attachment4_upld.pdf

PDF 440 KB Posted

Attached to
Janitorial Service Garrison Power Plant
Solicitation number
W9128F-18-R-0011
Issued by

About this file

Attachment 4 Floor Plan

View the file

Other files

File Type Posted
Attachment_3_Cleaning_RequirementsUPDATEDFINAL_upld.XLSX XLSX spreadsheet
18R0011solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4-1

ATTACHMENT 4-1: POWER PLANT – PLAN VIEW

PENSTOCK FLOOR

P P Compressors

P P P E e e e e n n n n n s s s s s t t t t t o o o o o c c c c c k k k k k

5 4 3 2 1

Stairs Stairs

Attachment 4-2

ATTACHMENT 4-2: POWER PLANT – PLAN VIEW

FLOOR 1, ELEVATION 1652.0

Sanitary

Drainage

Area Elevator

Oil

Storage

Room Oil

Purifi-cation

Room

Lobby

CO2 Room No. 3

Attachment 4-3

ATTACHMENT 4-3: POWER PLANT – PLAN VIEW

FLOOR 2, ELEVATION 1669.0

Fan Room No. 2

Elevator

Water Treatment

Room

Equipment

Storage

Station Service

Air Compressor Rm

Stair

No. 3

Attachment 4-4 3

Turbines

ATTACHMENT 4-4: POWER PLANT – PLAN VIEW

FLOOR 3 (Turbine Floor), ELEVATION 1684.0

Pump Room Fan Room No. 3

Fan Room No. 4 Corridor No. 1

Machine Shop

5 4 3 2 1

Stairs Stairs Stair #7 Stair #8

Corridor No. 2 Stair #3

Attachment 4-5

ATTACHMENT 4-5: POWER PLANT – PLAN VIEW

FLOOR 3 (Office Areas), ELEVATION 1684

Stair

No. 2

Men’s Restroom Locker/Lunch Rm

Elev. Janitorial Kitchen

To Turbines

Corridor No. 1

Mech.

Office

Electronics

Office

Computer Room

Office 1 Office 2

Spreader Room

ATTACHMENT 4-6: POWER PLANT – PLAN VIEW

Attachment 4-6

FLOOR 4 (Generator Floor), ELEVATION 1703.0 Generator

Unit Control Board

Stair access to Generator

Overhead Door Service Passage

5 4 3 2 1

Control Room

Stairs Stairs Stair #7 Stair #8

Assembly Bay

ATTACHMENT 4-7: POWER PLANT – PLAN VIEW

Stair No. 2

Vestibule No. 2

RR

Women’s

Men’s

Generator Floor

Elev.

First Aid Rm

Jan.

Service Passage

RR RR

Public

Lobby

Vestibule

No. 1

Meter Rm

Safety

Vault Obser- Stair

Lunch

Rm

Stor.

RR

vation

Room Relay Room No. 1

Closet

Electrical

Shop & Office

(Shop is 2 levels)

Control Room

Exit to Transformer Deck Attachment 4-7

FLOOR 4 (Control Room, etc.), ELEVATION 1703

Attachment 4-8

Stair

No. 2

ATTACHMENT 4-8: POWER PLANT – PLAN VIEW

FLOOR 5, ELEVATION 1717.25

Kitchen

Elec. Eng. Copier

Rm.

Asst.

PP

Supt

Elev.

Fan

Room

No. 1

Stair

No.1

Corridor

Supplies

Fem

Tech

Women’s

RR

PP

Supt

Men’s

Attachment 4-9

ATTACHMENT 4-9: POWER PLANT – PLAN VIEW

FLOOR 6, ELEVATION 1730.25

Stair

No. 2

Storage Rms Janitorial Storage

Corridor

Conference

Room Men’s

RR

Print

Room

Observation

Gallery Stair

No. 1

Women’s

ATTACHMENT 4-10: INTAKE STRUCTURE

Balcony

Diesel

Generator

Room

Main Level

Air Compressor

Room

Office Restroom Water

Treatment

Room

Attachment 4-10

File details come from the government source that posted it.