed Anchor Special
Inspector Qualifications
SD-03 Product Data
2.1.1.3 G DOMechanical Anchors in Concrete
3.1.2 G PONon-Shrink, Non-Metallic Grout
SD-06 Test Reports
3.3.3 G POPost-Installed Anchor Special
Inspections Report
SD-07 Certificates
2.1.1.1 G POPost-Installed Anchor
Certification
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES
05 05 20.00 27 2.1.1.2 G POManufacturer's Printed
Installation Instructions
3.1.2 G PONon-Shrink, Non-Metallic Grout
1.5Manufacturer's Material Safety
Data Sheets
05 12 00 SD-01 Preconstruction Submittals
1.3.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.3.2 G DOFabrication Drawings
SD-03 Product Data
2.4.1Welding Electrodes and Rods
2.4.2Non-Shrink Grout
SD-06 Test Reports
2.3Bolts, Nuts, and Washers
Weld Inspection Reports
3.6.2Embrittlement Test Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.3.3.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.6.1.1Certified Welding Inspector
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES
05 12 00 3.4Welding Procedure Specifications
(WPS)
05 50 13 SD-02 Shop Drawings
G DOFloor Gratings
SD-03 Product Data
G DOFloor Gratings
SD-04 Samples
G POCertificates of Compliance
05 51 33 SD-02 Shop Drawings
2.3Ladders
SD-03 Product Data
2.3.1Ladder Climbing Devices
05 52 00 SD-02 Shop Drawings
1.2.1 G DOFabrication Drawings
G DOIron and Steel Hardware
G DOSteel Shapes, Plates, Bars and
Strips
2.3 G DOSafety Gates
SD-03 Product Data
2.2.1 G POStructural-Steel Plates, Shapes, and Bars
2.3 G DOSafety Gates
SD-07 Certificates
1.4.1 G POWelding Procedures
1.4.2 G POWelder Qualification
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES
05 52 00 Installation Instructions
22 15 14.00 40 SD-02 Shop Drawings
2.1 G DOInstallation Drawings
SD-03 Product Data
2.3.1 G DOAboveground Piping Materials
2.4.2 G DOSupporting Elements
2.2.1 G DOValves
SD-06 Test Reports
3.2.1.4 G POPiping System Test Report
23 64 26 SD-03 Product Data
G DOValve Actuators
2.3 G DOFloorstand
2.4 G DOValve Extension Stem
Components
2.5.1 G DOCast Iron Tee
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
File details come from the government source that posted it. Updated .