RELEASED_W9128F22R0011 AM0001 - 22 JUN 22.pdf
PDF 493 KB Posted
- Attached to
- Gavins Point Tailrace Bulkheads Federal contract opportunity
- Solicitation number
- W9128F22R0011
About this file
This document contains an amendment to a solicitation and the related federal contract opportunity. The amendment modifies the solicitation by extending the response due date from June 27, 2022 to July 11, 2022. It also revises specifications and drawings.
The federal contract opportunity is for fabrication of six new draft tube bulkheads including rubber seals to replace existing tailrace bulkheads at Gavins Point Dam in Crofton, Nebraska. Prior to fabrication, the contractor must field verify dimensions. The contractor must also perform functionality and water tightness tests after installation and provide inspection reports and as-built drawings. The work must be completed within 480 days of notice to proceed. The estimated cost is between $1,000,000 to $5,000,000. The NAICS code is 237990. The solicitation is available through SAM.gov and responses are due by July 11, 2022. The contracting office is the U.S. Army Corps of Engineers District in Omaha, Nebraska.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RELEASED_AM0002_W9128F22R0011.pdf | ||
| AM0001 - Attachment_S-003 AMD 1 Hoisting Rings.pdf | ||
| GP Dam_Bulkhead Laydown Areas.pdf | ||
| Gavins_TailraceBulkhead_Photos and drawings.pdf | ||
| 20220607 GP Tailrace Bulkheads Site Visit Sign-in Sheet Post.pdf | ||
| Gavins Point DT Bulkhead - Contract Drawings (Signed).pdf | ||
| Tailrace Bulk Head Replacement GP Dam specs.pdf | ||
| W9128F22R0011.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate Amendment No. 0001 to the Specifications. See Am0001 in SF30 Block 14 Continuation Page for description of amendment changes. The date proposals are due has been extended to 11 July 2022 at 2:00pm. All other terms and conditions remain the same.
Gavins Point Bulkhead Tailrace, Gavins Point Dam, South Dakota
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Jun-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F22R0011
X 9B. DATED (SEE ITEM 11)
24-May-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jun-2022
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F22R0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
22 June 2022 Solicitation No. W9128F22R0011
Date of Issue: 24 May 2022 Date of Receiving Proposals: 11 July 2022
SUBJECT: Amendment No. 0001 to Request for Proposal Solicitation Package for Construction of Tailrace Bulkhead Replacement, Gavin’s Point Dam.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Section 01 30 00.24 Page 8, paragraph 1.9.2.b Delete paragraph :
“b. Payment for materials delivered off-site must be made only after receipt of paid invoices listing the value of material and labor incorporated in the items along with a canceled check showing the prime contractor's title to the items delivered off site. Payment for materials delivered off-site must be limited to the following items: TBD.”
And replace with:
“b. Payment for materials delivered off-site must be made only after receipt of paid invoices listing the value of material and labor incorporated in the items along with a canceled check showing the prime contractor's title to the items delivered off site. Payment for materials delivered off-site must be limited to the following items: List specific materials to be considered for payment when off-site delivery is made.”
(2) Section 01 32 01.00 10 Page 5, paragraph 3.3.4 Delete Paragraph 3.3.4 Mandatory tasks:
“Include the following activities/tasks in the initial project schedule and all updates.
a. Submission, review, and acceptance of SD-01 Preconstruction Submittals (Individual activity for each).
b. Submission, review and acceptance of features require design completion
c. Submission of mechanical/electrical/information systems layout drawings.
d. Long procurement activities
e. Submission and approval of O & M manuals.
f. Submission and approval of as-built drawings.
g. Submission and approval of DD1354 data and installed equipment lists.
h. Submission and approval of testing and air balance (TAB).
i. Submission of TAB specialist design review report.
j. Submission and approval of fire protection specialist.
k. Submission and approval of Building Commissioning Plan, test data, and reports: Develop the schedule logic associated with testing and commissioning of mechanical systems to a level of detail consistent with the contract commissioning requirements. All tasks associated with all building testing and commissioning will be completed prior to submission of building commissioning report and subsequent contract completion.
l. Air and water balancing.
m. Building commissioning - Functional Performance Testing.
n. Controls testing plan submission.
o. Controls testing.
p. Performance Verification testing.
q. Other systems testing, if required.
r. Contractor's pre-final inspection.
s. Correction of punch list from Contractor's pre-final inspection.
t. Government's pre-final inspection.
u. Correction of punch list from Government's pre-final inspection.
v. Final inspection.”
And replace it with:
“3.3.4 Mandatory Tasks Include the following activities/tasks in the initial project schedule and all updates.
a. Submission, review, and acceptance of SD-01 Preconstruction Submittals (Individual activity for each).
b. Not Applicable.
c. Not Applicable.
d. Long procurement activities.
e. Submission and approval of O & M manuals.
f. Submission and approval of as-built drawings.
g. Not Applicable.
h. Not Applicable.
i. Not Applicable.
j. Not Applicable.
k. Not Applicable.
l. Not Applicable.
m. Not Applicable.
n. Not Applicable.
o. Not Applicable.
p. Performance Verification testing.
q. Other systems testing, if required.
r. Contractor's pre-final inspection.
s. Correction of punch list from Contractor's pre-final inspection.
t. Government's pre-final inspection.
u. Correction of punch list from Government's pre-final inspection.
v. Final inspection.”
b. Drawings (Reissued). The following drawings are revised with latest revision date of 17 June 2022 and reissued with this amendment.
(1) Sheet S-003
2. This amendment is a part of the proposal papers and its receipt shall be acknowledged. All other conditions and requirements of the specifications remain unchanged.
3. See Section 00 21 00, on how to submit electronic offers.
4. Electronic Offers will be received until 2:00 p.m., local time at place of receiving proposals, 11 July 2022, as stated in the Request For Proposal.
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
22 June 2022
JAC/[2100]
SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
The required response date/time has changed from 27-Jun-2022 02:00 PM to 11-Jul-2022 02:00 PM.