Submittal Register Amendment 0001- 28 July 2022.pdf

PDF 638 KB Posted

Attached to
Fort George Bank Stabilization Federal contract opportunity
Solicitation number
W9128F22B0006
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This submittal register and federal contract opportunity document outlines requirements for the Fort George Bank Stabilization project. The U.S. Army Corps of Engineers - Omaha District is seeking bids to stabilize approximately 2,600 linear feet of bank along Lake Sharpe in Stanley County, South Dakota. Work will include regrading and armoring the bank with geotextile fabric and riprap stone. The submittal register specifies pre-construction plans and close-out documents for quality control, safety compliance, environmental protection, and materials testing that contractors must provide. The contract award is set for mid-September 2022, with work to be fully completed by March 2023 during winter drawdown conditions. Bids are restricted to small businesses with a NAICS code of 237990 and size standard of $39.5M. A mandatory site visit will be held on July 21, 2022 to review the project area.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES

Fort George Bank Stabilization 2022 - Big Bend Dam, SD

01 12 00 SD-01 Preconstruction Submittals

G AOProposed Methods of Operation

1.11 G AOProgress Charts

1.2Construction Right-of-Way

1.7.2State and Federal Highways

1.7.3State and Local Public Roads

SD-11 Closeout Submittals

1.12Warranty of Construction

01 33 00 SD-01 Preconstruction Submittals

1.8 G AOSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7.1 G AOACCIDENT PREVENTION PLAN

(APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 G AOAccident Reports

SD-07 Certificates

1.8Activity Hazard Analysis (AHA)

1.13License Certificates

01 41 26.01 24 SD-01 Preconstruction Submittals

3.2.1Notice of Intent

Authorization Letter

3.2.4Storm Water Pollution Prevention

Plan

3.2.7Notice of Termination

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Am0001

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES

01 41 26.01 24 SD-06 Test Reports

3.2.5Reports

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G AOContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9Verification Statement

01 57 23 SD-07 Certificates

2.1.3Mill Certificate or Affidavit

02 24 50 SD-03 Product Data

Stone Weight Limitations; G-PO

SD-06 Test Reports

1.6.3 G POInitial Sampling and Testing

SD-11 Closeout Submittals

Waybills and Delivery Tickets;

G-PO

31 00 00 SD-01 Preconstruction Submittals

1.6Dewatering Work Plan

3.1Earthwork Notification

Source of Borrow Material

SD-03 Product Data

G AOGeotextile

SD-06 Test Reports

2.1Borrow Site Testing

3.10Testing

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES

31 00 00 3.10 G AOTesting

31 05 19 SD-03 Product Data

2.2Manufacturing Quality Control

Sampling and Testing

SD-04 Samples

3.1Quality Assurance Samples and

Tests

SD-07 Certificates

2.1.1Geotextile

32 05 33 SD-01 Preconstruction Submittals

1.2.1Delivery

SD-03 Product Data

3.3.2 G AOEquipment

SD-07 Certificates

3.6 G AOTurf Establishment Period

2.1.1Seed

GA

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS