Am-0009_W9128F21R0079.pdf
PDF 255 KB Posted
- Solicitation number
- W9128F21R0079
About this file
This is a solicitation for the construction of a B-21 Formal Training Unit/Aircraft Maintenance Unit (FTU/AMU) at Ellsworth Air Force Base in South Dakota. The project includes construction of approximately 44,487 square feet of secure aircraft maintenance space, 43,776 square feet of secure squadron operations space, and 5,000 square feet of non-secure flight kitchen. Associated site work, demolition, utilities, and infrastructure are also within scope. Optional bid items include furniture, security systems, and closed-circuit television. Facilities must be designed and constructed according to Department of Defense criteria for unified facilities and high-performance, sustainable buildings. The project requires compliance with antiterrorism and force protection standards. Proposals were due by January 14, 2022 with award anticipated thereafter. The Army Corps of Engineers serves as the contracting agency.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
W9128F
B-21: FORMAL TRAINING UNIT/AMU (FTU), PN FXBM1093477, FY22, ELLSWORTH AFB, SOUTH DAKOTA
See attached documentation for content of the amendment revisions to solicitation
Date for receipt of Volume II proposals is 14 JAN 2022 at 1400 hours CST
Government Point of Contact: Katherine Fisher, Contract Specialist, Katherine.K.Fisher@usace.army.mil
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Contracting Division (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901
See Item 6
W9128F21R0079
01/07/2022
08/24/2021
01/07/2022
Am #0009 - 1
Am #0009 - 2 (Continuation SF 30)
7 JAN 2022
Solicitation No. W9128F 21 R 0079
Date of Issue: 24 AUG 2021 New Date of Receiving Volume II Proposal: 14 JAN 2022
SUBJECT: Amendment No. 0009 to Request for Proposal Solicitation Package for Construction of B-21: FORMAL TRAINING UNIT/AMU (FTU), PN FXBM1093477.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Standard Form 1442 (SF1442), Page 00 10 00-1, item 13.A., delete the time and date for proposal receipt and substitute “1600” and “14 JAN 2022”.
(2) Section 01 30 00.24 Attachments, delete General Wage Rate Decision Number SD20220001 in its entirety and substitute General Wage Rate Decision Number SD20220001 dated 01/07/2022. General Wage Rate Decision Number SD20220001 dated 01/07/2022 is included as an attachment to this Amendment.
(3) Section 01 30 00.24 Attachments, delete General Wage Rate Decision Number SD20220027 in its entirety and substitute General Wage Rate Decision Number SD20220027 dated 01/07/2022. General Wage Rate Decision Number SD20220027 dated 01/07/2022 is included as an attachment to this Amendment.
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.
Pages or Sections Deleted Pages or Sections Substituted or Added 01 14 00 01 14 00 ** 01 14 00AT – EAFB EAL Instructions 23 04 48.00 40 23 04 48.00 40 26 05 48.00 10 26 05 48.00 10
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.
3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.
4. Offers will be received until 2:00 p.m. CST on 14 JAN 2022.
Am #0009 - 3 (Continuation SF 30)
Attachments:
Section 00 10 00 – SF1442 and CLIN Pricing Schedule General Wage Rate Decisions SD20220001 dated 01/07/2022.
SD20220027 dated 01/07/2022 Specifications listed in 1.b., above
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
07 JAN 2022
nep/2160
This page was intentionally left blank for duplex printing.
Am #0009 00 10 00(SF1442) - Page 1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
W9128F-21-R-0079
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
24 AUG 2021
PAGES OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
7. ISSUED BY CODE CT 8. ADDRESS OFFER TO
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Contracting Division (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901
See Block 7
9. FOR INFORMATION
CALL:
A. NAME
Katherine Fisher
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) Use Email: Katherine.K.Fisher@usace.army.mil
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
The offeror hereby agrees to do all work described in the documents entitled:
B-21: FORMAL TRAINING UNIT/AMU (FTU), PN FXBM1093477, FY22
ELLSWORTH AFB, SOUTH DAKOTA
RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION 00 45 00.
*BLOCK 13A. – REFER TO SECTION 00 22 00 FOR THE NUMBER OF COPIES TO BE SUBMITTED WITH THE ORIGINAL OFFER.
THIS SOLICITATION IS UNRESTRICTED.
Procurement will be through a bifurcated Request For Proposal (RFP) best-value tradeoff.
11. The Contractor shall begin performance within 10 calendar days and complete it within 800 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time 14 JAN 2022. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 120 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442(REV. 4-85)
Prescribed by GSA FAR(48 CFR) 53.236-1(d)
Am #0009 00 10 00(SF1442) - Page 2
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
DUNS Number:
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within 120 calendar days after the date extension confirmation is due.
AMOUNTS
SEE ATTACHED CLIN PRICING SCHEDULE
Contractor’s Fax No. CAGE CODE Contractor’s E-Mail address
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
U.S. Army Engineer District, Omaha 1616 Capitol Ave.
Omaha, Nebraska 68102-4901
USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,
(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
STANDARD FORM 1442 BACK (REV. 4-85)
CLIN SCHEDULE 00 10 00 – 3 W9128F21R0079
Am #0009
CONTRACT LINE ITEM (CLIN) PRICING SCHEDULE
ITEM
NO.
DESCRIPTION EST
QTY
UNIT UNIT
PRICE
AMOUNT
BASIC ITEMS
Entire work complete for Construction of the B-21 Formal Training Unit/AMU (FTU), complete to the five-foot line, excluding items separately listed below.
Scope includes construction of the design and associated systems described above and throughout this Contract. (MILCON)
Job
XXX
Sitework, Utilities, and Pavements from five-foot line to the limits of construction of the B-21 Formal Training Unit/AMU (FTU), including all required demolition, excluding items listed separately below.
(MILCON)
Entire work complete for Cybersecurity documentation and alterations to commercial equipment, devices, firmware, and software to satisfy cybersecurity requirements as described in this Contract), excluding Cybersecurity items separately listed below. (MILCON)
TOTAL BASIC AMOUNT $_____________________________
OPTION ITEMS
[Option] the FTU off-site/overflow parking lot.
(MILCON)
Entire work complete for Procurement and Installation of raised-access flooring in FTU server room(s). (O&M)
Entire work complete for Procurement and Installation of FF&E. (O&M)
CLIN SCHEDULE 00 10 00 – 4 W9128F21R0079
Entire work complete for Procurement, Installation, Commissioning, and Cybersecurity of Intrusion Detection System (IDS), Closed-Circuit Television (CCTV) system and Access Control System (ACS). (O&M)
Entire work complete for Procurement Installation, Commissioning, and Cybersecurity of audio-visual (A/V) system equipment and devices. (O&M)
Entire work complete to provide access control and secure area oversight as defined in 01 14 00 Work Restrictions and associated references. (O&M)
Entire work complete for temporary Government trailer facilities during construction as indicated in this Contract.
(O&M)
Entire work complete for additional removal and disposal of contaminated soils (Category 3 soils as defined in Specification 02 61 13) not previously identified in the project hazardous material survey documentation and not otherwise included in the basic amount. (MILCON)
CY
Entire work complete for removal and disposal of additional asbestos containing material (ACM) piping not previously identified in the project hazardous material survey documentation, and not otherwise included in the basic amount. (MILCON)
LF
TOTAL AMOUNT (BASIC PLUS OPTIONS) $_________________________________
NOTES:
1. See SECTION 00 21 00, INSTRUCTIONS TO OFFERORS for evaluation of options. The Government reserves the right to exercise Option Items 0004-0008 within 640 days of Notice to Proceed and Option Items 0009-0012 within 365 days of Notice to Proceed. Abbreviations: Operations and Maintenance (O&M), Military Construction (MILCON)
2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the price submitted.
CLIN SCHEDULE 00 10 00 – 5 W9128F21R0079
3. A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump-sum price affected. If the modification is not so apportioned, the single adjustment will be applied to Item No. 0001.
4. Contract duration is 800 calendar days for award basic and option items. No contract duration extension will be provided upon award of any combination of option items.
5. Quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to General Conditions (Contract Clauses) Clause FAR 52.211-18 “Variation in Estimated Quantities”.
CLIN SCHEDULE 00 10 00 – 6 W9128F21R0079
SUPPLEMENTAL PRICE BREAKDOWN OF PRICING SCHEDULE TEMPLATE
TOTAL WITH MARKUPS AMOUNT TO EQUAL TOTAL BASIC AMOUNT
AS INDICATED ON PAGE 3 AND 4 OF THIS SECTION 00 10 00
DIVISION MASTERFORMAT 2016 DESCRIPTION UNIT AMOUNT
01 GENERAL REQUIREMENTS (minus item 0101) LS $_______________
0101 01 33 29 Sustainability Documentation LS $_______________
02 EXISTING CONDITIONS LS $_______________
03 CONCRETE LS $_______________
04 MASONRY LS $_______________
05 METALS LS $_______________
06 WOOD, PLASTICS, AND COMPOSITES LS $_______________
07 THERMAL AND MOISTURE PROTECTION LS $______________
08 OPENINGS LS $_______________
09 FINISHES LS $_______________
10 SPECIALTIES LS $______________
11 EQUIPMENT LS $_______________
12 FURNISHINGS LS $_______________
13 SPECIAL CONSTRUCTION LS $_______________
14 CONVEYING EQUIPMENT LS $_______________
21 FIRE SUPPRESSION LS $_______________
22 PLUMBING LS $______________
23 HEATING, VENTILATING, AND AIR CONDITIONING LS $_______________
25 INTEGRATED AUTOMATION LS $_______________
26 ELECTRICAL LS $_______________
27 COMMUNICATIONS LS $_______________
28 ELECTRONIC SAFETY AND SECURITY LS $_______________
31 EARTHWORK LS $_______________
32 EXTERIOR IMPROVEMENTS LS $_______________
33 UTILITIES LS $_______________
34 TRANSPORTATION LS $_______________
Total Price Breakdown Amount
Prime Contractor Markups:
--G&A General and Administrative Expense $ ______________ --FOOH Field Office Overhead not defined by Division -01 $ ______________ --PROFIT Profit $ ______________ --P&PB Performance and Payment Bond $ ______________
TOTAL WITH MARKUPS
All items must be entered in dollars.
“TOTAL WITH MARKUPS” from this Price Breakdown must match the “TOTAL BASIC
AMOUNT”.
Am #0009 SD20220001 - 1 01/07/2022
General Decision Number: SD20220001 01/07/2022
Superseded General Decision Number: SD20210001
State: South Dakota
Construction Types: Heavy and Highway
Counties: South Dakota Statewide.
HEAVY AND HIGHWAY CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022, Executive Order 14026 generally applies to the contract. The contractor must pay all covered workers at least $15.00 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022, Executive Order 13658 generally applies to the contract. The contractor must pay all covered workers at least $11.25 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/07/2022
Am #0009 SD20220001 - 2 01/07/2022
* SUSD2018-001 03/20/2018
Rates Fringes
CARPENTER........................$ 27.96 0.00
CONCRETE FINISHER................$ 21.41 0.00
ELECTRICIAN......................$ 26.42 3.85
LABORER
Group 1.....................$ 18.86 0.00 Group 2.....................$ 17.51 0.00 Group 3.....................$ 18.95 0.00 Group 5.....................$ 27.96 0.00 Group 6.....................$ 21.41 0.00
LABORER CLASSIFICATIONS:
GROUP 1: Air Tool Operator; Common Laborer; Landscape Worker, Flagger, Pilot Car Driver; Trucks under 26,000 GVW; Blue-top Checker, Materials Checker.
GROUP 2: Mechanic Tender; Pipe Layer (except culvert); Form Builder Tender; Special Surface Finish Applicator; Striping.
GROUP 3: Asphalt Plant Tender; Pile Driver Leadsman; Form Setter, Oiler/Greaser.
GROUP 5: Form Builder
GROUP 6: Grade Checker
PAINTER..........................$ 21.41 0.00
POWER EQUIPMENT OPERATOR:
Group 1.....................$ 20.62 0.00 Group 2.....................$ 20.66 0.00 Group 3.....................$ 22.02 0.00 Group 4.....................$ 23.79 0.00 Group 5.....................$ 24.77 0.00
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Concrete Paving Cure Machine; Concrete Paving Joint Sealer; Conveyor; Tractor (farm type with attachments); Self- Propelled Broom; Concrete Routing Machine; Paver Feeder;
Pugmill; Skid Steer.
GROUP 2: Bull Dozer 80 HP or less; Front End Loader 1.25 CY or less; Self-Propelled Roller (except Hot Mix); Sheepsfoot/50 Ton Pneumatic Roller; Pneumatic Tire Tractor or Crawler (includes Water Wagon and Power Spray Units); Wagon Drill; Air Trac; Truck Type Auger; Concrete Paving Saw.
GROUP 3: Asphalt Distributor; Bull Dozer over 80 HP; Concrete
Am #0009 SD20220001 - 3 01/07/2022
Paving Finishing Machine; Backhoes/Excavators 20 tons or less;
Crusher (may include internal screening plant); Front End Loader over 1.25 CY; Rough Motor Grader; Self-Propelled Hot Mix Roller; Push Tractor; Euclid or Dumpster; Material Spreader; Rumble Strip Machine.
GROUP 4:Asphalt Paving Machine Screed; Asphalt Paving Machine;
Cranes/Derricks/Draglines/Pile Drivers/Shovels 30 to 50 tons;
Backhoes/Excavators 21 to 40 tons; Maintenance Mechanic;
Scrapers; Concrete Pump Truck.
GROUP 5:Asphalt Plant; Concrete Batch Plant;
Backhoes/Excavators over 40 tons;
Cranes/Derricks/Draglines/Pile Drivers/Shovels over 50 tons;
Heavy Duty Mechanic; Finish Motor Grader; Automatic Fine Grader; Milling Machine; Bridge Welder.
TRUCK DRIVER
Group 1.....................$ 21.46 0.00 Group 2.....................$ 21.66 4.22
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Tandem Truck without trailer or pup; Single Axle Truck over 26,000 GVW with trailer.
GROUP 2: Semi-Tractor and Trailer; Tandem Truck with Pup.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
Am #0009 SD20220001 - 4 01/07/2022
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union, which prevailed in the survey for this classification, which in this example would be Plumbers 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Am #0009 SD20220001 - 5 01/07/2022
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Division National Office Branch of Wage Surveys. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Am #0009 SD20220001 - 6 01/07/2022
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Am #0009 SD20220027 - 1 01/07/2022
General Decision Number: SD20220027 01/07/2022
Superseded General Decision Number: SD20210027
State: South Dakota
Construction Type: Building
County: Meade County in South Dakota.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022, Executive Order 14026 generally applies to the contract. The contractor must pay all covered workers at least $15.00 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022, Executive Order 13658 generally applies to the contract. The contractor must pay all covered workers at least $11.25 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/07/2022
Am #0009 SD20220027 - 2 01/07/2022
BRSD0004-003 05/01/2017
Rates Fringes
BRICKLAYER.......................$ 31.96 3.94
* PLUM0300-015 05/01/2021
Rates Fringes
PIPEFITTER.......................$ 31.61 15.19
SFSD0669-003 04/01/2021
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 33.01 20.97
SUSD2012-024 08/21/2014
Rates Fringes
CARPENTER, Excludes Drywall Hanging and Metal Stud Installation, and Form Work......$ 18.67 0.00
CEMENT MASON/CONCRETE FINISHER...$ 19.58 0.00
DRYWALL HANGER AND METAL STUD
INSTALLER........................$ 18.19 0.00
ELECTRICIAN......................$ 18.84 2.42
FORM WORKER......................$ 17.50 0.00
INSULATOR - MECHANICAL
(Duct, Pipe & Mechanical System Insulation)...............$ 15.20 0.00
IRONWORKER, STRUCTURAL...........$ 23.91 12.05
LABORER: Common or General......$ 11.66 1.65
LABORER: Mason Tender - Brick...$ 20.70 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 17.80 0.00
PAINTER (Brush, Roller, and Spray)...........................$ 18.48 0.00
PLUMBER..........................$ 20.45 7.83
Am #0009 SD20220027 - 3 01/07/2022
ROOFER...........................$ 13.74 1.35
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 18.68 3.72
TRUCK DRIVER: Dump Truck........$ 15.06 1.10
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of
Am #0009 SD20220027 - 4 01/07/2022 the union, which prevailed in the survey for this classification, which in this example would be Plumbers 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
Am #0009 SD20220027 - 5 01/07/2022
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Division National Office Branch of Wage Surveys. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
This page was intentionally left blank for duplex printing.
B-21-Formal Training Unit/AMU (FTU) , Ellsworth AFB, SD EL96
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Secure Area(s)
1.2.2 Construction Secure Area Perimeter
1.2.2.1 CSP and Secure Area Implementation
1.2.3 Security and Site Access Management Plan (SSAMP)
1.2.4 US Persons
1.3 SUBMITTALS
1.4 PROJECT SECURITY AND SITE ACCESS MANAGEMENT PLAN (SSAMP)
1.5 ORDER OF WORK RESTRICTIONS
1.5.1 Desire for Innovation
1.6 DOCUMENT CONTROL
1.7 BASE ACCESS AND SECURITY
1.7.1 General
1.7.2 Base Hours
1.7.3 Scheduled and Unscheduled No Work Days
1.7.3.1 Operational Delays
1.7.3.2 Right to Deny Entry onto Base
1.7.4 Activity Regulations
1.7.4.1 Subcontractors and Personnel Contacts
1.7.4.2 Identification Badges and Installation Access
1.7.4.3 No Smoking Policy
1.8 RESTRICTED AREA (RA) ACCESS AND SECURITY[*Am-3] <text deleted>
[**Am-3]
1.8.1 Right to Deny Entry into Restricted Area
1.8.2 RA Badging
1.8.3 Contractor-Provided Escorts
1.8.3.1 Escort Ratios
1.8.3.2 Self-Escort Badging
1.8.3.3 Cleared American Guards (CAGs)
1.9 FREE ZONE ACCESS AND SECURITY (AS REQUIRED)
1.10 SECURE AREA OVERSIGHT
1.10.1 Supplemental Secure Area Access Control and
Surveillance/Oversight (Bid Option)
1.10.1.1 Oversight (Surveillance) Responsibilities and Ratios
1.10.1.2 Cleared American Surveillance Technicians (CASTs)
1.10.1.3 Non-cleared American Surveillance Technicians (NASTs)
1.11 PROJECT "SECURE AREA" ACCESS AND SECURITY
1.12 ACCESS AND SECURITY ROLES AND RESPONSIBILITIES
1.12.1 Access Within Construction Secure Area Perimeter
1.12.1.1 Contractor Responsibilities
1.12.1.2 Government Responsibilities
1.12.2 Access Within RA, Outside Secure Area Perimeter, within established Free Zone (AS REQUIRED)
SECTION 01 14 00 Page 1Am #0009
1.12.2.1 Contractor Responsibilities
1.12.2.2 Government Responsibilities
1.12.3 Access Within RA, Outside Secure Area Perimeter, no Free Zone
(AS REQUIRED)
1.12.3.1 Contractor Responsibilities
1.12.3.2 Government Responsibilities
1.12.4 Requesting New or Revised Construction Secure Area
Perimeter(s)
1.13 INFORMATION ACCESS
1.14 COMMUNICATIONS SECURITY (COMSEC) MONITORING
1.15 RECORDING DEVICES
1.15.1 Secure Area Sign
1.16 RADIOS
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 14 00 Page 2Am #0009
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 REFERENCES
The design publications listed below shall be used as sources of criteria for the design. The most current edition of the code or standard (with errata and addenda) available at the RFP proposal submission deadline shall be used as criteria for the design - unless noted otherwise. The criteria from these sources may be supplemented, but not supplanted, by applicable criteria contained in nationally recognized codes and standards.
INTELLIGENCE COMMUNITY STANDARD (ICS)
ICD/ICS 705 Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities
ICS 705-1 Physical and Technical Security Standard for Sensitive Compartmented Information Facilities
ICS 705-2 Standards for the Accreditation and Reciprocal Use of Sensitive Compartmented Information
UNITED STATES AIR FORCE (USAF)
AFI 31-101 Integrated Defense
AFI 16-1404 Air Force Information Security Program
AFI 16-1406 Air Force Industrial Security Program
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. DEPARTMENT OF DEFENSE (DOD)
DODM 5200.01 DoD Information Security Program (Volumes 1-3)
DODM 5205.07 (Volume 3) DoD Special Access Program (SAP) Security Manual: Physical Security
UFC 4-010-05 Sensitive Compartmented Information Facilities Planning, Design, and Construction, with Change 1, dated 1 October 2013
SECTION 01 14 00 Page 3Am #0009
1.2 DEFINITIONS
See the design drawings and specifications for descriptions of major components of work under this project to include, but not limited to "Secure Area," "open-storage area," etc.
1.2.1 Secure Area(s)
Areas identified in the design documents as "secure areas" shall be designed, constructed, and accredited to the criteria listed below. The contractor shall design and construct the perimeter and all spaces within the boundary in compliance with the following criteria:
The listed criteria carries impacts to all building systems within the designated boundary. Use the most current version of the referenced criteria available at the bid submission deadline:
a. ICD/ICS 705 - Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities.
https://www.dni.gov/files/Governance/IC-Tech-Specs-for-Const-and-Mgmt-of-SCIFs-v15
b. ICS 705-1 - Physical and Technical Security Standards for Sensitive Compartmented Information Facilities.
c. ICS 705-2 - Standards for the Accreditation and Reciprocal Use of Sensitive Compartmented Information.
d. UFC 4-010-05 - Sensitive Compartmented Information Facility Planning, Design and Construction.
e. DODM 5205.07 - DoD Special Access Program (SAP) Security Manual:
Physical Security
The design drawings and specifications indicate the technical mitigations required by the project. This specification indicates the Contractor and Government's role(s) in administering the secure areas during construction for accreditation by assigned authorities.
1.2.2 Construction Secure Area Perimeter
[*Am-3] A potentially moving boundary established during project construction by which the SSO and SSM assign layers of oversight for purposes of Construction Security Plan (CSP) implementation in compliance with ICD/ICS 705 and DODM 5205.07. This perimeter is established by a site perimeter fence (described below and in the design drawings) early in construction and prior to the construction of the physical, permanent secure area boundaries as defined in the facility floor plans. Once the permanent secure area boundaries are substantial enough to establish effective access control (as determined by the SSM), the boundary may be re-established by the SSM to isolate secure area construction and materials from non-secure area construction for more effective secure area oversight. Continuity of the secure area perimeter must be maintained by the Contractor (via a combination of temporary and/or permanent construction) for the entirety of contruction from CSP implementation through facility turnover. Coordinate the perimeter(s) and transtions from one CSP implementation perimeter to another with the SSM and with the anticipated order of construction, through the duration of the project.
SECTION 01 14 00 Page 4Am #0009
[**Am-3]
1.2.2.1 CSP and Secure Area Implementation
This project contains a single (1) building (the B-21 Formal Training Unit/AMU (FTU)) and associated sitework and utilites. CSP implementation will occur on each facility in their entirety, within the constraints described herein:
a. Secure area oversight and administration per secure area criteria referenced below will occur on the facility perimeter once building foundations are dug and work to construct the FTU begins. It is assumed that oversight will be most efficient by securing the project site until the FTU perimeter constructed to a degree that the physical secure [*Am-3] facility [**Am-3] boundary can be secured on its own.
From there, it is assumed that the facility will be constructed in secure "zones" in order to compartmentalize and isolate non-secure areas from secure areas. Oversight is required on approximately four
(4) distinct secure area perimeters within the FTU - each with their own access control and oversight requirements - comprising approximately 75% of the total facility square footage. Specific areas and zones will be disclosed after construction contract award, but will not be identified in this solicitation. The FTU flight kitchen and portions of the AMU are not considered secure areas per the definitions referenced by this specification. Two (2) of those perimeters comprise the entirety of the second floor and two (2) of those perimeters occur on portions of the first floor. Exemption of any space or spaces from oversight is at the sole discretion of the SSM. Grading, site work, and utility work outside the footprint of the FTU is not considered secure area work unless referenced otherwise
- but may be captured within a secure perimeter depending upon individual contractor schedule, fenced/secured perimeters, and phasing of such work. Any work [*Am-3] or materials [**Am-3] within a secure area perimeter will be considered "secure area work" unless specifically isolated from the established perimeter(s).
b. The Government does not intend to establish a secure area perimeter and access control until site preparation and grading for the FTU facility is complete, but the contractor shall submit an approach for Government approval in the SSAMP. Excavation for foundations may occur without a secure perimeter established, but any construction or placement of construction materials (concrete, steel, masonry, reinforcing, conduit, etc.) within the facility footprint must occur after a perimeter is secured and access control is established.
c. [*Am-3] During construction, the Contractor shall continuously notify the Government when secure perimeters and secure material storage areas are intented to be established and/or revised depending upon the nature of work being performed. This shall be discussed during established weekly meetings so that the Government may position personnel to carry out inspection and oversight of those activities, materials and features of work. The Government reserves the right to segregate and compartmentalize materials from the established stock for installation and/or inspection as part of the secure area perimeter. All materials intended to be installed in a project secure area shall be stored within a fenced perimeter on the project site.
The Contractor shall provide a high security lock and keys by which to secure each perimeter at the end of each work day. The SSM shall be provided with sole keyed access to any secure material storage area(s)
SECTION 01 14 00 Page 5Am #0009 and the SSM reserves the right to track entry and egress from the storage area(s). Secure area material storage areas will be secured by the SSM after the end of each work day and re-opened by the SSM each day. [**Am-3]
d. The Government will establish and man the access-controlled [*Am-3] secure area and secure area material storage [**Am-3] perimeter(s) -either at secureable building and/or room boundaries, or at contractor-provided fenced boundaries as indicated in the design drawings. The point at which access control is established may vary as each respective facility is constructed and secured. The Government does not intend to dictate the time at which individual perimeters are established as long as the security of the facility is continually maintained as the facility is constructed. The Contractor shall notify the Government NLT 30 Days in advance when they anticipate any features of work will be ready for access control to be established.
e. CSP implementation will only occur on the project onces the SSAMP is approved and the secure area [*Am-3] and secure area material storage [**Am-3] perimeter(s) are constructed (by the Contractor) and secureable by the SSM. The contractor may perform work around and outside the secure area perimeter, but no construction that conceals a volume, void, or that transverses or penetrates the secure area perimeter/volume on the secure or unsecure side will be allowed without written approval by the Government. This would include ductwork, piping, conduit, and equipment that occurs within the secure perimeter walls, plenum, or within the secure space itself. These features may be routed to the perimeter of the secure area, but shall not penetrate that boundary until Government oversight is in place.
CSP implementation will occur from that point through the entire duration of construction to include procurement and installation of any bid options.
f. Once the perimeter(s) are coordinated and established, access to the facilities will be…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .