Amendment 0001 Tank Inspection YNG W9128F22Q0014.pdf
PDF 1 MB Posted
- Attached to
- POL Tank Inspection - Youngstown (YNG)
- Solicitation number
- W9128F22Q0014
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 Tank Inspection YNG W9128F22Q0014.pdf | ||
| att h-return to service letter.docx | DOCX document | |
| att e-api out-of-service telecon briefing template.docx | DOCX document | |
| att a-general installation security requirements.docx | DOCX document | |
| att g-api out-of-service template.docx | DOCX document | |
| att j-yng-fy15-fac 2002-tank 2002-final.pdf | ||
| att i-yng-fy20-fac 2001-tank 2001-final.pdf | ||
| ATT F-API Out-of-Service Example.pdf | ||
| Solicitation W9128F22Q0014 Tank Inspection YNG.pdf | ||
| att c-yng-fy22-fac 2001 and 2002.pdf | ||
| att b-yng-fy22-fac 2001 and 2002.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9128F22Q0014 30-Dec-2021
b. TELEPHONE NUMBER
402-995-2210
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 25 Feb 2022
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9128F9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
NICOLE L PARKER
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$16,500,000
NAICS:
541990
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF60
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9128F22Q0014
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job API Out of Srv Tank Inspect FAC2001
FFP
All work to conduct Kick-Off Meeting, complete transfer/removal of fuel, complete tank cleaning, Complete API Out of Service tank inspection, complete visual inspection of containment, and complete DRAFT and FINAL reports.
FOB: Destination
PSC CD: H391
NET AMT
0002 1 Job Wiper Seal Replacement FAC 2001
FFP
All work to replace wiper seal and pan penetration seals in accordance with the
PWS.
0003 1 Job API Out of Srv Tank Inspect FAC2002
FFP
All work to conduct Kick-Off Meeting, complete transfer/removal of fuel, complete tank cleaning, Complete STI Out-of-Service tank inspection, complete visual inspection of containment, and complete DRAFT and FINAL reports.
0004 1 Job Wiper Seal Replacement FAC 2002
FFP
All work to replace wiper seal and pan penetration seals in accordance with the
PWS.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
0003 N/A N/A N/A N/A
0004 N/A N/A N/A N/A
PERFORMANCE WORK STATEMENT
Part 1 General Information
1. GENERAL: This is a non-personnel services contract to perform inspections on Department of Defense fuel tanks. This service may entail the removal and transfer of remaining fuel, cleaning, providing strapping charts, replacing wiper seals, and provide an above-ground storage tank (AST) API or STI inspection on tank(s) listed in the Attachment B. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
1.1. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to execute the fuel removal, transfer, or disposal of remaining fuel, clean the tank, then perform an API AST Internal and External inspection on the tank(s) as applicable at the location and tanks specified in Attachment B as defined in the this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2. Background: This tank’s inspection is part of a maintenance program to keep the tank in compliance and is required to be internally inspected to be compliant with EPA, API and UFC requirements.
1.3. Objectives: Perform fuel removal, transfer, or disposal of approximately 5000 gallons of remaining fuel, clean the tank, replace the existing wiper seal with a new double wiper seal, perform an AST Internal and External inspection on FAC 2001 and 2002 at Youngstown Air Reserve Station, OH.
1.4. Scope: Remove and transfer of 5000 gallons of fuel product. Contractor will be responsible for coordinating with the installation as to how the fuel will be transferred and stored during the services provided in this PWS. Any fuel or residual product that will be disposed of the contractor will be responsible to coordinate with environmental and safety authorities having jurisdiction to obtain and execute required permits, manifests, etc.
Clean the tank and perform an internal API AST inspection to also include the visual inspection of the containment area. No more than one tank may be taken out of service at a time.
1.4.1. Tank Cleaning: Contractor shall perform tank cleaning in accordance with UFGS 33 01 50.55.
1.4.2. Tank Inspection: The tank inspection shall be in conformance with applicable industry standards API 653, NFPA 30, NFPA 326, UFGS 33 01 50.65, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local, service or host nation requirements.
1.5 Period of Performance: The period of performance shall be for 180 calendar days starting at the date of contract award.
1.6. General Information
1.6.1. Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.2. Recognized Holidays: The Contractor is not required to perform work on federal holidays that fall within the POP identified in 1.5.
1.6.3. Hours of Operation: The contractor is responsible for contacting the installation POC to determine work hours at the worksite location. The contractor will conduct work during the hours that are provided by the installation POC. Other than normal duty hours must be coordinated with the KO or his/her designated representative. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
When hiring personnel, the Contractor shall maintain stability and continuity of the workforce.
1.6.4. Place of Performance: The work to be performed under this contract will be performed at the location specified in Attachment B.
1.6.5. Type of Contract: The government will award a Firm Fixed Price Contract
1.6.6. Security Requirements: Reference Attachment A – General Installation Security Requirements.
1.6.7. Site Access: Contractor shall coordinate with the installation personnel for access to the site. Typical site access requirements are government issued photo ID, fingerprints, passport, vehicle insurance information are but a few but it will be up to the installation on what documents will need to be provided for base entry. Points of contact for the installation will be provided upon award.
1.6.8. Meetings/Kick-Off Meetings: The Contractor shall coordinate with USACE PM and conduct a kickoff meeting prior to field activities. This can be accomplished either prior to mobilization and inspection activities or onsite prior to commencement of inspection activities. The Work Plan shall be discussed, and further coordination and scheduling accomplished at this meeting. These meetings shall be at no additional cost to the government.
1.6.8.1 Out of Service Out Brief: The Contractor shall be responsible to establish a report of findings and coordinate a teleconference after the inspection is complete and at least 24 hours prior to placing tank back in service. This teleconference will review deficiencies found during the inspection with the Government making the final decision on whether to place this tank back into service. The Contractor can use Attachment E- API OUT-OF- SERVICE TELECON BRIEFING TEMPLATE or their own format however this document shall include the next recommended inspection intervals for both In-Service and Out-of-Service Inspection, and State regulated inspection intervals, if applicable. Also when listing the findings they shall be categorized as either “Mandatory”, “Short Term” or “Long Term”. Individuals to be on the teleconference will be provided after award.
1.6.9. Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration.
The COR is authorized to perform the following functions:
a) assure that the Contractor performs the technical requirements of the contract.
b) perform inspections necessary in connection with contract performance
c) maintain written and oral communications with the Contractor concerning technical aspects of the contract.
d) issue written interpretations of technical requirements, including Government drawings, designs, and specifications
e) monitor Contractor’s performance and notifies both the Contracting Officer and Contractor of any deficiencies
f) coordinate availability of government furnished property
g) provide site entry of Contractor personnel
A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regards to changes in cost or price, estimates or changes in delivery dates.
The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.10. Key Personnel: The follow personnel are considered key personnel by the government: Certified API 653 Inspector, Site Safety, and Project Manager.
1.6.11. Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor if as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. MANDATORY REPAIR. Action necessary to preserve or restore the structural and hydraulic integrity of the tank or piping, or to mitigate a safety hazard. Include any condition which has or may breach the hydraulic or structural integrity of the tank prior to the next integrity inspection.
2.1.8. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.9. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.10. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.11. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.12. RECOMMENDED REPAIR. Action intended to extend the service life of the tank or piping and to address conditions that currently, or within the next service interval, will not have an adverse effect on tank operability or integrity. Applicability is limited to exclude soft or elastomeric parts for any pressure containing system.
2.1.13. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.14. TANK INSPECTION. A multi-disciplinary engineering assessment of all petroleum, oil and lubricant storage tank systems within or connected to the tank hydraulic boundary. Systems include nozzles, appurtenances and conveyance systems such as piping, stilling well, valve, flow control, cathodic protection, overfill protection, spill prevention, containment lead detection, fire suppression, gauging, ventilation, lighting and other electrical systems. Inspection includes a review of cathodic protection reports and relevant as-built records when available.
Unless state otherwise, the limits are the boundary of the secondary containment.
2.1.15. TANK INSPECTOR. An individual certified as a fuel storage tank inspector. The recognized certification is API Std 653.
2.1.16. WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.17. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement ANG Army National Guard AR Army Regulation AST Aboveground Storage Tank API American Petroleum Institute ATG Automatic Tank Gauging AWWA American Water Works Association CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DAF Department of the Air Force DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense EPA Environmental Protection Agency FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 IAP International Airport KO Contracting Officer MOGAS Motor Gasoline NFPA National Fire Protection Association OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit UFC Unified Facilities Criteria UFGS Unified Facilities Guide Specification
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: No Government furnished items or services are required.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2. Equipment: The Contractor shall provide all tools and inspection equipment needed to perform the inspection and other services to be performed under the PWS.
4.3. Project Inspection Management Plan (PMP): After contract award the Contractor shall develop a Project / Inspection Management Plan for the assigned facility. The Contractor shall review all available Tank data and inspection reports, particularly the installation SPCC Plan’s Tank inspection requirements, previous inspection reports, and existing owner inspection reports. The Contractor may also submit additional data requests to the Installation for any other information which may be helpful in pre-inspection and Work Plan preparation.
As part of the initial PMP, the Contractor shall prepare and include a brief (< 10 pages) Work Plan, as an attachment, which will include proposed schedule, inspection activities, personnel performing inspection, required training certificates, and additional data or support requests. This plan shall be submitted to the USACE PM in DRAFT form prior to Field Inspections for review and approval.
4.4. Health and Safety Plan (HSP) and Accident Prevention Plan (APP):
The Contractor will prepare a Health and Safety Plan (HSP) to comply with 29 Code of Federal Regulations (CFR) 1910 and 1926 as well as applicable Military Service (Army, Air Force, or Navy), OSHA, state, host nation, and local and installation health and safety regulations regarding the proposed work effort. Qualifications for individuals who will be on-site for safety shall be submitted in the HSP.
The Accident Prevention Plan (APP) is required by FAR clause 52.236-13. The APP describes the methods by which the contractor or USACE personnel will meet the safety and health requirements listed in EM 385-1-1, Entry into Confined Spaces shall comply with the requirements of 29 CFR 1910.146.
Abbreviated Accident Prevention Plans may be developed and submitted per Form A-01 Abbreviated Accident Prevention Plan Checklist Page A-13 of the EM 385-1-1. This may be submitted to develop a plan more specific to the work performed under this PWS but shall still comply as indicated above.
PART 5
SPECIFIC TASKS
5. Specific Tasks:
5.1. Basic Services.
5.1.1. Remove and transfer of 5000 gallons of fuel product. The contractor will be responsible to coordinate with environmental and safety authorities having jurisdiction to obtain and execute required permits, manifests, etc. to dispose of any fuel or residual product.
5.1.2. Clean the tank and perform an internal AST inspection to also include the visual inspection of the containment area. The contractor shall visually inspect containment for ability to contain the entire contents of the tank in the event of catastrophic failure, assessing for cracks, settlement, and deterioration. Record dimensions of cracks and provide photographic evidence of each deficiency. Tank cleaning shall be done in accordance with UFGS 33 01 50.55. The tank Inspection shall be in conformance with applicable industry standards API 653, NFPA
30, NFPA 326, UFGS 33 01 50.65, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local, service or host nation requirements. At a minimum, table 8-1 within UFC 3-460-01 shall be followed.
5.1.3. Remove and completely replace existing Internal Floating Roof Wiper Seal (foam log, double wiper, etc.)
with a new double wiper seal in accordance with UFGS 33 56 21.17 and the IFR manufacturer’s recommendations;
penetration seals in floating pan will also be replaced.
5.1.4. Hydrostatically test the containment inlet, basin, line, valve. Visually assess the liner integrity and impermeability where applicable. Each containment drain inlet, drain line and containment drain valve shall be hydrostatically tested to assure the drainage system is liquid tight. The Contractor shall perform a hydrostatic test to ensure the drainpipe and release valve do not leak. The Contractor shall perform a hydrostatic test to ensure the integrity of the inlet sump.
Drain Line and Release Valve: Test in accordance with applicable requirements of AWWA C600 for hydrostatic testing. Ensure the release valve is closed and pressurize the end of the pipe within the containment basin sump. Test for leakage by filling the pipe with water and pressurizing to 10 psi using a suitable pump connected to the pipeline. The test pressure shall not vary by more than ±1 psi for the duration of the test. Hold this pressure for no less than 2 hours. If the system does not hold pressure, check the outfall point to see if water is bypassing the valve. Test pressure shall be maintained during the test by adding makeup water through the pressure test pump into the pipeline. Accurately note the amount of makeup water required to maintain pressure during the test.
Containment Drain Inlet: Test for leakage by filling the inlet with water to a level at least 1-2 inches above the top of the inlet structure. The inlet shall hold this water for not less than 2 hours with no measurable change in the water level.
5.1.5. Provide legible tank stencil or label on tank. Upon completion of the Out-of-Service inspection the contractor shall provide a legible tank stencil or decal, consisting of black letters at least 1” in height, stating the date cleaned and inspected, the contractor’s name and the name of the contractor’s personnel supervising the work. Remove any existing stencils displaying previous inspection information. New information shall be provided in the following format:
Date Cleaned and Inspected: Day-Month-Year ABC Contracting Supervisor: John Doe
5.1.6. Provide Teleconference out briefing prior to closing the tank. The Contractor shall be responsible to establish a report of findings and coordinate a teleconference after the inspection is complete and at least 24 hours prior to placing tank back in service. This teleconference will review deficiencies found during the inspection with the Government making the final decision on whether to place this tank back into service. The Contractor can use Attachment E- API OUT-OF-SERVICE TELECON BRIEFING TEMPLATE or their own format however this document shall include the next recommended inspection intervals for both In-Service and Out-of-Service Inspection, and State regulated inspection intervals, if applicable. When listing the findings, they shall be categorized as either “Mandatory”, “Short Term” or “Long Term”. Personnel to be included on the call will be identified after award.
5.1.7. Complete roundness survey as required per Attachment B.
5.1.8. Provide DRAFT and FINAL inspection reports per the attached templates. Provide separate report for each tank inspected. Specify the due date for the next inspection. Include API Std 653 inspector record certificate number and signature.
5.2. SUTABILITY FOR SERVICE: Evaluate inspection data to determine suitability for continued use. Identify conditions which pose a risk to integrity. Determine a metal loss threshold for mandatory repairs. In the determination of mandatory repairs:
a. Use a "first, do no harm" approach to classifying tank repairs.
b. Use Desired Service Interval as the time to next inspection unless notified otherwise by the Contracting Officer.
c. Use minimum remaining thickness (MRT) no less than 100 mils at the next inspection.
d. Do not classify as mandatory repair of conditions which are noncompliant with current standards but are un-related to structural or hydraulic integrity (e.g., gouge, improper weld spacing, weld profile).
e. Apply repair determination to individual indications. Do not average across an entire plate or course.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
American Petroleum Institute (API) 650 – Welded Tanks for Oil Storage 653 – Standard for the Tank Inspection, Repair, Alteration, and Reconstruction
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 30 – Flammable and Combustible Liquids Code NFPA 70 – National Electrical Code (NEC) NFPA 326 – Standard for Safeguarding of Tanks and Containers for Entry, Cleaning, or Repairs
UNIFIED FACILITIES CRITERIA (UFC)
UFC 3-460-01 Design: Petroleum Fuel Facilities UFC 3-460-03 Petroleum Fuel Systems Maintenance
UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS)
UFGS 33 01 50.65 Inspection of Field Fabricated Fuel Storage Tanks UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 112 EPA: Oil Pollution Prevention
PART 7
PERFORMANCE REQUIREMENTS SUMMARY
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective
Standard Performance Threshold
Method of Surveillance
PRS # 1.
Kick-Off Meeting with USACE and Stakeholders
State, local, and federal requirements regulating fuel storage tanks
100% The contractor will schedule this Meeting either on-site prior to commencement of work or via tele-con prior to being onsite. Submit agenda and meeting minutes to stakeholders.
PRS # 2.
Remove and transfer 500 gal of fuel product from the AST
State, local, and federal requirements regulating fuel storage tanks
100% Contractor will coordinate the transfer of the fuel with the installation.
Random Inspection.
PRS # 3.
Clean AST
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection
PRS # 4.
Provide an API 653 Internal Inspection and visual inspection of the containment area
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection
The contractor is to provide a DRAFT and FINAL report for MCX review and comment
PRS # 5.
Remove and Replace existing wiper seal with new double wiper seal
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection.
Photos in the draft and final reports
PRS #6.
Replace the manway bolts with stainless steel bolts and replace the manway gasket prior to filling the tank
State, local, and federal requirements regulating fuel storage tanks
100% Random Inspection.
Photos in the draft and final reports
PRS # 7.
Out-Brief Meeting with USACE and Stakeholders
State, local, and federal requirements regulating fuel storage tanks
100% Participation in the out brief.
PRS #8.
Fill with product past the first shell course manway elevation to ensure no leaks after tank closure
State, local and federal requirements regulating fuel storage tanks
100% Random Inspection
PART 8
DELIVERABLES SCHEDULE
DELIVERABLE SCOPE OF WORK
PARAGRAPH
DUE DATE
Project Inspection Management Plan/Work Plan & Health and Safety Plan (Draft)
4.3 & 4.4 15 days after award
Project Inspection Management Plan/Work Plan & Health and Safety Plan (Final)
4.3 & 4.4 5 days after receipt of comments
Inspection and Evaluation Report – (Draft) 5.1.7 28 days after Field Inspection
Inspection and Evaluation Report – to include populated Attachment C Excel Sheet for each base (Final)
5.1.7 7 days after receipt of comments
PART 9
ATTACHMENT LISTING
9. Attachment List:
9.1. Attachment A – General Installation Security Requirements
9.2. Attachment B – Fuel Storage Tank List
9.3. Attachment C – Fuel Storage Tank Excel Document
9.4. Attachment D – Monthly Contractors Progress, Management and Status Report
9.5. Attachment E – API Out of Service Telecon Briefing Template
9.6. Attachment F – API Out of Service Example
9.7. Attachment G – API Out of Service Template
9.8. Attachment H – Return to Service Letter
9.9. Attachment I – FAC 2001 Previous Report
9.10 Attachment J – FAC 2002 Previous Report
WAGE DETERINATION
"REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015-4263 Daniel W. Simms Division of | Revision No.: 16 Director Wage Determinations| Date Of Last Revision: 10/20/2021 Note: Under Executive Order (EO) 13658 an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1 2015. If this contract is covered by the EO the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination if it is higher) for all hours spent performing on the contract in calendar year 2021. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
State: Ohio
Area: Ohio Counties of Mahoning Trumbull
**Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 14.17 01012 - Accounting Clerk II 15.91 01013 - Accounting Clerk III 18.29 01020 - Administrative Assistant 22.86
01035 - Court Reporter 23.99 01041 - Customer Service Representative I 13.13 01042 - Customer Service Representative II 14.45 01043 - Customer Service Representative III 16.10 01051 - Data Entry Operator I 13.52 01052 - Data Entry Operator II 14.75 01060 - Dispatcher Motor Vehicle 19.57 01070 - Document Preparation Clerk 14.28 01090 - Duplicating Machine Operator 14.28 01111 - General Clerk I 13.67 01112 - General Clerk II 14.91 01113 - General Clerk III 16.73 01120 - Housing Referral Assistant 19.94 01141 - Messenger Courier 14.40 01191 - Order Clerk I 14.21 01192 - Order Clerk II 15.51 01261 - Personnel Assistant (Employment) I 16.94 01262 - Personnel Assistant (Employment) II 19.16 01263 - Personnel Assistant (Employment) III 22.37 01270 - Production Control Clerk 21.76 01290 - Rental Clerk 14.54 01300 - Scheduler Maintenance 15.66 01311 - Secretary I 15.66 01312 - Secretary II 17.51 01313 - Secretary III 19.46 01320 - Service Order Dispatcher 17.42 01410 - Supply Technician 22.86 01420 - Survey Worker 19.16 01460 - Switchboard Operator/Receptionist 13.03 01531 - Travel Clerk I 13.68 01532 - Travel Clerk II 14.55 01533 - Travel Clerk III 15.73 01611 - Word Processor I 14.80 01612 - Word Processor II 16.91 01613 - Word Processor III 19.16 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer Fiberglass 20.33 05010 - Automotive Electrician 19.67 05040 - Automotive Glass Installer 18.92 05070 - Automotive Worker 18.92 05110 - Mobile Equipment Servicer 17.27 05130 - Motor Equipment Metal Mechanic 20.55 05160 - Motor Equipment Metal Worker 18.92 05190 - Motor Vehicle Mechanic 20.55 05220 - Motor Vehicle Mechanic Helper 16.50 05250 - Motor Vehicle Upholstery Worker 18.07 05280 - Motor Vehicle Wrecker 18.92 05310 - Painter Automotive 19.67 05340 - Radiator Repair Specialist 18.92 05370 - Tire Repairer 15.89 05400 - Transmission Repair Specialist 20.55 07000 - Food Preparation And Service Occupations 07010 - Baker 14.44 07041 - Cook I 12.73 07042 - Cook II 14.44 07070 - Dishwasher 9.49 07130 - Food Service Worker 10.66 07210 - Meat Cutter 16.82 07260 - Waiter/Waitress 9.72 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 20.07 09040 - Furniture Handler 13.89 09080 - Furniture Refinisher 18.73 09090 - Furniture Refinisher Helper 15.71 09110 - Furniture Repairer Minor 17.22 09130 - Upholsterer 18.73 11000 - General Services And Support Occupations 11030 - Cleaner Vehicles 12.06 11060 - Elevator Operator 12.44 11090 - Gardener 15.20
11122 - Housekeeping Aide 12.44 11150 - Janitor 12.44 11210 - Laborer Grounds Maintenance 12.14 11240 - Maid or Houseman 10.05 11260 - Pruner 11.09 11270 - Tractor Operator 14.23 11330 - Trail Maintenance Worker 12.14 11360 - Window Cleaner 13.64 12000 - Health Occupations 12010 - Ambulance Driver 15.19 12011 - Breath Alcohol Technician 18.49 12012 - Certified Occupational Therapist Assistant 29.25 12015 - Certified Physical Therapist Assistant 28.30 12020 - Dental Assistant 18.43 12025 - Dental Hygienist 31.50 12030 - EKG Technician 29.68 12035 - Electroneurodiagnostic Technologist 29.68 12040 - Emergency Medical Technician 15.19 12071 - Licensed Practical Nurse I 16.54 12072 - Licensed Practical Nurse II 18.49 12073 - Licensed Practical Nurse III 20.61 12100 - Medical Assistant 14.31 12130 - Medical Laboratory Technician 26.29 12160 - Medical Record Clerk 16.02 12190 - Medical Record Technician 18.43 12195 - Medical Transcriptionist 17.95 12210 - Nuclear Medicine Technologist 34.21 12221 - Nursing Assistant I 11.85 12222 - Nursing Assistant II 13.32 12223 - Nursing Assistant III 14.53 12224 - Nursing Assistant IV 16.32 12235 - Optical Dispenser 17.91 12236 - Optical Technician 15.82 12250 - Pharmacy Technician 14.75 12280 - Phlebotomist 16.36 12305 - Radiologic Technologist 24.80 12311 - Registered Nurse I 23.67 12312 - Registered Nurse II 28.95 12313 - Registered Nurse II Specialist 28.95 12314 - Registered Nurse III 35.03 12315 - Registered Nurse III Anesthetist 35.03 12316 - Registered Nurse IV 41.98 12317 - Scheduler (Drug and Alcohol Testing) 22.90 12320 - Substance Abuse Treatment Counselor 20.30 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 17.87 13012 - Exhibits Specialist II 22.15 13013 - Exhibits Specialist III 27.09 13041 - Illustrator I 17.87 13042 - Illustrator II 22.15 13043 - Illustrator III 27.09 13047 - Librarian 24.52 13050 - Library Aide/Clerk 12.65 13054 - Library Information Technology Systems 22.15 Administrator 13058 - Library Technician 16.42 13061 - Media Specialist I 15.98 13062 - Media Specialist II 17.87 13063 - Media Specialist III 19.93 13071 - Photographer I 15.61 13072 - Photographer II 18.10 13073 - Photographer III 21.80 13074 - Photographer IV 26.45 13075 - Photographer V 32.01 13090 - Technical Order Library Clerk 14.09 13110 - Video Teleconference Technician 17.58 14000 - Information Technology Occupations 14041 - Computer Operator I 15.96 14042 - Computer Operator II 17.84 14043 - Computer Operator III 19.90
14044 - Computer Operator IV 22.10 14045 - Computer Operator V 24.48 14071 - Computer Programmer I (see 1) 14072 - Computer Programmer II (see 1) 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 15.96 14160 - Personal Computer Support Technician 22.10 14170 - System Support Specialist 24.65 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 29.30 15020 - Aircrew Training Devices Instructor (Rated) 35.46 15030 - Air Crew Training Devices Instructor (Pilot) 42.49 15050 - Computer Based Training Specialist / Instructor 29.30 15060 - Educational Technologist 35.33 15070 - Flight Instructor (Pilot) 42.49 15080 - Graphic Artist 22.27 15085 - Maintenance Test Pilot Fixed Jet/Prop 42.49 15086 - Maintenance Test Pilot Rotary Wing 42.49 15088 - Non-Maintenance Test/Co-Pilot 42.49 15090 - Technical Instructor 20.47 15095 - Technical Instructor/Course Developer 24.12 15110 - Test Proctor 17.57 15120 - Tutor 17.57 16000 - Laundry Dry-Cleaning Pressing And Related Occupations 16010 - Assembler 10.74 16030 - Counter Attendant 10.74 16040 - Dry Cleaner 13.28 16070 - Finisher Flatwork Machine 10.74 16090 - Presser Hand 10.74 16110 - Presser Machine Drycleaning 10.74 16130 - Presser Machine Shirts 10.74 16160 - Presser Machine Wearing Apparel Laundry 10.74 16190 - Sewing Machine Operator 14.11 16220 - Tailor 15.02 16250 - Washer Machine 11.52 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) 24.76 19040 - Tool And Die Maker 28.34 21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator 19.21 21030 - Material Coordinator 21.76 21040 - Material Expediter 21.76 21050 - Material Handling Laborer 13.90 21071 - Order Filler 14.85 21080 - Production Line Worker (Food Processing) 19.21 21110 - Shipping Packer 16.31 21130 - Shipping/Receiving Clerk 16.31 21140 - Store Worker I 16.23 21150 - Stock Clerk 21.26 21210 - Tools And Parts Attendant 19.21 21410 - Warehouse Specialist 19.21 23000 - Mechanics And Maintenance And Repair Occupations 23010 - Aerospace Structural Welder 32.47 23019 - Aircraft Logs and Records Technician 26.65 23021 - Aircraft Mechanic I 31.14 23022 - Aircraft Mechanic II 32.47 23023 - Aircraft Mechanic III 33.65 23040 - Aircraft Mechanic Helper 23.45 23050 - Aircraft Painter 29.88 23060 - Aircraft Servicer 26.65 23070 - Aircraft Survival Flight Equipment Technician 29.88 23080 - Aircraft Worker 28.42 23091 - Aircrew Life Support Equipment (ALSE) Mechanic 28.42 I 23092 - Aircrew Life Support Equipment (ALSE) Mechanic 31.14
II
23110 - Appliance Mechanic 22.50 23120 - Bicycle Repairer 20.61 23125 - Cable Splicer 40.23 23130 - Carpenter Maintenance 26.64 23140 - Carpet Layer 25.56 23160 - Electrician Maintenance 30.05 23181 - Electronics Technician Maintenance I 28.06 23182 - Electronics Technician Maintenance II 29.58 23183 - Electronics Technician Maintenance III 32.00 23260 - Fabric Worker 21.92 23290 - Fire Alarm System Mechanic 22.04 23310 - Fire Extinguisher Repairer 20.61 23311 - Fuel Distribution System Mechanic 33.72 23312 - Fuel Distribution System Operator 26.71 23370 - General Maintenance Worker 19.52 23380 - Ground Support Equipment Mechanic 31.14 23381 - Ground Support Equipment Servicer 26.65 23382 - Ground Support Equipment Worker 28.42 23391 - Gunsmith I 20.61 23392 - Gunsmith II 23.38 23393 - Gunsmith III 26.02 23410 - Heating Ventilation And Air-Conditioning 22.31 Mechanic 23411 - Heating Ventilation And Air Contidioning 23.27 Mechanic (Research Facility) 23430 - Heavy Equipment Mechanic 26.89 23440 - Heavy Equipment Operator 26.68 23460 - Instrument Mechanic 26.02 23465 - Laboratory/Shelter Mechanic 24.64 23470 - Laborer 13.90 23510 - Locksmith 24.64 23530 - Machinery Maintenance Mechanic 29.40 23550 - Machinist Maintenance 23.51 23580 - Maintenance Trades Helper 16.09 23591 - Metrology Technician I 26.02 23592 - Metrology Technician II 27.19 23593 - Metrology Technician III 28.22 23640 - Millwright 33.36 23710 - Office Appliance Repairer 20.72 23760 - Painter Maintenance 26.30 23790 - Pipefitter Maintenance 31.84 23810 - Plumber Maintenance 30.16 23820 - Pneudraulic Systems Mechanic 26.02 23850 - Rigger 26.02 23870 - Scale Mechanic 23.38 23890 - Sheet-Metal Worker Maintenance 28.12 23910 - Small Engine Mechanic 19.52 23931 - Telecommunications Mechanic I 30.69 23932 - Telecommunications Mechanic II 32.07 23950 - Telephone Lineman 25.68 23960 - Welder Combination Maintenance 21.30 23965 - Well Driller 26.02 23970 - Woodcraft Worker 26.02 23980 - Woodworker 20.61 24000 - Personal Needs Occupations 24550 - Case Manager 14.36 24570 - Child Care Attendant 10.57 24580 - Child Care Center Clerk 13.90 24610 - Chore Aide 11.29 24620 - Family Readiness And Support Services 14.36 Coordinator 24630 - Homemaker 15.44 25000 - Plant And System Operations Occupations 25010 - Boiler Tender 25.08 25040 - Sewage Plant Operator 23.94 25070 - Stationary Engineer 25.08 25190 - Ventilation Equipment Tender 18.66 25210 - Water Treatment Plant Operator 23.94 27000 - Protective Service Occupations 27004 - Alarm Monitor 18.26
27007 - Baggage Inspector 14.34 27008 - Corrections Officer 24.11 27010 - Court Security Officer 19.25 27030 - Detection Dog Handler 17.88 27040 - Detention Officer 24.11 27070 - Firefighter 17.08 27101 - Guard I 14.34 27102 - Guard II 17.88 27131 - Police Officer I 21.33 27132 - Police Officer II 23.70 28000 - Recreation Occupations 28041 - Carnival Equipment Operator 12.29 28042 - Carnival Equipment Repairer 13.13 28043 - Carnival Worker 9.63 28210 - Gate Attendant/Gate Tender 14.77 28310 - Lifeguard 10.92 28350 - Park Attendant (Aide) 16.52 28510 - Recreation Aide/Health Facility Attendant 12.06 28515 - Recreation Specialist 20.47 28630 - Sports Official 13.16 28690 - Swimming Pool Operator 16.22 29000 - Stevedoring/Longshoremen Occupational Services 29010 - Blocker And Bracer 23.51 29020 - Hatch Tender 23.51 29030 - Line Handler 23.51 29041 - Stevedore I 22.04 29042 - Stevedore II 24.78 30000 - Technical Occupations 30010 - Air Traffic Control Specialist Center (HFO) (see 2) 40.29 30011 - Air Traffic Control Specialist Station (HFO) (see 2) 27.78 30012 - Air Traffic Control Specialist Terminal (HFO) (see 2) 30.59 30021 - Archeological Technician I 19.30 30022 - Archeological Technician II 21.59 30023 - Archeological Technician III 24.66 30030 - Cartographic Technician 26.76 30040 - Civil Engineering Technician 23.61 30051 - Cryogenic Technician I 27.31 30052 - Cryogenic Technician II 30.17 30061 - Drafter/CAD Operator I 19.30 30062 - Drafter/CAD Operator II 21.59 30063 - Drafter/CAD Operator III 24.08 30064 - Drafter/CAD Operator IV 29.62 30081 - Engineering Technician I 18.89 30082 - Engineering Technician II 21.20 30083 - Engineering Technician III 23.71 30084 - Engineering Technician IV 29.38 30085 - Engineering Technician V 35.94 30086 - Engineering Technician VI 43.48 30090 - Environmental Technician 24.66 30095 - Evidence Control Specialist 24.66 30210 - Laboratory Technician 23.78 30221 - Latent Fingerprint Technician I 27.31 30222 - Latent Fingerprint Technician II 30.17 30240 - Mathematical Technician 26.45 30361 - Paralegal/Legal Assistant I 18.84 30362 - Paralegal/Legal Assistant II 23.34 30363 - Paralegal/Legal Assistant III 28.55 30364 - Paralegal/Legal Assistant IV 34.55 30375 - Petroleum Supply Specialist 30.17 30390 - Photo-Optics Technician 26.27 30395 - Radiation Control Technician 30.17 30461 - Technical Writer I 24.66 30462 - Technical Writer II 30.17 30463 - Technical Writer III 36.50 30491 - Unexploded Ordnance (UXO) Technician I 25.60 30492 - Unexploded Ordnance (UXO) Technician II 30.98 30493 - Unexploded Ordnance (UXO) Technician III 37.13 30494 - Unexploded (UXO) Safety Escort 25.60 30495 - Unexploded (UXO) Sweep Personnel 25.60 30501 - Weather Forecaster I 27.31
30502 - Weather Forecaster II 33.23 30620 - Weather Observer Combined Upper Air Or (see 2) 24.08 Surface Programs 30621 - Weather Observer Senior (see 2) 26.27 31000 - Transportation/Mobile Equipment Operation Occupations 31010 - Airplane Pilot 30.98 31020 - Bus Aide 14.80 31030 - Bus Driver 20.88 31043 - Driver Courier 14.81 31260 - Parking and Lot Attendant 11.82 31290 - Shuttle Bus Driver 14.81 31310 - Taxi Driver 13.01 31361 - Truckdriver Light 15.28 31362 - Truckdriver Medium 17.78 31363 - Truckdriver Heavy 22.27 31364 - Truckdriver Tractor-Trailer 22.27 99000 - Miscellaneous Occupations 99020 - Cabin Safety Specialist 15.10 99030 - Cashier 10.54 99050 - Desk Clerk 12.25 99095 - Embalmer 32.26 99130 - Flight Follower 25.60 99251 - Laboratory Animal Caretaker I 12.82 99252 - Laboratory Animal Caretaker II 13.69 99260 - Marketing Analyst 24.26 99310 - Mortician 32.26 99410 - Pest Controller 23.14 99510 - Photofinishing Worker 14.39 99710 - Recycling Laborer 18.62 99711 - Recycling Specialist 21.82 99730 - Refuse Collector 17.02 99810 - Sales Clerk 12.06 99820 - School Crossing Guard 12.27 99830 - Survey Party Chief 22.31 99831 - Surveying Aide 12.70 99832 - Surveying Technician 20.03 99840 - Vending Machine Attendant 17.04 99841 - Vending Machine Repairer 20.65 99842 - Vending Machine Repairer Helper 17.04
Note: Executive Order (EO) 13706 Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1 2017. If this contract is covered by the EO the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness injury or other health-related needs including preventive care; to assist a family member (or person who is like family to the employee) who is ill injured or has other health-related needs including preventive care; or for reasons resulting from or to assist a family member (or person who is like family to the employee) who is the victim of domestic violence sexual assault or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:
HEALTH & WELFARE: $4.60 per hour up to 40 hours per week or $184.00 per week or
$797.33 per month
HEALTH & WELFARE EO 13706: $4.23 per hour up to 40 hours per week or $169.20 per week or $733.20 per month*
*This rate is to be used only when compensating employees for performance on an SCA-covered contract also covered by EO 13706 Establishing Paid Sick Leave for Federal Contractors. A contractor may not receive credit toward its SCA obligations for any paid sick leave provided pursuant to EO 13706.
VACATION: 2 weeks paid vacation after 1 year of service with a contractor or successor 3 weeks after 5 years and 4 weeks after 15 years. Length of service includes the whole span of continuous service with the present contractor or successor wherever employed and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg. 29 CFR 4.173)
HOLIDAYS: A minimum of eleven paid holidays per year: New Year's Day Martin Luther King Jr.'s Birthday Washington's Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans' Day Thanksgiving Day and Christmas Day.