This special notice announces an industry day for the Fort Randall Unit Rehab project. The U.S. Army Corps of Engineers, Omaha District will host the event on October 16-17, 2019 at 113 Randall Creek Road in Fairfax, SD from 9:00am to 5:00pm. The purposes of the industry day are to review the project scope of work, provide a tour of one of the dam's eight turbine generator units, and solicit comments on the draft specifications from industry. The project scope involves rehabilitating the eight units, including replacing turbine runners, refurbishing or replacing wicket gates, refurbishing head covers and stay rings, and installing new generator stator windings. Other mechanical and electrical upgrades are also included. Attendance is limited to two representatives per company, who must register with their names and affiliations by October 9, 2019. Foreign citizens must register by September 16 and provide passport information. Questions about the industry day must be submitted through ProjNet by October 9, 2019 to be addressed at the event. The estimated project cost is between $100-250 million.
Draft Specifications - W9128F20R0003 - Fort Randall Major Unit Rehab
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
(Request For Proposal)
2nd Industry Day Review
Solicitation No. W9128F20R0003
Major Unit Rehab
Fort Randall Dam, SD
October 2019
US Army Corps of Engineers Omaha District
DRAFT
Major Unit Rehab Fort Randall Dam, SD
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00-3 PRICING SCHEDULE
00 10 00-11 OPTIONAL ITEMS TIMELINE
00 21 00 INSTRUCTIONS TO OFFERORS (RFP)
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 72 00 GENERAL CONDITIONS (CONTRACT CLAUSES - RFP)
00 73 00 SUPPLEMENTARY CONDITIONS (SPECIAL CONTRACT REQUIREMENTS)
DIVISION 01 - GENERAL REQUIREMENTS
01 11 10.00 26 SUMMARY OF WORK
01 12 00 CONSTRUCTION GENERAL
01 22 00.00 10 MEASUREMENT AND PAYMENT
01 30 00.24 OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 78 36.00 24 WARRANTY OF CONSTRUCTION
01 78 39.00 24 AS-BUILT DRAWINGS
DIVISION 03 - CONCRETE
03 60 00.02 26 MAJOR EQUIPMENT FOUNDATION REPAIR
DIVISION 05 - METALS
05 05 23.20 26 WELDING
05 05 33.20 26 NON-DESTRUCTIVE TESTING
05 14 00.13 26 STRUCTURAL ALUMINUM WELDING
05 50 03.01 26 METALWORK FABRICATION, MACHINE WORK, AND MISCELLANEOUS
PROVISIONS
05 50 04.01 26 METALS: MISCELLANEOUS, STANDARD ARTICLES, SHOP FABRICATED
ITEMS
05 50 14.00 26 TURBINE MAINTENANCE PLATFORM (OPTION 1)
05 50 14.01 26 TURBINE MAINTENANCE PLATFORM (OPTION 2)
DIVISION 09 - FINISHES
09 97 02.00 26 PAINTING: HYDRAULIC STRUCTURES
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00.00 26 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT
DIVISION 22 - PLUMBING
22 00 00.00 26 PIPING AND EQUIPMENT
22 00 00.12 26 DELIVERY OF TURBINE OIL
DIVISION 26 - ELECTRICAL
26 05 00.00 26 BASIC ELECTRICAL EQUIPMENT AND AUXILIARY ELECTRICAL
EQUIPMENT
26 05 19.00 26 INSULATED WIRE AND CABLE
DIVISION 40 - PROCESS INTERCONNECTIONS
40 05 13.96 26 WELDING, PIPING
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 67 13.12 26 FLUSHING AND CLEANING OF LUBRICATING OIL SYSTEMS
DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
42 13 19.00 26 GENERATOR THRUST BEARING OIL COOLERS
DIVISION 48 - ELECTRICAL POWER GENERATION
48 06 15.12 26 TURBINE OIL
48 13 13.00 26 HYDRAULIC TURBINE MODEL TESTING
48 13 13.01 26 HYDRAULIC TURBINE
48 13 13.02 26 DISASSEMBLY AND REASSEMBLY OF HYDRAULIC TURBINE GENERATOR
UNIT
48 13 13.04 26 EXISTING TURBINE COMPONENT, REFURBISHMENT, AND REPLACEMENT
48 13 13.06 26 GENERATOR THRUST BEARING INSPECTION AND OPTIONAL
REFURBISHMENT
48 13 13.07 26 GUIDE BEARING INSPECTION & REFURBISHMENT
48 13 13.08 26 CAVITATION AND CRACK REPAIR (OPTIONAL)
48 13 13.11 26 MISCELLANEOUS PARTS, MATERIALS, AND SERVICES
48 13 16.00 26 REWIND OF HYDRAULIC-TURBINE DRIVEN GENERATORS
48 13 16.03 26 MACHINE CONDITION MONITORING SYSTEM
48 70 01.00 26 NERC COMPLIANCE FOR HYDROGENERATORS
DIVISION 49 -
49 13 10.10 26 MECHANICAL COMPONENT, REFURBISHMENT AND REPLACEMENT
-- End of Project Table of Contents --
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
W9128F20R0003
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Contracting Division (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901
The offeror hereby agrees to do all work described in the documents entitled:
Major Unit Rehab Fort Randall Dam, SD
RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION
00 45 00. ELECTONIC COPIES OF OFFER ARE ACCEPTABLE.
For Best Value RFP *BLOCK 13a. – REFER TO SECTION 00 22 00 FOR THE NUMBER OF COPIES TO BE SUBMITTED WITH THE ORIGINAL
OFFER.
THIS SOLICITATION IS UNRESTRICTED AND IS OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPITATION
U.S.ARMY CORPS OF ENGINEERS, OMAHA
POC: Jessica Jackson (W9128F20R0003) Contracting Division (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901
CT
Jessica Jackson (402) 995-2052
2:00 pm
** See Section 00 73 00DRAFT
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
DUNS Number or Unique Entity Identifier Number:
U.S. Army Engineer District, Omaha 1616 Capitol Ave.
Omaha, Nebraska 68102-4901
USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005
SEE ATTACHED CLIN PRICING SCHEDULE
Contractor’s Fax No.____________ CAGE CODE ________________ Contractor’s E-Mail address_______________
CLIN Description Quantity Unit
Measure Unit Price Amount
0001 Hydraulic Turbine Model 1 Job XXX $______________
0002 Site Mobilization and Demobilization 1 Job XXX $______________
0003 On-Site Lead-Based Paint Removal 12000 EST Sq Ft $__________ $______________
0004 Painting 8 Each $__________ $______________
0005 Francis Turbine Runner 8 Each $__________ $______________
0006 Special Tools and Scaffolding 1 Job XXX $______________
0007 New Thrust Bearing Screw Jack 1 Job XXX $______________
0008 Pre-Disassembly Investigation 8 Each $__________ $______________
0009 Generating Unit Disassembly Including Inspections of Components
8 Each $__________ $______________
0010 Re-Establishing Stator Center 8 Each $__________ $__________
0011 Generating Unit Reassembly 8 Each $__________ $______________
0012 Operational Testing After Reassembly 8 Each $__________ $______________
0013 Penstock Geometry and Flow Meter Reporting 1 Job XXX $______________
0014 Line Bore Wicket Gate Stem Housing 8 Each $__________ $______________
0015 Stay Ring Inspection 8 Each $__________ $______________
0016 Supply Stationary Sealing Rings 8 Set $__________ $______________
Fort Randall Major Unit Rehab, Fort Randall, SD FRE2
SECTION 00 10 00
Pricing Schedule
BASE BID ITEMS
0017 Headcover Refurbishment 8 Each $__________ $______________
0018 Turbine Guide Bearing Housing and Head Cover Extension Refurbishment
8 Each $__________ $______________
0019 Bottom Ring Refurbishment 8 Each $__________ $______________
0020 Turbine Air Inlet Valve Refurbishment 8 Each $__________ $______________
0021 Furnish and Install All Self-Lubricating Bushings and Bearing Plates
8 Each $__________ $______________
0022 Perform Wicket Gate Operating Mechanism Analysis 1 Job XXX $______________
0023 Furnish and Install Turbine Shaft Sleeve 8 Each $__________ $______________
0024 Manufacture Spare Turbine Shaft Sleeve 1 Job XXX $______________
0025 Procure Spare Wicket Gate Stem Seal Set 1 Set XXX $______________
0026 Procure Spare Servomotor Packing Box Stem Seals 1 Set XXX $______________
0027 Operating Ring Refurbishment 8 Each $__________ $______________
0028 Turbine and Generator Shaft Inspection 8 Each $__________ $______________
0029 Machining of Turbine Shaft 8 Each $__________ $______________
0030 Supply and Install Main Turbine Shaft Packing Box
8 Each $__________ $______________
0031 Refurbish Wicket Gate Servomotor 8 Set $__________ $______________
0032 Thrust Runner Phase 1 Inspection 8 Each $__________ $______________
0033 Thrust Bearing Shoe Phase 1 Inspection 8 Set $__________ $______________
0034 Shipment of Turbine Guide Bearing (Installed and Spares)
10 Each $__________ $______________
0035 Ship Set of Upper Generator Guide Bearing Pads (Installed and Spare)
9 Set $__________ $______________
0036 Ship Set of Lower Generator Guide Bearing Pads (Installed and Spare)
9 Set $__________ $______________
0037 Refurbish Turbine Guide Bearing (Installed and Spares)
10 Each $__________ $______________
0038 Refurbish Set of Upper Generator Guide Bearing Pads (Installed and Spare)
9 Set $__________ $______________
0039 Refurbish Set of Lower Generator Guide Bearing Pads (Installed and Spare)
9 Set $__________ $______________
0040 Inspect Turbine Guide Bearing Oil Pumps/Motor System
8 Each $__________ $______________
0041 New Turbine Guide Bearing Oil Piping, Valves, and Filters
8 Each $__________ $______________
0042 Inspect, Clean, and Pressure Test Generator Air Coolers
8 Set $__________ $______________
0043 Inspect and Pressure Test Thrust Bearing Oil Cooler Assembly
8 Each $__________ $______________
0044 Supply and Install the 6 Inch Cooling Water Strainer
8 Each $__________ $______________
0045 Supply and Install the 14 Inch Cooling Water Valves
4 Set $__________ $______________
0046 Supply and Install the 6 Inch Cooling Water Valves
8 Set $__________ $______________
0047 Replace Headcover Condensing Piping 8 Each $__________ $______________
0048 Replace Depression Air Diaphragm Valves 8 Each $__________ $______________
0049 Replace Upper Generator Guide Bearing Oil Fill Pipe
8 Each $__________ $______________
0050 Provision of Boring Bar 1 Job XXX $______________
0051 Setup and Machining of Stay Ring Mounting Flange and O-Ring Sealing Surfaces
8 Each $__________ $______________
0052 Spiral Case Inspection 8 Each $__________ $______________
0053 Discharge Ring and Draft Tube Liner Inspection 8 Each $__________ $______________
0054 Piezometer Tap Inspection and Repair 8 Each $__________ $______________
0055 Replace Penstock Flow Meter Transducers and Wiring
8 Each $__________ $______________
0056 Replace Runner Coupling Fasteners 8 Set $__________ $______________
0057 Provide New Hydraulic Jacking System 8 Each $__________ $______________
0058 Inspect Generator Brake Rings 8 Each $__________ $______________
0059 Inspect and Test High Pressure Lift System 8 Each $__________ $______________
0060 Miscellaneous Electrical Work 8 Each $__________ $______________
0061 Furnish Complete Set of Stator Coils, Supplies, and Accessories
8 Each $__________ $______________
0062 Manufacture Prototype Coils Identical to Production Coils and Perform Prototype Testing
1 Job XXX $______________
Furnish Production Run Coils For and Perform Voltage Endurance Testing of Production Run Coils
1 Job XXX $______________
0064 Furnish Spare Generator Parts 1 Job XXX $______________
0065 Replace Three Generator Neutral Current Transformers
8 Each $__________ $______________
0066 Prepare Stamping Die, Furnish Stator Core Assembly
1 Job XXX $______________
0067 Remove Stator Winding 8 Each $__________ $______________
0068 Inspect, Clean, and Test Stator Core 7 Each $__________ $______________
0069 Inspect, Clean, and Test Rotor 8 Each $__________ $______________
0070 Install and Test Stator Winding 8 Each $__________ $______________
0071 Replace All Rotor Field Lead Bus Supports on a Per Unit Basis
8 Each $__________ $______________
0072 Remove Existing Stator Core Assembly and Install One Stator Core Assembly
1 Job XXX $______________
0073 Perform Special Field Tests 1 Job XXX $______________
0074 Perform Model Validation Testing 1 Job XXX $______________
0075 Vibration Monitoring System 8 Each $__________ $______________
Replace Turbine Pit Platform Decking and Stairway Steps 8 Each $__________ $______________
0077 Provide Thrust Bearing Oil Cooler Assembly 9 Each $__________ $______________
0078 Supply and Install the Flow Meters 8 Each $__________ $______________
0079 Drain and Dispose of Dirty Oil from CLO/DLO Tanks and Piping
Est.
3,500
Gal $__________ $______________
0080 Disposal of Oil Units 1-8 Est.
26,400
Gal $__________ $______________
0081 Flush and Clean Headers and Oil Tanks 1 Job XXX $______________
0082 Flush and Clean Unit Piping and Tanks 8 Each $__________ $______________
0083 Supply New Oil Units 1-8 Est.
26,400
Gal $__________ $______________
0084 Supply New Oil in Totes 500 Gal $__________ $______________
0085 Supply New Oil for CLO Tank Est.
2,800
Gal $__________ $______________
0086 Turbine Pit Piping and Associated Equipment 8 Each $__________ $______________
0087 Miscellaneous Parts and Materials NTE $182,400
Each $__________ $______________
0088 Welding Services NTE 1,600
Man Hours $__________ $______________
0089 Machinist Hire NTE 1,600
Man Hours $__________ $______________
0090 Electrical Hire NTE 1,600
Man Hours $__________ $______________
0091 Painter Hire NTE
Man Hours $__________ $______________
Miscellaneous Bid Line Item's (MBLI)DRAFT
0092 Other Skilled Craftsman Hire NTE 3,200
Man Hours $__________ $______________
0093 General Laborer Hire NTE 1,150
Man Hours $__________ $______________
0094 Liquid Penetrant Method NTE
Man Hours $__________ $______________
0095 Magnetic Particle Method
NTE
270 Man Hours $__________ $______________
0096 Ultrasonic Method NTE
Man Hours $__________ $______________
0097 Visual Inspection NTE
Man Hours $__________ $______________
Economic Price Adjustment (EPA)
FFP
1 Lot
TOTAL MISCELLANEOUS BID LINE ITEMS
TOTAL BASE BID
PROJECT NO.: _______
FOB: Destination
PURCHASE REQUEST NUMBER: ____________
The Government will make an EPA (limited to the Steel, Copper and insulating oil cost) for the optional transformer as detailed in the EPA Clause. The Contractor shall fill in the following information with the exception of the index to be used:
Cold-Rolled Steel: $__________/lb.
Total number of pounds of cold-rolled steel: __________ lbs.
Total cost of cold-rolled steel: $__________
Steel Index that shall be used to calculate the EPA for cold-rolled steel:
SteelBenchmarker – World Expert Market – Atlantic and Pacific Basin Spot Market New Booking Prices
Standard Plate Steel: $__________/lb.
Total number of pounds of standard plate steel: __________ lbs.
Total cost of standard plate steel: $__________
Steel Index that shall be used to calculate the EPA for standard plate steel:
SteelBenchmarker – World Expert Market – Atlantic and Pacific Basin Spot Market New Booking Prices
Copper: $__________/lb.
Total number of pounds of copper: __________ lbs.
Total cost of copper: $__________
Copper Index that shall be used to calculate the EPA:
London Metal Exchange
The chosen indexes can be found:
http://www.metalprices.com
Not Separately Priced
0099 Hydraulic Turbine Model Test with New Wicket Gates and Stay Vane Extensions
1 Job XXX $______________
0100 Hydraulic Turbine Model Test with New Wicket Gates
1 Job XXX $______________
0101 Additional Stay Ring Mounting Surface Machining 8 Each $__________ $______________
0102 Additional Head Cover Flange Machining 8 Each $__________ $______________
0103 Additional Bottom Ring Flange Machining 8 Each $__________ $______________
0104 Additional Bearing Housing Machining 8 Each $__________ $______________
0105 Refurbish Generator Brake Rings 8 Each $__________ $______________
0106 Thrust Bearing Shoes Phase 2 Inspection (Installed and Spares)
10 Set $__________ $______________
0107 Thrust Runner and Generator Shaft Phase 2 Inspection
8 Each $__________ $______________
0108 Shipment of Thrust Bearing Shoes (Installed and Spares)
10 Set $__________ $______________
0109 Refurbish Set of Thrust Bearing Shoes (Installed and Spares)
10 Set $__________ $______________
0110 Shipment of Thrust Bearing Runner 8 Each $__________ $______________
0111 Resurfacing Thrust Bearing Runner and Backside 8 Each $__________ $______________
Resurfacing Thrust Bearing Runner Running Surface Only; Runner Separate from Generator Shaft
8 Each $__________ $______________
0113 Resurfacing Thrust Bearing Runner Running Surface Only; Runner Mounted on Generator Shaft
8 Each $__________ $______________
0114 Shipment of Generator Shaft 8 Each $__________ $______________
0115 Refurbishment of Generator Shaft 8 Each $__________ $______________
0116 Provide New Wicket Gates (Existing Design) 1 Set $__________ $______________
OPTIONAL BID ITEMS
These items may be exercised up to the totals stated below per item or not at all at the discretion of the
Government.
0117 Refurbish Wicket Gates 7 Set $__________ $______________
0118 Provide New Wicket Gates (New Design) 8 Set $__________ $______________
0119 Provide New Wicket Gate Spares (New Design) 3 Each $__________ $______________
0120 Provide Stay Vane Extensions 8 Set $__________ $______________
0121 Provide New Wicket Gate Operating Mechanism 8 Each $__________ $______________
0122 Refurbish Wicket Gate Operating Mechanism 8 Each $__________ $______________
0123 Design and Furnish Turbine Maintenance Platform and Gangway (Option 1)
2 Set $__________ $______________
0124 Design and Furnish Turbine Maintenance Platform and Gangway (Option 2)
2 Set $__________ $______________
0125 Refurbish Rotor Field Pole NTE 42 Poles 42 Each $__________ $______________
0126 Refurbish Rotor Field Poles for One Generator 7 Set $__________ $______________
0127 Refurbish Rotor Field Poles for all Generators 8 Set $__________ $______________
0128 Provide Segregated Phase Bus Stand-off Insulators, NTE 1000 Units
1000 Each $__________ $______________
0129 Perform Additional Stator Core Interlaminar Insulation Test
8 Each $__________ $______________
0130 Furnish One Complete Stator Core Assembly 7 Each $__________ $______________
0131 Remove Existing Stator Core, Install and Test New Stator Core
7 Each $__________ $______________
0132 Re-Leveling Sole Plates 8 Each $__________ $______________
0133 Provide Main Shaft Packing Box Lantern Ring 8 Each $__________ $__________
0134 Bore Wicket Gate Servomotor Cylinders 16 Each $__________ $__________
0135 Chrome Plate Wicket Gate Servomotor Piston Rod 16 Each $__________ $__________
0136 Design and Furnish Thrust Bearing Platform 8 Each $__________ $______________
$______________TOTAL BASE BID PLUS OPTIONS
TOTAL OPTIONAL BID ITEMS
CLIN DESCRIPTION
TIMEFRAME WHEN
OPTIONAL ITEM MAY BE
EXERCSIED
IF EXERCISED, TIME
EXTENSION TO
COMPLETE WORK FOR
ITEM
Hydraulic Turbine Model Test with
New Wicket Gates and Stay Vane
Extensions
NLT forty‐five (45) days after Government
Approval of the
Preliminary Model Test
Report No additional time
Hydraulic Turbine Model Test with
New Wicket Gates
NLT forty‐five (45) days after Government
Approval of the
Preliminary Model Test
Report No additional time
Additional Stay Ring Mounting
Surface Machining
NLT forty‐five (45) days after Government
Approval of each unit's
Stay Ring As‐Found
Inspection Report 5 additional days
Additional Head Cover Flange
Machining
NLT thirty (30) days after notification of base machining of head cover flange No additional time
Additional Bottom Ring Flange
Machining
NLT thirty (30) days after notification of base machining of bottom ring flange No additional time
Additional Bearing Housing
Machining
NLT thirty (30) days after notification of base machining of bearing housing No additional time
0105 Refurbish Generator Brake Rings
NLT forty‐five (45) days after Government
Approval of each unit's
Generator Brake
Inspection Report No additional time
Thrust Bearing Shoes Phase 2
Inspection (Installed and Spares)
NLT forty‐five (45) days after Government
Approval of each unit's
Phase 1 Inspection Report No additional time
Thrust Runner and Generator
Shaft Phase 2 Inspection
NLT forty‐five (45) days after Government
Approval of each unit's
Phase 1 Inspection Report No additional time
Fort Randall Major Unit Rehabilitation ‐ Optional Items
00 10 00 Page 11
Shipment of Thrust Bearing Shoes
(Installed and Spares)
NLT 90 days after
Government Approval of each unit's Phase 1
Inspection Report No additional time
Refurbish Set of Thrust Bearing
Shoes (Installed and Spares)
NLT forty‐five (45) days after Government
Approval of each unit's
Thrust Bearing Site
Inspection Report No additional time
Shipment of Thrust Bearing
Runner
NLT forty‐five (45) days after Government
Approval of each unit's
Thrust Bearing Site
Inspection Report No additional time
Resurfacing Thrust Bearing
Runner and Backside
NLT forty‐five (45) days after Government
Approval of each unit's
Thrust Bearing Site
Inspection Report No additional time
Resurfacing Thrust Bearing
Runner Running Surface Only;
Runner Separate from Generator
Shaft
NLT forty‐five (45) days after Government
Approval of each unit's
Thrust Bearing Site
Inspection Report No additional time
Resurfacing Thrust Bearing
Runner Running Surface Only;
Runner Mounted on Generator
Shaft
NLT forty‐five (45) days after Government
Approval of each unit's
Thrust Bearing Site
Inspection Report No additional time
0114 Shipment of Generator Shaft
NLT forty‐five (45) days after Government
Approval of each unit's
Generator Shaft Site
Inspection Report No additional time
0115 Refurbishment of Generator Shaft
NLT forty‐five (45) days after Government
Approval of each unit's
Generator Shaft Site
Inspection Report No additional time
Provide New Wicket Gates
(Existing Design)
NLT forty‐five (45) days after Government
Approval of the Final
Model Test Report No additional time
0117 Refurbish Wicket Gates
NLT forty‐five (45) days after Government
Approval of the Final
Model Test Report No additional time
00 10 00 Page 12
Provide New Wicket Gates (New
Design)
NLT forty‐five (45) days after Government
Approval of the Final
Model Test Report No additional time
Provide New Wicket Gate Spares
(New Design)
NLT forty‐five (45) days after Government
Approval of the Final
Model Test Report No additional time
0120 Provide Stay Vane Extensions
NLT forty‐five (45) days after Government
Approval of the Final
Model Test Report No additional time
Provide New Wicket Gate
Operating Mechanism
NLT sixty (60) days after
Government Approval of the Wicket Gate
Mechanism Condition
Analysis Report and
Recommendations No additional time
Refurbish Wicket Gate Operating
Mechanism
NLT sixty (60) days after
Government Approval of the Wicket Gate
Mechanism Condition
Analysis Report and
Recommendations No additional time
Design and Furnish Turbine
Maintenance Platform and
Gangway (Option 1)
NLT sixty (60) days after
Government Approval of
Final Hydraulic Design of
Turbine Runner No additional time
Design and Furnish Turbine
Maintenance Platform and
Gangway (Option 2)
NLT sixty (60) days after
Government Approval of
Final Hydraulic Design of
Turbine Runner No additional time
Refurbish Rotor Field Poles NTE 42
Poles
NLT sixty (60) days after initial field winding testing for each generator No additional time
Refurbish Rotor Field Poles for
One Generator
NLT sixty (60) days after initial field winding testing for each generator No additional time
Refurbish Rotor Field Poles for all
Generators
NLT sixty (60) days after initial field winding testing for each generator No additional time
00 10 00 Page 13
Provide Segregated Phase Bus
Stand‐off Insulators, NTE 1000 units
NLT sixty (60) days after inspection report received No additional time
Perform Additional Stator Core
Interlaminar Insulation Test
NLT thirty (30) days after execution of repairs
30 additional days from date of exercising the option
Furnish One Complete Stator Core
Assembly
NLT eight (8) years after contract award No additional time
Remove Existing Stator Core, Install and Test New Stator Core
NLT thirty (30) days after each stator core interlaminar insulation test report approved
3 additional months from the date of exercising the option
0132 Re‐Leveling Sole Plates
NLT thirty (30) days after
Government exercise of option to replace new stator core on each unit
3 additional weeks from the date of exercising the option
Provide Main Shaft Packing Box
Lantern Ring
NLT forty‐five (45) days after Government approval of each unit's lantern ring inspection report No additional time
Bore Wicket Gate Servomotor
Cylinders
NLT forty‐five (45) days after Government approval of each unit's wicket gate servomotor inspection report No additional time
Chrome Plate Wicket Gate
Servomotor Piston Rod
NLT forty‐five (45) days after Government approval of each unit's wicket gate servomotor inspection report No additional time
Design and Furnish Thrust Bearing
Platform
NLT ninety (90) days after
Government approval of the turbine Final Model
Test Report No additional time
00 10 00 Page 14
Major Rehab, Fort Randall Dam, SD FRE2
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 21 00
INSTRUCTIONS TO OFFERORS (RFP)
7/19
PART 1 GENERAL
1.1 (FAR 52.211-2) AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA
ITEM DESCRIPTIONS LISTED IN THE ACQUISITION STREAMLINING AND
STANDARDIZATION INFORMATION SYSTEM (ASSIST) (APR 2014)
1.2 FAR 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS-SECONDARY SITE
OF THE WORK (MAY 2014)
1.3 (DFARS 252.204-7008) COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE
INFORMATION CONTROLS (OCT 2016)
1.4 (DFARS 252.215-7008) ONLY ONE OFFER (JUN 2019)
1.5 (DFARS 252.215-7010) REQUIREMENTS FOR CERTIFIED COST OR PRICING
DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA—BASIC (JUN
2019)
1.6 (FAR 52.204-7) SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
1.7 (FAR 52.204-16) COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING
(JUL 2016)
1.8 (FAR 52.215-1) INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION
(JAN 2017)
1.9 (FAR 52.216-1) TYPE OF CONTRACT (APR 1984)
1.10 (FAR 52.217-5) EVALUATION OF OPTIONS (JUL 1990)
1.11 *FAR 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-CONSTRUCTION
MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)
1.12 (FAR 52.232-18) AVAILABILITY OF FUNDS (APR 1984)
1.13 (FAR 52.233-2) SERVICE OF PROTEST (SEPT 2006)
1.14 (FAR 52.236-27) SITE VISIT (CONSTRUCTION) (FEB 1995).
1.15 (FAR 52.252-1) SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
(FEB 1998)
1.16 SOLICITATION RESTRICTIONS
1.16.1 GENERAL CONTRACTOR
1.16.2 ESTIMATED CONSTRUCTION COST
1.16.3 SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS
1.16.4 SUBMISSION DEADLINE
1.16.5 RETURN ADDRESS REQUIREMENTS
1.17 COPIES OF SOLICITATION DOCUMENT AND AMENDMENTS
1.18 OFFEROR'S QUESTIONS AND COMMENTS
1.18.1 BIDDER INQUIRY
1.18.2 PLAN HOLDER'S LIST
1.19 GENERAL DESCRIPTION OF WORK
1.20 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION AND CONTRACT AWARD
1.21 SOURCE SELECTION BOARD (SSB)
1.22 FEDERAL, STATE AND LOCAL TAXES
1.23 TAXES - STATE OF SOUTH DAKOTA
1.23.1 EXCISE TAX
1.23.2 USE TAX
1.23.3 INFORMATION
1.24 SUBCONTRACTING PLAN/SUBCONTRACTING GOALS REGARDING THE UTILIZATION
DOCUMENT 00 21 00 Page 1
OF SMALL BUSINESS CONCERNS
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section Table of Contents --
DOCUMENT 00 21 00 Page 2
SECTION 00 21 00
INSTRUCTIONS TO OFFERORS (RFP)
7/19
PART 1 GENERAL
PROVISIONS INCORPORATED BY REFERENCE (IBR)
1.1 (FAR 52.211-2) AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA ITEM
DESCRIPTIONS LISTED IN THE ACQUISITION STREAMLINING AND STANDARDIZATION
INFORMATION SYSTEM (ASSIST) (APR 2014)
(a) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:
(1) ASSIST (https://assist.dla.mil/online/start/);
(2) Quick Search (http://quicksearch.dla.mil/);
(3) ASSISTdocs.com (http://assistdocs.com).
(b) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by-
(1) Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm);
(2) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or
(3) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone (215) 697-2667/2179, Facsimile (215) 697-1462.
(End of provision)
1.2 FAR 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS-SECONDARY SITE OF
THE WORK (MAY 2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of provision)
1.3 (DFARS 252.204-7008) COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE
INFORMATION CONTROLS (OCT 2016)
(a) Definitions. As used in this provision—
“Controlled technical information,” “covered contractor information system,” “covered defense information,” “cyber incident,” “information system,” and “technical information” are defined in clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting.
(b) The security requirements required by contract clause 252.204-7012, shall be implemented for all covered defense information on all covered contractor information systems that support the performance of this contract.
DOCUMENT 00 21 00 Page 3
(c) For covered contractor information systems that are not part of an information technology service or system operated on behalf of the Government (see 252.204-7012(b)(2)—
(1) By submission of this offer, the Offeror represents that it will implement the security requirements specified by National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 “Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations” (see http://dx.doi.org/10.6028/NIST.SP.800-171) that are in effect at the time the solicitation is issued or as authorized by the contracting officer not later than December 31, 2017.
(2)(i) If the Offeror proposes to vary from any of the security requirements specified by NIST SP 800-171 that are in effect at the time the solicitation is issued or as authorized by the Contracting Officer, the Offeror shall submit to the Contracting Officer, for consideration by the DoD Chief Information Officer (CIO), a written explanation of—
(A) Why a particular security requirement is not applicable; or
(B) How an alternative but equally effective, security measure is used to compensate for the inability to satisfy a particular requirement and achieve equivalent protection.
(ii) An authorized representative of the DoD CIO will adjudicate offeror requests to vary from NIST SP 800-171 requirements in writing prior to contract award. Any accepted variance from NIST SP 800-171 shall be incorporated into the resulting contract.
(End of provision)
1.4 (DFARS 252.215-7008) ONLY ONE OFFER (JUN 2019)
(a) Cost or pricing data requirements. After initial submission of offers, if the Contracting Officer notifies the Offeror that only one offer was received, the Offeror agrees to-
(1) Submit any additional cost or pricing data that is required in order to determine whether the price is fair and reasonable or to comply with the statutory requirement for certified cost or pricing data (10 U.S.C. 2306a and FAR 15.403-3); and
(2) Except as provided in paragraph (b) of this provision, if the acquisition exceeds the certified cost or pricing data threshold and an exception to the requirement for certified cost or pricing data at FAR 15.403-1(b)(2) through (5) does not apply, certify all cost or pricing data in accordance with paragraph (c) of DFARS provision 252.215-7010, Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data, of this solicitation.
(b) Canadian Commercial Corporation. If the Offeror is the Canadian Commercial Corporation, certified cost or pricing data are not required.
If the Contracting Officer notifies the Canadian Commercial Corporation that additional data other than certified cost or pricing data are required in accordance with DFARS 225.870-4(c), the Canadian Commercial Corporation shall obtain and provide the following:
(1) Profit rate or fee (as applicable).
(2) Analysis provided by Public Works and Government Services Canada
DOCUMENT 00 21 00 Page 4 to the Canadian Commercial Corporation to determine a fair and reasonable price (comparable to the analysis required at FAR 15.404-1).
(3) Data other than certified cost or pricing data necessary to permit a determination by the U.S. Contracting Officer that the proposed price is fair and reasonable U.S. Contracting Officer to provide description of the data required in accordance with FAR 15.403-3(a)(1) with the notification.
(4) As specified in FAR 15.403-3(a)(4), an offeror who does not comply with a requirement to submit data that the U.S. Contracting Officer has deemed necessary to determine price reasonableness or cost realism is ineligible for award unless the head of the contracting activity determines that it is in the best interest of the Government to make the award to that offeror.
(c) Subcontracts. Unless the Offeror is the Canadian Commercial Corporation, the Offeror shall insert the substance of this provision, including this paragraph (c), in all subcontracts exceeding the simplified acquisition threshold defined in FAR part 2.
(End of provision)
1.5 (DFARS 252.215-7010) REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA
AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA—BASIC (JUN 2019)
(a) Definitions. As used in this provision—
“Market prices” means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from sources independent of the offerors.
“Non-Government sales” means sales of the supplies or services to non-Governmental entities for purposes other than governmental purposes.
“Relevant sales data” means information provided by an offeror on sales of the same or similar items that can be used to establish price reasonableness taking into consideration the age, volume, and nature of the transactions (including any related discounts, refunds, rebates, offsets, or other adjustments).
“Sufficient non-Government sales” means relevant sales data that reflects market pricing and contains enough information to make adjustments covered by FAR 15.404-1(b)(2)(ii)(B).
“Uncertified cost data” means the subset of “data other than certified cost or pricing data” (see FAR 2.101) that relates to cost.
(b) Exceptions from certified cost or pricing data.
(1) In lieu of submitting certified cost or pricing data, the Offeror may submit a written request for exception by submitting the information described in paragraphs (b)(1)(i) and (ii) of this provision.
The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted and whether the price is fair and reasonable.
(i) Exception for prices set by law or regulation -
DOCUMENT 00 21 00 Page 5
Identification of the law or regulation establishing the prices offered. If the prices are controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Commercial item exception. For a commercial item exception, the Offeror shall submit, at a minimum, information that is adequate for evaluating the reasonableness of the price for this acquisition, including prices at which the same item or similar items have been sold in the commercial market. Such information shall include—
(A) For items previously determined to be commercial, the contract number and military department, defense agency, or other DoD component that rendered such determination, and if available, a Government point of contact;
(B) For items priced based on a catalog—
(1) A copy of or identification of the Offeror’s current catalog showing the price for that item; and
(2) If the catalog pricing provided with this proposal is not consistent with all relevant sales data, a detailed description of differences or inconsistencies between or among the relevant sales data, the proposed price, and the catalog price (including any related discounts, refunds, rebates, offsets, or other adjustments);
(C) For items priced based on market pricing, a description of the nature of the commercial market, the methodology used to establish a market price, and all relevant sales data. The description shall be adequate to permit DoD to verify the accuracy of the description;
(D) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item; or
(E) For items provided by nontraditional defense contractors, a statement that the entity is not currently performing and has not performed, for at least the 1-year period preceding the solicitation of sources by DoD for the procurement or transaction, any contract or subcontract for DoD that is subject to full coverage under the cost accounting standards prescribed pursuant to 41 U.S.C. 1502 and the regulations implementing such section.
(2) The Offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and to determine the reasonableness of price.
(c) Requirements for certified cost or pricing data. If the Offeror is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:
(1) The Offeror shall prepare and submit certified cost or pricing data and supporting attachments in accordance with the instructions contained in Table 15-2 of FAR 15.408, which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in Table 15-2 are incorporated as a mandatory format
DOCUMENT 00 21 00 Page 6 to be used in any resultant contract, unless the Contracting Officer and the Offeror agree to a different format and change this provision to use Alternate I.
(2) As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the Offeror shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.
(3) The Offeror is responsible for determining whether a subcontractor qualifies for an exception from the requirement for submission of certified cost or pricing data on the basis of adequate price competition, i.e., two or more responsible offerors, competing independently, submit priced offers that satisfy FAR 15.403-1(c)(1)(i).
(d) Requirements for data other than certified cost or pricing data.
(1) Data other than certified cost or pricing data submitted in accordance with this provision shall include the minimum information necessary to permit a determination that the proposed price is fair and reasonable, to include the requirements in DFARS 215.402(a)(i) and 215.404-1(b).
(2) In cases in which uncertified cost data is required, the information shall be provided in the form in which it is regularly maintained by the Offeror or prospective subcontractor in its business operations.
(3) Within 10 days of a written request from the Contracting Officer for additional information to permit an adequate evaluation of the proposed price in accordance with FAR 15.403-3, the Offeror shall provide either the requested information, or a written explanation for the inability to fully comply.
(4) Subcontract price evaluation.
(i) Offerors shall obtain from subcontractors the minimum information necessary to support a determination of price reasonableness, as described in FAR part 15 and DFARS part 215.
(ii) No cost data may be required from a prospective subcontractor in any case in which there are sufficient non-Government sales of the same item to establish reasonableness of price.
(iii) If the Offeror relies on relevant sales data for similar items to determine the price is reasonable, the Offeror shall obtain only that technical information necessary—
(A) To support the conclusion that items are technically similar; and
(B) To explain any technical differences that account for variances between the proposed prices and the sales data presented.
(e) Subcontracts. The Offeror shall insert the substance of this provision, including this paragraph (e), in subcontracts exceeding the simplified acquisition threshold defined in FAR part 2. The Offeror shall require prospective subcontractors to adhere to the requirements of—
DOCUMENT 00 21 00 Page 7
(1) Paragraphs (c) and (d) of this provision for subcontracts above the threshold for submission of certified cost or pricing data in FAR 15.403-4; and
(2) Paragraph (d) of this provision for subcontracts exceeding the simplified acquisition threshold defined in FAR part 2.
(End of provision)
1.6 (FAR 52.204-7) SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
(a) Definitions. As used in this provision-
“Electronic Funds Transfer (EFT) indicator” means a fourcharacter suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
"Registered in the System for Award Management (SAM)" means that-
(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into SAM;
(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in SAM;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide TIN validation to the Government as a part of the SAM registration process;
and
(4) The Government has marked the record "Active".
“Unique entity identifier” means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “Unique Entity Identifier” followed by the unique entity identifier that identifies the Offeror’s name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in SAM.
(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:
DOCUMENT 00 21 00 Page 8
(1) Company legal business.
(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(3) Company Physical Street Address, City, State, and Zip Code.
(4) Company Mailing Address, City, State and Zip Code (if separate from physical).
(5) Company Telephone Number.
(6) Date the company was started.
(7) Number of employees at your location.
(8) Chief executive officer/key manager.
(9) Line of business (industry).
(10) Company Headquarters name and address (reporting relationship within your entity).
(d) Processing time should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation.
See https://www.sam.gov for information on registration.
(End of provision)
1.7 (FAR 52.204-16) COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL
2016)
(a) Definition. As used in this provision –
“Commercial and Government Entity (CAGE) code” means –
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity; or
(2) An identifier assigned by a member of the North Atlantic
Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code..
(b) The Offeror shall enter its CAGE code in its offer with its name and address or otherwise include it prominently in its proposal. The CAGE code entered must be for that name and address. Enter “CAGE” before the number. The CAGE code is required prior to award.
(c) CAGE codes may be obtained via–
(1) Registration in the System for Award Management (SAM) at www.sam.gov. If the Offeror is located in the United States or its outlying areas and does not already have a CAGE code assigned, the DLA Commercial and Government Entity (CAGE) Branch will assign a CAGE code as a part of the SAM registration process. SAM registrants located outside the United States and its outlying areas shall obtain a NCAGE code prior to registration in SAM (see paragraph (c)(3) of this provision).
(2) The DLA Contractor and Government Entity (CAGE) Branch. If registration in SAM is not required for the subject procurement, and the
DOCUMENT 00 21 00 Page 9 offeror does not otherwise register in SAM, an offeror located in the United States or its outlying areas may request that a CAGE code be assigned by submitting a request at https://cage.dla.mil.
(3) The appropriate country codification bureau. Entities located outside the United States and its outlying areas may obtain an NCAGE code by contacting the Codification Bureau in the foreign entity’s country if that country is a member of NATO or a sponsored nation. NCAGE codes may be obtained from the NSPA at https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx if the foreign entity’s country is not a member of NATO or a sponsored nation.
Points of contact for codification bureaus, as well as additional information on obtaining NCAGE codes, are available at http://www.nato.int/structur/AC/135/main/links/contacts.htm.
(d) Additional guidance for establishing and maintaining CAGE codes is available at https://cage.dla.mil.
(e) When a CAGE Code is required for the immediate owner and/or the highest-level owner by 52.204-17 or 52.212-3(p), the Offeror shall obtain the respective CAGE Code from that entity to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .