attachment4_upld.pdf
PDF 440 KB Posted
- Attached to
- Janitorial Service Garrison Power Plant
- Solicitation number
- W9128F-18-R-0011
About this file
Attachment 4 Floor Plan
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_3_Cleaning_RequirementsUPDATEDFINAL_upld.XLSX | XLSX spreadsheet | |
| 18R0011solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4-1
ATTACHMENT 4-1: POWER PLANT – PLAN VIEW
PENSTOCK FLOOR
P P Compressors
P P P E e e e e n n n n n s s s s s t t t t t o o o o o c c c c c k k k k k
5 4 3 2 1
Stairs Stairs
Attachment 4-2
ATTACHMENT 4-2: POWER PLANT – PLAN VIEW
FLOOR 1, ELEVATION 1652.0
Sanitary
Drainage
Area Elevator
Oil
Storage
Room Oil
Purifi-cation
Room
Lobby
CO2 Room No. 3
Attachment 4-3
ATTACHMENT 4-3: POWER PLANT – PLAN VIEW
FLOOR 2, ELEVATION 1669.0
Fan Room No. 2
Elevator
Water Treatment
Room
Equipment
Storage
Station Service
Air Compressor Rm
Stair
No. 3
Attachment 4-4 3
Turbines
ATTACHMENT 4-4: POWER PLANT – PLAN VIEW
FLOOR 3 (Turbine Floor), ELEVATION 1684.0
Pump Room Fan Room No. 3
Fan Room No. 4 Corridor No. 1
Machine Shop
5 4 3 2 1
Stairs Stairs Stair #7 Stair #8
Corridor No. 2 Stair #3
Attachment 4-5
ATTACHMENT 4-5: POWER PLANT – PLAN VIEW
FLOOR 3 (Office Areas), ELEVATION 1684
Stair
No. 2
Men’s Restroom Locker/Lunch Rm
Elev. Janitorial Kitchen
To Turbines
Corridor No. 1
Mech.
Office
Electronics
Office
Computer Room
Office 1 Office 2
Spreader Room
ATTACHMENT 4-6: POWER PLANT – PLAN VIEW
Attachment 4-6
FLOOR 4 (Generator Floor), ELEVATION 1703.0 Generator
Unit Control Board
Stair access to Generator
Overhead Door Service Passage
5 4 3 2 1
Control Room
Stairs Stairs Stair #7 Stair #8
Assembly Bay
ATTACHMENT 4-7: POWER PLANT – PLAN VIEW
Stair No. 2
Vestibule No. 2
RR
Women’s
Men’s
Generator Floor
Elev.
First Aid Rm
Jan.
Service Passage
RR RR
Public
Lobby
Vestibule
No. 1
Meter Rm
Safety
Vault Obser- Stair
Lunch
Rm
Stor.
RR
vation
Room Relay Room No. 1
Closet
Electrical
Shop & Office
(Shop is 2 levels)
Control Room
Exit to Transformer Deck Attachment 4-7
FLOOR 4 (Control Room, etc.), ELEVATION 1703
Attachment 4-8
Stair
No. 2
ATTACHMENT 4-8: POWER PLANT – PLAN VIEW
FLOOR 5, ELEVATION 1717.25
Kitchen
Elec. Eng. Copier
Rm.
Asst.
PP
Supt
Elev.
Fan
Room
No. 1
Stair
No.1
Corridor
Supplies
Fem
Tech
Women’s
RR
PP
Supt
Men’s
Attachment 4-9
ATTACHMENT 4-9: POWER PLANT – PLAN VIEW
FLOOR 6, ELEVATION 1730.25
Stair
No. 2
Storage Rms Janitorial Storage
Corridor
Conference
Room Men’s
RR
Room
Observation
Gallery Stair
No. 1
Women’s
ATTACHMENT 4-10: INTAKE STRUCTURE
Balcony
Diesel
Generator
Room
Main Level
Air Compressor
Room
Office Restroom Water
Treatment
Room
Attachment 4-10
File details come from the government source that posted it.