Am-0003_W9128F-19-R-0005.pdf

PDF 2 MB Posted

Attached to
SOF Mountaineering Facility Federal contract opportunity
Solicitation number
W9128F19R0005
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

Amendment 3 Documentation

View the file

Other files for this federal contract opportunity

Other files attached to SOF Mountaineering Facility, newest first.
File Type Posted
Am-0006_W9128F-19-R-0005.pdf PDF
Am-0005_W9128F-19-R-0005.pdf PDF
Am-0004_W9128F-19-R-0005.pdf PDF
Am-0002_W9128F-19-R-0005.pdf PDF
CAD-BIM-Files_Instructions.txt TXT text file
Am-0001_W9128F-19-R-0005.pdf PDF
FCAY.zip ZIP file
SID_Electronic_Color_Board_Binder_RTA.pdf PDF
SPECS_W9128F-19-R-0005.pdf PDF
App-A_DRAWINGS_W9128F-19-R-0005.PDF PDF
FFE_Mountaineering_Project_RTA_for_Binder.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment No. 0003 W9128F

SOF MOUNTAINEERING FACILITY, PN 81899 (FY19), FORT CARSON, COLORADO

See attached documentation for content of the amendment revisions to solicitation

Date for receipt of proposals is 20 FEB 2019 at 1400 hours

Government Point of Contact: Bill Rawe, Contract Specialist (402) 996-3722

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Rocky Mountain Area Office Attn: CONTRACTING DIVISION (CENWO-CT-M) 5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919

See Item 6

W9128F-19-R-0005

01/31/2019

01/10/2019

01/31/2019

Am #0003 - 1

Am #0003 - 2 (Continuation SF 30)

31 January 2019 Solicitation No. W9128F 19 R 0005

Date of Issue: 10 JAN 2019 Date of Receiving Proposals: 20 FEB 2019

SUBJECT: Amendment No. 0003 to Request for Proposal Solicitation Package for Design and Construction of SOF MOUNTAINEERING FACILITY.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.)

(1) Section 01 86 13 Page 8, paragraph 1.13.3, add the following sentence to the end of the first paragraph: "Strobes and text signs shall be provided per ECB 2018-17."

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless of whether changes are shown with highlighting.

Pages or Sections Deleted Pages or Sections Substituted or Added 01 33 29 Attachment 1 01 33 29 Attachment 1

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.

4. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 20 FEB 2019.

Attachments:

Pre-Bid Site Visit Sign-In – For Information Only Specification Pages listed in 1.b., above

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

31 JAN 2019

nep/2160

Am #0003 FOR INFORMATION ONLY

Am #0003 FOR INFORMATION ONLY

Silver

% Baseline

100%

#DIV/0!

#DIV/0!

#DIV/0!

POC: Brian Nohr, CENWO-EDD-G Phone: 402-995-2172 eMail: Brian.A.Nohr@USACE.Army.Mil

SOF Mountaineering - Ft Carson, CO FCAY

01 33 29AT1

Am #0003 n/a

SOF Mountaineering - Ft Carson, CO FCAY

#DIV/0! #DIV/0! 0.0%

IPC 2006

SOF Mountaineering - Ft Carson, CO FCAY

Energy & Sustainability Mandates Worksheet

Does not include mandates prior to 2005 or those that are generally met

100%

100% 100%

100%

100% 100% Fleet Vehicle Support

100%

100% 100%

100% 100% Building Management

100% 100%

Overall Rating: 100% 100%

Building Energy Intensity (Gross)

Energy Efficiency in New Construction and Major Renovations

Renewable Energy Generation

Renewable Energy Usage

High Performance Sustainable Buildings

Advanced Metering and Measurement

Support for Local Communities

Products and Equipment

01 33 29 AT - HPSB Checklist - Army Energy Sustain Record Card.xlsx, printed on 10/15/2018 at 4:40 PM

SOF Mountaineering - Ft Carson, CO FCAY

LEED v4 for BD+C: New Construction and Major Renovation Project Checklist

Project Name: SOF MOUNTAINEERING FACILITY - PN81899 (FY19) Project Address: FORT CARSON, CO

Y ? N

1 Credit 1

2 1 29 16

16 Credit 16 1 Credit 1

2 Credit 2 Historic District 1 Priority Designation 1 Brownfield Remediation 2

5 Credit 5 Surrounding Density 2-3 Diverse Uses 1-2

5 Credit 5 1 Credit 1

1 Credit 1 1 Credit Green Vehicles 1

6 1 4 10

Y Prereq Required 1 Credit 1

2 Credit 2 On-Site Restoration 1-2 Financial Support 1

1 Credit 1 2 1 Credit 3

Percentile of Rainfall Events 1-3 Natural Land Cover Conditions 2-3

2 1 Credit 2 1 Nonroof and Roof 1-2 1 Parking Under Cover 1

1 Credit 1

6 0 2 11

Y Prereq Required Y Prereq Required Y Prereq Building-Level Water Metering Required 2 Credit 2

2 No Irrigation Required 2 Reduced Irrigation 1-2

3 Credit 6 Reduce by 25% 1 Reduce by 30% 2

3 Reduce by 35% 3 Reduce by 40% 4 Reduce by 45% 5 Reduce by 50% 6

2 Credit 2 1 Credit Water Metering 1

Site Development - Protect or Restore Habitat (Up to 2 points)

Location and Transportation

Sensitive Land Protection LEED for Neighborhood Development Location (Up to 16 Points)

Bicycle Facilities

Integrative Process

Construction Activity Pollution Prevention

High Priority Site (Up to 2 points)

Surrounding Density and Diverse Uses (Up to 5 points)

Sustainable Sites

Heat Island Reduction (Up to 2 points)

Outdoor Water Use Reduction (Up to 2 points)

Indoor Water Use Reduction (Up to 6 points)

Outdoor Water Use Reduction Indoor Water Use Reduction

Water Efficiency

Access to Quality Transit

Reduced Parking Footprint

Open Space

Site Assessment

Rainwater Management (Up to 3 points)

Light Pollution Reduction

Cooling Tower Water Use

SOF Mountaineering Facility - Ft Carson, CO FCAY

12 10 11 33

Y Prereq Required Y Prereq Required Y Prereq Required Y Prereq Required 2 4 Credit 6

Enhanced Systems Commissioning 3-4 2 Envelope Commissioning 2

8 10 0 Credit 18 8 Whole-Building Energy Simulation 1-18

Prescriptive Compliance: ASHRAE Advanced Energy Design Guide 1-6 1 Credit 1

2 Credit 2 3 Credit 3

1 Credit 1 1 No Refrigerants or Low-Impact Refrigerants 1

Calculation of Refrigerant Impact 1 2 Credit 2

8 0 5 13

Y Prereq Required Y Prereq Required

5 Credit 5 Historic Building Reuse 5 Renovation of Abandoned or Blighted Building 5 Building and Material Reuse 2-4 Whole-Building Life-Cycle Assessment 3

2 Credit 2 Environmental Product Declaration 1 Multi-Attribute Optimization 1

2 Credit 2 Raw Material Source and Extraction Reporting 1 Leadership Extraction Practices 1

2 Credit Building Product Disclosure and Optimization - Material Ingredients (Up to 2 points) 2 Material Ingredient Reporting 1 Material Ingredient Optimization 1

2 Credit 2 Diversion 1

2 Divert 75% and Four Material Streams 2 Reduction of Total Waste Material 2

8 3 6 Indoor Environmental Quality 16

Y Prereq Required Y Prereq Required 1 1 Credit 2 3 Credit 3 1 Credit Construction Indoor Air Quality Management Plan 1 1 2 Credit 2

1 Flush-Out 1

Air Testing 2 1 Credit 1 1 1 Credit 2

1 Lighting Control 1 Lighting Quality 1

3 Credit 3 Simulation: Spatial Daylight Autonomy 1-3 Simulation: Illuminance Calculations 1-2 Measurement 1-3

1 Credit 1 1 Credit 1

Building Product Disclosure and Optimization - Sourcing of Raw Materials (Up to 2 points)

Construction and Demolition Waste Management Planning

Materials and Resources

Storage and Collection of Recyclables

Optimize Energy Performance (Up to 18 points)

Advanced Energy Metering

Construction and Demolition Waste Management (Up to 2 points)

Minimum Indoor Air Quality Performance

Building Product Disclosure and Optimization - Environmental Product Declarations (Up to 2 points)

Renewable Energy Production Enhanced Refrigerant Management (Up to 1 point)

Building Life-Cycle Impact Reduction (Up to 5 points)

Green Power and Carbon Offsets

Enhanced Commissioning (Up to 6 points)

Building-Level Energy Metering

Fundamental Commissioning and Verification

Demand Response

Interior Lighting

Daylight (Up to 3 points)

Environmental Tobacco Smoke Control

Energy and Atmosphere

Minimum Energy Performance

Fundamental Refrigerant Management

Acoustic Performance Quality Views

Enhanced Indoor Air Quality Strategies Low-Emitting Materials

Indoor Air Quality Assessment (Up to 2 points)

Thermal Comfort

SOF Mountaineering Facility - Ft Carson, CO FCAY

4 2 0 Innovation 6

3 2 Credit 5 Innovation 1 Pilot 1 Additional Strategies, Innovation 1-3 Additional Strategies, Pilot 1-3 Additional Strategies, Exemplary Performance 1-2

1 Credit 1

3 1 0 Regional Priority 4

1 Credit Regional Priority: Specific Credit Outdoor Water Use Reduction 1 1 Credit Regional Priority: Specific Credit Indoor Water Use Reduction 1

1 Credit Regional Priority: Specific Credit Optimize Energy Performance 1 1 Credit Regional Priority: Specific Credit Rainwater Management 1

50 18 57 TOTALS Possible Points: 110 Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80 to 110

LEED Accredited Professional

Innovation (Up to 5 points)

SOF Mountaineering Facility - Ft Carson, CO FCAY

Standard_Form_30
Am-0003_W9128F-19-R-0005_Narrative
Attachments
Pre-Bid Site Visit Sign-In - FIO
01 33 29AT1 - HIGH PERFORMANCE AND SUSTAINABLE BUILDING (HPSB) CHECKLIST

File details come from the government source that posted it.