Amendment 0003 - 100percent design.pdf
PDF 386 KB Posted
- Attached to
- Fighter Alert Shelter, Truax Field, Madison, WI
- Solicitation number
- W9128F20R0068
About this file
This solicitation requests proposals for the construction of a new 28,000 square foot Fighter Alert Shelter at Truax Field in Madison, Wisconsin. The shelter is required to house four universal fighter aircraft and include automatic opening front and rear aircraft doors, heating, fire detection and suppression systems, and support for an intrusion detection system and backup emergency generator. Proposals will be evaluated on specialized experience, project management plan, past performance, and small business participation.
Volume I technical proposals were previously submitted based on 95% design specifications. An amendment issued on February 9, 2021 provides 100% design specifications and requests Volume II proposals including Factor 4 on small business participation and pricing information. Proposals are due March 12, 2021 and the contract is expected to be awarded on April 29, 2021. Evaluation will follow the FAR Part 15 best value tradeoff process. The solicitation is open to both large and small businesses and has a 30% small business participation goal. The project is estimated between $10-25 million and must comply with DOD and Air Force standards.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment includes the 100% design and f inal Specif ications along w ith requesting Volume II proposals w hich includes Factor 4 and Price.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 27
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Feb-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128F20R0068
X 9B. DATED (SEE ITEM 11)
04-Nov-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Feb-2021
CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128F20R0068
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 07-Dec-2020 12:00 PM to 12-Mar-2021 12:00 PM.
The following have been modified:
00 10 00
CONTRACT LINE ITEM (CLIN) PRICING SCHEDULE
ITEM NO. DESCRIPTION QTY UNIT UNIT
PRICE
AMOUNT
BASIC ITEMS
0001 All work complete to Construct the Fighter Alert Shelter up to 5 feet outside of the building.
1 Job XXX
0002 All work complete to Construct Sitework, Utilities, and Pavements, complete from the five-foot line to the limits of construction of the Fighter Alert Shelter.
1 Job XXX
All work to complete and integrate an electronic security system (ESS) that meets the requirements of UFC 4-021- 02.
1 Job XXX
All work complete to Provide Foam Pumps, Controllers, Atmospheric Tank, Relief Valves, Fire Alarm equipment, In-line Balance Proportioners, and any additional equipment, labor, programming, or design effort in compliance with UFC 4-211-01.
1 Job XXX
0005 All work complete to Demolish Underground Utility Lines, Pavements, Slabs, Foundations, and other site features shown on Optional Additional Demolition plan sheets.
1 Job XXX
TOTAL BASIC AMOUNT $_______________________
OPTION ITEMS
[Option]
All work complete to provide Pre Conditioned Air (PCA) (Units) including but not limited to unit structural supports, piping and pipe supports, 4 Job $____ Per Unit control, control wiring, testing and balancing, etc. for complete functioning PCA system.
[Option]
Contaminated Soil Disposal – Includes all work to excavate and dispose of fuel contaminated soil found to be above Truax Field action levels requiring offsite disposal during construction and any offsite clean soil to replace contaminated soil volume.
2000 Cubic
Yards
$____ Per Cubic Yard
[Option]
Contaminated Groundwater – Includes all work to containerize, and properly dispose of contaminated petroleum-contaminated groundwater and provide notification to regulatory agencies for petroleum-contaminated groundwater that cannot be discharged to the sewer.
500 Gallons $____ Per Cubic Yard $_________________
[Option]
New 15,000 – gallon high expansion foam containment, piping from industrial waste manhole to containment and new actuator valve with manhole to control industrial discharge.
Job
XXX
TOTAL AMOUNT (BASIC PLUS OPTIONS) $_______________________
NOTES:
1. The Government reserves the right to exercise options within 180 calendar days after issuance of Notice to Proceed. Any option exercised shall be completed within the 450 days of total construction duration.
2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. In case of variation between the prices per CLIN and the total amount of all CLINs, the prices per CLIN will be considered the price submitted.
3. A modification to a proposal which provides for a single adjustment to the total amounts, should state the application of the adjustment to each respective CLIN price affected. If the modification is not so apportioned, the single adjustment will be applied to CLIN 0001.
4. Quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to General Conditions (Contract Clauses) Clause “Variation in Estimated Quantity”.
SECTION 00 21 00 - INSTRUCTIONS
The following have been added by full text:
INSTRUCTIONS TO OFFERORS VOL 2
SECTION 00 21 00
INSTRUCTIONS TO OFFERORS
1. SOLICITATION RESTRICTIONS
1.1. RETURN ADDRESS REQUIREMENTS
Offeror(s) must ensure that ALL mail sent to the Omaha District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bid guarantees, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located at 1616 Capitol Avenue, Omaha, Nebraska 68102-4901 if it does not contain a return mailing address. THERE WILL BE NO
EXCEPTIONS.
1.2. CADD AND ELECTRONIC DESIGN FILES (IF PROVIDED)
If provided, the CADD survey files and other electronic design files are provided on an as-is basis. Any Government provided survey, and the other electronic design files are provided to assist the Contractor in preparing their proposal using their own commercially purchased software. The Contractor shall take all professionally prudent and reasonable actions to verify the accuracy of the data provided and shall assume all liability from the use of these files. The Contractor shall be responsible for obtaining any other software necessary to view the files provided. No other CADD design files will be provided for proposal preparation other than those provided at the time of RFP issuance. No assistance with the files will be provided.
2. COPIES OF SOLICITATION DOCUMENT AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the Contract Opportunities website at:
https://beta.sam.gov/
It shall be the Contractor's responsibility to check the websites for any amendments. The Offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation. A list of interested vendors (potential Offerors and subcontractors) is available on the contract opportunities website listed above (registration required).
3. OFFEROR'S QUESTIONS AND COMMENTS
Questions and/or comments relative to the solicitation documents should be submitted via Bidder Inquiry as indicated below. See instructions on when e-mail or mailing is appropriate. Mailing address is shown on the Standard Form (SF) 1442, Item 8, unless directed otherwise.
3.1. BIDDER INQUIRY
Technical inquiries and questions relating to technical requirements, proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at: https://www.projnet.org/projnet/ No Later Than ten (10) calendar days before the due date and time of proposals, in order that they may be given consideration or actions taken prior to receipt of offers. Phone calls for non-technical or procedural type questions should be made between 8:30 a.m. and 3:30 p.m. (Central Standard Time) Monday through Friday. The Bidder Inquiry system is to be used to ask and receive answers to all non-proprietary questions.
To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below. A prospective vendor who submits a comment https://beta.sam.gov/ https://www.projnet.org/projnet/
/question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet.
The Solicitation Number is: W9128F20R0068 The Bidder Inquiry Key is: IAHH5S-M544AC
a. Registration for ProjNet Bidder Inquiry Access If you are already registered, go to Entering Bidder Inquiries in ProjNet Bidder Inquiry System below.
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
b. Entering Bidder Inquiries in ProjNet Bidder Inquiry System
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
8. Follow online screen instructions to enter specific bidder inquiries for the project.
c. The Bidder Inquiry System will be unavailable for new inquires ten (10) calendar days before the due date and time of proposals in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation.
d. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
3.2. PLAN HOLDER'S LIST
For Viewing a List of Interested Vendors (i.e. planholders List) and Receiving Notifications or e-mail of changes regarding a solicitation, Contract Opportunities has these features available. For this solicitation, go to https://beta.sam.gov/ and register as a vendor or enter user name and password to login. If you wish for General Contractors, Subcontractors, Suppliers, Plan Rooms or Print Shops to have the ability to contact you, click on the "Add me to Interested Vendors" for the solicitation.
4. PROPOSAL CHARACTERISTICS
4.1. PAGE LIMITATIONS AND FORMAT
Page limitations for Volume I, Technical Proposal (Evaluation Factors 1, 2 and 3) and for Volume II, Technical Proposal (Evaluation Factor 4) are in Table 1, below. Title Sheets, Tables of Content, Dividers, and blank pages are not included the page limitations below and should not be numbered. Do not submit cover letters for any file submitted, however, a title sheet is recommended as the first page of each file identifying your firm’s name and the file’s title. Any extraneous information or cover letters that provides additional information about your firm that is not requested by this solicitation will not be reviewed or evaluated.
Pages for each factor should be separately and sequentially numbered (i.e., the first page submitted for evaluation for each factor should be “1”). All text shall be at least 10 pt. font and easily read. All text shall be typed and single-spaced. Each page shall be 8-1/2” x 11” (organizational chart and project schedule are the only documents that may be submitted on an 11” x 17”). Margins should be no less than 1” (right, left, top, and bottom).
Pages that exceed the page limitations for any factor will not be reviewed and the information contained on those pages will not be considered for evaluation. Page limitations are per factor, i.e., an Offeror may not reduce the page count for one factor in order to submit additional pages for another factor.
TABLE 1: Volume I, Technical Proposal Evaluation
Factor Title Page Limitation
1 Specialized Experience 7 (2 pages per project plus a 1-page teaming narrative)
2 Project Management Plan 14 pages (Org Chart not included in page count)
3 Past Performance No page limit Volume II, Technical Proposal
4 Small Business Participation No page limit
Volume II, Price Proposal, when solicited, will not have a page limitation.
Volume I, Technical Proposals were already submitted and received. No changes to Volume I proposals will be received.
Volume II, Technical Factor 4 Proposal and Price Proposal, shall be submitted as the following separate files for Volume II (reference Section 5, PROPOSAL SUBMISSION INSTRUCTIONS below):
W9128F20R0068_VOL2_FIRMNAME_REQD_DOCS
W9128F20R0068_VOL2_FIRMNAME_FACTOR4
W9128F20R0068_VOL2_FIRMNAME_PRICE
4.2 VOLUME II, FILE 1, REQUIRED DOCUMENTS
The following shall be submitted in the file titled “W9128F20R0068_VOL2_FIRMNAME_REQD_DOCS” in the sequence listed below:
• Title Sheet
• Table of Contents
• Completed SF 1442, to include acknowledgement of amendment(s)
• Contractor Team Arrangement Requirements (if previously not included in Volume I)
• Acknowledgement of amendment(s) on SF30s can be submitted as well, but not required.
Component requirements:
a. Title Sheet: The title sheet shall contain:
• Solicitation number
• Name, title, address, email, and telephone number of the Offeror.
• Offeror’s tax identification number (TIN)
• Names, titles, emails, and telephone numbers of persons authorized to negotiate on the
Offeror’s behalf with the Government in connection with this RFP.
• Name, title and signature of the person authorized to sign the proposal.
• A statement specifying agreement with all terms, conditions and provisions included in the
RFP.
b. SF 1442: The SF 1442 shall be completed and signed by a person authorized by the Offeror.
c. Contractor Team Arrangement Requirements: For Contractor Team Arrangements, including Joint Ventures, submit the information required by “Contractor Team Arrangements” paragraph, below.
d. Completed SF 30: Offeror shall submit acknowledgement of all amendments to the RFP in accordance with the instructions on the Standard Form 30 (amendment form).
There is no page limit for the Required Documents file.
5. PROPOSAL SUBMISSION INSTRUCTIONS
The Offeror’s proposal shall be submitted electronically, as described below. The Offeror’s proposal shall not contain classified data. The use of hyperlinks in proposals is prohibited.
The only authorized transmission method for proposals in response to this solicitation is electronically via DoD SAFE online submission. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.
The Government must receive the Offeror’s proposal by the date/time specified in this solicitation.
Offerors shall email their proposals using the following link: https://safe.apps.mil/
Please send proposals using the link above to Contract Specialist, Melissa Harlon, at Melissa.r.harlon@usace.army.mil and to Contracting Officer, Ann Young, at Ann.t.young@usace.army.mil.
5.1. INSTRUCTIONS FOR SUBMITTING ELECTRONIC PROPOSALS:
In an effort to reduce paperwork and cost, all proposals shall be submitted electronically through the DoD SAFE site. Submission shall be in Adobe PDF format, preferably with Optical Character Resolution (OCR). Required documents shall be submitted as a separate file; Evaluation Factor 4 shall be submitted as one (1) separate file; Price shall be submitted as a separate file. Reference Paragraph 4.3 below for the file descriptions. You are limited to five (5) maximum files per upload (total size cannot exceed 2GB).
If you have a large file size, recommend that you combine or ZIP your files before uploading to the SAFE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
5.2. REQUEST FOR UPLOAD CODE:
Offerors must email Contract Specialist, Melissa Harlon, at Melissa.r.harlon@usace.army.mil and to Contracting Officer, Ann Young, at Ann.t.young@usace.army.mil within ten (10) days, but no later than https://safe.apps.mil/ mailto:Melissa.r.harlon@usace.army.mil mailto:Ann.t.young@usace.army.mil mailto:Melissa.r.harlon@usace.army.mil mailto:Ann.t.young@usace.army.mil five (5) working days, prior to the proposal due date to receive a request code which will allow for file uploads via the DoD SAFE site. Offerors that fail to email for a request code by five (5) working days before proposal submission date may not be able to receive a request code in time to upload their submission.
5.3. FILE DESCRIPTION:
Include a “File Description” for each file(s) you upload. The “File Description” will be included in the email notice to each of the recipients you choose to have access your file(s). Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.) Offerors shall use the following example for file descriptions:
W9128F20R0068_VOL2_FIRMNAME_REQD_DOCS
W9128F20R0068_VOL2_FIRMNAME_FACTOR4
W9128F20R0068_VOL2_FIRMNAME_PRICE
5.4. INSTRUCTIONS TO FOLLOW ON THE SAFE WEBSITE:
1. Once at the SAFE website select the “Drop-off” icon. This allows users without a CAC or users whose computer is not configured to read a CAC the option to access the SAFE site as a guest.
2. After selecting the “Click Here” link you will be prompted to add your personal information, file information, recipient (Government representative) information and email settings.
3. When completing your file information for transmittal via the SAFE website, you will be required to enter the email address for all recipients. For this solicitation, the recipients are the Contract Specialist and the Contracting Officer. The Contract Specialist for this solicitation is Melissa.r.harlon@usace.army.mil, and the Contracting Officer is Ann.t.young@usace.army.mil. The E-Mail address of the person who initiated the request code will be automatically entered. The Offeror must enter the E-Mail address for both the Contracting Officer and Specialist. The Offeror can enter an additional E-Mail address if desired. After entering the email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your proposal is submitted, a notification will be sent to the recipients you added.
NOTE: Do NOT send the SAFE site packages to group email accounts.
Even if you successfully upload your proposal to the SAFE site, notification will not be sent to the Government recipients until you verify your email address. Entering an incorrect email may result in the rejection of your submission for lateness. An Offeror can confirm proper submission by the ‘Drop-Off Completed” screen which generates based on proper file submission.
NOTE: It has been reported that documents are more quickly uploaded into the SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.
5.5. RECEIPT OF SUBMISSIONS:
For the purposes of establishing whether a proposal submission is considered timely, the Government considers the date and time the submission is completely uploaded into the DoD SAFE website. For proposals larger than the 2GB capacity of the DoD SAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded into the DoD SAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases. The Government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
mailto:Ann.t.young@usace.army.mil
6. CONTRACTOR TEAM ARRANGEMENTS
6.1 CONTRACTOR TEAM ARRANGMENTS OTHER THAN JOINT VENTURE/ MENTOR-PROTÉGÉ
All Offerors proposing a team arrangement other than a Joint Venture/Mentor-Protégé, shall submit the following information in the Required Documents file:
a. A listing of each team arrangement member’s corporate name (no abbreviations), address, point of contact, phone number, DUNS Number, and Cage Code.
b. A copy of the signed team arrangement agreement or binding letter of commitment between each team member. All team arrangement agreements and letters of commitment shall:
(1) Clearly identify the expected relationship, role and responsibility between the firms, Prime Contractor, and of the subcontractor or other entity (type and proportion of work to be performed);
and
(2) Be signed by the appropriate individual(s) of each company.
6.2 JOINT VENTURE TEAM ARRANGEMENTS (INCLUDING MENTOR-PROTÉGÉS)
No contract may be awarded to a Joint Venture/Mentor-Protégé that is not registered in the System for Award Management (SAM) database. The Joint Venture/Mentor-Protégé must have its own registered Data Universal Numbering System (DUNS) number. Any Joint Venture/Mentor-Protégé agreement that is required to be approved by the Small Business Administration (SBA) shall be approved in accordance to the applicable Code of Federal Regulations (CFR). If the applicable requirements are not met prior to the due date for proposals, the proposal will be rendered unawardable.
a. In the cover letter of your proposal, provide the complete names, addresses, and phone number of the firms comprising the Joint Venture/Mentor-Protégé.
b. A copy of the Joint Venture/Mentor-Protégé agreement.
c. Signature requirements: SF 1442, SOLICITATION, OFFER, AND AWARD (pages 00 10 00-1 and 00 10 00-2), Block 20 requires that the name and title of a person authorized to sign the offer for the Joint Venture/Mentor-Protégé be provided. In the case of a Joint Venture/Mentor-Protégé, subject Standard Form shall be signed by the principal representative of the Joint Venture/ Mentor-Protégé (or the alternate principal representative, if the principal representative is unavailable).
d. In addition to the requirements stated above, and to assure a single point of contact for resolution of contractual matters and payments, the Offeror shall submit a certificate signed by each participant in the Joint Venture containing the following statement:
“The parties hereto expressly understand and agree as follows:
1. (Name, title, and company) is the principal representative of the Joint Venture. As such, all communications regarding the administration of the contract and the performance of the work thereunder may be directed to him or her. In the absence of (same name, title, and company), (enter name, title, and company of alternate) is the alternate principal representative of the Joint Venture/Mentor-Protégé. These individuals have authority to sign on behalf of the Joint Venture/Mentor-Protégé.
2. Direction, approvals, required notices, and all other communications from the Government to the Joint Venture/Mentor-Protégé, including transmittal of payments by the Government, shall be directed to (enter name, title, and company of principal), principal representative of the Joint Venture/Mentor-Protégé.”
NOTE: Provide telephone numbers and email addresses for the points of contact listed in the above statement.
6.3 INTEGRITY AND VALIDITY OF CONTRACTOR TEAM ARRANGEMENTS
The Contracting Officer will recognize the integrity and validity of contractor team arrangements; provided that the arrangements are identified and company relationships are fully disclosed and validation of formal agreements and relationships (i.e., Mentor-Protégé agreements, Joint Ventures, partnerships, etc.)
are provided in the offer and submitted with the proposal responding to the solicitation. Nothing in the solicitation authorizes contractor team arrangements in violation of antitrust statutes or limits the Government’s rights to:
a. Require consent to subcontracts (see FAR Subpart 44.2);
b. Determine, based on the stated contractor team arrangement, the responsibilities of the Prime
Contractor (see FAR Subpart 9.1);
c. Provide to the Prime Contractor data rights owned or controlled by the Government;
d. Pursue its policies on competitive contracting, subcontracting, and component breakout initial production or an any other time; and
e. Hold the Prime Contractor fully responsible for contract performance, regardless of team arrangement between the Prime Contractor and its subcontractors.
7. BIFURCATED SOLICITATION SELECTION PROCEDURES
This is a Bifurcated solicitation process following FAR Part 15, Contracting by Negotiation. This solicitation is being issued at 95% design specifications, with 100% design specifications issued on or about 09 February 2021.
The acquisition process for this solicitation will be a Bifurcated Request for Proposal (RFP) Best Value Trade-off procurement process. The dates below are estimations for this bifurcated process and can easily change due to several circumstances. The intent of the estimated schedule below is to assist the Offeror in understanding the bifurcated process.
1. Solicitation was advertised on 4 November 2020 with 95% design specifications
2. Submission of Volume I Technical Proposal (Evaluation Factors 1 through 3) occurred on 7
December 2020 based on 95% design specifications
3. Source Selection Evaluation Board review of technical proposals estimated range of 8 December
2020 – 28 December 2020
4. Solicitation amendment issued on 09 February 2021 for all Offerors who submitted Volume I
Technical proposals. Amendment includes Factor 4 submission requirements and 100% design specifications and request for Volume II Technical (Factor 4) & Price Proposals
5. Submission of Volume II Technical Factor 4 and Price Proposals on or about 12 March 2021
6. Source Selection Evaluation Board review of technical proposals, Price analysis, and Source
Selection Authority review of Best Value Trade-off estimated range of 15 March 2021 – 25 March
7. Contract award on or about 29 April 2021
8. DEBRIEFING OFFERORS
Offerors may request a debriefing in accordance with FAR 15.505 Preaward Debriefing of Offerors or FAR 15.506 Postaward Debriefing of Offerors.
The following have been deleted:
INSTRUCTIONS TO OFFERORS
SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS
EVALUATION CRITERIA VOL 2
SECTION 00 22 00
EVALUATION CRITERIA
1. GENERAL SCOPE OF WORK
Construct a Fighter Alert Shelter at Truax Field Madison, WI: This project will be executed using a design-bid-build (DBB) project delivery method, which will require the contractor to provide the government with a complete facility and warranty based on the Request for Proposal (RFP).
Estimate of the magnitude of this project is between $10M and $25M.
This project will provide a new 28,000 SF Fighter Alert Shelter for four universal fighter aircraft to accommodate the mission of the facility. Special construction requirements: the shelter shall house four aircraft with automatic opening front and rear aircraft doors; heating, fire detection and ultra-high-pressure fire suppression system/closed head wet-pipe sprinkler fire suppression systems. Provide support for Intrusion Detection System (IDS) and installation of a backup emergency generator. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200- 01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facility shall be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective.
This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria.
All work shall be in accordance with RFP documents issued within this solicitation.
Competition for this contract will be full and open competition. The North American Industry Classification System (NAICS) code is 236220 (Commercial and Institutional Building Construction), with a corresponding small business size standard of $39.5M.
OFFERORS ARE REQUIRED TO BE REGISTERED IN THE SYSTEM FOR AWARD MANAGEMENT
WEBSITE (SAM.GOV) FOR NAICS CODE 236220 PRIOR TO THE DATE PROPOSALS ARE DUE.
2. TECHNICAL RATINGS
The evaluation ratings for Technical Factors 1 and 2 will be on an adjectival basis in conjunction with a narrative composed of the discussion of the particular strengths, weaknesses, and deficiencies of the proposal. The Source Selection Team (SST) will use a combined technical/risk rating system that includes consideration of risk in conjunction with the strengths, weaknesses, and deficiencies in determining technical ratings. Combined technical/risk evaluations shall utilize the combined technical/risk ratings listed in Table 1. The Combined technical/risk ratings will be used to evaluate Factor 1 Specialized Experience and Factor 2 Project Management Plan. The evaluation rating that will be used for Factor 3 Past Performance and Factor 4 Small Business Participation is described further below.
Table 1: Combined Technical/Risk Ratings Color Rating Description Blue Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red Unacceptable Proposal does not meet requirements of the solicitation and, thus, contains one or more deficiencies, and risk of unsuccessful performance is unacceptable. Proposal is unawardable.
RATING DEFINITIONS
Strength: is an aspect of an Offeror's proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance
Significant Strength: an aspect of an Offeror's proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
Weakness: a flaw in the proposal that increases the risk of unsuccessful contract performance.
Significant Weakness: a flaw that appreciably increases the risk of unsuccessful contract performance.
Deficiency: A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
3. PAST PERFORMANCE RATING
The Past Performance evaluation factor assesses the degree of confidence the Government has in an Offeror’s ability to supply products and services that meet users’ needs, based on a demonstrated record of performance. The Past Performance evaluation results in an assessment of the Offeror’s probability of meeting the solicitation requirements. The Past Performance evaluation considers each Offeror's demonstrated recent and relevant record of performance in supplying products and services that meet the contract’s requirements. One performance confidence assessment rating is assigned for each Offeror after evaluating the Offeror's recent Past Performance, focusing on performance that is relevant to the contract requirements. There are two aspects to the Past Performance evaluation, Relevancy and Contractor Performance, which are described below:
a. Relevancy. The first aspect of the Past Performance evaluation is to determine how relevant previous experience accomplished by the Offeror is to the anticipated work to be accomplished under this project scope. Recent is defined as Past Performance on contracts that had a construction completion date (otherwise known as a beneficial occupancy date (BOD)) within the past seven (7) years of this solicitation release. Relevancy is defined as similarity of items stated within this solicitation such as: types of projects, dollar value, contract type, and relative complexity. With respect to relevancy, more relevant Past Performance will typically be a stronger predictor of future success and have more influence on the Past Performance confidence assessment. Relevancy is not a separate proposal rating but is used to develop an overall Past Performance Confidence Assessment. The four levels of relevancy ratings are:
Very Relevant. Present/Past Performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant. Present/Past Performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant. Present/Past Performance effort involved some of the scope and
Not Relevant. Present/Past Performance effort involved little or none of the scope and
b. Contractor Performance. The second aspect of the Past Performance evaluation is to determine how well the contractor performed on the contracts. The Past Performance evaluation performed in support of a current source selection does not establish, create, or change the existing record and history of the Offeror’s Past Performance on past contracts; rather, the Past Performance evaluation process gathers information from stakeholders on how well the Offeror performed those past contracts. The Source Selection Evaluation Board will review this Past Performance information and determine the quality and usefulness as it applies to performance confidence assessment.
After evaluating relevancy and contractor performance, a Performance Confidence Assessment rating will be determined. In conducting a performance confidence assessment, each Offeror shall be assigned one of the following ratings:
Substantial Confidence. Based on the Offeror’s recent/relevant performance record, the
Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence. Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Limited Confidence. Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
No Confidence. Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.
Unknown Confidence (Neutral). No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. Per Federal Acquisition Regulation (FAR) 15.305(a) (2) (iv), “In the case of an Offeror without a record of relevant Past Performance or for whom information on Past Performance is not available, the Offeror may not be evaluated either favorably or unfavorably on Past Performance.”
4. SMALL BUSINESS RATING METHOD
The small business evaluation for Factor 4 will utilize the following ratings as stated in the below table for this solicitation.
Table 2: Small Business Rating Method Color Rating Description Blue Outstanding Proposal indicates an exceptional approach and understanding of the small business objectives.
Purple Good Proposal indicates a thorough approach and understanding of the small business objectives.
Green Acceptable Proposal indicates an adequate approach and understanding of small business objectives.
Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the small business objectives.
Red Unacceptable Proposal does not meet small business objectives.
5. PAST PERFORMANCE RECORDS
Past performance records may be obtainable by Offerors using one of the following methods:
(1) Accessing Past Performance information directly from Contractor Performance Assessment Reporting System (CPARS) website at https://www.cpars.gov/ for CCASS completed before 27 June 2014 and for merged CPARS completed after 1 July 2014. CPARS is an electronic repository of performance information collected by all the major federal performance reporting systems and can be accessed at the aforementioned website.
All Department of Defense (DoD) employees (military and civilian), including DoD Contractors that are working on site (military/government facilities) or contractors working offsite using Government Furnished Equipment (GFE) are required to use certificates from DoD Public Key Infrastructure (PKI) to access CPARS. If the contractor doesn't work on site or with GFE they are encouraged to obtain and use a certificate from an External Certificate Authority (ECA). For DoD users, the use of PKI Login is Mandatory.
Federal and Contractor users can use the PKI login category if they have PKI.
External Certificate Authority External Certificate Authorities (ECAs) and Interim External Certificate Authorities (IECAs) provide digital certificates to the DoD's private industry partners, contractors using their own equipment or working in non-government facilities, allied partners, and other agencies.
Additional information about the PKI certificate is at https://www.cpars.gov/pki_info.htm web page.
You will also need your DUNS number and Marketing Partner Identification Number (MPIN) to log onto CPARS. The MPIN number was selected by whoever registered your company in the System for Award Management (SAM) Registry at https://beta.sam.gov/. If you do not know your MPIN number, you will need to contact the SAM help desk by emailing them from the email link on the SAM web page. Please be aware that they will only release the MPIN number to the person who originally registered your company. Additional instructions on locating your MPIN is located in the Frequently Asked Questions (FAQs) section under the Help tab, or -
(2) Past Performance Questionnaires (PPQs) may be used to provide or supplement a firm’s past performance with other than U.S. Governmental clients. Contact your client point of contact (POC) for the project you need a past performance record, and request the POC to complete the PPQ. The PPQ included in this solicitation is provided for the Offeror to submit to the client for each project the Offeror may need a past performance record for to meet the requirements in this synopsis. Ensure correct phone https://www.cpars.gov/ https://www.sam.gov/portal/public/SAM/ numbers and email addresses are provided for the client POC. Completed PPQs should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). It is the Offeror’s responsibility to follow-up with client POCs to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Melissa Harlon, Contract Specialist, via email at Melissa.r.harlon@usace.army.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs.
However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If a PPQ is to be submitted for a project, the complete PPQ shall be submitted (either by the client POC or the Offeror) prior to proposal closing date.
6. RELATIVE IMPORTANCE OF EVALUATION FACTORS
Evaluation factors are listed below in descending order of importance:
Volume I Factors Descending Order of Importance
Factor 1 – Specialized Experience 1st Most Important Factor
Factor 2 – Project Management Plan 2nd Most Important Factor
Factor 3 – Past Performance 3rd Most Important Factor
Factor 4 – Small Business Participation 4th Most Important Factor
All evaluation factors other than cost or price, when combined, are approximately equal to cost or price.
7. BASIS OF AWARD
The Government will evaluate proposals in accordance with the criteria described within the solicitation, and will award a firm-fixed-price contract to the responsible Offeror whose proposal is determined to represent the best value to the Government utilizing the best value tradeoff process as described in FAR 15.101-1.
The Government intends to evaluate proposals and award contracts without conducting discussions with Offerors. However, in the event the Procuring Contracting Officer (PCO) concludes conducting discussions is in the best interest of the Government, the PCO will document the rationale for the competitive range determination, in which the Source Selection Authority (SSA) will review and approve the PCO’s determination. If the PCO determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the PCO may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a price and technical standpoint.
8. FACTORS TO BE EVALUATED
8.1 VOLUME I – FACTOR 1 – SPECIALIZED EXPERIENCE
• Previously submitted under Volume I
8.2 VOLUME I – FACTOR 2 – PROJECT MANAGEMENT PLAN
• Previously submitted under Volume I
8.3 VOLUME I – FACTOR 3 – PAST PERFORMANCE
• Previously submitted under Volume I
8.4 VOLUME II – FACTOR 4 – SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT
(REQUIRED FOR ALL OFFERORS)
8.4.1 Submission Requirements (There is no page limitation for Small Business Participation Commitment Document)
This factor requires all Offerors, regardless of size status to address their planned small business usage for this project. All Offerors are required to provide a Small Business Participation Commitment Document (SBPCD). It should address their corporate approach and methodology for acquiring, soliciting and using small businesses in the performance of this contract. All documentation for this factor should address the Offeror's commitments to providing subcontracting opportunities, as well as evidence of planned and/or continued outreach efforts to encourage and use small businesses. This SBPCD should include a breakdown of small business subcategories to be used as shown on the chart in (d) below.
Separate from the Small Business Participation Plan (Factor 4) required by all offerors, a Subcontracting Plan will ONLY be required from the Apparent Successful Offeror if the firm is an Other Than Small Business (OTSB) - meeting the requirements of FAR 52.219-9 and DFARS 252.219-7003. The Apparent Successful OTSB must submit an acceptable subcontracting plan to be eligible for award. Subcontracting Plans shall reflect and be consistent with the commitments offered in the Small Business Participation Plan. Please do not submit a Subcontracting Plan for Factor 4.
The SBPCD should demonstrate commitment to all federally designated categories of small business:
Small Businesses (SBs), Veteran-Owned Small Businesses (VOSBs), Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) HUBZone Small Businesses (HUB), Small Disadvantaged Businesses (SDBs), Woman-Owned Small Business (WOSBs), and when applicable, Historically Black Colleges/Universities/Minority Institutions (HBCU/MIs).
Offerors should propose the level of participation of small businesses (as a small business prime, joint venture, teaming arrangement, and/or small business subcontractors) in the performance of the acquisition relative to the objectives/goals set forth in the evaluation of this area. The SBPCD should identify all categories for participation as part of the Offeror's team. This should include a general description of the type of work, product or service anticipated to be supplied via a small business concern.
A specific format is not required, however, items (a) through (f) as stated below shall be provided as a minimum.
(a) Provide a Narrative addressing the corporate approach and methodology for acquiring, soliciting and using small businesses in the performance of this contract. The Narrative should address the Offeror's commitment to providing subcontracting opportunities, as well as evidence of planned and /or continued outreach efforts to encourage and use small businesses. The Narrative should provide detailed supporting documentation regarding the individual commitment expressed in percentages for evaluators to determine the goals stated are realistic.
(b) Check the applicable size and categories for the PRIME Offeror for this procurement – Check all applicable boxes:
{___} Large Prime
- or - {___} Small Business Prime; also categorized as a:
{___} Small Disadvantaged Business (SDB) {___} Woman-Owned Small Business (WOSB) {___} Historically Underutilized Zone (HUB Zone) Small Business {___} Veteran Owned Small Business (VOSB) {___} Service Disabled Veteran Owned Small Business (SDVOSB)
(c) Submit the total percentages of work to be performed by both large and small businesses
(include the percentage of work to be performed both by Prime, joint venture, teaming arrangement, and subcontractors). Percentages are based on Total Contract Value. For this project, the small business participation goal is 30% of the Total Contract Value performed by the Small Business Community.
Total Percentage planned for Large Business(es): = __________% Total Percentage planned for Small Business(es): = __________% (Small Business Prime Contractors – Include yourselves in the above percentage.)
For example: If you are a Small Business Prime Contractor and will be doing 40% of the work and you will be subcontracting another 20% of the Total Contract Value to other small business firms, then your Total Percentage planned for Small Business will equal 60%.
(d) Indicate the total percentage of participation to be performed by each type of subcategory small business. The percentage of work performed by Small Businesses that qualify in multiple small business categories may be counted in each category:
For example: Firm A (WOSB and SDVOSB) performing 2%; and Firm B (SDB, HubZ and WOSB) performing 3%. Results equate to: SB 5%; SDB 3%; HubZone 3%; WOSB 5%;
SDVOSB 2%; VOSB 2%;). SDVOSBs are also VOSBs automatically; however, VOSBs are not automatically SDVOSBs.
Small Business _________% Small Disadvantaged Business _________% HUB Zone Small Business _________% Woman Owned Small Business _________% Service-Disabled Veteran-Owned SB _________% Veteran-Owned Small Business _________%
(e) Identify the Prime Offeror and type of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .