Ft Randall GSU Transformer Install Contract Drawings 1of2 - Industry Day 20200420.pdf
PDF 90 MB Posted
- Solicitation number
- W9128F20R0057
About this file
This notice announces an industry day for a federal contract opportunity to install generator step-up transformers at Fort Randall Dam in South Dakota. The Army Corps of Engineers will host a virtual industry day on April 27, 2020 from 10:00 to 11:30 AM Central Time to introduce the Fort Randall GSU Transformer Install project and allow industry to provide feedback on the draft specifications. The work includes installing one three-phase 13.8/115kV transformer and three three-phase 13.8/230kV transformers, modifying associated power and protection systems, redesigning the 15kV bus and structures, and replacing takeoff towers to accommodate the new single three-phase configuration instead of three single-phase transformers. Fire protection and oil containment will also be incorporated. Offerors must complete the work within 985 days of the notice to proceed over two outage periods specified in the forthcoming solicitation. The primary NAICS code is 237130. Interested parties must register with beta SAM and submit any questions to the identified project in ProjNet by April 24, 2020.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .