US Regions - Locked.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- Advanced Contract Initiative (ACI) Emergency Temporary Roofing Repairs, CONUS Small Business
- Solicitation number
- W9128F20R0032
About this file
This document contains a solicitation for emergency temporary roofing repair contracts and the associated pricing schedule template. The U.S. Army Corps of Engineers is seeking proposals for four single-award task order contracts valued at $45 million each to provide emergency temporary roofing installation in two regions covering 20 states. The contracts include a five-year base period and a two-year option period. Eligible contractors must be small businesses in NAICS code 238160 for roofing contractors. The solicitation will result in awards to one small business, one service-disabled veteran-owned small business, one Historically Underutilized Business Zone small business, and one woman-owned small business. The pricing schedule template includes line items for planning, work order processing, installation of plastic sheeting on shingle and metal roofs, structural panel and rafter installation, debris removal, and small roof repairs over seven annual periods. Questions regarding the presolicitation should be directed to the named contracting specialist.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Northeast
SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE
W9128F-20-R-XXXX
TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00
Contractor Name: _______________________________________________________________
| NORTHEAST REGION |
| Connecticut, Deleware, District of Columbia, Maine, Massachusetts, New Hampshire, New Jersey, New Yort, Pennsylvania, Rhode Island, Virginia |
NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only
Line Item Description Unit of Issue Unit Price Qty Total
| 1100 | Northeast Region Year 1 | ||||
| 1101 | Planning Effort | Negotiated Line Item | |||
| 1102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 1103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 1104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 1105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 1106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 1107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 1108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 1109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 1 | $ 25,000.00 |
| 2100 | Northeast Region Year 2 | ||||
| 2101 | Planning Effort | Negotiated Line Item | |||
| 2102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 2103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 2104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 2105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 2106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 2107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 2108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 2109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 2 | $ 25,000.00 |
| 3100 | Northeast Region Year 3 | ||||
| 3101 | Planning Effort | Negotiated Line Item | |||
| 3102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 3103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 3104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 3105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 3106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 3107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 3108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 3109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 3 | $ 25,000.00 |
| 4100 | Northeast Region Year 4 | ||||
| 4101 | Planning Effort | Negotiated Line Item | |||
| 4102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 4103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 4104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 4105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 4106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 4107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 4108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 4109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 4 | $ 25,000.00 |
| 5100 | Northeast Region Year 5 | ||||
| 5101 | Planning Effort | Negotiated Line Item | |||
| 5102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 5103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 5104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 5105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 5106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 5107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 5108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 5109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 5 | $ 25,000.00 |
| 6100 | Northeast Region Year 6 | ||||
| 6101 | Planning Effort | Negotiated Line Item | |||
| 6102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 6103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 6104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 6105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 6106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 6107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 6108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 6109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 6 | $ 25,000.00 |
| 7100 | Northeast Region Year 7 | ||||
| 7101 | Planning Effort | Negotiated Line Item | |||
| 7102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 7103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 7104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 7105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 7106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 7107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 7108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 7109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 7 | $ 25,000.00 |
Southeast
SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE
W9128F-20-R-XXXX
TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00
Contractor Name: _______________________________________________________________
| SOUTHEAST REGION |
| Florida, Georgia, North Carolina, South Carolina |
NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only
Line Item Description Unit of Issue Unit Price Qty Total
| 1200 | Southeast Region Year 1 | ||||
| 1201 | Planning Effort | Negotiated Line Item | |||
| 1202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 1203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 1204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 1205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 1206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 1207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 1208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 1209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 1 | $ 25,000.00 |
| 2200 | Southeast Region Year 2 | ||||
| 2201 | Planning Effort | Negotiated Line Item | |||
| 2202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 2203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 2204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 2205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 2206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 2207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 2208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 2209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 2 | $ 25,000.00 |
| 3200 | Southeast Region Year 3 | ||||
| 3201 | Planning Effort | Negotiated Line Item | |||
| 3202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 3203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 3204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 3205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 3206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 3207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 3208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 3209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 3 | $ 25,000.00 |
| 4200 | Southeast Region Year 4 | ||||
| 4201 | Planning Effort | Negotiated Line Item | |||
| 4202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 4203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 4204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 4205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 4206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 4207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 4208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 4209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 4 | $ 25,000.00 |
| 5200 | Southeast Region Year 5 | ||||
| 5201 | Planning Effort | Negotiated Line Item | |||
| 5202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 5203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 5204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 5205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 5206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 5207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 5208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 5209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 5 | $ 25,000.00 |
| 6200 | Southeast Region Year 6 | ||||
| 6201 | Planning Effort | Negotiated Line Item | |||
| 6202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 6203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 6204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 6205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 6206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 6207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 6208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 6209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 6 | $ 25,000.00 |
| 7200 | Southeast Region Year 7 | ||||
| 7201 | Planning Effort | Negotiated Line Item | |||
| 7202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 7203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 7204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 7205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 7206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 7207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 7208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 7209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 7 | $ 25,000.00 |
Gulf Coast
SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE
W9128F-20-R-XXXX
TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00
Contractor Name: _______________________________________________________________
| GULF COAST REGION |
| Alabama, Louisiana, Mississippi, Texas |
NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only
Line Item Description Unit of Issue Unit Price Qty Total
| 1300 | Gulf Region Year 1 | ||||
| 1301 | Planning Effort | Negotiated Line Item | |||
| 1302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 1303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 1304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 1305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 1306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 1307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 1308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 1309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 1 | $ 25,000.00 |
| 2300 | Gulf Region Year 2 | ||||
| 2301 | Planning Effort | Negotiated Line Item | |||
| 2302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 2303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 2304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 2305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 2306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 2307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 2308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 2309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 2 | $ 25,000.00 |
| 3300 | Gulf Region Year 3 | ||||
| 3301 | Planning Effort | Negotiated Line Item | |||
| 3302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 3303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 3304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 3305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 3306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 3307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 3308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 3309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 3 | $ 25,000.00 |
| 4300 | Gulf Region Year 4 | ||||
| 4301 | Planning Effort | Negotiated Line Item | |||
| 4302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 4303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 4304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 4305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 4306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 4307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 4308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 4309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 4 | $ 25,000.00 |
| 5300 | Gulf Region Year 5 | ||||
| 5301 | Planning Effort | Negotiated Line Item | |||
| 5302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 5303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 5304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 5305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 5306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 5307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 5308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 5309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 5 | $ 25,000.00 |
| 6300 | Gulf Region Year 6 | ||||
| 6301 | Planning Effort | Negotiated Line Item | |||
| 6302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 6303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 6304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 6305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 6306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 6307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 6308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 6309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 6 | $ 25,000.00 |
| 7300 | Gulf Region Year 7 | ||||
| 7301 | Planning Effort | Negotiated Line Item | |||
| 7302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 7303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 7304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 7305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 7306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 7307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 7308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 7309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 7 | $ 25,000.00 |
File details come from the government source that posted it. Updated .