Am-0008_W9128F-19-R-0002.pdf

PDF 2 MB Posted

Attached to
Tactical Equipment Maintenance Facility Federal contract opportunity
Solicitation number
W9128F19R0002
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

Am-0008_W9128F-19-R-0002

View the file

Other files for this federal contract opportunity

Other files attached to Tactical Equipment Maintenance Facility, newest first.
File Type Posted
Am-0009_W9128F-19-R-0002.pdf PDF
Am-0008_W9128F-19-R-0002_Drawings.pdf PDF
Am-0007_W9128F-19-R-0002_Drawings.pdf PDF
Am-0007_W9128F-19-R-0002.pdf PDF
Am-0006_W9128F-19-R-0002.pdf PDF
Am-0006_W9128F-19-R-0002_Drawings.pdf PDF
Am-0005_W9128F-19-R-0002.pdf PDF
Am-0005_W9128F-19-R-0002_Drawings(Reissued).pdf PDF
Am-0004_W9128F-19-R-0002.pdf PDF
Am-0003_W9128F-19-R-0002_Drawings(Reissued).pdf PDF
Am-0003_W9128F-19-R-0002.pdf PDF
Am-0002_W9128F-19-R-0002.pdf PDF
Am-0001_W9128F-19-R-0002.pdf PDF
FCCI_ADVERTISEMENT_VOL._1.PDF PDF
FCCI_ADVERTISEMENT_VOL._1.PDF PDF
FCCI_ADVERTISEMENT_VOL._2.PDF PDF
FCCI_ADVERTISEMENT_VOL._3.PDF PDF
FCCI_ADVERTISEMENT_VOL._4.PDF PDF
RTA_SPECS_W9128F-19-R-0002_TEMF.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment No. 0008 W9128F

TACTICAL EQUIPMENT MAINTENANCE FACILITY, PN 77301 (FY19), FORT CARSON, COLORADO

See attached documentation for content of the amendment revisions to solicitation

Date for receipt of proposals is 30 MAY 2019 at 1400 hours

Government Point of Contact: Bill Rawe, Contract Specialist (402) 996-3722

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Rocky Mountain Area Office Attn: CONTRACTING DIVISION (CENWO-CT-M) 5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919

See Item 6

W9128F-19-R-0002

05/17/2019

04/03/2019

05/17/2019

Am #0008 - 1

Am #0008 - 2 (Continuation SF 30)

17 May 2019 Solicitation No. W9128F 19 R 0002

Date of Issue: 3 APR 2019 Date of Receiving Proposals: 30 MAY 2019

SUBJECT: Amendment No. 0008 to Request for Proposal Solicitation Package for Construction of TACTICAL EQUIPMENT MAINTENANCE FACILITY.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.)

(1) Section 05 30 00, page 10, add paragraph 2.3 as follows:

“2.3 Awning Roof Deck

Steel deck finish shall be Galvalume, 1 1/2x20 GA. "B" Deck, AZ55 Coating Weight.”

(2) Section 07 54 19, page 11, delete paragraphs 2.3 and 2.4 in their entirety and replace with the following:

“2.3 NOT USED

2.4 NOT USED”

(3) Section 08 33 23, page 6, paragraph 2.1.2.1 “Wind Loading”, revise the first sentence to delete “100” and replace with “25” as follows:

“Design and fabricate door assembly to withstand the wind loading pressure of at least 25 pounds per square foot with a maximum deflection of 1/120 of the opening width.”

(4) Section 31 05 19, page 2, delete paragraphs 1.1 “MEASUREMENT” and 1.2 “PAYMENT” in their entirety and replace with the following:

“1.1 NOT USED

1.2 NOT USED”

(5) Section 32 17 23, page 4, delete paragraph and subparagraphs 1.1 “UNIT PRICES” in their entirety and replace with the following:

“1.1 NOT USED”

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified with highlighting, all portions of the revised specification pages apply regardless

Am #0008 - 3 of whether changes are shown with highlighting.

Pages or Sections Deleted Pages or Sections Substituted or Added

01 33 00 – SUBMITTAL REGISTER 01 33 00 – SUBMITTAL REGISTER

01 91 00.15 Appendix B – Basis 01 91 00.15 Appendix B – Basis of Design of Design 03 30 00.00 10 03 30 00.00 10 22 00 00 22 00 00 32 12 16 32 12 16 32 13 13.03 32 13 13.03 33 51 15 33 51 15 33 56 10.50 11 33 56 10.50 11 ** 41 22 13.13

c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border, and reissued with this amendment.

Volume 1 of 4 – Site Facilities Package:

(1) Sheet CS111, SITE PLAN – AREA 11

(2) Sheet CS111A, SITE PLAN – AREA 11 – OPTION

(3) Sheet CS115, SITE PLAN – AREA 15

(4) Sheet CS115A, SITE PLAN – AREA 15 – OPTION

(5) Sheet CG510, DETENTION POND DETAILS

(6) Sheet CP301, PAVEMENT TYPICAL SECTIONS

Volume 2 of 4 – Building Package – CAB TEMF North:

(1) Sheet G-002, INDEX – VOLUME 2

(2) Sheet S-502, TYPICAL STRUCTURAL DETAILS

(3) Sheet S-521, FLOOR FRAMING DETAILS

(4) Sheet A-121, COMPOSITE SECOND FLOOR PLAN

(5) Sheet A-207, SOUTH ELEVATION – AREA “C”

(6) Sheet A-208, EAST AND WEST ELEVATIONS

(7) Sheet A-320, WALL TYPES

(8) Sheet A-401, ENLARGED STAIR PLANS

(9) Sheet A-402, ENLARGED STAIR SECTIONS

(10) Sheet A-403, ENLARGED STAIR SECTIONS

(11) Sheet A-404, ENLARGED STAIR SECTIONS

(12) Sheet A-405, ENLARGED STAIR SECTIONS

(13) Sheet A-417, ENLARGED AWNING PLAN

Am #0008 - 4

(14) Sheet A-601, ROOM FINISH SCHEDULE

(15) Sheet A-603, DOOR SCHEDULE AND DETAILS

Volume 3 of 4 – Building Package – CAB TEMF South:

(1) Sheet G-002, INDEX – VOLUME 3

(2) Sheet S-502, TYPICAL STRUCTURAL DETAILS

(3) Sheet S-521, FLOOR FRAMING DETAILS

(4) Sheet A-121, COMPOSITE SECOND FLOOR PLAN

(5) Sheet A-204, NORTH ELEVATION – AREA “C”

(6) Sheet A-207, SOUTH ELEVATION – AREA “C”

(7) Sheet A-208, EAST AND WEST ELEVATIONS

(8) Sheet A-320, WALL TYPES

(9) Sheet A-401, ENLARGED STAIR PLANS

(10) Sheet A-402, ENLARGED STAIR SECTIONS

(11) Sheet A-403, ENLARGED STAIR SECTIONS

(12) Sheet A-404, ENLARGED STAIR SECTIONS

(13) Sheet A-405, ENLARGED STAIR SECTIONS

(14) Sheet A-417, ENLARGED AWNING PLAN

(15) Sheet A-601, ROOM FINISH SCHEDULE

(16) Sheet A-603, DOOR SCHEDULE AND DETAILS

Volume 4 of 4 – Building Package – Support Facilities:

(1) Sheet G-002, INDEX – VOLUME 4

(2) Sheet A-201UV, BUILDING ELEVATIONS & SECTION

(3) Sheet A-202UV, BUILDING ELEVATIONS & SECTIONS

(4) Sheet A-201DS, BUILDING ELEVATIONS - OPTION

(5) Sheet A-202DS, BUILDING ELEVATIONS - OPTION

(6) Sheet A-201OS, BUILDING ELEVATIONS & SECTIONS - OPTION

(7) Sheet A-201PH, BUILDING ELEVATIONS & SECTIONS

(8) Sheet A-510, ROOF DETAILS

Am #0008 - 5

d. Drawings (New). The following new drawings dated as indicated on the drawing border are hereby added to the request for proposal drawings and are issued with this amendment.

(1) Sheet A-901, PERSPECTIVE VIEWS

Volume 3 of 4 – Building Package – CAB TEMF South:

Volume 4 of 4 – Building Package – Support Facilities:

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.

4. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 30 MAY 2019.

Attachments:

Specification Pages listed in 1.b., above Drawings listed in 1.c. and 1.d., above (provided under separate cover)

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

17 MAY 2019

nep/2160

This page was intentionally left blank for duplex printing.

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 104 PAGES

Tactical Equipment Maintenance Facility (FY19) - Fort Carson, CO

01 30 00.24 SD-02 Shop Drawings

1.29 G ROEquipment Room Drawings

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 G ROSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.2.1 G ROPreliminary Sustainability

Notebook 1.5.2.1Preliminary High Performance and Sustainable Building Checklist SD-07 Certificates

1.2Third Party Certification (TPC) SD-11 Closeout Submittals

1.5.2.1 G ROFinal Sustainability Notebook

1.5.2.1 G ROFinal High Performance and

Sustainable Building Checklist

1.5.2.1 G ROAmended Final Sustainability

Notebook

3.2.1 G ROThird Party Certification Plaque

and Certificates 01 33 39.00 10 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 104 PAGES

01 33 39.00 10 1.4.1 G DOAdvanced Modeling Project Execution Plan (PxP)

1.4.2PxP Demonstration 01 35 26 SD-01 Preconstruction Submittals

1.7 G ROAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports 1.12Notifications and Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates 1.6.1.4Crane Operators/Riggers

1.7.2.2 G ROStandard Lift Plan

1.7.2.3 G ROCritical Lift Plan

1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates

01 41 26.05 24 SD-01 Preconstruction Submittals 3.2.4.1Inspector Qualifications

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan SD-06 Test Reports

3.9Verification Statement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 104 PAGES

01 45 35 SD-06 Test Reports 3.1.3Daily Reports 3.1.1Biweekly Reports 3.1.2Biweekly Reports

SD-07 Certificates 2.1Fabrication Plant 2.1Steel Truss Plant 2.1AC472 Accreditation 2.1Steel Joist Institute Membership 2.1Certified Plant 2.1Certificate of Compliance

1.5 G ROSpecial Inspector

SD-11 Closeout Submittals 3.1.1Interim Final Report

3.1.1 G ROComprehensive Final Report

3.1.3 G ROComprehensive Final Report

01 57 20.00 10 SD-01 Preconstruction Submittals

1.7 GEnvironmental Protection Plan

3.4.2 G ROFort Carson Air Quality

Assessment Forms 01 57 23 SD-07 Certificates

2.1.3Mill Certificate or Affidavit 01 74 19 SD-01 Preconstruction Submittals

1.5 G ROWaste Management Plan

SD-11 Closeout Submittals

1.6Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 104 PAGES

01 78 24.00 10 SD-01 Preconstruction Submittals 1.5.1Facility Data Project Execution

Plan SD-10 Operation and Maintenance Data

3.1 G DOFacility Data Workbook, Construction Progress

3.1 G DOFacility Document Set, Construction Progress

SD-11 Closeout Submittals

3.2 G DOFacility Data Workbook, Construction Final

1.5.3 G DOFacility Document Set, Construction Final

3.2 G DOFacility Document Set, Construction Final 01 78 36.00 24 SD-11 Closeout Submittals

1.2.5Equipment Warranty Booklet 01 78 39.00 24 SD-03 Product Data

1.7.2 G DO50 Percent Preliminary As-Built

Drawings

1.7.3 G DO100 Percent Preliminary As-Built

Drawings

SD-11 Closeout Submittals

1.7.4 G DOFinal As-Built Drawings

1.4.4 G ROLEED Documentation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 104 PAGES

01 91 00.15 SD-01 Preconstruction Submittals

1.7 G DOCommissioning Firm

1.7.1 G DOLead Commissioning Specialist

1.7.2 G DOTechnical Commissioning

Specialists

1.7 G DOCommissioning Firm's Contract

SD-06 Test Reports

3.1.4 G DODesign Review Report

3.1.3.1 G DOInterim Construction Phase

Commissioning Plan

3.1.3.1 G DOInterim Construction Phase

Commissioning Plan

3.1.3.2 G DOFinal Construction Phase

Commissioning Plan

3.1.6.2 G DOPre-Functional Checklists

1.9Issues Log

3.2 G DOCommissioning Report

SD-07 Certificates

1.10 G DOCertificate of Readiness

SD-10 Operation and Maintenance Data

3.1.7 G ROTraining Plan

3.1.7 G ROTraining Attendance Rosters

3.1.8 G DOSystems Manual

3.1.9 G DOMaintenance and Service Life

Plans

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 104 PAGES

01 91 00.15 SD-11 Closeout Submittals

3.2 S DOFinal Commissioning Report

03 11 13.00 10 SD-02 Shop Drawings

3.1.1 G ROFormwork

SD-03 Product Data

2.1 G ROForm Materials

2.1.4 G ROForm Releasing Agents

SD-05 Design Data Part 2 G ROCalculations

03 15 00.00 10 SD-03 Product Data

2.2 G ROPreformed Expansion Joint Filler

2.3 G ROSealant

SD-04 Samples 2.3.2Lubricant for Preformed

Compression Seals 2.3.3Field-Molded Type

SD-07 Certificates

2.2 G ROPreformed Expansion Joint Filler

2.3 G ROSealant

03 20 00.00 10 SD-02 Shop Drawings

3.1 G DOReinforcement

SD-07 Certificates

2.3 G ROReinforcing Steel

1.3.1 G ROQualified Welders

03 30 00.00 10 SD-01 Preconstruction Submittals

1.5.2 G ROQuality Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 104 PAGES

03 30 00.00 10 1.5.1 G ROLaboratory Accreditation

3.9.5.6 G ROSampling Plan

SD-03 Product Data Part 2Recycled Content Products

2.2 G ROCementitious Materials

G ROVapor Retarder

2.12 G ROVapor Barrier

2.1.5 G ROFloor Finish

2.9 G ROFloor Hardener

2.4 G ROChemical Admixtures

G ROSealers SD-04 Samples

2.4.4Surface Retarder SD-05 Design Data

2.1.1 G ROMixture Proportions

SD-06 Test Reports

2.1.1 G ROMixture Proportions

3.9 G ROTesting and Inspection for CQC

2.2.3Fly Ash 2.2.5Ground Granulated

Blast-Furnace (GGBF) Slag 2.3Aggregates 3.9.5.1Air Content 3.9.5.3Slump 3.9.5.6Compressive Strength 2.5Water

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 104 PAGES

03 30 00.00 10 SD-07 Certificates

1.5 G ROContractor Quality Control

Personnel

3.2.1 G ROReady-Mix Plant

03 42 13.00 10 SD-01 Preconstruction Submittals 1.3.2.2Quality Control Procedures

SD-02 Shop Drawings

2.1.1 G ROStandard Precast Units

2.1.2 G ROCustom-Made Precast Units

3.2.4.3Special Finishes

SD-03 Product Data 2.1.1Standard Precast Units 2.1.3Proprietary Precast Units 3.1.3Embedded Items 2.2.6Accessories

SD-05 Design Data

2.1.2 G RODesign Calculations

2.1.5.1Concrete Mix Proportions

SD-06 Test Reports 1.3.2.4Test Reports

SD-07 Certificates 1.3.2.2Quality Control Procedures

SD-11 Closeout Submittals

2.2.1 SRecycled content for fly ash and

pozzolan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 104 PAGES

03 42 13.00 10 2.2.1 SRecycled content for Ground Iron Blast-Furnace Slag

2.2.1 SRecycled content for Silica Fume

2.2.1 SRecycled content for Synthetic

Fiber Reinforcement

2.2.1 SRecycled content for steel

03 45 00 SD-01 Preconstruction Submittals 1.11.5Pre-Installation Meeting

SD-02 Shop Drawings

1.11.1 G DOPrecast Drawings

SD-03 Product Data

2.3 G DOCast-In Embedded Items And

Connectors

2.3.2 G DOConnection Devices

2.5Gasket 2.7Bearing Pads

SD-04 Samples

1.11.2 G DOConcrete Wall Panel Surface

Finish 1.11.4Mock-up

SD-05 Design Data

1.5.4 G DODesign Calculations

2.1.1 G DOContractor-Furnished Mix Design

2.4.9 G DORepair of Surface Defects

1.5.5 G DOThermal Calculations

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 104 PAGES

03 45 00 1.10.2 G ROStrength Tests Slump, RO Air Content, RO

3.6.4Testing Precast Units for Strength

SD-07 Certificates

1.4 G ROManufacturer's Qualifications

Fabricator Quality Certifications,G,RO

Erector Certification, RO SD-08 Manufacturer’s Instructions

3.3 G DOInstallation

3.8 G ROCleaning

SD-11 Closeout Submittals

1.11.3 G ROBatch Ticket Information

03 45 33 SD-02 Shop Drawings

2.1.1.2 G DODrawings of Precast Members

SD-03 Product Data

2.2.7.1 G ROInserts

SD-04 Samples 2.3.9Surface Finish

SD-05 Design Data

2.1.1.2 G DODesign Calculations

1.4.3 G ROConcrete Mix Design

SD-06 Test Reports

1.4.3 G ROConcrete Mix Design

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 104 PAGES

03 45 33 2.2.1.1Fly Ash 2.2.1.2Pozzolan 2.2.1.4Ground Granulated

Blast-Furnace Slag 2.2.3Aggregates 2.2.2Water

SD-07 Certificates 2.3Quality Control Procedures 1.4.1.3Erector's Post Audit Declaration

SD-11 Closeout Submittals 1.4.4Batch Ticket

04 20 00 SD-02 Shop Drawings

3.3.3.1 G DOCut CMU

3.4.1.1 G DODetail Drawings

SD-03 Product Data

1.5.1 G ROHot Weather Procedures

1.5.2 G ROCold Weather Procedures

2.2.2.2.1 G ROCement

2.4.1.1 G ROCementitious Materials

G ROInsulation SD-04 Samples

1.3.1.1 G ROMock-Up Panel

2.2.2.2 G ROConcrete Masonry Units (CMU)

2.2.2.5 G ROConcrete Brick

2.4.1.4 G ROAdmixtures for Masonry Mortar

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 104 PAGES

04 20 00 2.6.2 G ROAnchors, Ties, and Bar Positioners

2.6.3 G ROJoint Reinforcement

G ROInsulation

SD-05 Design Data

2.1.2 G ROMasonry Compressive Strength

2.2.2.4Fire-Rated Concrete Masonry

Units

3.2.5 G ROBracing Calculations

2.6.2.3.1 G DOMasonry Veneer Anchor Design

Calculations

2.6.2.3.2 G DOMasonry Veneer Anchor Design

Calculations SD-06 Test Reports

2.2.2.4Fire-Rated Concrete Masonry Units

3.6.1.1Field Testing of Mortar 3.6.1.2Field Testing of Grout 3.6.1.3Prism Tests 3.6.1.4Single-Wythe Masonry Wall

Water Penetration Test SD-07 Certificates

1.3.2 G ROSpecial Masonry Inspector

Qualifications

2.2.2.2Concrete Masonry Units (CMU) 2.2.2.5Concrete Brick

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 104 PAGES

04 20 00 2.2.3Precast Concrete Units 2.4.1.1Cementitious Materials 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout 2.6.2Anchors, Ties, and Bar

Positioners 2.6.3Joint Reinforcement

Insulation SD-08 Manufacturer’s Instructions

2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance Data

3.8Take-Back Program 05 05 23.16 SD-01 Preconstruction Submittals

3.2 G ROWelding Quality Assurance Plan

SD-03 Product Data

1.3 G DOWelding Procedure Qualifications

1.3.4Welder, Welding Operator, and

Tacker Qualification

1.3.2 G DOPrevious Qualifications

1.3.3 G ROPre-Qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports 3.3Nondestructive Testing 3.2Weld Inspection Log

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 104 PAGES

05 05 23.16 SD-07 Certificates 1.3.1Certified Welding Procedure

Specifications (WPS) 1.3.1Certified Brazing Procedure

Specifications (BPS) 1.3.1Certified Procedure Qualification

Records (PQR) 1.3.1Certified Welder Performance

Qualifications (WPQ) 1.3.1Certified Brazer Performance

Qualifications (BPQ) 1.3.5Certified Welding Inspector 1.3.5Nondestructive Testing

Personnel 05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 G DOErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 G DOFabrication Drawings

SD-03 Product Data

2.7.2 G ROShop Primer

2.4.1 G ROWelding Electrodes and Rods

2.3.2.3 G RODirect Tension Indicator Washers

2.4.2 G RONon-Shrink Grout

2.3.3 G ROTension Control Bolts

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 104 PAGES

05 12 00 1.4.3Design Calculations for Steel Connections

1.4.2Shoring and Temporary Bracing SD-06 Test Reports

2.7.2 G ROClass B Coating

2.3 G ROBolts, Nuts, and Washers

3.7.1.2 G ROWeld Inspection Reports

3.7.3.1 G ROBolt Testing Reports

3.7.4Embrittlement Test Reports

SD-07 Certificates

2.2 G ROSteel

2.3 G ROBolts, Nuts, and Washers

2.5 G ROGalvanizing

1.3AISC Structural Steel Fabricator

Quality Certification 1.3AISC Structural Steel Erector

Quality Certification

1.4.4.1 G ROWelding Procedures and

Qualifications

2.4.1 G ROWelding Electrodes and Rods

3.7.1.1 G ROCertified Welding Inspector

1.4.4.2Overhead, Top Running Crane

Rail Beam 05 21 00 SD-01 Preconstruction Submittals

1.3.2 G ROWelder Qualification

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 104 PAGES

05 21 00 1.3.1 G ROSteel Joist Framing SD-05 Design Data

2.2 G RODesign Calculations

SD-06 Test Reports

3.4 G ROErection Inspection

3.4 G ROWelding Inspections

SD-07 Certificates

1.3.2 G ROCertification of Compliance

05 30 00 SD-02 Shop Drawings

1.3.5 G ROFabrication Drawings

SD-03 Product Data

2.2 G ROAccessories

2.1 G RODeck Units

2.1.4 G ROGalvanizing Repair Paint

2.2.17 G ROMechanical Fasteners

2.1.4 G ROTouch-Up Paint

1.3.3Welding Equipment 1.3.3Welding Rods and Accessories

SD-04 Samples

2.1.1 G ROMetal Roof Deck Units

2.2.4 G ROFlexible Closure Strips

SD-05 Design Data

2.1 G DODeck Units

SD-07 Certificates

1.3.2 G ROPowder-Actuated Tool Operator

1.3.3 G ROWelder Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 104 PAGES

05 30 00 1.3.3 G ROWelding Procedures

1.3.4.1 G ROFire Safety

1.3.1 G ROManufacturer's Certificate

2.2.12 G ROStud Manufacture's Certification

2.2.12 G ROStud Manufacture's Test Reports

05 40 00 SD-02 Shop Drawings

1.6.1 G DOFraming Components

SD-03 Product Data 2.1Studs, Joists

SD-05 Design Data

1.6.2 GMetal Framing Calculations

SD-07 Certificates 1.4Load-Bearing Cold-Formed Metal

Framing 3.2.1Welds

05 50 13 SD-02 Shop Drawings

2.5 G ROFloor Gratings

2.6 G ROBollards/Pipe Guards

2.7 G ROAngles and Plates

2.8 G RORoof Hatches

SD-03 Product Data

2.4 G ROCorner Guards

2.5 G ROFloor Gratings

2.1 G ROCertificates of Compliance

2.2 G ROCertified Mill

2.1 S RORecycled Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 104 PAGES

05 51 00 SD-02 Shop Drawings

2.1.1 G DOMetal Stair System

SD-03 Product Data

2.1.4 G ROProtective Coating

2.1.2 G ROSteel Pan Stairs

2.2.1 G ROSteel Stairs

SD-07 Certificates

1.3.1 G DOWelding Procedures

1.3.1 G DOWelder Qualification

05 51 33 SD-02 Shop Drawings 2.3Ladders

SD-03 Product Data 2.3Ladders 2.3.2Ladder Safety Devices

SD-07 Certificates 1.3Fabricator Certification for Ladder

Assembly 1.3Fabricator Certification for Ships

Ladder Assembly 05 52 00 SD-02 Shop Drawings

1.2.1 G DOFabrication Drawings

SD-03 Product Data

2.1.2 G ROProtective Coating

2.2.8 G DOSteel Railings and Handrails

1.2.1 G ROManufacturer Data Sheet

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 104 PAGES

05 52 00 1.4.1 G DOWelding Procedures

1.4.2 G DOWelder Qualification

06 10 00 SD-02 Shop Drawings

1.9.2 GModifications of Structural

Members

2.3.2 GNailing Strips

SD-03 Product Data 1.8Fire-retardant Treatment 1.4.3Structural-use and OSB Panels 2.4Oriented Strand Board 2.5.1Adhesives

SD-05 Design Data

1.9.2 GModifications of Structural

Members SD-06 Test Reports

1.4.4Preservative-treated SD-07 Certificates

1.10.1Certificates of Grade

1.10.2 GCertified Sustainably Harvested

Wood 1.7Preservative Treatment 1.10.3Indoor Air Quality

SD-10 Operation and Maintenance Data

3.4Take-back Program 06 41 16.00 10 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 104 PAGES

06 41 16.00 10 1.5.2Shop Drawings 2.10Shop Drawings 3.1Installation

SD-03 Product Data 2.1Wood Materials 2.10.7.3Finish Schedule 1.5.3Certification

SD-04 Samples 2.3Plastic Laminates 2.6Cabinet Hardware

SD-07 Certificates 1.5Quality Assurance 3.1Laminate Clad Casework

SD-11 Closeout Submittals 1.3LEED Documentation

06 61 16 SD-02 Shop Drawings

1.5.2 G DODetail Drawings

3.1 G DOInstallation

SD-03 Product Data 2.1Solid Polymer Material 2.3Fabrications 1.5.3Certification 1.5.3VOC Content

SD-04 Samples

2.1 G ROMaterial

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 104 PAGES

06 61 16 2.1Solid Polymer Material SD-07 Certificates

2.3Fabrications 1.5.1Qualifications

SD-10 Operation and Maintenance Data

3.2Clean-up SD-11 Closeout Submittals

1.3LEED Documentation 07 05 23 SD-01 Preconstruction Submittals

1.4 G ROWork Plan

SD-03 Product Data

2.2 G DOThermal Imaging Camera

SD-05 Design Data

3.2 G DOEnvelope Surface Area

Calculations

SD-07 Certificates 1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 G DOPressure Test Procedures

3.5.8 G DOAir Leakage Test Report

3.6.5 G DODiagnostic Test Report

07 13 53 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 104 PAGES

07 13 53 1.3 G DOManufacturer's Standard Details

2.2 G DOElastomeric Waterproofing Sheet

Material

2.6 GProtection Board

1.4 GPrimers, Adhesives, and Mastics

2.2 GPrimers, Adhesives, and Mastics

SD-06 Test Reports

2.2 G ROElastomeric Waterproofing Sheet

Material

3.6 G ROField Quality Control

3.7 GProtective Covering

SD-07 Certificates 2.2Elastomeric Waterproofing Sheet

Material

1.4 G ROPrimers, Adhesives, and Mastics

2.2 G ROPrimers, Adhesives, and Mastics

1.4 G ROProtective Coverings

1.7 G ROSpecial Warranties

1.7 G ROSpecial Warranties

2.1.1 G ROCertificates Of Compliance

2.1.2 G ROCertificates Of Compliance

SD-08 Manufacturer’s Instructions

1.4 GPrimers, Adhesives, and Mastics

2.2 GPrimers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1.1 G ROCertificates Of Compliance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 104 PAGES

07 13 53 2.1.2 G ROCertificates Of Compliance 07 21 16 SD-03 Product Data

2.2Blanket Insulation 2.3Sill Sealer Insulation 2.5Pressure Sensitive Tape 2.6Accessories

SD-08 Manufacturer’s Instructions 3.3.1Insulation

SD-11 Closeout Submittals

2.1.1 SRecycled Content for Insulation

Materials

2.1.2 SReduce Volatile Organic

Compounds (VOC) 07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

1.3 GVerification of Existing Conditions

SD-03 Product Data

2.2 G DOInsulation

1.4 G DOCover Board

2.4 G ROFasteners

SD-07 Certificates

1.8 GVolatile Organic Compounds

(VOC) Content

1.6 G rOInstaller Qualifications

1.6 G rOCertificates Of Compliance For

Felt Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 104 PAGES

07 22 00 SD-08 Manufacturer’s Instructions

2.4 GFasteners

2.2 GInsulation

SD-11 Closeout Submittals

1.8 SVolatile Organic Compounds

(VOC) Content 07 27 10.00 10 SD-06 Test Reports

1.8 G DODesign Review Report

3.1.2 G ROTesting and Inspection

SD-07 Certificates

1.7 G ROAir Barrier Inspector

07 27 19.01 SD-01 Preconstruction Submittals

1.8.1 G ROQualifications of Manufacturer

1.8.2 G ROQualifications of Installer

SD-02 Shop Drawings

1.4 GSelf-adhering Air Barrier

SD-03 Product Data

1.4 G DOSelf-adhering Air Barrier

2.3 G DOPrimers, Adhesives, and Mastics

1.4.2 G ROSafety Data Sheets

SD-04 Samples

1.4 GSelf-adhering Air Barrier

SD-06 Test Reports

1.6 G ROField Peel Adhesion Test

1.4.4 G ROFlame Propagation of Wall

Assemblies

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 104 PAGES

07 27 19.01 1.4.4 G DOFlame Spread and Smoke Developed Index Ratings

3.4.1 G ROSite Inspections and Testing

SD-07 Certificates

1.4 G ROSelf-adhering Air Barrier

1.8.1 G ROQualifications of Manufacturer

1.8.2 G ROQualifications of Installer

SD-08 Manufacturer’s Instructions

1.4 GSelf-adhering Air Barrier

2.3 GPrimers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1 SVolatile Organic Compound

(VOC) Content 07 27 26 SD-01 Preconstruction Submittals

1.3Sustainability Reporting SD-03 Product Data

3.3.1 G DOOpen-Cell Spray Polyurethane

Foam

3.3.1 G DOClosed-Cell Spray Polyurethane

Foam

1.6 G DOThermal Barrier

SD-07 Certificates

1.6 G ROQualification of Applicator

SD-08 Manufacturer’s Instructions

1.7Manufacturer's Installation Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 104 PAGES

07 42 13 SD-01 Preconstruction Submittals

1.5.3 G ROQualification of Manufacturer

1.5.4 G ROQualification of Installation

Contractor

1.8 G ROWarranty

SD-02 Shop Drawings

1.5.1.1 G DOInstallation Drawings

SD-03 Product Data 2.1Recycled Content;

2.2.1 G DOWall Panels

2.2.2 G DOFactory Color Finish

1.5.5 G ROClosure Materials

2.5.4.3 G ROPressure Sensitive Tape

2.5.4.1 G ROSealants and Caulking

1.5.3.1 G ROGalvanizing Repair Paint

1.5.3.1 G ROEnamel Repair Paint

1.5.5 G ROAccessories

2.5 G ROAccessories

SD-04 Samples

2.2.1 G ROWall Panels

1.5.3.1 G ROFasteners

2.5.3 G ROMetal Closure Strips

SD-05 Design Data

1.5.1.2 G DOWind load design analysis

SD-06 Test Reports

3.6.2 G ROLeakage Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 104 PAGES

07 42 13 1.3.2 G ROWind Load Tests

2.2.2.6 G ROCoating

2.2.2.6 G ROChalking

SD-07 Certificates

1.5.3.1 G ROCoil Stock

1.5.3.1 G ROFasteners

1.5.3.1 G ROGalvanizing Repair Paint

1.5.3.1 G ROEnamel Repair Paint

SD-08 Manufacturer’s Instructions

3.2 GInstallation

SD-11 Closeout Submittals

1.8 G ROWarranty

1.5.6 G ROMaintenance Instructions

1.8.120 year 'No Dollar Limit' warranty for labor and material 07 42 63 SD-01 Preconstruction Submittals

1.5.3Qualification of Manufacturer 1.5.4Qualification of Installer 1.5.4.1Qualifications for Welding Work

SD-02 Shop Drawings 1.5.1Fabrication and Installation drawings 1.5.1Wall Panel Assemblies 1.5.1Flashing and Accessories 1.5.1Anchorage Systems

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 104 PAGES

07 42 63 Certification 1.5.1sustainable acquisition 1.5.1Manufacturer's catalog data 1.5.1Factory Color Finish 1.5.1Sub-girts and Formed Shapes 1.5.1Closure Materials 1.5.1Insulation 1.5.1Pressure Sensitive Tape 2.4.4.1Sealants and Caulking 1.5.1Rated Wall Assembly 1.5.1Galvanizing Repair Paint

Enamel Repair Paint Aluminized Steel Repair Paint

1.5.1Accessories SD-04 Samples

1.5.1Wall Panel Assemblies 1.5.1Fasteners 1.5.1Metal Closure Strips 1.5.1Insulation 1.5.1manufacturer's color charts and chips SD-05 Design Data

1.5.1Wind Design Analysis SD-06 Test Reports

3.7.2Leakage Tests 1.3.2Wind Load Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 104 PAGES

07 42 63 1.3.2Seismic Tests 1.5.1Factory Color Finish

SD-07 Certificates 1.5.1Fasteners 1.5.1Galvanizing Repair Paint

Enamel Repair Paint 1.5.3Qualification of Manufacturer 1.5.4Qualification of Installer 1.5.1wall system assembly wind load and fire rating classification listings SD-08 Manufacturer’s Instructions

1.5.1Installation of Wall Panels SD-11 Closeout Submittals Warranty

1.5.1Instructions 1.5.1Safety Data Sheets

1.5.120 year 'No-Dollar-Limit'

Warranty 07 54 19 SD-02 Shop Drawings

1.7 G DODetail Drawings

1.7 G DORoof Plan

SD-03 Product Data

3.2.2 G DOPVC Roofing Membrane

2.1.2Bonding Adhesive 1.6.4Flashing 3.2.2.2Flashing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 104 PAGES

07 54 19 2.1.5Membrane Fasteners and Plates 2.1.8Roof Insulation 2.1.6Pre-Manufactured Accessories 2.1.6Pre-Manufactured Accessories 3.6.1Water Cutoffs 2.1.1Information Card

SD-05 Design Data

1.3.2 G DOWind Uplift Resistance

SD-07 Certificates 1.6.1Qualification of Manufacturer 1.6.2Qualifications of Applicator 1.6.3Qualification of Engineer of

Record 1.3.2Wind Uplift Resistance 1.3.1Fire Resistance 2.1.1Minimum Polymer Thickness 2.1.4Minimum Polymer Thickness

1.11 GSample

SD-08 Manufacturer’s Instructions

3.2 GApplication Method

2.1.4 GMembrane Flashing

3.3.2 GMembrane Flashing

3.2.4Perimeter Attachment 2.1.5.2Auxiliary Fasteners 2.1.6Pre-Manufactured Accessories 2.1.6Pre-Manufactured Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 104 PAGES

07 54 19 1.9 G ROCold Weather SD-11 Closeout Submittals

1.4LEED Documentation

1.11 G ROWarranty

2.1.1 G ROInformation Card

3.9 G ROInstructions to Government

Personnel 07 60 00 SD-02 Shop Drawings

2.2.1 GExposed Sheet Metal

3.1.16 G DOGutters

3.1.17 G DODownspouts

1.4.1 GExpansion Joints

2.2.1 GGravel Stops and Fasciae

3.1.18 G DOFlashing for Roof Drains

3.1.10 G DOBase Flashing

3.1.11 G DOCounterflashing

3.1.25 G DOFlashing at Roof Penetrations

and Equipment Supports

2.2.14 GReglets

3.1.27 G DOCopings

3.1.15 GDrip Edges

3.1.23 GEave Flashing

SD-03 Product Data

2.2.11 G DOCool Roof

SD-04 Samples

1.4.2 G DOFinish Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 104 PAGES

07 60 00 SD-07 Certificates

2.1 G ROCertificates of Compliance

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

3.5 G ROQuality Control Plan

SD-10 Operation and Maintenance Data

1.4.3 G ROCleaning and Maintenance

SD-11 Closeout Submittals

2.1 S RORecycled Content

07 61 14.00 20 SD-02 Shop Drawings

1.2.4 G DORoofing

SD-03 Product Data

2.2 G DORoofing Panels

2.4 G ROAttachment Clips

2.5.1 G ROClosures

2.5 G ROAccessories

2.5.2 G ROFasteners

2.5.3 G ROSealants

2.6Insulation

1.7 G DOWarranty

SD-04 Samples

2.2 G ROPanel

2.5Accessories

2.5.3 G ROSealants

2.3 G ROIntermediate Support

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 104 PAGES

07 61 14.00 20 SD-05 Design Data

1.5 G DODesign Calculations

SD-06 Test Reports

3.6 G ROField Inspection

1.3.3 G DOStructural Performance

1.6.6Finish

SD-07 Certificates 1.6.3Manufacturer's Technical

Representative

1.6.4 G ROInstaller's Qualifications

2.2 G DOCoil Stock

SD-08 Manufacturer’s Instructions

3.3 G ROInstallation

SD-11 Closeout Submittals 3.8Information Card

2.2 SEnergy Star Label for Steel

Roofing Product

2.2.1 SRecycled Content for Steel

Roofing Product 1.7Warranty

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 104 PAGES

07 84 00 SD-07 Certificates 1.5.2Inspector Qualifications 2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.2 G ROSealants

2.3 G ROPrimers

2.4 G ROBond Breakers

2.5 G ROBackstops

3.1 G ROField Adhesion

SD-07 Certificates

1.4.1 G ROIndoor Air Quality

SD-11 Closeout Submittals

2.2.1 SIndoor Air Quality For Interior

Sealants

2.2.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.2.4 SIndoor Air Quality For Interior

Acoustical Sealants

2.6 SIndoor Air Quality For Interior

Caulking 08 11 13 SD-02 Shop Drawings

2.1 G DODoors

2.1 G DODoors

2.6 G DOFrames

2.6 G DOFrames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.