Amend 3 ACI Roofing Gulf Coast Price Schedule.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- Advanced Contract Initiative (ACI) Emergency Temporary Roofing Repairs, Gulf Coast CONUS Unrestricted
- Solicitation number
- W9128F20R0033
About this file
This document contains a price schedule for a seven-year advanced contract initiative for emergency temporary roofing repairs in three regions along the Gulf Coast following a natural disaster. The solicitation seeks a roofing contractor to provide planning efforts, work order processing, installation of government-furnished plastic sheeting on shingle and metal roofs, structural panel and rafter installation, debris clearance, and small roof repairs across the Northeast, Southeast, and Gulf Coast regions. Pricing is established at $25,000 per year for each region. The total contract value over seven years is $175,000. The solicitation is issued by the Department of the Army Corps of Engineers Omaha District as an unrestricted procurement under NAICS code 238160 for roofing contractors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Northeast
SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE
W9128F-20-R-0033
TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00
Contractor Name: _______________________________________________________________
| NORTHEAST REGION |
| Connecticut, Deleware, District of Columbia, Maine, Massachusetts, New Hampshire, New Jersey, New Yort, Pennsylvania, Rhode Island, Virginia |
NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only
Line Item Description Unit of Issue Unit Price Qty Total
| 1100 | Northeast Region Year 1 | ||||
| 1101 | Planning Effort | Negotiated Line Item | |||
| 1102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 1103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 1104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 1105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 1106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 1107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 1108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 1109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 1 | $ 25,000.00 |
| 2100 | Northeast Region Year 2 | ||||
| 2101 | Planning Effort | Negotiated Line Item | |||
| 2102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 2103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 2104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 2105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 2106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 2107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 2108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 2109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 2 | $ 25,000.00 |
| 3100 | Northeast Region Year 3 | ||||
| 3101 | Planning Effort | Negotiated Line Item | |||
| 3102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 3103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 3104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 3105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 3106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 3107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 3108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 3109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 3 | $ 25,000.00 |
| 4100 | Northeast Region Year 4 | ||||
| 4101 | Planning Effort | Negotiated Line Item | |||
| 4102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 4103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 4104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 4105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 4106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 4107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 4108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 4109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 4 | $ 25,000.00 |
| 5100 | Northeast Region Year 5 | ||||
| 5101 | Planning Effort | Negotiated Line Item | |||
| 5102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 5103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 5104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 5105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 5106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 5107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 5108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 5109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 5 | $ 25,000.00 |
| 6100 | Northeast Region Year 6 | ||||
| 6101 | Planning Effort | Negotiated Line Item | |||
| 6102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 6103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 6104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 6105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 6106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 6107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 6108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 6109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 6 | $ 25,000.00 |
| 7100 | Northeast Region Year 7 | ||||
| 7101 | Planning Effort | Negotiated Line Item | |||
| 7102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 7103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 7104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 7105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 7106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 7107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 7108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 7109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 7 | $ 25,000.00 |
Southeast
SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE
W9128F-20-R-0033
TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00
Contractor Name: _______________________________________________________________
| SOUTHEAST REGION |
| Florida, Georgia, North Carolina, South Carolina |
NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only
Line Item Description Unit of Issue Unit Price Qty Total
| 1200 | Southeast Region Year 1 | ||||
| 1201 | Planning Effort | Negotiated Line Item | |||
| 1202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 1203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 1204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 1205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 1206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 1207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 1208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 1209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 1 | $ 25,000.00 |
| 2200 | Southeast Region Year 2 | ||||
| 2201 | Planning Effort | Negotiated Line Item | |||
| 2202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 2203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 2204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 2205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 2206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 2207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 2208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 2209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 2 | $ 25,000.00 |
| 3200 | Southeast Region Year 3 | ||||
| 3201 | Planning Effort | Negotiated Line Item | |||
| 3202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 3203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 3204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 3205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 3206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 3207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 3208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 3209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 3 | $ 25,000.00 |
| 4200 | Southeast Region Year 4 | ||||
| 4201 | Planning Effort | Negotiated Line Item | |||
| 4202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 4203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 4204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 4205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 4206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 4207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 4208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 4209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 4 | $ 25,000.00 |
| 5200 | Southeast Region Year 5 | ||||
| 5201 | Planning Effort | Negotiated Line Item | |||
| 5202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 5203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 5204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 5205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 5206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 5207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 5208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 5209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 5 | $ 25,000.00 |
| 6200 | Southeast Region Year 6 | ||||
| 6201 | Planning Effort | Negotiated Line Item | |||
| 6202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 6203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 6204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 6205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 6206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 6207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 6208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 6209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 6 | $ 25,000.00 |
| 7200 | Southeast Region Year 7 | ||||
| 7201 | Planning Effort | Negotiated Line Item | |||
| 7202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 7203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 7204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 7205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 7206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 7207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 7208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 7209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 7 | $ 25,000.00 |
Gulf Coast
SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE
W9128F-20-R-0033
TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00
Contractor Name: _______________________________________________________________
| GULF COAST REGION |
| Alabama, Louisiana, Mississippi, Texas |
NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only
Line Item Description Unit of Issue Unit Price Qty Total
| 1300 | Gulf Region Year 1 | ||||
| 1301 | Planning Effort | Negotiated Line Item | |||
| 1302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 1303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 1304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 1305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 1306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 1307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 1308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 1309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 1 | $ 25,000.00 |
| 2300 | Gulf Region Year 2 | ||||
| 2301 | Planning Effort | Negotiated Line Item | |||
| 2302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 2303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 2304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 2305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 2306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 2307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 2308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 2309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 2 | $ 25,000.00 |
| 3300 | Gulf Region Year 3 | ||||
| 3301 | Planning Effort | Negotiated Line Item | |||
| 3302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 3303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 3304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 3305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 3306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 3307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 3308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 3309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 3 | $ 25,000.00 |
| 4300 | Gulf Region Year 4 | ||||
| 4301 | Planning Effort | Negotiated Line Item | |||
| 4302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 4303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 4304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 4305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 4306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 4307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 4308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 4309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 4 | $ 25,000.00 |
| 5300 | Gulf Region Year 5 | ||||
| 5301 | Planning Effort | Negotiated Line Item | |||
| 5302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 5303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 5304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 5305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 5306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 5307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 5308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 5309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 5 | $ 25,000.00 |
| 6300 | Gulf Region Year 6 | ||||
| 6301 | Planning Effort | Negotiated Line Item | |||
| 6302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 6303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 6304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 6305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 6306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 6307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 6308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 6309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 6 | $ 25,000.00 |
| 7300 | Gulf Region Year 7 | ||||
| 7301 | Planning Effort | Negotiated Line Item | |||
| 7302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 7303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 7304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 7305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 7306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 7307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 7308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 7309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 7 | $ 25,000.00 |
File details come from the government source that posted it. Updated .