KO Signed Abstract - W9128F22B0006 - Fort George Bank Stabilization.pdf

PDF 453 KB Posted

Attached to
Fort George Bank Stabilization
Solicitation number
W9128F22B0006
Issued by

About this file

This abstract of offers is for the Fort George Bank Stabilization project solicited by the U.S. Army Corps of Engineers Omaha District. The solicitation will close on or about September 15, 2022 and is restricted to small businesses with a NAICS code of 237990 and size standard of $39.5 million. A site visit is scheduled for July 21, 2022 at 11:00am Central Time near Fort George. The project scope involves bank stabilization along approximately 2,600 linear feet of Lake Big Bend near Fort George in Stanley County, South Dakota. Work will cut, regrade, and compact the existing bank for geotextile fabric and riprap placement. All work must comply with regulations and be completed between contract award and March 17, 2023 during frozen ground conditions. The abstract lists five line items for the work and totals received from five offerors ranging from $861,191 to $938,274.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED3. DATE OPENED

23-Aug-22

I CERTIFY THAT I HAVE OPENED, READ AND

AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED

23-Aug-22

Fort George Bank Stabilization Stanley County, South Dakota D. OFFEROR

C. REASONABLE CONTRACT Bid Security 20% Yes

7A 7B 7C D. E. F.

ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

Entire work, complete to supply and install Class "C" Sioux Quartzite Riprap to the Old Fort Thompson site as designated on the design cross section.

9,600 Tons $69.64 $668,544.00 $687,360.00 $61.50 $590,400.00 $68.00 $652,800.00 $62.00 $595,200.00

Entire work, complete to excavate and install random fill at the Fort George site as shown on the design cross section

6,163 Cubic Yards

$16.77 $103,353.51 $92,445.00 $40.13 $247,321.19 $20.00 $123,260.00 $14.00 $86,282.00

Entire work, complete to supply and install geotextile to the Fort George site as shown on the design cross section

2,600 Lineal feet of shoreline

$18.30 $47,580.00 $26,000.00 $11.12 $28,912.00 $10.00 $26,000.00 $12.00 $31,200.00

Entire work, complete to excavate random fill from toe as needed for design cross-section at the Fort George site.

397 CY $10.11 $4,013.67 $11,910.00 $39.51 $15,685.47 $50.00 $19,850.00 $10.00 $3,970.00

All other work, including, but not limited to tree removal, site preparation, site restoration/seeding, mobilization and demobilization. This excludes all other Basic Items.

1 Job $37,700.00 $37,700.00 $97,900.00 $55,955.00 $55,955.00 $84,090.00 $84,090.00 $165,000.00 $165,000.00

TOTAL $861,191.18 $915,615.00 $938,273.66 $906,000.00 $881,652.00

Bid Security 20% Yes

C. AMENDMENTS ACKNOWLEDGED: 3

NO. 3

C. OFFEROR

A-G-E Corporation

704 W Hwy 14

Fort Pierre, SD 57532

Bid Security 20% Yes

C. AMENDMENTS ACKNOWLEDGED : 3

Bid Security 20% Yes

C. AMENDMENTS ACKNOWLEDGED : 3

(Without Profit)

(Including Profit)

Pierre, SD 57501 Meriden, KS 66512

B. REASONABLE CONTRACT

6. NUMBER OF AMENDMENTS ISSUED

PO Box 1162 601 E. Wyandotte Street

A. HIRED LABOR

IGE Morris, Inc Mammoth Sports Construction

Constance Ellard

NO. 1 NO. 2

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

W9128F22B0007

4. ISSUING OFFICE

8. GOVERNMENT ESTIMATE

(Check A, B or C AND COMPLETE D, E AND F)

CONTRACTING DIVISION (CENWO-CT)

US ARMY CORPS OF ENGINEERS

l PAGES

9. OFFERS

TO THIS SOLICITATION

SIGNATURE

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

OMAHA, NE 68102-1618

1616 CAPITOL AVENUE

5. PROJECT TITLE

A. OFFEROR B. OFFEROR

C. AMENDMENTS ACKNOWLEDGED: 3

Sharpe Enterprises, Inc.

19087 N Garfield

Pierre, SD 57532

NO. 4

File details come from the government source that posted it. Updated .