EAFB FTU AM-0010 DWGS VOL1.pdf

PDF 12 MB Posted

Attached to
B-21 Formal Training Unit/AMU (FTU), Ellsworth AFB, South Dakota
Solicitation number
W9128F21R0079
Issued by

About this file

This document outlines a federal contract opportunity to construct a B-21 Formal Training Unit/Aircraft Maintenance Unit facility at Ellsworth Air Force Base in South Dakota. The Department of the Army Corps of Engineers Engineering District Omaha is seeking bids to build a new approximately 44,487 square foot secure aircraft maintenance space, 43,776 square foot secure squadron operations space, and 5,000 square foot non-secure flight kitchen in support of B-21 operations at the base. The project scope also includes all associated site work, demolition, utilities and infrastructure, with optional bids for furniture, intrusion detection systems, access control systems, and closed-circuit television systems. Facilities must be designed and constructed according to Department of Defense and Air Force standards for unified facilities, high performance buildings, and antiterrorism/force protection requirements.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DS

DS DS

DS DS DS

DS

DS

DS

DS

DS DS

DS

DS

DS

VAN

VA

N

DS

DS DS

X X X X X X

X

X

X X X

X X X X X X

X

X

X X X X X

X X

X X

X X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X X

PHASE 1

CONTRACTOR PARKING

AREA IN EXISTING

PARKING LOT

FTU

CONTRACTOR

TRAILER

AREA

CONTROLLED

CONSTRUCTION GATE

AND GUARD SHACK WITH

POWER

CONSTRUCTION

SECURITY

PERIMETER

FENCE

FTU

FENCED

CONTRACTOR

TRAILER AREA

CONSTRUCTION

SECURITY

PERIMETER

FENCE

HAUL ROUTE

SEE SHEET G100

TEMPORARY

AIRFIELD SECURITY

FENCE - COORDINATE

WITH GC101-102 FOR

EXTENTS AND

REQUIREMENTS

TEMPORARY BARRIER

MOUNTED SECURITY

FENCE - COORDINATE

WITH GC101-GC102

FOR EXTENTS AND

REQUIREMENTS

PHASE 2

CONTRACTOR

PARKING AREA

EXISTING AIRFIELD

SECURITY FENCE

EXISTING AIRFIELD

SECURITY FENCE

GOVERNMENT

PARKING ONLY

GOVERNMENT

PARKING ONLY

X

X X

X X

X

X

X X X X

TEMPORARY

AIRFIELD SECURITY

FENCE - COORDINATE

WITH GC101-102 FOR

EXTENTS AND

REQUIREMENTS

TEMPORARY BARRIER

MOUNTED SECURITY

FENCE - COORDINATE

WITH GC101-GC102

FOR EXTENTS AND

REQUIREMENTS

BERGSTROM DR BERGSTROM DR

B7520

B7274

B7273

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1 LAYDOWN AND STAGING AREA PLAN

SCALE: 1" = 60' 0 60' 120'

GENERAL SHEET NOTES

SHEET LEGEND

1. REFER TO SHEET C-001 AND C-002 FOR GENERAL CIVIL

NOTES, LEGENDS, AND ABBREVIATIONS.

2. THE CONSTRUCTION SECURE AREA IS ALL THAT AREA WITHIN

THE CONSTRUCTION SECURITY PERIMETER FENCE / AIRFIELD

SECURITY FENCE. THE CONSTRUCTION SECURITY

PERIMETER FENCE SHALL BE INSTALLED AT THE

APPROPRIATE TIME AS DEFINED BY SPECIFICATION 01 14 00,

WORK RESTRICTIONS. AIRFIELD SECURITY FENCING SHALL

BE INSTALLED IN ACCORDANCE WITH THE CONSTRUCTION

SAFETY PHASING PLANS.

3. CONTRACTOR PARKING AREAS MUST BE PHASED TO

FACILITATE REQUIRED SITE WORK. PHASE 1 CONTRACTOR

PARKING AREA WILL BE USED DURING SITE IMPROVEMENTS

IN THE PHASE 2 PARKING AREA. PHASE 2 PARKING AREA WILL

BE USED DURING SITE IMPROVEMENTS IN THE PHASE 1

PARKING AREA. NO EQUIPMENT SHALL BE PARKED AND NO

STORAGE WILL BE PERMITTED WITHIN 30-FT OF THE AIRFIELD

SECURITY FENCE.

4. AIRFIELD ACCESS IS NOT ALLOWED UNLESS APPROVED BY

THE COR AS OUTLINED IN THE CONTRACT SPECIFICATIONS.

CRANE ACCESS AND CONCRETE POURS INSIDE THE SECURE

AREA MUST PASS THROUGH THE CONTROLLED ACCESS

GATE.

5. PARKING SHOWN ON THIS PLAN IS THE FINAL PARKING LOT

LAYOUT. REFER TO THE EXISTING CONDITION DRAWINGS

FOR THE EXISTING PARKING LOT REFERENCED IN THE PHASE

1 CONTRACTOR PARKING AREA. AT NO TIME WILL THE

CONTRACTOR PARK EQUIPMENT OR ALLOW CONTRACTOR

PARKING ON THE FINAL PAVEMENT LAYER. PARKING OF

CONTRACTOR VEHICLES WILL BE ALLOWED ON THE FIRST

PAVEMENT LAYER ONLY. ANY DAMAGE TO THE PAVEMENT

LAYERS WILL BE REPAIRED AT NO ADDITIONAL COST AND TO

THE SATISFACTION OF THE GOVERNMENT.

6. FOR THE CONSTRUCTION SECURITY PERIMETER FENCE AND

GATE, REFER TO DETAIL A1 ON SHEET C-508 AND C-509.

7. REFER TO GC101 AND GC102 FOR TEMPORARY AND

PERMANENT AIRFIELD FENCING AND TEMPORARY BARRIER

MOUNTED FENCE REQUIREMENTS.

8. THE CONSTRUCTION SECURITY PERIMETER FENCE SHALL

REMAIN IN PLACE ONCE CONSTRUCTED AND REMOVED ONLY

AFTER COR WRITTEN APPROVAL.

SECURITY FENCE

CONTRACTOR TRAILER AREA

CONSTRUCTION ACCESS ROUTE

CONTRACTOR TRAILER AREA FENCE

X

PLAN NORTH

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

LA

YD

O W

N A

N D

S

TA

G

IN

G A

R

EA

P

LA

N

G-101

AM

-0

3:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

AM

-0

4:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

10 10

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

BB B

C

C C

B

C

E E

E EE

B B B

E E E E E E E E E E E E E

E E

D D

D D

D D

D D

D D

D D

D D

D D

D D

D D

D D

D D

D D

SET R

EBAR

.21

BASE C

ONTR

OL L

OGO C

AP

.96

SET R

EBAR

.21

BASE C

ONTR

OL L

OGO C

AP

.96

SET R

EBAR

.21

BASE C

ONTR

OL L

OGO C

AP

.96

.26

.05

.28

.34

.23

.14

.12

.00

.00

.10

.17

.46

.64

.60

.41

.30

.26

.30

.39

.47

XX

X X

X

X

X

SIM FACILITY

ADDITION

FFE=3245.50

B8225

EXISTING

SIM FACILITY

FFE = 3243.5

T

X

X

X

X X X X X X

X

DS

DS DS

DS DS DS

DS

DS

DS

DS

DS DS

DS

DS

DS

HYD

X X

X X

HYD

IE 95'

FD

C

VA

N

VAN

VAN

VA

N

DS

DS DS

X

SIM

MPF FTD

FTU

OFFSITE

FTU

FTU HAUL ROUTE

SIM/ FTD HAUL ROUTE

SCOTT DRIVE

MCCONNELL

B

LV

D

BERGSTROM DRIVE

EP H

OW

E S T

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1 OVERALL PROJECT CONSTRUCTION AREA PLAN

SCALE: 1" = 150' 0 150' 300'

GENERAL SHEET NOTES

SHEET LEGEND

1. REFER TO SHEET C-001 AND C-002 FOR GENERAL CIVIL

NOTES, LEGENDS, AND ABBREVIATIONS.

2. COORDINATE REQUIREMENTS FOR HAUL ROUTES WITH

SHEET G-101.

3. INFORMATION SHOWN HEREON IS FOR INFORMATION ONLY

AND REPRESENTS THE NEED FOR CONTINUOUS

COORDINATION BETWEEN ALL CONTRACTORS WITH

RESPECT TO ROAD ACCESS AND ROAD CLOSURES AS

OUTLINED IN THE CONTRACT SPECIFICATIONS.

4. ALL RESPECTIVE CONTRACTORS SHALL COORDINATE

DIRECTLY WITH THE COR ON A WEEKLY BASIS THROUGHOUT

CONSTRUCTION OR AS DEFINED IN THE CONTRACT

SPECIFICATIONS.

5. THE OFFSITE FTU PARKING LOT CONSTRUCTION SHALL BE

COORDINATED WITH THE COR WITH RESPECT TO TIMING AND

ACCESS. THE CONTRACTOR SHALL NOT INTERFERE WITH

THE FTD OR MPF CONSTRUCTION PROJECTS. THE

CONTRACTOR SHALL COORDINATE AND MATCH ALL

CONSTRUCTION INTERFACE POINTS WITH THE ADJACENT

CONTRACTOR TO INCLUDE PAVEMENTS, CURB AND GUTTER,

STRIPING, ETC, AND ALL SITE IMPROVEMENTS.

PLAN NORTH

CONSTRUCTION ACCESS ROUTE

CONSTRUCTION AREA

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

O

VE

R

AL

L

PR

O

JE

C T

C O

N

ST

R U

C

TI

O N

A R

EA

P

LA

N

G-102

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

B7274

B7520

B7273

MH (MISC)

JE

T

FU

EL

MECH

COMM

ELEC

FTU

FFE=3231.00

XXXX

X

X X

X X

XX X X X X

X

X X X X X X X X X X X X X

X X

X X

X

X

X

X

XXX

X X X

X

X X X X

X X

X X X X X

X X

X

X

X X

X

X

X

X

X

X

X X X X

X

X

DS

DS DS

DS DS DS

DS

DS

DS

DS

DS DS

DS

DS

DS

X

X X

X X

X X

X

X X

X X

VAN

VA

N

B7273

BERGSTROM DR

B7274

DS

DS DS

N:675237.88 E:1243294.11

N:675007.44 E:1243486.44

N:674933.94 E:1243574.02

N:674907.77 E:1243595.87

N:674819.47 E:1243587.91

N:674717.31 E:1243673.18

N:674710.29 E:1243664.75

N:674675.85 E:1243661.65

N:674582.63 E:1243739.46

N:674792.06 E:1243762.72

N:674817.50 E:1243741.40

N:675130.24 E:1243628.11

N:675189.93 E:1243578.28

N:675220.78 E:1243273.57

X X X X

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

C1

CONSTRUCTION SAFETY PHASING PLAN - PHASE 2

PLAN NORTH

SHEET KEYNOTES

1. AIRFIELD SECURITY FENCE - DETAIL A1/C-510

2. DEMOLISH TEMPORARY BARRIER MOUNTED

SECURITY FENCE AFTER COMPLETE INSTALLATION

OF THE AIRFIELD SECURITY FENCE AND

ACCEPTANCE BY THE COR.

3. EXISTING FENCE TO REMAIN

4. MOTORIZED CANTILEVERED SLIDING SECURITY GATE

- DETAIL A1/C-511

5. DEMOLISH TEMPORARY AIRFIELD SECURITY FENCE

AFTER COMPLETE INSTALLATION OF THE

PERMANENT AIRFIELD SECURITY FENCE AND

ACCEPTANCE BY THE COR.

6. DEMOLISH EXISTING SECURITY FENCE AFTER

COMPLETE INSTALLATION OF THE PERMANENT

AIRFIELD SECURITY FENCE AND ACCEPTANCE BY

THE COR.

7. EXISTING FENCE TO REMAIN - BUILT UNDER GC101

PLAN

SCALE: 1" = 40' 0 40' 80'

GENERAL SHEET NOTES

1. COORDINATE ALL FENCE CONSTRUCTION AND

TIMING WITH THE CONSTRUCTION SAFETY

PHASING NOTES, DEMOLITION PLAN, AND SITE

PLAN.

2. TEMPORARY BARRIERS MUST BE REMOVED AND

REPLACED ON A DAILY BASIS WHEN

CONSTRUCTION IS REQUIRED IN AREAS

OUTSIDE THE BARRIER SUCH AS

PAVEMENT/CURBS, ETC. BARRIER SHALL NOT BE

REMOVED WITHOUT WRITTEN APPROVAL BY THE

COR.

3. ALL TEMPORARY FENCING SHALL BE REMOVED

OFF GOVERNMENT PROPERTY AT THE END OF

THE PROJECT AND AFTER APPROVAL BY COR.

4. CONTRACTOR SHALL RESTORE ALL EXISTING

CONDITIONS THAT ARE DISTURBED BY THE

FENCE REMOVAL PROCESS TO THEIR ORIGINAL

CONDITIONS OR BETTER.

10'

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

C O

N

ST

R U

C

TI

O N

S

AF

ET

Y

PH

AS

IN

G

P

LA

N

PH

AS

E

GC102

AM

-0

4:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

ADJACENT HANGAR LEGEND

ADJACENT HANGAR COMMON CONSTRUCTION LINE

ADJACENT HANGAR SITE IMPROVEMENT UNDER

SEPARATE CONTRACT

THE CONTRACTOR SHALL COORDINATE WITH THE

COR AND THE ADJACENT HANGAR PROJECTS FOR

ALL CONSTRUCTION ALONG THE COMMON

PAVEMENT CONSTRUCTION LINE TO INCLUDE

TIMING AND TEMPORARY MOVING OF BARRIER

MOUNTED FENCE LINE AS SHOWN ON AND IN

ACCORDANCE WITH THE REQUIREMENTS OF

SHEETS GC101/GC102 - CONSTRUCTION SAFETY

PHASING PLANS

NOTE :

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

TP #62

TP #61

TP #63

TP #60

" R

C P

24" RCP

" R

C P

18" RCP

INLET

INV=3224.55

18" RCP

TP #68

INV=3237.12

TP #67

15" RCP

18" RCP

MH

RIM=3233.23

INV.NE=3227.20

INV.SE=3226.41

MH

RIM=3234.02

INV=3229.18

INV.NE=3228.13

INV.SW=3228.07

INV.NE=3229.02

INV.SW=3228.98

18" RCP

15" RCP

INV=

3237.32

INV=

3241.62

12" R C

P

4" DRAIN TILE

INV=3236.46

30" RCP

2" GAS

6" W

8" W

8" W

AI

RIM=3242.40

INV.SE=3240.00

STMH

RIM=3242.77

INV.NE=3238.38

INV.N=3238.26

INV.SE=3238.23

18" RCP

AI

RIM=3241.89

INV.NE=3238.55

INV.SW=3238.54

6" W

8" W

8" W

CONCRETE

P

VMT

CONCRETE

P

VMT

AS

PH

AL

T

PV

M

T

AS

PH

AL

T

PV

M

T

GRAVEL

GRAVEL

AI

RIM=3220.99

INV=3218.14

MH (MISC)

RIM=3224.28

INV=3219.64

MH

RIM=3230.44

INV.NW=3224.09

INV.NE=3224.02

INV.SW=3223.74

AI

RIM=3229.16

INV.NE=3224.45

INV.NW=3224.35

INV.SW=3224.15

AI

INV.SE=3226.08

INV.NW=3226.0

3" WATER

8" WATER

8" WATER

12" WATER

3" IRRIG

W

ATER

APPRO

X

DI

INV=3225.88

DI

INV.NE=3225.64

INV.NW=3225.63

INV.S=3222.41

AG VALVE

CMH 7

CMH

8210A

CMH

461BD

TP #70

TP #69

12" RCP

" R

CP

24" RCP

12" RCP 36" RCP

AI

RIM=3218.97

INV.NW=3212.97

INV.E=3211.74

AI

RIM=3218.78

INV.SE=3215.55

INV.S=3215.52

AI

RIM=3221.70

INV=3217.00

JE

T

FU

EL

CATH

ODIC

PROTE

CTIO

N

PANEL

EMH

UNVERIFIED

SIM FACILITY

ADDITION

FFE=3245.50

B8225

EXISTING

SIM FACILITY

FFE = 3243.5

C/L

C/L C /L

C /L

C/LC/L

C/ L

C/L C/L C/L C/L C/L C/L C/L C/L C/L

C /L

C /L

C/L

C/L

C/L

C/ L

C /L

C /L

C/ L

C/LC/LC/L

C/L

C/L

C /L

C/L

C/LC/LC/L

C/L

C/L

C/LC/L

C /L

C /L

C/L C/L C/L

C /L

C /L

B7520

B7274

B8210

SIM

OFFSITE

FTU AREA

EP

H

OW

E

ST

MCCONNELL

BLV

D

BERGSTROM DR

RICKENBACKER ST

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

D

. E

LL

ED

G

E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

O

VE

R

AL

L D

EM

O

LI

TI

O N

P

LA

N

CD100

GENERAL SHEET NOTES

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

A1

OVERALL DEMOLITION PLAN

PLAN NORTH

SCALE: 1" = 100' 0 100' 200'

CD101 CD102M

A

TC

H

L

IN

E

CD103

AM

-0

4:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

INV=

3220.41

R C

P

15" RCP

24" RCP

12" RCP

18" RCP

APPROX.-

UNABLE TO LOCATEAPPROX.-UNABLE TO LOCATE

MH

RIM=3221.70

INV.NE=3210.70

INV.SW=3210.61

B7520

" R

C P

AI

RIM=3218.55

INV.S=3216.47

INV.E=3215.31

INV.W=3215.30

MH

RIM=3223.06

INV.N=3211.54

INV.E=3211.54

INV.S=3211.53

INV.W=3211.53

AI

RIM=3219.18

INV.W=3214.61

INV.SE=3214.53

AI

RIM=3218.32

INV.SW=3215.90

INV.NE=3215.90

AI

RIM=3220.74

INV.SW=3218.23

INV.NE=3218.16

BERGSTROM DRIVE BERGSTROM DRIVE

M cC

O N

N

EL

L

BL

VD

DI

INV=

3222.44

24" RCP BURIED

AI

RIM=3220.99

INV=3218.14

MH

RIM=3224.37

INV.SW=3221.18

INV.W=3221.13

INV.NE=3221.05

DI

INV=3221.13

DI

INV.W=3222.38

INV.E=3222.33

INV=

3221.04

INV=

3221.61

CMH 7

CMH

8210A

CMH

461BD

McC

ONNELL

B

LV

D

N:674784.41 E:1243742.70

N:674607.85 E:1243899.17

N:674622.62 E:1243992.59

N:674667.11 E:1244320.71

N:674763.18 E:1244274.17

N:674794.24 E:1244248.56

N:674746.36 E:1244254.06

N:674777.21 E:1244228.24

N:674667.61 E:1244275.96

N:674668.46 E:1244255.35

C/L C/L C/L C/L C/L C/L C/L C/L C/L C/L C/L

C /L

C /L

C /L

C/L C/L C/L

C/ L

C/ L

C/LC/L

C/L

C/L

C/L

C/L

C/ L

C/ L

C /L

C /L

C /L

C/LC/L

C /L

C /L

C /L

C /L

C /L

C/ L

C/L

C/L

C/LC/LC/LC/LC/LC/L

N:675027.40 E:1244014.95

N:674966.46 E:1244002.28

FUEL LINE STORM

SEWER CROSSING

SEE GENERAL SHEET

NOTE 4

N:674703.08 E:1243629.29

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

PLAN NORTH

M A

T C

H L

IN

E

S

E E

S H

E E

T C

D F

O R

C O

N T

IN

U

A T

IO

N

A1

DEMOLITION PLAN

1. REFER TO C-001 FOR ABBREVIATIONS AND

LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

3. CONTRACTOR SHALL PROTECT EXISTING JET FUEL

LINE AT ALL TIMES.

4. THERE IS AN EXISTING JET FUEL LINE THAT PASSES

THROUGH THE TOP OF THE 60” STORM SEWER LINE

WITHIN A 12” CORRUGATED METAL CARRIER PIPE

(CMP) AT THE LOCATION NOTED IN GRID G1. THE

STRUCTURAL INTEGRITY OF THE STORM SEWER

LINE IS UNKNOWN. THE CONTRACTOR SHALL

PROTECT THIS AREA FROM ALL EQUIPMENT AND

CONSTRUCTION LOADS THROUGHOUT THE

DURATION OF CONSTRUCTION. THE CONTRACTOR

SHALL EXCAVATE THE AREA TO DETERMINE THE

ACTUAL CONDITION OF THE CMP AND OR

CONCRETE CAP IF PRESENT. THE CONTRACTOR

SHALL REPORT THE FINDINGS, WITH

PHOTOGRAPHS TO THE GOVERNMENT

IMMEDIATELY, AND SHALL SEEK COR APPROVAL

PRIOR TO BACKFILL. HAND-OPERATED

COMPACTION EQUIPMENT SHALL BE USED IN LIEU

OF LARGER EQUIPMENT WITHIN 10' OF THE UTILITY

INTERSECTION AND FOR FILL DEPTHS LESS THAN

OR EQUAL TO 3'.

SHEET KEYNOTES

GENERAL SHEET NOTES

29 16

6 TYP. 24

2. DEMOLISH BITUMINOUS PAVEMENT AND BASE

3. DEMOLISH CONCRETE CURB AND GUTTER

4. DEMOLISH CONCRETE PAVEMENT AND BASE

5. DEMOLISH CONCRETE SIDEWALK AND BASE

6. DEMOLISH CONCRETE BOLLARDS

7. SAW CUT PAVEMENT WITH STRAIGHT EDGE

8. DEMOLISH STORM DRAINAGE PIPE

9. DEMOLISH STORM DRAINAGE STRUCTURE

12. DEMOLISH WATER LINE

13. DEMOLISH END SECTION

15. DEMOLISH NATURAL GAS LINE

16. DEMOLISH LIGHT POLE AND CONCRETE BASE

18. PROTECT EXISTING JET FUEL LINE

20. PROTECT EXISTING 60" STORM DRAINAGE PIPE TO

REMAIN

24. DEMOLISH FENCE - SEE SHEET GC101 AND GC102 FOR

PHASING

29. DEMOLISH SITE ELECTRICAL - SEE SITE ELECTRICAL

PLANS

30. DEMOLISH SITE COMMUNICATION - SEE SITE

ELECTRICAL PLANS

39. CONSTRUCTION LIMITS

47. ABANDON IN PLACE STORM SEWER PIPE AND FILL

WITH CONCRETE

52. ABANDON IN PLACE COMMUNICATION - SEE SITE

ELECTRICAL PLANS

SCALE: 1" = 30' 0 30' 60'

52 52

2.

30 29

7 7

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

D

EM

O

LI

TI

O

N P

LA

N

CD102

AM

-0

4:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

SET

REBAR

.21

SET

REBAR

.21

SET

REBAR

.21

XX

X X

X X

X X X X X X X

X X

X

X

CRCS

DS

DS DS

DS DS DS

DS

DS

DS

DS

DS DS

DS

DS

DS

X X

X

X

X X

VA

N

VAN

VAN

VA

N

T

DS

DS DS

X

X X

X X

XX

X

X

X

X

X

X

X

X

B7520

B7274

B8210

FTU

MPF

FTD

SIM

OFFSITE

FTU AREA

EP

H

OW

E

ST

MCCONNELL

BLV

D

BERGSTROM DR

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1

OVERALL SITE PLAN

PLAN NORTH

GENERAL SHEET NOTES

1. REFER TO C-001 FOR ABBREVIATIONS AND

LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

SCALE: 1" = 100' 0 50' 100' 200'

CS101 CS102

M A

TC

H

L

IN

E

CS103

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

O

VE

R

AL

L

SI

TE

P

LA

N

CS100

AM

-0

4:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

MECH

COMM

ELEC

FTU

FFE=3231.00

X X X X X X X X

X

X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X X X

X

X

X

X

X

X

XXXXX

DS

DS DS

DS DS DS

DS

DS

DS

DS

DS DS

DS

DS

DS

.528.

VAN

B7273

BERGSTROM DR

B7274

DS

DS DS

X XX

8'

.7

78'

10'

8'

10'

.8

10' 8'45'20'

9.

5'

10'

.1

.5

.5

R20'

R20'

R15

R

R

0'

R20

R30' R18'

N:675103.83 E:1243958.27

N:675427.33 E:1243686.67N:675486.25

E:1243637.22

N:675303.71 E:1243300.57

N:675267.09 E:1243238.99

N:674769.55 E:1243573.61

N:674819.47 E:1243587.91

N:674907.77 E:1243595.87

N:674933.94 E:1243574.02

N:675007.44 E:1243486.44

N:675237.88 E:1243294.11

N:675220.78 E:1243273.57

N:675189.93 E:1243578.28 N:675130.24

E:1243628.11

N:675201.69 E:1243469.54

N:675053.68 E:1243593.08

R

8'

R

0'

R8

R50

R18'

R40.3'

R1.7'

R2

N:674958.77 E:1243900.93

N:675077.36 E:1243952.43

N:675416.69 E:1243669.20

N:675383.37 E:1243613.65

N:675036.35 E:1243903.30

N:675134.66 E:1243525.49

N:675103.36 E:1243459.78

.6'

10.2' 14 .6

TYP.

TYP.

N:674817.50 E:1243741.39

R15'

9'

9'

R50'

R50'

R30 'R12'

8'

15.6'

.7

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1

SITE PLAN

PLAN NORTH

M A

T C

H L

IN

E

S

E E

S H

E E

T C

S

F O

R C

O N

T

IN

U A

T

IO

N

TYP.

TYP.

TYP.

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

3. COORDINATES FOR THE BUILDING ARE LOCATED AT THE

OUTSIDE FACE OF WALL. COORDINATE BUILDING LAYOUT

WITH THE ARCHITECTURAL PLANS.

EXISTING PARKING B7274

NORTH LOT 125 POV SPACES

EAST LOT 105 POV SPACES

ACCESSIBLE PARKING 5 SPACES

FTU PARKING (195 FTE) 137 POV SPACES @ 70%

FTU PARKING (111 STUDENTS) 67 POV SPACES @ 60%

ACCESSIBLE PARKING 8 SPACES

TOTAL POV REQ/PROVIDED 434/412 POV SPACES

ONSITE 328 SPACES

OFFSITE BID OPTION 84 SPACES

TOTAL ACCESSIBLE PARKING

REQ/PROVIDED 8/8 SPACES

(CALCULATION PER ONSITE PARKING)

GOV FLIGHT KITCHEN PARKING 13 SPACES

CTK PARKING 18 SPACES

GOV CTK PARKING 4 SPACES

6 6

6 440

7 8 TYP.

1. SITE BITUMINOUS PAVEMENT AND BASE - DETAIL

E1/C-501

2. PORTLAND CEMENT CONCRETE PAVEMENT AND BASE -

DETAIL G1/C-501

4. 30" CONCRETE CURB AND GUTTER MODIFIED TYPE B-

DETAIL D6/C-502

5. 30" CONCRETE CURB AND GUTTER MODIFIED TYPE BL-

DETAIL D6/C-502

6. CONCRETE SIDEWALK - DETAIL F6/C-501

7. 4" PAINTED WHITE STRIPE

8. PAINTED UNIVERSAL ACCESSIBLE SYMBOL - DETAIL

A4/C-501

9. ACCESSIBLE PARKING MARKING AND SIGN - DETAIL

A1/C-501

10. 10" WHITE STOP BAR - DETAIL B8/C-501

11. R1-1 STOP SIGN AND POST - DETAIL B4/C-501

14. 33' UNOBSTRUCTED SPACE

17. DUMPSTER ENCLOSURE - SEE ARCHITECTURAL PLAN

18. ACCESSIBLE RAMP - DETAIL D3/C-502

21. SITE HEAVY DUTY BITUMINOUS PAVEMENT AND BASE -

DETAIL G4/C-501

22. RIVER ROCK AND TRENCH DRAIN BORDER - DETAIL

F9/C-501

23. CONCRETE STOOP - SEE STRUCTURAL PLAN

24. CONCRETE WHEEL STOP - DETAIL A6/C-501

32. AIRFIELD SECURITY FENCE FE-7 - DETAIL A1/C-510

34. LOADING ZONE - DETAIL C10/C-501

38. CONCRETE CURB AND GUTTER MATCH EXISTING WIDTH

AND PROFILE

40. 30" CONCRETE CURB AND GUTTER MODIFIED ROLL

CURB- DETAIL D6/C-502 STARTS AT CURB TAPER

43. CONCRETE FLUME - SEE GRADING

45. BOLLARD - DETAIL D1/C-502

47. STRIPED ISLAND - DETAIL C8/C-501

51. MOTORIZED CANTILEVER SLIDING SECURITY GATE

DETAIL A1/C-511 - SEE ELECTRICAL

53. 6' CURB TAPER - DETAIL E9/C-501

56. MECHANICAL EQUIPMENT - SEE MECHANICAL

58. 30" CONCRETE RIBBON CURB - DETAIL D9/C-501

60. DO NOT ENTER (R5-1) SIGN AND SIGN POST

61. 5" SINGLE SOLID WHITE ROAD MARKING

65. THICKENED EDGE EXPANSION JOINT AT

STRUCTURE/BLDG - DETAIL F3/C-505

67. CONCRETE SIDEWALK RAMP TO STOOP

69. BUILDING BOLLARD - SEE STRUCTURAL PLAN

70. 5' X 10' INDUCTION LOOP DETECTOR. SAWCUT AND

SEAL IN PAVEMENT PER MANUFACTURERS

RECOMMENDATION

38 38 38

SCALE: 1" = 30' 0 30' 60'

TYP.

23 23

23 23

SHEET KEYNOTES

GENERAL SHEET NOTES

PARKING ANALYSIS

TYP.

69 TYP.

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

SI

TE

P

LA

N

CS101

AM

-0

3:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

AM

-0

4:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

ADJACENT HANGAR LEGEND

COORDINATE WITH GC102 FOR REQUIREMENTS

AM

-0

5:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

XXXXXXX

X

X

X X

X X

X X

X

X X

XX

24 24

23 44 44

DS

DS

X

X X

X X

X X

X X

X X

X

X

X

X X

X X

X

X

VA

N

BERGSTROM DR

B7520

X

36.7' 6'

18.5' 26' 18.5' 18.5' 26' 18.5' 18.5' 26' 20'

.5

R14 .5'

36.7'

R30'

R25'

R3.5'

R 15'

R13'

R 30'

R15

R30'

R25'

10' X 20' SPACES

' X

0'

S

PA

C

ES

' X

0'

S

PA

C

ES

11.2'

N:674667.08 E:1244320.71

N:674741.94 E:1244257.73

N:675032.65 E:1244011.56

N:674582.63 E:1243739.45

N:674675.85 E:1243661.65

N:674710.29 E:1243664.75

N:674792.06 E:1243762.72

N:674606.70 E:1243900.15

N:674622.78 E:1243988.78

N:674657.53 E:1243959.59

N:674621.74 E:1243991.00

N:674667.62 E:1244275.92

N:674668.48 E:1244254.71

N:675008.27 E:1244002.90

N:674749.59 E:1244024.73

N:674712.10 E:1243979.82

N:674723.12 E:1244026.62

N:674690.75 E:1243688.93

N:674717.32 E:1243673.17

N:674719.62 E:1243691.54

.5

N:674705.03 E:1244001.89

N:674951.80 E:1243969.70

N:674960.31 E:1243983.02

30'

6'6'

5'5'

5' 5.

5'

5.

5'

5'

R3'

R2'

R10'

R10

R100'

R3'

10'

9' 9'

9' 9'

9'

TY

P.

TYP.

TYP.

9'

TY

P.

TY

P.

TY

P.

R50'

R50'

N:674672.27 E:1243655.25

8'

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1

SITE PLAN

PLAN NORTH

M A

T C

H L

IN

E

S

E E

S H

E E

T C

S

F O

R C

O N

T

IN

U A

T

IO

N

TYP.

1. SITE BITUMINOUS PAVEMENT AND BASE - DETAIL

E1/C-501

2. PORTLAND CEMENT CONCRETE PAVEMENT AND BASE

- DETAIL G1/C-501

3. ROAD BITUMINOUS PAVEMENT AND BASE - DETAIL

E4/C-501

4. 30" CONCRETE CURB AND GUTTER MODIFIED TYPE B-

DETAIL D6/C-502

5. 30" CONCRETE CURB AND GUTTER MODIFIED TYPE BL-

DETAIL D6/C-502

6. CONCRETE SIDEWALK - DETAIL F6/C-501

7. 4" PAINTED WHITE STRIPE

8. PAINTED UNIVERSAL ACCESSIBLE SYMBOL - DETAIL

A4/C-501

9. ACCESSIBLE PARKING MARKING AND SIGN - DETAIL

A1/C-501

13. 4" DOUBLE SOLID YELLOW ROAD MARKING - A8/C-501

14. 33' UNOBSTRUCTED SPACE

18. ACCESSIBLE RAMP - DETAIL D3/C-502

21. SITE HEAVY DUTY BITUMINOUS PAVEMENT AND BASE -

DETAIL G4/C-501

22. RIVER ROCK AND TRENCH DRAIN BORDER - DETAIL

F9/C-501

24. CONCRETE WHEEL STOP - DETAIL A6/C-501

30. 5' CHAIN LINK FENCE

32. AIRFIELD SECURITY FENCE FE-7 - DETAIL A1/C-510

38. CONCRETE CURB AND GUTTER MATCH EXISTING

WIDTH AND PROFILE

43. CONCRETE FLUME - SEE GRADING

45. BOLLARD - DETAIL D1/C-502

47. STRIPED ISLAND - DETAIL C8/C-501

53. 6' CURB TAPER - DETAIL E9/C-501

58. 30" CONCRETE RIBBON CURB - DETAIL D9/C-501

62. BICYCLE RACK - DETAIL A8/C-502

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

3. COORDINATES FOR THE BUILDING ARE LOCATED AT

THE OUTSIDE FACE OF WALL. COORDINATE BUILDING

LAYOUT WITH THE ARCHITECTURAL PLANS.

TYP. TYP.

8 TYP.

9 24

EXISTING PARKING B7274

NORTH LOT 125 POV SPACES

EAST LOT 105 POV SPACES

ACCESSIBLE PARKING 5 SPACES

FTU PARKING (195 FTE) 137 POV SPACES @ 70%

FTU PARKING (111 STUDENTS) 67 POV SPACES @ 60%

ACCESSIBLE PARKING 8 SPACES

TOTAL POV REQ/PROVIDED 434/412 POV SPACES

ONSITE 328 SPACES

OFFSITE BID OPTION 84 SPACES

TOTAL ACCESSIBLE PARKING

REQ/PROVIDED 8/8 SPACES

(CALCULATION PER ONSITE PARKING)

GOV FLIGHT KITCHEN PARKING 13 SPACES

CTK PARKING 18 SPACES

GOV CTK PARKING 4 SPACES

SCALE: 1" = 30' 0 30' 60'

9 TYP.

EX

. C

O N

C R

ET

E

SHEET KEYNOTES

GENERAL SHEET NOTES

PARKING ANALYSIS

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

SI

TE

P

LA

N

CS102

AM

-0

4:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

ADJACENT HANGAR LEGEND

COORDINATE WITH GC102 FOR REQUIREMENTS

5 5

AM

-0

5:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N S

/2

COMM

ELEC

MECH

B8306

OFFSITE

FTU AREA

UTILITY

YARD

FFE 3229.0

B8210

X

XXX

X

X X

X X

X X

X X

X X

X X

X X

20'24'

10'

TYP.

N:675401.58 E:1244304.27

N:675245.52 E:1244435.39 N:675223.96

E:1244409.73

8'

10'

TYP.

10'

TYP.

10'

TYP.

10'

TYP.

8'26'8'40'

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1

SITE PLAN - BID OPTION 0004

PLAN NORTH

TYP.

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

3. THE CONTRACTOR SHALL COORDINATE WITH THE COR

AND THE FTD/MPF PROJECTS FOR ACCESS AND TIMING

TO THE OFFSITE PARKING LOT CONSTRUCTION AREA.

4. BID OPTION 0004 APPLIES TO ALL OFFSITE FTU

CONSTRUCTION.

5. THE CONTRACTOR SHALL CONSTRUCT PAVEMENT AND

CURB AND GUTTER TO THE LOCATION SHOWN AND

CONNECT TO THE FTD AND MPF CONSTRUCTION LIMIT.

SAW CUT ALONG THE COMMON PAVEMENT

CONSTRUCTION LINE PRIOR TO PLACING NEW

PAVEMENT.

TYP.

EXISTING PARKING B7274

NORTH LOT 125 POV SPACES

EAST LOT 105 POV SPACES

ACCESSIBLE PARKING 5 SPACES

FTU PARKING (195 FTE) 137 POV SPACES @ 70%

FTU PARKING (111 STUDENTS) 67 POV SPACES @ 60%

ACCESSIBLE PARKING 8 SPACES

TOTAL POV REQ/PROVIDED 434/412 POV SPACES

ONSITE 328 SPACES

OFFSITE BID OPTION 84 SPACES

TOTAL ACCESSIBLE PARKING

REQ/PROVIDED 8/8 SPACES

(CALCULATION PER ONSITE PARKING)

GOV FLIGHT KITCHEN PARKING 13 SPACES

CTK PARKING 18 SPACES

GOV CTK PARKING 4 SPACES

SCALE: 1" = 30' 0 30' 60'

FTD

SITE

MPF

SITE

SHEET KEYNOTES

GENERAL SHEET NOTES

PARKING ANALYSIS

1. SITE BITUMINOUS PAVEMENT AND BASE - DETAIL

E1/C-501

4. 30" CONCRETE CURB AND GUTTER MODIFIED TYPE B-

DETAIL D6/C-502

7. 4" PAINTED WHITE STRIPE

47. STRIPED ISLAND - DETAIL C8/C-501

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

SI

TE

P

LA

N

BI

D

O

PT

IO

N

CS103

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

15" RCP

3237.32

INV=

3241.62

12" R C

P

4" DRAIN TILE

INV=3236.46

AI

RIM=3242.40

INV.SE=3240.00

STMH

RIM=3242.77

INV.NE=3238.38

INV.N=3238.26

INV.SE=3238.23

18" RCP

AI

RIM=3241.89

INV.NE=3238.55

INV.SW=3238.54

SET

REBAR

.21

SET

REBAR

.21

SET

REBAR

.21

SIM FACILITY

ADDITION

FFE=3245.50

B8225

EXISTING

SIM FACILITY

FFE = 3243.5

XX

X X

X X

X X X X X X X

X X

X

X

DS

DS DS

DS DS DS

DS

DS

DS

DS

DS DS

DS

DS

DS

P P

P P

P

HYD

X X

X

X

X X

HYD

F D

C

T

CMH

EMH

EMH

CMH

CMH

CMH

EMH

ES

DS

DS DS

B7520

B7274

B8210

FTU

MPF

FTD

SIM

OFFSITE

FTU AREA

EP

H

OW

E

ST

MCCONNELL

BLV

D

BERGSTROM DR

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1

OVERALL JOINT LAYOUT PLAN

PLAN NORTH

GENERAL SHEET NOTES

1. REFER TO C-001 FOR ABBREVIATIONS AND

LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

SCALE: 1" = 100' 0 100' 200'

CP101

CP102

M A

TC

H

L

IN

E

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

O

VE

R

AL

L

JO

IN

T

LA

YO

U T

PL

AN

CP100

AM

-0

4:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

B7520

DI

INV.W=3222.38

INV.E=3222.33

XXXXXXX

X

X

X X

X X

X X

X

X

X

X

X X

X X

X X

X X

X X

X

X

X

X X

X X

X

X

BERGSTROM DR

B7520

R R

R

R

R R

R

R

X

RF

A

A R R C

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1

JOINT LAYOUT PLAN

PLAN NORTH

M A

T C

H L

IN

E

S

E E

S H

E E

T C

P

F O

R C

O N

T

IN

U A

T

IO

N

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

SCALE: 1" = 30' 0 30' 60'

GENERAL SHEET NOTES

LEGEND

RF RIGID/FLEXIBLE PAVEMENT THICKENED EDGE

JOINT, TYPE RF - DETAIL F6/C-505

REINFORCED PCC PAVEMENT, TYPE R

- DETAIL A1/C-505

R

A TIED CONSTRUCTION JOINT, TYPE A

- DETAIL C1/C-505

X DOWELED CONSTRUCTION JOINT AT EXISTING

PAVEMENT, TYPE X - DETAIL A3/C-505

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

JO

IN

T

LA

YO

U

T

PL

AN

CP102

AM

-0

4:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

ADJACENT HANGAR LEGEND

COORDINATE WITH GC102 FOR REQUIREMENTS

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

C DOWELED CONTRACTION JOINT, TYPE C

- DETAIL E3/C-505

INV=3237.12

AG VALVE

CMH 7

CMH

461BD

12" RCP

" R

CP

24" RCP

12" RCP 36" RCP

AI

RIM=3218.97

INV.NW=3212.97

INV.E=3211.74

AI

RIM=3218.78

INV.SE=3215.55

INV.S=3215.52

AI

RIM=3221.70

INV=3217.00

SET R

EBAR

.21

SET R

EBAR

.21

SET R

EBAR

.21

ST ST STST ST

ST ST

ST ST ST

ST

ST

ST

ST ST

ST ST

ST

ST

ST

ST

ST

XX

X X

X X

X X X X X X X

X X

X

X

P

P

P P P

P

ST ST

ST

ST

DS

DS DS

DS DS DS

DS

DS

DS

DS

DS DS

DS

DS

DS

P

ST

ST

X X

X

X

X X

ST ST ST

T

DS

DS DS

ST

STST

B7520

B7274

B8210

FTU

MPF

FTD

SIM

OFFSITE

FTU AREA

EP

H

OW

E

ST

MCCONNELL

BLV

D

BERGSTROM DR

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1

OVERALL GRADING AND DRAINAGE PLAN

PLAN NORTH

GENERAL SHEET NOTES

1. REFER TO C-001 FOR ABBREVIATIONS AND

LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

SCALE: 1" = 100' 0 100' 200'

CG101 CG102

M A

TC

H

L

IN

E

CG103

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

O

VE

R

AL

L G

R

AD

IN

G

A N

D D

R

AI

N

AG

E

PL

AN

CG100

AM

-0

4:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

R C

P

24" RCP

12" RCP

18" RCP

B7520

" R

C P

AI

RIM=3218.55

INV.S=3216.47

INV.E=3215.31

INV.W=3215.30

AI

RIM=3219.18

INV.W=3214.61

INV.SE=3214.53

AI

RIM=3218.32

INV.SW=3215.90

INV.NE=3215.90

AI

RIM=3220.74

INV.SW=3218.23

INV.NE=3218.16

3223 3221

32223223

DI

INV=

3222.44

24" RCP BURIED

AI

RIM=3220.99

INV=3218.14

CMH 7

CMH

461BD

G

G G

G G

G G

G G

G G

G

ST

ST

ST ST ST ST ST ST ST ST ST

ST

ST ST ST ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

XXXXXXX

X

X

X X

X X

X X

X

X X

XX

30.5

30.98 30.69

30.86

30.6930.5

29.27

29.64

28.928.3

.7

26.5

25.95

25.2525.6

25.6

25.4

25.0

24.7 24.8

25.2

27.9

27.7

29.15

28.5

28.3

29.15 28.8

25.4

25.2

25.2 25.3

24.5

25.3

23.5 25.0

23.0

23.6

23.7 23.3

24.0

23.8 P

P P

P P

P P

ST ST ST ST

ST

ST

ST

ST

ST

ST

DS

DS

ST

23.95

23.24

X

X X

X X

X X

X X

X X

X

X

X

X X

X X

X

X

ST

ST

ST

29.64

28.8

23.4

23.8 23.5

24.5 30.69

.5

28.8

28.2

27.1

29.0

BERGSTROM DR

B7520 30.96

30.80

30.80

30.80

29.15

30.4030.40

30.70

27.35 27.25

27.60

28 32

26 32

CO INV=3228.0

CO INV=3226.5

CO INV=3225.5

STDI-A1

STCI-A2STDI-A3

STDI-A4

OCS-A5

STCI-B1

STCI-B2

STCI-A2.2

STMH-C8

STMH-C9

STCI-A2.1

STHW-B0

STMH-C10.1.1

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1

GRADING AND DRAINAGE PLAN

PLAN NORTH

M A

T C

H L

IN

E

S

E E

S H

E E

T C

G F

O R

C O

N T

IN

U

A T

IO

N

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

3. ALL SPOT ELEVATIONS ARE TRUNCATED. DATUM

STARTS AT 3200.

4. SEE PROFILES FOR STORM SEWER PIPE SIZES AND

MATERIAL TYPES.

5. THE CONTRACTOR SHALL MATCH EXISTING GRADES

AT NEW PAVEMENT LOCATIONS WHERE ABUTTING

EXISTING PAVEMENTS, ELEVATIONS SHOWN ARE

APPROXIMATE AT THESE LOCATIONS. MATCH

EXISTING GRADES AT BERGSTROM DRIVE OPEN CUT.

6. THE CONTRACTOR SHALL PROTECT THE EXISTING

JET FUEL LINE AT ALL TIMES.

7. PERIMETER TRENCH DRAINS SHALL BE SLOPED AT

1% MINIMUM FROM THE STARTING POINT TO THE

CONNECTING MANHOLE OR INLET. PERFORATED

PIPE SHALL ONLY BE USED IN THE GRAVEL TRENCH

DRAIN. SOLID PIPE SHALL BE USED UNDER ALL HARD

SURFACES AND OUTSIDE THE GRAVEL TRENCH

DRAIN.

8. ALL PERIMETER DRAIN CLEANOUTS SHALL HAVE A

COLOR MATCHING 6-INCH PVC DRAIN GRATE IN LIEU

OF A CAP INSTALLED 2-INCHES ABOVE

SURROUNDING RIVER ROCK ELEVATION.

9. SEE DETAILS FOR PIPE BEDDING REQUIREMENTS.

1. REINFORCED CONCRETE STORM SEWER PIPE

2. PRECAST CONCRETE MANHOLE - DETAIL D3/C-503

3. PRECAST CONCRETE DROP INLET - DETAIL D3/C-503

4. CONCRETE FLUME - DETAIL C8/C-503

5. PRECAST CONCRETE HEADWALL - DETAIL A1/C-503

6. PERIMETER TRENCH DRAIN (SEE GENERAL SHEET

NOTE 7) - DETAIL F9/C-501

8. OUTLET CONTROL STRUCTURE - DETAIL D8/C-504

10. DETENTION POND

13. PRECAST CURB INLET - DETAIL D1/C-503

20 . CLEANOUT - DETAIL D8/C-506

32 . MATCH EXISTING ELEVATION

SCALE: 1" = 30' 0 30' 60'

GENERAL SHEET NOTES

SHEET KEYNOTES

20 TYP.

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

G R

AD

IN

G A

N D

D R

AI

N

AG

E

PL

AN

CG102

AM

-0

4:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

STORM SEWER LINE A1-A7 PROFILE

HORZ. SCALE 1"= 30'

VERT. SCALE 1"= 5'

0+50 1+00 1+50 2+00 2+50

OC

S-

A5

TO

P:

.00

IE

O

UT

.00

' (S

TD

I-A 4)

ST

DI

-A

TO

P:

.00

IE

IN

.70

' (O

CS

-A 5)

IE

O

UT

.70 ' (S

TD

I-A

3)

24" RCP

33' @ 0.91%

24" RCP

96' @ 0.73%

ST

DI

-A

TO

P:

.00

IE

IN

.00

' (S

TD

I-A 4)

IE

O

UT

.00 ' (S

TC

I-A

2)

24" RCP

82' @ 0.73%

ST

CI

-A

TO

P:

.00

IE

IN

.40

' (S

TD

I-A 3)

IE

IN

.40

' (S

TC

I-A 2.1

IE

O

UT

.40

' (S

TD

I-A 1)

24" RCP

46' @ 0.87%

ST

DI

-A

TO

P:

.18

IE

IN

.00

' (S

TC

I-A 2)

IE

O

UT

.53 ' (S

TM

H-

EX

-1

EL

EC

TR

IC

AL

C

ON

CR

ET

E

DU

CT

B

AN

K

CR

OS

SI

NG

- S

EE

G

EN

ER

AL

N

OT

E

EXISTING 8" SANITARY SEWER

ELEV:3212.83

EX

IS

TI

NG

C

OM

MU

NI

CA

TI

ON

LI

NE

C

RO

SS

IN

G

STORM SEWER LINE B0-B2 PROFILE

HORZ. SCALE 1"= 30'

VERT. SCALE 1"= 5'

0+50

ST

CI

-B

TO

P:

.20

IE

IN

.50

' (S

TC

I-B 2)

IE

O

UT

.50 ' (S

TH

W

-B 0)

18" RCP

28' @ 1.08%

18" RCP

46' @ 1.08%

18" MIN.

CLEARANCE

CO

MM

UN

IC

AT

IO

N

CO

NC

RE

TE

D

UC

T

BA

NK

CR

OS

SI

NG

SE

E

GE

NE

RA

L N

OT

E

CO

MM

UN

IC

AT

IO

N

CO

NC

RE

TE

D

UC

T

BA

NK

CR

OS

SI

NG

SE

E

GE

NE

RA

L N

OT

E

12" MIN.

CLEARANCE

12" MIN.

CLEARANCE

ST

CI

-B

TO

P:

.15

IE

O

UT

.80 ' (S

TC

I-B

1)

ST

HW

-B

TO

P:

.50

IE

IN

.00

' (S

TC

I-B 1)

EXISTING

SURFACE

EXISTING

SURFACE

PROPOSED

SURFACE

PROPOSED

SURFACE

10YR HGL

POND

100YR HGL

(ROUTED FLOW)

POND

10YR HGL

STORM SEWER LINE C8-C8.7 PROFILE

HORZ. SCALE 1"= 30'

VERT. SCALE 1"= 5'

0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00

ST

DI

-C 8.7

TO

P:

.30

IE

IN

.50

' (S

TD

I-C 8.8

IE

IN

.25 ' (C

O- C8

.7)

IE

O

UT

.30

' (S

TD

I-C 8.6

18" RCP

70' @ 0.57%

ST

DI

-C 8.6

TO

P:

.30

IE

IN

.90

' (S

TD

I-C 8.7

IE

O

UT

.80

' (S

TD

I-C 8.5

18" RCP

70' @ 0.57%

ST

DI

-C 8.5

TO

P:

.30

IE

IN

.40

' (S

TD

I-C 8.6

IE

IN

.40 ' (S

TD

I-C

8.5 .1)

IE

IN

.40

' (C O-

C8 .5)

IE

O

UT

.40 ' (S

TC

I-C

8.4

ST

CI

-C 8.4

TO

P:

.10

IE

IN

.20

' (S

TD

I-C 8.5

IE

O

UT

.20

' (S

TC

I-C 8.3

18" RCP

35' @ 0.57% 18" RCP

111' @ 0.72% 24" RCP

168' @ 0.83%

ST

CI

-C 8.3

TO

P:

.70

IE

IN

.40

' (S

TC

I-C 8.4

IE

IN

.40 ' (S

TD

I-C

8.3 .1)

IE

O

UT

.90 ' (S

TC

I-C

8.2

ST

CI

-C 8.2

TO

P:

.40

IE

IN

.50

' (S

TC

I-C 8.3

IE

IN

.50 ' (C

O- C8

.2)

IE

O

UT

.50

' (S

TM

H- C8

.1)

ST

MH

-C 8.1

TO

P:

.60

IE

IN

.20

' (S

TC

I-C 8.2

IE

IN

.20 ' (S

TC

I-C

8.1 .1)

IE

O

UT

.20 ' (S

TM

H-

C8

24" RCP

32' @ 0.94%

36" RCP

118' @ 0.85%

EX

IS

TI

NG

" W

AT

ER

LIN

E

CR

OS

SI

NG

CO

MM

UN

IC

AT

IO

N

CO

NC

RE

TE

D

UC

T

BA

NK

CR

OS

SI

NG

SE

E

GE

NE

RA

L N

OT

E

8" SANITARY SEWER

ELEV:3214.65

ST

MH

-C

TO

P:

.00

IE

IN

.20

' (S

TM

H- C9

IE

IN

.20 ' (S

TM

H-

C8 .1)

IE

O

UT

.16 ' (S

TM

H-

C6

EL

EC

TR

IC

AL

C

ON

CR

ET

E

DU

CT

B

AN

K

CR

OS

SI

NG

SE

E

GE

NE

RA

L N

OT

E

ST

DI

-C 8.8

TO

P:

.40

IE

IN

.70

' (S

TD

I-C 8.9

IE

O

UT

.70

' (S

TD

I-C 8.7

ST

DI

-C 8.9

TO

P:

.70

IE

IN

.60

' (S

TC

O- C8

.10

IE

O

UT

.30 ' (S

TD

I-C

8.8

15" RCP

76' @ 0.79%

15" RCP

37' @ 0.54%

" W

AT

ER

LIN

E

CR

OS

SI

NG

2.5 " N

AT

UR

AL

G

AS

LI

NE

6" SANITARY SEWER

ELEV:3223.66

EX

IS

TI

NG

8" W

AT

ER

LIN

E

CR

OS

SI

NG

18" MIN.

CLEARANCE

18" MIN.

CLEARANCE

EX

IS

TI

NG

N

AT

UR

AL

G

AS

LI

NE

18" MIN.

CLEARANCE

12" MIN.

CLEARANCE12" MIN.

CLEARANCE

8" PVC

ELEV:3226.60

CO

MM

UN

IC

AT

IO

N

CO

NC

RE

TE

D

UC

T

BA

NK

C

RO

SS

IN

G

- S

EE

G

EN

ER

AL

N

OT

E

12" MIN.

CLEARANCE

CO

MM

UN

IC

AT

IO

N

CO

NC

RE

TE

D

UC

T

BA

NK

C

RO

SS

IN

G

- S

EE

G

EN

ER

AL

N

OT

E

12" MIN.

CLEARANCE

EXISTING

SURFACE PROPOSED

SURFACE

10YR HGL

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1

STORM SEWER PROFILES

GENERAL NOTES

1. REFER TO C-001 FOR ABBREVIATIONS

AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL

NOTES.

3. PIPE LENGTHS ARE SHOWN FROM

CENTER OF STRUCTURE TO CENTER

OF STRUCTURE. CONTRACTOR SHALL

BID ON ACTUAL LENGTH OF PIPE.

4. ALL REINFORCED CONCRETE STORM

SEWER SHALL BE CLASS III.

5. ALL STORM SEWER PIPE SHALL HAVE

BEDDING. SEE C-507 FOR

REQUIREMENTS.

6. REFER TO ES500 SERIES FOR

COMMUNICATION AND ELECTRICAL

DUCT BANK DETAILS.

7. REFER TO GRADING PLAN FOR

ADDITIONAL PERIMETER DRAIN

ELEVATIONS.

8. TOP ELEVATION FOR CURB INLET IS

LOCATED AT THE EDGE OF PAVEMENT.

TOP OF STRUCTURE IS AS PER DETAIL

D1/C-503

9. TOP ELEVATION OF DROP INLET IS AT

THE TOP OF GRATE.

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

ST

O

R M

S

EW

ER

P

R O

FI

LE

S

CG201

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

STORM SEWER LINE C12-C12.1 PROFILE

HORZ. SCALE 1"= 30'

VERT. SCALE 1"= 5'

STORM SEWER LINE C8.5-C8.5.1 PROFILE

HORZ. SCALE 1"= 30'

VERT. SCALE 1"= 5'

STORM SEWER LINE C8.3-C8.3.2 PROFILE

HORZ. SCALE 1"= 30'

VERT. SCALE 1"= 5'

STORM SEWER LINE C8.1-C8.1.2 PROFILE

HORZ. SCALE 1"= 30'

VERT. SCALE 1"= 5'

0+50 0+50

ST

CI

-C 8.1

.1

TO

P:

.10

IE

IN

.45 ' (S

TC

I-C

8.1 .2)

IE

O

UT

.45 ' (S

TM

H-

C8 .1)

36" RCP

31' @ 0.80%

ST

MH

-C 8.1

TO

P:

.60

IE

IN

.20

' (S

TC

I-C 8.2

IE

IN

.20 ' (S

TC

I-C

8.1 .1)

IE

O

UT

.20 ' (S

TM

H-

C8

ST

DI

-C 8.3

.2

TO

P:

.00

IE

O

UT

.10

' (S

TD

I-C 8.3

.1)

ST

DI

-C 8.3

.1

TO

P:

.00

IE

IN

.60 ' (S

TD

I-C

8.3 .2)

IE

IN

.10

' (C O-

C8 .3.

1)

IE

O

UT

.60

' (S

TC

I-C 8.3

ST

CI

-C 8.3

TO

P:

.70

IE

IN

.40

' (S

TC

I-C 8.4

IE

IN

.40 ' (S

TD

I-C

8.3 .1)

IE

O

UT

.90 ' (S

TC

I-C

8.2

18" RCP

17' @ 1.18%

18" RCP

45' @ 1.10% 18" RCP

26' @ 0.76%

ST

DI

-C 8.5

TO

P:

.30

IE

IN

.40

' (S

TD

I-C 8.6

IE

IN

.40 ' (S

TD

I-C

8.5 .1)

IE

IN

.40

' (C O-

C8 .5)

IE

O

UT

.40 ' (S

TC

I-C

8.4

ST

DI

-C 8.5

.1

TO

P:

.90

IE

O

UT

.60

' (S

TD

I-C 8.5

ST

DI

-C

.1

TO

P:

.50

IE

O

UT

.50

' (S

TC

I-C

ST

CI

-C

TO

P:

.00

IE

IN

.00

' (S

TC

I-C

IE

IN

.20 ' (S

TD

I-C

.1)

IE

O

UT

.00 ' (S

TC

I-C

18" RCP

31' @ 0.98%

6" W

AT

ER

LIN

E

CR

OS

SI

NG

8" SANITARY SEWER

ELEV:3215.40

36" RCP

22' @ 0.91%

CO

MM

UN

IC

AT

IO

N

CO

NC

RE

TE

D

UC

T

BA

NK

CR

OS

SI

NG

SE

E

GE

NE

RA

L N

OT

E

12" MIN.

CLEARANCE

ST

CI

-C 8.1

.2

TO

P:

.10

IE

IN

.67 ' (S

TC

I-E

X- 3)

IE

O

UT

.65 ' (S

TC

I-C

8.1 .1)

STORM SEWER LINE X5-C14.5 PROFILE

HORZ. SCALE 1"= 30'

VERT. SCALE 1"= 5'

ST

CI

-C

TO

P:

.72

IE

IN

.25

' (X 1)

IE

IN

.25

' (X 5)

IE

O

UT

.25 ' (S

TC

I-C

18" RCP

35' @ 1.00% MIN.

X5 - CONNECTION TO EXISTING

STORM SEWER PIPE.

CONTRACTOR SHALL FIELD VERIFY

INVERT ELEVATION, ADJUST ELEVATIONS

AS REQUIRED TO MAINTAIN A 1% SLOPE

ON THE NEW STORM SEWER PIPE.

APPROXIMATE INVERT ELEVATION = 3224.8

CONTRACTOR SHALL FIELD

VERIFY DEPTH AND LOCATION

OF EXISTING 18-INCH RCP.

EXISTING

SURFACE EXISTING SURFACE EXISTING

SURFACE

EXISTING

SURFACE

PROPOSED

SURFACEPROPOSED

SURFACE

PROPOSED

SURFACE

PROPOSED

SURFACE

10YR HGL

10YR HGL

10YR HGL

10YR HGL

EXISTING

SURFACE

PROPOSED

SURFACE

10YR HGL

STORM SEWER LINE C10-C10.3 PROFILE

HORZ. SCALE 1"= 30'

VERT. SCALE 1"= 5'

STORM SEWER LINE A2-A2.2 PROFILE

HORZ. SCALE 1"= 30'

VERT. SCALE 1"= 5'

0+50 1+00

24" RCP

56' @ 1.08%

24" RCP

59' @ 1.02%

ST

CI

-A 2.1

TO

P:

.40

IE

IN

.00

' (S

TC

I-A 2.2

IE

O

UT

.00

' (S

TC

I-A 2)

0+50 1+00 1+50 2+00

STORM SEWER LINE C10.1-C10.1.1 PROFILE

HORZ. SCALE 1"= 30'

VERT. SCALE 1"= 5'

ST

MH

-C

.3

TO

P:

.70

IE

O

UT

.70

' (S

TM

H- C1

0.2

ST

MH

-C

.2

TO

P:

.70

IE

IN

.40 ' (S

TM

H-

C1 0.3

IE

O

UT

.40

' (S

TM

H- C1

0.1

10" PVC

116' @ 1.12% 12" PVC

88' @ 1.02%

8" SANITARY SEWER

ELEV:3218.61

18" RCP19' @ 2.09%

0+50 1+00

ST

MH

-C

.1.

TO

P:

.99

IE

IN

.50

' (C O-

C1 0.1

.1)

IE

O

UT

.00

' (S

TM

H- C1

0.1

ST

MH

-C

.1

TO

P:

.40

IE

IN

.50 ' (S

TM

H-

C1 0.1

.1)

IE

IN

.50 ' (S

TM

H-

C1 0.2

IE

O

UT

.00

' (S

TD

I-C

12" PVC

105' @ 1.43%

ST

MH

-C

.1

TO

P:

.40

IE

IN

.50 ' (S

TM

H-

C1 0.1

.1)

IE

IN

.50 ' (S

TM

H-

C1 0.2

IE

O

UT

.00

' (S

TD

I-C

ST

DI

-C

TO

P:

.97

IE

IN

.10 ' (S

TC

I-C

IE

IN

.60

' (S

TM

H- C1

0.1

IE

O

UT

.10 ' (S

TM

H-

C9

8" PVC

ELEV:3224.08

8" PVC

ELEV:3225.23

8" PVC

ELEV:3224.14

8" PVC

ELEV:3224.64

8" PVC

ELEV:3225.54

8" PVC

ELEV:3225.80

8" PVC

ELEV:3225.16

8" PVC

ELEV:3224.64

ST

CI

-A

TO

P:

.00

IE

IN

.40

' (S

TD

I-A 3)

IE

IN

.40

' (S

TC

I-A 2.1

IE

O

UT

.40

' (S

TD

I-A 1)

ST

CI

-A 2.2

TO

P:

.10

IE

O

UT

.60 ' (S

TC

I-A

2.1

EXISTING

SURFACE

PROPOSED

SURFACE

EXISTING

SURFACE

PROPOSED

SURFACE

EXISTING

SURFACE

PROPOSED

SURFACE

10YR HGL

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1

STORM SEWER PROFILES

GENERAL NOTES

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

3. PIPE LENGTHS ARE SHOWN FROM CENTER OF STRUCTURE TO CENTER OF

STRUCTURE. CONTRACTOR SHALL BID ON ACTUAL LENGTH OF PIPE.

4. ALL REINFORCED CONCRETE STORM SEWER SHALL BE CLASS III.

5. ALL STORM SEWER PIPE SHALL HAVE BEDDING. SEE C-507 FOR

REQUIREMENTS.

6. REFER TO ES500 SERIES FOR COMMUNICATION AND ELECTRICAL DUCT

BANK DETAILS.

7. REFER TO GRADING PLAN FOR ADDITIONAL PERIMETER DRAIN

ELEVATIONS.

8. TOP ELEVATION FOR CURB INLET IS LOCATED AT THE EDGE OF

PAVEMENT. TOP OF STRUCTURE IS AS PER DETAIL D1/C-503

9. TOP ELEVATION OF DROP INLET IS AT THE TOP OF GRATE.

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

ST

O

R M

S

EW

ER

P

R O

FI

LE

S

CG203

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

15" RCP

3237.32

INV=

3241.62

12" R C

P

4" DRAIN TILE

INV=3236.46

AI

RIM=3242.40

INV.SE=3240.00

STMH

RIM=3242.77

INV.NE=3238.38

INV.N=3238.26

INV.SE=3238.23

18" RCP

AI

RIM=3241.89

INV.NE=3238.55

INV.SW=3238.54

SET

REBAR

.21

SET

REBAR

.21

SET

REBAR

.21

ST ST ST

G

XX

X

X X

X

X

X

X

X

SS SS

ST ST

SS

SS

SS

ST ST

ST ST ST

ST

ST

ST

ST ST

ST ST

ST

ST

ST

ST

ST

XX

X X

X X

X X X X X X X

X X

X

X

P

P

P P P

P

ST ST

ST

ST

DS

DS DS

DS DS DS

DS

DS

DS

DS

DS DS

DS

DS

DS

P

ST

ST

HYD

X X

X

X

X X

HYD

ST ST ST

F D

C

T

DS

DS DS

ST

STST

ST

ST

B7520

B7274

B8210

FTU

MPF

FTD

SIM

OFFSITE

FTU AREA

EP

H

OW

E

ST

MCCONNELL

BLV

D

BERGSTROM DR

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1

OVERALL JOINT SPOT ELEVATION PLAN

PLAN NORTH

GENERAL SHEET NOTES

1. REFER TO C-001 FOR ABBREVIATIONS AND

LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

SCALE: 1" = 100' 0 100' 200'

CJ101

CJ102

M A

TC

H

L

IN

E

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

O

VE

R

AL

L

JO

IN

T

SP

O

T

EL

EV

AT

IO

N

P

LA

N

CJ100

AM

-0

4:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

/2

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

B7520

DI

INV.W=3222.38

INV.E=3222.33

XXXXXXX

X

X

X X

X X

X X

X

X

X

X

X X

X X

X X

X X

X X

X

X

X

X X

X X

X

X

BERGSTROM DR

B7520

.93

.8829 .86

.52

.47

.96

.0129.

.3928 .48

27.

.86

27.

25.

24.

.56

24.

24.

24.

.41

(24 .39

(24 .30

(24 .26

23.30

23.23 23.17

23.10

(23 .29

.05

(23 .28

(23 .40

(23 .53

(23 .68

(23 .72

(23.19)

(23.20)

(23.23)

24.

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1

JOINT SPOT ELEVATION PLAN

PLAN NORTH

M A

T C

H L

IN

E

S

E E

S H

E E

T C

J F

O R

C O

N T

IN

U

A T

IO

N

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

3. ALL SPOT ELEVATIONS ARE TRUNCATED. DATUM

STARTS AT 3200.

4. REFER TO CP101 AND CP102 FOR UTILITY STRUCTURE

LOCATION.

SCALE: 1" = 30' 0 30' 60'

GENERAL SHEET NOTES

LEGEND

SPOT ELEVATIONX 32

.50

EXISTING SPOT ELEVATIONX (32

.50

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

JO

IN

T

SP

O T

EL

EV

AT

IO

N P

LA

N

CJ102

AM

-0

4:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

ADJACENT HANGAR LEGEND

COORDINATE WITH GC102 FOR REQUIREMENTS

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

APPROX.-

UNABLE TO LOCATEAPPROX.-UNABLE TO LOCATE

INV=3237.12

2" GAS

12" RCP

" R

CP

24" RCP

12" RCP 36" RCP

AI

RIM=3218.97

INV.NW=3212.97

INV.E=3211.74

AI

RIM=3218.78

INV.SE=3215.55

INV.S=3215.52

AI

RIM=3221.70

INV=3217.00

APPROX.-UNABLE TO LOCATE

EMH

UNVERIFIED

SET R

EBAR

.21

SET R

EBAR

.21

SET R

EBAR

.21

ST ST ST

G

XX

X

X X

X

X

X

X

X

ST ST

MECH

SIM FACILITY

ADDITION

FFE=3245.50

COMM

ELEC

B8225

EXISTING

SIM FACILITY

FFE = 3243.5

HYD

ST

ST ST

ST

STST

W W

W

ST

ST

ST

ST

ST ST

FW

W

FW

G

G G

G

GG

C R C S

ST

UP

U P

UP

T

U E

HYD

S

UC

UC

UC

UC

U C

U C

U C

U C S

COMM

ELEC

MECH

WM

B8306

ST ST

ST ST ST

ST

ST

ST

ST ST

ST ST

ST

ST

ST

ST

ST

XX

X X

X X

X X X X X X X

X X

X

X

P

P

P P P

P

ST ST

ST

ST

C/L

C/L C /L

C /L

C/LC/L

C/ L

C/L C/L C/L C/L C/L C/L C/L C/L C/L

C /L

C /L

C/L

C/L

C/L

C/ L

C /L

C /L

C/ L

C/LC/LC/L

C/L

C/L

C /L

C/L

C/LC/LC/L

C/L

C/L

X X

X X

X

X X X

X

X

X

X

X

X X X

CRCS

DS

DS DS

DS DS DS

DS

DS

DS

DS

DS DS

DS

DS

DS

P

ST

ST

P

P

COCO

CO

CO_E

CO

CO_NCO

COCO CO

HYD

X X

X

X

X X

HYD

ST ST ST

FDC

4" SS

2 1/2" G

SS SS

P P

PPPP

UP

C/LC/L

C /L

C /L

C/L C/L C/L

C /L

C /L

P P

FD

C

UTILITY

YARD

FFE 3229.0

T

DS

DS DS

ST

STST

UP

XX

XX XX XX XX

XX

XX XX

XX

XX XX XX

XX

XX XX XX XX XX

XX

XX

XX

XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX

XX XX XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX XX

XX

XX

XX

XX

XX XX XX XX

B7520

B7274

B8210

FTU

MPF

FTD

SIM

OFFSITE

FTU AREA

EP

H

OW

E

ST

MCCONNELL

BLV

D

BERGSTROM DR

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1

OVERALL EROSION CONTROL PLAN

PLAN NORTH

GENERAL SHEET NOTES

1. REFER TO C-001 FOR ABBREVIATIONS AND

LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

SCALE: 1" = 100' 0 100' 200'

CE101 CE102M

A

TC

H

L

IN

E

CE103

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

O

VE

R

AL

L

ER

O

SI

O N

C O

N

TR

O L

PL

AN

CE100

AM

-0

4:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

APPROX.-

UNABLE TO LOCATEAPPROX.-UNABLE TO LOCATE

CMH 7

CMH

461BD

ST

SS

SS

SS

SS

SS

ST

ST

ST ST ST ST ST ST ST ST ST

ST

ST ST ST ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

XXXXXXX

X

X

X X

X X

X X

X

X X

XXP

P

P P

P P

P

ST ST ST ST

ST

ST

ST

ST

ST

ST

C/L C/L C/L C/L C/L C/L C/L C/L C/L C/L C/L

C /L

C /L

C /L

C/L C/L C/L

C/ L

C/ L

C/LC/L

C/L

C/L

C/L

C/L

C/ L

C/ L

C /L

C /L

C /L

C/LC/L

C /L

C /L

C /L

C /L

C /L

C/ L

C/L

C/L

C/LC/LC/LC/LC/LC/L

DS

DS

ST

X

X X

X X

X X

X X

X X

X

X

X

X X

X X

X

X

ST

ST

ST

ST ST ST ST ST ST ST ST ST ST

BERGSTROM DR

B7520

UC UC UC UC UC UC UC UC UC UCCMH

XX

XX

XX XX XX XX XX XX XX XX XX XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

28 32

26 32

24 32

20 3219

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1

EROSION CONTROL PLAN

PLAN NORTH

M A

T C

H L

IN

E

S

E E

S H

E E

T C

G F

O R

C O

N T

IN

U

A T

IO

N

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

3. EROSION CONTROL ELEMENTS ARE SHOWN AT ALL

REQUIRED LOCATIONS. CONTRACTOR SHALL

IMPLEMENT CONTROLS AT THE CORRECT TIME

DURING CONSTRUCTION AND MODIFY OR ADD

CONTROLS AS THE NEED ARISES OR AS DIRECTED

BY THE COR. COORDINATE WITH SHEET C-002,

GENERAL EROSION CONTROL NOTES AND THE

CONTRACTOR DEVELOPED STORMWATER

POLLUTION PREVENTION PLAN (SWPPP).

1. RIP-RAP - DETAIL A5/C-504

2. TEMPORARY SEDIMENT TRAP - DETAIL A1/C-504

3. TEMPORARY SILT FENCE - DETAIL D6/C-504

4. TEMPORARY CONSTRUCTION ENTRANCE - DETAIL

D1/C-504

5. TEMPORARY CURB INLET GRAVEL FILTER - DETAIL

D3/C-504

7. PROJECT DEMARCATION/CONSTRUCTION LIMIT LINE

8. TEMPORARY RETROFITTING - DETAIL A8/C-504

SCALE: 1" = 30' 0 30' 60'

GENERAL SHEET NOTES

SHEET KEYNOTES

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

ER

O

SI

O

N C

O N

TR

O

L

PL

AN

CE102

AM

-0

4:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

SET

REBAR

.21

SET

REBAR

.21

SET

REBAR

.21

SS

FW

C S-

C R

CS-CR

C S-

C R

CS-CR

SS SS

G G

G

GG

SIM FACILITY

ADDITION

FFE=3245.50

B8225

EXISTING

SIM FACILITY

FFE = 3243.5

U P

U P

COMM

ELEC

MECH

WM

UP

UP

UP

UP

UP UP

UP

SS

SS

SS

B8306

UP UP UP UP UP SS

SS

SS

SS

SS

SS

SS SS

XX

X X

X X

X X X X X X X

X X

X

X

W

W

SS SS SS SS

G G

UP

T

CRCS

DS

DS DS

DS DS DS

DS

DS

DS

DS

DS DS

DS

DS

DS

P P

P P

P

HYD

U P

U P

U P

U P

X X

X

X

X X

HYD

F D

C

HYD

FDC

HYD

HYD

HYD

VAN

EMH

G

U

CUC

UC

UC

UC

UC

UC

UC UC

UC

UC

UC

UC

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

UC UC UC

CMH

CM

H

CMH

CMH

CM

H

UC UC UC UC

U

C

CM

H

UC UC UC

UC UC

U C

U C

U C

U C

U C

U C

U C

U C

U C

UTILITY

YARD

FFE 3229.0

T

CMH

EMH

EMH

CMH

CMH

CMH

FWFWFWCM

H

EMH

ES

UC UC UC UC UC

UC UC UC

U C

U C

U C

U C

UC UC UCCMH

DS

DS DS

INV=3237.12

2" GAS

6" W

8" W

8" W

6" W

8" W

8" W

3" WATER

8" WATER

8" WATER

12" WATER

3" IRRIG

W

ATER

APPRO

X

12" RCP

" R

CP

24" RCP

12" RCP 36" RCP

AI

RIM=3218.97

INV.NW=3212.97

INV.E=3211.74

AI

RIM=3218.78

INV.SE=3215.55

INV.S=3215.52

AI

RIM=3221.70

INV=3217.00

JE

T

FU

EL

EMH

UNVERIFIED

B7520

B7274

B8210

FTU

MPF

FTD

SIM

OFFSITE

FTU AREA

EP

H

OW

E

ST

MCCONNELL

BLV

D

BERGSTROM DR

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1

OVERALL UTILITY PLAN

PLAN

NORTH

GENERAL SHEET NOTES

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

SCALE: 1" = 100' 0 100' 200'

CU101 CU102M

A

TC

H

L

IN

E

CU103

D . E

LL

ED

G E

T.

BE

LI

AK

O

VA

L.

T

AL

IA

FE

R

R O

J.

H

AL

L

O

VE

R

AL

L U

TI

LI

TY

P

LA

N

CU100

AM

-0

4:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

AM

-0

0:

G

EN

ER

AL

R

EV

IS

IO

N

S

/2

SS

G

G G

G G

G G

G G

G G

G

SS

SS

SS

SS

SS

SS

ST

ST

ST ST ST ST ST ST ST ST ST

ST

ST ST ST ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

XXXXXXX

X

X

X X

X X

X X

X

X X

XXP

P

P P

P P

P

SS

ST ST ST ST

ST

ST

ST

ST

ST

ST

DS

DS

ST

HYD

U P

U P

UP

UP

UP

U

P U

P U

P U

P U

P U

P U

P U

P U

P U

P U

P

X

X X

X X

X X

X X

X X

X

X

X

X X

X X

X

X

ST

ST

ST

UC

UC

UC

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

U C

UC UC UC UC UC UC UC UC UC UC CMH

CMH

UC UC UC UC

UC

UC UC UC UC UC

U C

U C

U C

BERGSTROM DR

B7520

UC UC UC UC UC UC UC UC UC UCCMH

SSMH X-2

SSMH X-0

SSMH X-0.1

SSMH X-1

R C

P

24" RCP

12" RCP

18" RCP

APPROX.-

UNABLE TO LOCATEAPPROX.-UNABLE TO LOCATE

MH

RIM=3221.70

INV.NE=3210.70

INV.SW=3210.61

" R

C P

AI

RIM=3218.55

INV.S=3216.47

INV.E=3215.31

INV.W=3215.30

MH

RIM=3223.06

INV.N=3211.54

INV.E=3211.54

INV.S=3211.53

INV.W=3211.53

AI

RIM=3219.18

INV.W=3214.61

INV.SE=3214.53

AI

RIM=3218.32

INV.SW=3215.90

INV.NE=3215.90

AI

RIM=3220.74

INV.SW=3218.23

INV.NE=3218.16

DI

INV=

3222.44

24" RCP BURIED

CMH 7

CMH

461BD

UP

UP

UP

U P

U P

U P

EMH

UC

UC

UC

UC

U C

U C

CMH

APPROX.-UNABLE TO LOCATE

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

AL

A

VE

N

U , S

U

IT

E

O

M

AH

A, N

EB

R

AS

KA

O C

TO

BE

R

B-

: F O

R M

AL

T

R

AI

N

IN

G U

N

IT

/A M

U (F

TU

EL

LS

W O

R

TH

A

IR

F O

R C

E

BA

SE

, S

O U

TH

D

AK

O

TA

P

R O

JE

C

T N

U M

BE

R

: F

XB

M

W

F2 1R

ADVERTISEMENT - 100% DESIGN

FTU

AM

-0

2:

D

ES

IG

N

IS

SU

ED

F

O R

P R

IC

IN

G

/2

A1

UTILITY PLAN

PLAN

NORTH

M A

T C

H L

IN

E

S

E E

S H

E E

T C

U F

O R

C O

N T

IN

U

A T

IO

N

1. REFER TO C-001 FOR ABBREVIATIONS AND LEGENDS.

2. REFER TO C-002 FOR GENERAL CIVIL NOTES.

3. THE CONTRACTOR SHALL PROTECT THE EXISTING

JET FUEL LINE AT ALL TIMES.

4. REFER TO ELECTRICAL SITE PLAN FOR SITE

LIGHTING CIRCUIT LAYOUT.

5. THE CONTRACTOR SHALL COORDINATE TIMING AND

CONSTRUCTION OF THE FTD SANITARY SEWER LINE

AND CONNECTIONS TO SSMH X-2 ON THE FTU SITE

WITH THE COR.

10. PRECAST SANITARY SEWER MANHOLE - DETAIL

A1/C-502

11. UNDERGROUND ELECTRICAL CONCRETE DUCT BANK -

SEE ELECTRICAL PLANS

12. UNDERGROUND COMMUNICATION CONCRETE DUCT

BANK - SEE ELECTRICAL PLANS

19. SITE LIGHTING - SEE ELECTRICAL PLANS

24. 8" SANITARY SEWER PIPE

25. UNDERGROUND COMMUNICATION CONCRETE DUCT

BANK AND MANHOLES BUILT BY MPF

41. DROP MANHOLE - DETAIL D8/C-503

45. 6" NATURAL GAS LINE

46. COMMUNICATION MANHOLE - SEE ELECTRICAL PLANS

57. ELECTRICAL MANHOLE - SEE ELECTRICAL PLANS

58. UNDERGROUND ELECTRICAL CONCRETE DUCT BANK

BY FTD PROJECT

59. UNDERGROUND COMMUNICATION CONCRETE DUCT

B…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .