Submittal Register Amendment 0001- 28 July 2022.pdf
PDF 638 KB Posted
- Attached to
- Fort George Bank Stabilization Federal contract opportunity
- Solicitation number
- W9128F22B0006
About this file
This submittal register and federal contract opportunity document outlines requirements for the Fort George Bank Stabilization project. The U.S. Army Corps of Engineers - Omaha District is seeking bids to stabilize approximately 2,600 linear feet of bank along Lake Sharpe in Stanley County, South Dakota. Work will include regrading and armoring the bank with geotextile fabric and riprap stone. The submittal register specifies pre-construction plans and close-out documents for quality control, safety compliance, environmental protection, and materials testing that contractors must provide. The contract award is set for mid-September 2022, with work to be fully completed by March 2023 during winter drawdown conditions. Bids are restricted to small businesses with a NAICS code of 237990 and size standard of $39.5M. A mandatory site visit will be held on July 21, 2022 to review the project area.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| KO Signed Abstract - W9128F22B0006 - Fort George Bank Stabilization.pdf | ||
| Amd0003 - W9128F22B0006.pdf | ||
| Amd0002 - W9128F22B0006.pdf | ||
| W9128F22B0006 - Amendment 0001 - 28 July 2022 .pdf | ||
| Spec Update - 02 24 50 - 28 July 2022 .pdf | ||
| Drawings - W9128F22B0006 Fort George Bank Stabilization 2022.pdf | ||
| Site Visit Directions - 21 July 2022 - Ft George.pdf | ||
| Specifications - W9128F22B0006 Fort George Bank Stabilization.pdf | ||
| Solicitation - W9128F22B0006 - Fort George Bank Stabilization.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES
Fort George Bank Stabilization 2022 - Big Bend Dam, SD
01 12 00 SD-01 Preconstruction Submittals
G AOProposed Methods of Operation
1.11 G AOProgress Charts
1.2Construction Right-of-Way
1.7.2State and Federal Highways
1.7.3State and Local Public Roads
SD-11 Closeout Submittals
1.12Warranty of Construction
01 33 00 SD-01 Preconstruction Submittals
1.8 G AOSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7.1 G AOACCIDENT PREVENTION PLAN
(APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 G AOAccident Reports
SD-07 Certificates
1.8Activity Hazard Analysis (AHA)
1.13License Certificates
01 41 26.01 24 SD-01 Preconstruction Submittals
3.2.1Notice of Intent
Authorization Letter
3.2.4Storm Water Pollution Prevention
Plan
3.2.7Notice of Termination
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Am0001
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES
01 41 26.01 24 SD-06 Test Reports
3.2.5Reports
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G AOContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9Verification Statement
01 57 23 SD-07 Certificates
2.1.3Mill Certificate or Affidavit
02 24 50 SD-03 Product Data
Stone Weight Limitations; G-PO
SD-06 Test Reports
1.6.3 G POInitial Sampling and Testing
SD-11 Closeout Submittals
Waybills and Delivery Tickets;
G-PO
31 00 00 SD-01 Preconstruction Submittals
1.6Dewatering Work Plan
3.1Earthwork Notification
Source of Borrow Material
SD-03 Product Data
G AOGeotextile
SD-06 Test Reports
2.1Borrow Site Testing
3.10Testing
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES
31 00 00 3.10 G AOTesting
31 05 19 SD-03 Product Data
2.2Manufacturing Quality Control
Sampling and Testing
SD-04 Samples
3.1Quality Assurance Samples and
Tests
SD-07 Certificates
2.1.1Geotextile
32 05 33 SD-01 Preconstruction Submittals
1.2.1Delivery
SD-03 Product Data
3.3.2 G AOEquipment
SD-07 Certificates
3.6 G AOTurf Establishment Period
2.1.1Seed
GA
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
File details come from the government source that posted it. Updated .