W9128F22B0006 - Amendment 0001 - 28 July 2022 .pdf
PDF 500 KB Posted
- Attached to
- Fort George Bank Stabilization Federal contract opportunity
- Solicitation number
- W9128F22B0006
About this file
This amendment modifies an invitation for bid for bank stabilization work. The project involves stabilizing approximately 2,600 linear feet of vertical cut bank along the Missouri River in Stanley County, South Dakota. Revisions remove requirements for quartzite riprap and related submittals. The bid schedule and scope of work are updated to reference installing class C riprap as designated. The pre-bid site visit remains scheduled for July 21, 2022, with bids due August 15, 2022. The Corps of Engineers Omaha District will award a contract for excavation, fill placement, geotextile installation and riprap work to be completed by March 1, 2023. This is a small business set-aside soliciting bids for repairing and armoring the river bank to a protected slope.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| KO Signed Abstract - W9128F22B0006 - Fort George Bank Stabilization.pdf | ||
| Amd0003 - W9128F22B0006.pdf | ||
| Amd0002 - W9128F22B0006.pdf | ||
| Spec Update - 02 24 50 - 28 July 2022 .pdf | ||
| Submittal Register Amendment 0001- 28 July 2022.pdf | ||
| Specifications - W9128F22B0006 Fort George Bank Stabilization.pdf | ||
| Solicitation - W9128F22B0006 - Fort George Bank Stabilization.pdf | ||
| Drawings - W9128F22B0006 Fort George Bank Stabilization 2022.pdf | ||
| Site Visit Directions - 21 July 2022 - Ft George.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Am0001 in SF30 Block 14 Continuation Page for description of amendment changes. Additional changes have been made removing “Sioux Quartzite” in Line Item 0001 of the Bid Schedule and the Scope of Work.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Jul-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F22B0006
X 9B. DATED (SEE ITEM 11)
14-Jul-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Jul-2022
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F22B0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AM0001
28 July 2022 Solicitation No. W9128F22B0006
Date of Issue: 14 July 2022 Date of Opening: 15 August 2022
SUBJECT: Amendment No. 0001 to Specifications and Drawings for Construction of Fort George Bank Stabilization 2022.
TO: Prospective Bidders and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Section 01 22 00 Page 2, paragraph 2.1
Delete “Quartzite”.
(2) Section 31 00 00 Page 5, paragraph 1.3
Delete submittal “Rock; G, AO”.
(3) Section 31 00 00 Page 7, paragraph 2.2-2.2.1
Delete paragraphs “2.2 Material For Rip-Rap” and “2.2.1 Rock”.
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified by [“Am-__” in the areas of added revisions.](underlining of added text and/or strikeout of deleted text.)
Pages or Sections Deleted Pages or Sections Substituted or Added Submittal Register Submittal Register Am0001 02 24 50 Stone (Riprap) Protection
2. This amendment is a part of the bidding papers and its receipt shall be acknowledged. All other conditions and requirements of the specifications remain unchanged.
a. See Section 00 21 00, paragraph: Instructions to Bidders, on how to submit electronic bids.
3. Electric bids will be received until 2:00 p.m., local time at place of bid opening, 15 August 2022.
Attachments:
Spec Pages listed in 1.b. above
U.S. Army Engineer District, Omaha Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901
28 July 2022
JAC/[2100]
SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
CLIN 0001
The CLIN description has changed from Class "C' Sioux Quartzite Riprap Install to Class "C' Riprap Install.
The CLIN extended description has changed from:
Entire work, complete to supply and install Class “C” Sioux Quartzite Riprap to the Fort George site as shown on the design cross section
To:
Entire work, complete to supply and install Class “C” Riprap to the Fort George site as shown on the design cross section
The following have been modified:
BID SCHEDULE
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
SCOPE OF WORK
Section 01 11 00 Summary of Work
Fort George Bank Stabilization 2022 Lower Brule, SD February 2022
BIDDING SCHEDULE
ITEM
NO.
DESCRIPTION QUANTITY UNIT AMOUNT
BASIC ITEMS
0001 Entire work, complete to supply and install Class “C” Riprap to the Fort George site as shown on the design cross section
Tons
0002 Entire work, complete to excavate and install random fill at the Fort George site as shown on the design cross section.
Cubic Yards
0003 Entire work, complete to supply and install geotextile to the Fort George site as shown on the design cross section
Lineal feet of shoreline
0004 Entire work, complete to excavate random fill from toe as needed for design cross-section at the Fort George site.
CY
All other work, including, but not limited to tree removal, site preparation, site restoration/seeding, mobilization and demobilization. This excludes all other Basic Items.
Job
TOTAL AMOUNT $
1.0 Scope of Work.
Work consists of stabilizing a vertical cut bank along the Missouri River near Fort George Creek.
At the Fort George site, as designated on the drawings, work consists of repairing and armoring a 2600 ft stretch of vertical cut bank to restore it to a 2:1 protected slope. Construction activities include excavation of random fill from the designated borrow site, excavation of a toe per the designed cross section, installation of random fill, earthwork shaping of the bank to meet the design cross section, supply and installation of geotextile, and supply and installation of Class “C” Riprap. Other work includes but is not limited to hauling and stockpile of construction materials, site preparation, and site restoration.
Construction of the slope and placement of riprap must occur from the shoreline. No heavy machinery will be permitted on the top of bank. Access points are designated in the drawings. No material shall be dropped, placed, or pushed from the top of the bank.
All work and transport of materials associated with this project must comply with all federal, state, and local regulations.
Work must be completed on frozen ground and during the winter draw down. The goal for the Contractor shall be to (a) commence work under this contract on 9 September 2022 after receiving the notice to proceed, (b) prosecute the work diligently within 173 construction days, and (c) complete the entire work ready for use no later than 1 March 2023.
(End of Summary of Changes)