Q_andA_Sunny Point_25_Jan_2021_W9128F21R0029_.pdf
PDF 62 KB Posted
- Attached to
- Fuel Removal and AST STI SP0001 External Inspection at Military Ocean Terminal Sunny Point
- Solicitation number
- W9128F21R0029
About this file
This document contains questions and answers regarding a federal solicitation for fuel removal and storage tank inspection services at Military Ocean Terminal Sunny Point. The solicitation seeks to have the contractor perform fuel removal, transfer, or disposal of remaining fuel; replace wiper seals; provide strapping charts; clean the tank; and conduct an aboveground storage tank inspection or storage tank inspection on specified tanks at the location. The questions and answers indicate the inspection is an external one with no fuel being removed from the tanks, and that the contractor should use an example report attachment to document any inspection photos rather than actual photos being provided with the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q_andA_Sunny Point_29 Jan 2021_21R0029.pdf | ||
| Q_andA_Sunny Point_28 Jan 2021_21R0029.pdf | ||
| ATT H-TANK LOCATION FAC 180.pdf | ||
| Q_andA_Sunny Point_21_Jan_2021_W9128F21R0029_.pdf | ||
| ATT J-TANK LOCATION OVERVIEW.pdf | ||
| CONVAULT_Product_Description.jpg | JPG image | |
| ATT I-TANK LOCATION FAC 50.pdf | ||
| Modification_Copy_1449_SF30_21R0029_Sunny_PT.pdf | ||
| Conformed_Copy_1449_21R0029_Sunny_PT.pdf | ||
| ATT G-STI In-Service Template.docx | DOCX document | |
| ATT C-Fuel Storage Excel Document.xlsx | XLSX spreadsheet | |
| ATT A-General Installation Security Requirements.docx | DOCX document | |
| ATT B-Fuel Storage Tank List.xlsx | XLSX spreadsheet | |
| 1449_Solicitation.pdf | ||
| ATT E-Monthly Contractors Progress Management and Status Reports.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9128F21R0029 Sunny Point 25 Jan 2021
1) I just wanted to ask if you were aware that none of the pictures in the inspection report are attached. Is there a way that we can get a copy of the pictures? (see Att G in email)
ANSWER:
That is because ATT G is an example of the report that they should provide. The contractor should take the pictures and insert them into the example to create the report.
There are no reports for the Sunny Point tanks as the Sunny Point tanks are being inspected for the first time for DLA.
2) Is there any indication of our much residual fuel would need to be removed from each tank? Also is it to be relocated to other tanks onsite or taken off-site for recycling/disposal?
ANSWER:
Sunny Point is an STI external inspection with no fuel being removed.