Amendment 0006.pdf
PDF 487 KB Posted
- Attached to
- Fighter Alert Shelter, Truax Field, Madison, WI
- Solicitation number
- W9128F20R0068
About this file
This solicitation package includes an amendment to an existing federal contract opportunity for construction services. The amendment updates the wage determination, changes one contract line item from a base item to an option, and extends the response date for revised price proposals to April 16, 2021. The opportunity being amended is to construct a new 28,000 square foot Fighter Alert Shelter at Truax Field in Madison, Wisconsin for the Department of the Army Corps of Engineers Engineering District Omaha. The shelter must house four universal fighter aircraft and include special construction features such as automatic opening doors, a fire suppression system, and support for security and backup power systems. The facility design must comply with Department of Defense standards for antiterrorism, sustainability, and performance requirements.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This Amendment is to update the Wage Decision and to revise CLIN 0003 (Integrate ESS to current ADVANTOR system) from a base CLIN to an optional CLIN. Solicitation is only extended for revised Volume II Price Proposals only; no other submission is requested.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Apr-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9128F20R0068
X 9B. DATED (SEE ITEM 11)
04-Nov-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Apr-2021
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F20R0068
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 12-Mar-2021 12:00 PM to 16-Apr-2021 12:00 PM.
CLIN 0003
The option status has changed from No Status to Option.
The following have been modified:
00 10 00
CONTRACT LINE ITEM (CLIN) PRICING SCHEDULE
ITEM NO. DESCRIPTION QTY UNIT UNIT
PRICE
AMOUNT
BASIC ITEMS
0001 All work complete to Construct the Fighter Alert Shelter up to 5 feet outside of the building.
1 Job XXX
0002 All work complete to Construct Sitework, Utilities, and Pavements, complete from the five-foot line to the limits of construction of the Fighter Alert Shelter.
1 Job XXX
All work to complete and integrate an electronic security system (ESS) that meets the requirements of UFC 4-021- 02.
1 Job XXX
All work complete to Provide Foam Pumps, Controllers, Atmospheric Tank, Relief Valves, Fire Alarm equipment, In-line Balance Proportioners, and any additional equipment, labor, programming, or design effort in compliance with UFC 4-211-01.
1 Job XXX
0005 All work complete to Demolish Underground Utility Lines, Pavements, Slabs, Foundations, and other site features shown on Optional Additional Demolition plan sheets.
1 Job XXX
TOTAL BASIC AMOUNT $_______________________
OPTION ITEMS
[Option]
All work to complete and integrate an electronic security system (ESS) that meets the requirements of UFC 4-021- 02.
1 Job XXX
[Option]
All work complete to provide Pre Conditioned Air (PCA) (Units) including but not limited to unit structural supports, piping and pipe supports, control, control wiring, testing and balancing, etc. for complete functioning PCA system.
4 Job $____ Per Unit
[Option]
Contaminated Soil Disposal – Includes all work to excavate and dispose of fuel contaminated soil found to be above Truax Field action levels requiring offsite disposal during construction and any offsite clean soil to replace contaminated soil volume.
2000 Cubic
Yards
$____ Per Cubic Yard
[Option]
Contaminated Groundwater – Includes all work to containerize, and properly dispose of contaminated petroleum-contaminated groundwater and provide notification to regulatory agencies for petroleum-contaminated groundwater that cannot be discharged to the sewer.
500 Gallons $____ Per Cubic Yard $_________________
[Option]
New 15,000 – gallon high expansion foam containment, piping from industrial waste manhole to containment and new actuator valve with manhole to control industrial discharge.
Job
XXX
TOTAL AMOUNT (BASIC PLUS OPTIONS) $_______________________
NOTES:
1. The Government reserves the right to exercise options within 180 calendar days after issuance of Notice to Proceed. Any option exercised shall be completed within the 450 days of total construction duration.
2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. In case of variation between the prices per CLIN and the total amount of all CLINs, the prices per CLIN will be considered the price submitted.
3. A modification to a proposal which provides for a single adjustment to the total amounts, should state the application of the adjustment to each respective CLIN price affected. If the modification is not so apportioned, the single adjustment will be applied to CLIN 0001.
4. Quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to General Conditions (Contract Clauses) Clause “Variation in Estimated Quantity”.
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been added by full text:
WAGE DECISION_WI20210005_REV2
"General Decision Number: WI20210005 04/09/2021
Superseded General Decision Number: WI20200005
State: Wisconsin
Construction Type: Building
County: Dane County in Wisconsin.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/01/2021 1 03/19/2021 2 04/09/2021
ASBE0205-001 06/01/2001
Rates Fringes
Asbestos Removal worker/hazardous material handler Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not.............$ 17.90 4.45
BOIL0107-001 01/01/2017
Rates Fringes
BOILERMAKER
Boilermaker.................$ 35.65 29.89 Small Boiler Repair (under 25,000 lbs/hr)..............$ 26.91 16.00
BRWI0013-001 06/01/2020
Rates Fringes
BRICKLAYER
Bricklayer..................$ 37.36 24.43 Terrazzo Finisher...........$ 29.78 23.22 Terrazzo Worker.............$ 39.06 23.69 Tile Finisher...............$ 26.98 23.22 Tile Layer..................$ 36.42 22.70
CARP0252-007 06/01/2016
Rates Fringes
CARPENTER (Including Acoustical work and Drywall hanging; Excluding Batt Insulation)
CARPENTER & SOFT FLOOR
LAYER.......................$ 33.56 18.00
MILLWRIGHT..................$ 35.08 18.35
PILEDRIVERMAN...............$ 34.12 18.00
ELEC0014-005 07/05/2020
Rates Fringes
Teledata System Installer Installer/Technician........$ 27.75 15.14
Low voltage construction, installation, maintenance and removal of teledata facilities (voice, data, and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V-SAT, bypass, CATV, WAN (wide area networks), LAN (local area networks), and ISDN (integrated systems digital network).
ELEC0159-002 08/02/2020
Rates Fringes
ELECTRICIAN......................$ 41.86 22.67
ELEV0132-001 01/01/2020
Rates Fringes
ELEVATOR MECHANIC................$ 53.80 34.765+a+b
FOOTNOTE:
a. PAID VACATION: Employer contributes 8% of basic hourly rate as vacation pay for employees with more than 5 years or more of service, and 6% for less than 5 years of service.
b. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
ENGI0139-002 06/01/2020
Rates Fringes
OPERATOR: Power Equipment Group 1.....................$ 42.92 23.15 Group 2.....................$ 41.67 23.15 Group 3.....................$ 39.97 23.15 Group 4.....................$ 39.44 23.15 Group 5.....................$ 37.37 23.15 Group 6.....................$ 35.84 23.15
HAZARDOUS WASTE PREMIUMS:
EPA Level ""A"" Protection: $3.00 per hour EPA Level ""B"" Protection: $2.00 per hour EPA Level ""C"" Protection: $1.00 per hour
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of over 100 tons;
Cranes, Tower Cranes, and Derricks with boom, leads and/or jib lengths 176 ft or longer.
GROUP 2: Backhoes (Excavators) weighing 130,000 lbs & over;
Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of 100 tons or less;
Cranes, Tower Cranes, and Derricks with boom, leads, and/or jib lengths 175 ft or less; Caisson Rigs; Pile Driver
GROUP 3: Backhoes (Excavators) weighing under 130,000 lbs;
Travelling Crane (bridge type); Milling Machine; Concrete Paver over 27 E; Concrete Spreader and Distributor;
Concrete Laser Screed; Concrete Grinder and Planing Machine; Slipform Curb and Gutter Machine; Boring Machine (Directional); Dredge Operator; Skid Rigs; Over 46 meter Concrete Pump.
GROUP 4: Hydraulic Backhoe (tractor or truck mounted);
Hydraulic Crane, 10 tons or less; Tractor, Bulldozer, or End Loader (over 40 hp); Motor Patrol; Scraper Operator;
Bituminous Plant and Paver Operator; Screed-Milling Machine; Roller over 5 tons; Concrete Pumps 46 meter & under; Grout Pumps; Rotec Type Machine; Hydro Blaster, 10,000 psi and over; Rotary Drill Operator; Percussion Drilling Machine; Air Track Drill with or without integral hammer; Blaster; Boring Machine (vertical or horizontal);
Side Boom; Trencher, wheel type or chain type having 8 inch or larger bucket; Rail Leveling Machine (Railroad); Tie Placer; Tie Extractor; Tie Tamper; Stone Leveler; Straddle Carrier; Material Hoists; Stack Hoist; Man Hoists; Mechanic and Welder; Off Road Maaerial Haulers
GROUP 5: Tractor, Bulldozer, or Endloader (under 40 hp);
Tampers -Compactors, riding type; Stump Chipper, large;
Roller, Rubber Tire; Backfiller; Trencher, chain type (bucket under 8 inch); Concrete Auto Breaker, large;
Concrete Finishing Machine (road type); Concrete Batch Hopper; Concrete Conveyor Systems; Concrete Mixers, 14S or over; Pumps, Screw Type and Gypsum); Hydrohammers, small;
Brooms and Sweeeprs; Lift Slab Machine; Roller under 5 tons; Industrial Locomotives; Fireman (Pile Drivers and Derricks); Pumps (well points); Hoists, automatic; A-Frames and Winch Trucks; Hoists (tuggers); Boats (Tug, Safety, Work Barges and Launches); Assistant Engineer
GROUP 6: Shouldering Machine Operator; Farm or Industrial Tractor mounted equipment; Post Hole Digger; Auger (vertical and horizontal); Skid Steer Loader with or without attachments; Robotic Tool Carrier with or without attachments; Power Pack Vibratory/Ultra Sound Driver and Extractor; Fireman (Asphalt Plants); Screed Operator; Stone Crushers and Screening Plants; Air, Electric, Hydraulic Jacks (Slip Form); Prestress Machines; Air Compressor, 400 CFM or over; Refrigeration Plant/Freese Machine; Boiler Operators (temporary heat); Forklifts; Welding Machines;
Generators; Pumps over 3""; Compressors, under 400 CFM;
Heaters, Mechanical; Combination small equipment operator;
Winches, small electric; Oiler; Greaser; Rotary Drill Tender; Conveyor; Elevator Operator
IRON0383-002 06/01/2020
Rates Fringes
IRONWORKER.......................$ 37.10 27.06
LABO0464-001 06/01/2020
Rates Fringes
Laborer, General.................$ 30.05 17.88 Laborer: Asbestos/hazardous material remover (Preparation, removal, and encapsulation of hazardous materials from non-mechanical systems).........................$ 29.00 17.88
PAIN0802-001 06/01/2019
PAINTER (Brush and Roller Only)............................$ 30.93 18.44
PREMIUM RATES [Add to Basic Hourly Rate] Sandblaster $1.00 per hour Drywall Taper & Applicator $1.30 per hour
PAIN0941-001 06/01/2019
Rates Fringes
GLAZIER..........................$ 39.92 19.07
PLAS0599-001 06/01/2017
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 34.43 19.93
PLASTERER........................$ 33.70 23.13
PLUM0075-007 06/01/2015
Rates Fringes
PLUMBER (Including HVAC work)....$ 38.82 20.12
PLUM0601-007 06/01/2020
Rates Fringes
PIPEFITTER (Including HVAC work)............................$ 49.53 24.82
SFWI0669-002 04/01/2020
Rates Fringes
SPRINKLER FITTER.................$ 42.38 24.89
* SHEE0018-009 05/31/2020
Rates Fringes
Sheet Metal Worker (Including HVAC Duct work and Technicians).....................$ 42.02 28.90
TEAM0662-003 06/01/2020
Rates Fringes
TRUCK DRIVER
1 & 2 Axles.................$ 31.07 22.94 3 or more Axles.............$ 31.22 22.94
SUWI2002-011 01/23/2002
Asbestos Worker/Heat and Frost Insulator..................$ 25.36 8.37
Laborers:
Concrete Worker.............$ 16.34 3.59 Landscape...................$ 8.73 4.90
ROOFER...........................$ 18.01 3.28
Tile & Marble Finisher...........$ 13.89 7.58
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
The following have been deleted:
WAGE DECISION_WI20210005_REV0
(End of Summary of Changes)
File details come from the government source that posted it. Updated .