Attachment_3_Cleaning_RequirementsUPDATEDFINAL_upld.XLSX
XLSX spreadsheet 90 KB Posted
- Attached to
- Janitorial Service Garrison Power Plant Federal contract opportunity
- Solicitation number
- W9128F-18-R-0011
About this file
Attachment 3Cleaning Requiremetns
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| attachment4_upld.pdf | ||
| 18R0011solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Power Plant - Exterior
| ATTACHMENT 3-1: POWER PLANT - REQUIREMENTS | |||||||||||||||||||
| EXTERIOR/INTERIOR | |||||||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun | Annual - 2018 - Feb | Annual - 2019 - Feb | Annual - 2020 - Feb | Annual - 2021 - Feb | Annual - 2022 - Feb |
| 1 | Exterior | Cigarette receptacles (3 entrance areas). | X | ||||||||||||||||
| Trash cans. | X | X | |||||||||||||||||
| 2 | Exterior/Interior | Windows and blinds. | X |
ATTACHMENT 3-1, PAGE 1 OF 1
Power Plant - Penstocks
| ATTACHMENT 3-2: POWER PLANT - REQUIREMENTS | |||||||||||||||||||
| PENSTOCK FLOOR | |||||||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun | Annual - 2018 - Feb | Annual - 2019 - Feb | Annual - 2020 - Feb | Annual - 2021 - Feb | Annual - 2022 - Feb |
| 1 | Floor | Sweep entire floor, spray wash the entire floor (including areas under surge tanks) | X | ||||||||||||||||
| 2 | Stairways - From Fan Rooms 3 & 4 to Penstock Floor | Wash handrails (*April - September only) | *X |
Attachment 3-2, PAGE 1 OF 1
Elev. 1652
| ATTACHMENT 3-3: POWER PLANT - REQUIREMENTS | |||||||||||||||||||
| FLOOR 1, ELEVATION 1652 | |||||||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun | Annual - 2018 - Feb | Annual - 2019 - Feb | Annual - 2020 - Feb | Annual - 2021 - Feb | Annual - 2022 - Feb |
| 1 | Elevator | Vacuum floor. | X | ||||||||||||||||
| Clean. | X | ||||||||||||||||||
| 2 | Lobby | Dust, sweep, remove trash, damp mop floor. | X | ||||||||||||||||
| 3 | Stairways #3 (from Elev. 1652 to 1669) | Sweep, damp mop stairs, spot clean walls, wash down and clean all handrails. | X | ||||||||||||||||
| 4 | CO2 Room | Sweep/damp mop. | X | ||||||||||||||||
| 5 | Sanitary Drainage Area | Sweep, remove trash. Damp mop. | X |
Attachment 3-3, PAGE 1 OF 1
Elev. 1669
| ATTACHMENT 3-4: POWER PLANT - REQUIREMENTS | |||||||||||||||||||
| FLOOR 2, ELEVATION 1669 | |||||||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun | Annual - 2018 - Feb | Annual - 2019 - Feb | Annual - 2020 - Feb | Annual - 2021 - Feb | Annual - 2022 - Feb |
| 1 | Equipment Storage | Sweep, remove trash. | X | ||||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| 2 | Station Service Air Compressor Room | Sweep, remove trash, damp mop. | X | ||||||||||||||||
| 3 | Water Treatment Room | Sweep, remove trash. | X | ||||||||||||||||
| 4 | Fan Room #2 | Sweep, remove trash. | X | ||||||||||||||||
| 5 | Stairways # 3 (from elev. 1669 to 1684) | Vacuum, sweep, damp mop stairs, spot clean walls, wash and clean all handrails. | X |
Attachment 3-4, PAGE 1 OF 1
Elev. 1684
| ATTACHMENT 3-5: POWER PLANT - REQUIREMENTS | |||||||||||||||||||
| FLOOR 3, (TURBINE FLOOR), ELEVATION 1684 | |||||||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun | Annual - 2018 - Feb | Annual - 2019 - Feb | Annual - 2020 - Feb | Annual - 2021 - Feb | Annual - 2022 - Feb |
| 1 | Turbine Floor: UNITS #1, #2, #3, #4, & #5 | Sweep, remove trash. | X | X | |||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| 2 | Corridor No. 2 | Dust, vacuum, sweep, remove trash, damp mop. | X | X | |||||||||||||||
| 3 | Fan Room No. 3 (includes vestibule) | Sweep, damp mop. | X | X | |||||||||||||||
| 4 | Fan Room No. 4 (includes vestibule) | Sweep, damp mop. | X | X | |||||||||||||||
| 5 | Pump Room | Sweep, remove trash, damp mop. | X | ||||||||||||||||
| 6 | Machine Shop | Vacuum, sweep, remove trash, damp mop. | X |
ATTACHMENT 3-5, PAGE 1 OF 1
Elev. 1684
| ATTACHMENT 3-6: POWER PLANT - REQUIREMENTS | |||||||||||||||||||
| FLOOR 3, (OFFICE FLOOR), ELEVATION 1684 | |||||||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun | Annual - 2018 - Feb | Annual - 2019 - Feb | Annual - 2020 - Feb | Annual - 2021 - Feb | Annual - 2022 - Feb |
| 1 | Men's Restroom | Sweep, remove trash, damp mop, clean all plumbing & mirrors. | X | ||||||||||||||||
| Wash down walls. | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| 2 | Locker/Lunch Room | Dust, sweep, remove trash, damp mop, wipe off tables, wipe chairs | X | ||||||||||||||||
| Wash walls and lockers from floor to ceiling | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| 3 | Kitchen | Vacuum, sweep, remove trash, damp mop, clean all plumbing (including counters), microwave (wipe inside and out), clean top of stove, empty and rinse coffee pot, wipe off refrigerator doors | X | ||||||||||||||||
| Clean oven and refrigerator, wipe clean cupboard doors. | X | ||||||||||||||||||
| Wash walls from floor to ceiling | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax and buff. (includes moving out refrigerator and stove) | X | X | X | ||||||||||||||||
| 4 | Electronics Office | Remove trash, vacuum floor | X | ||||||||||||||||
| Vacuum chairs. | X | ||||||||||||||||||
| 5 | Mech. Office | Remove trash. | X | ||||||||||||||||
| Dust, vacuum, sweep, damp mop. | X | ||||||||||||||||||
| Vacuum chairs. | X | ||||||||||||||||||
| ATTACHMENT 3-6, PAGE 1 OF 2 | |||||||||||||||||||
| 6 | Corridor No. 1 | Dust, vacuum, sweep, remove trash, clean fountain. | X | ||||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| Wash walls from floor to ceiling | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| 7 | Stair No. 2 (Elev. 1684 - 1703) | Dust op of tile, vacuum, sweep, damp mop stairs, spot clean walls. Handrails- wash down and clean. | X | ||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| 8 | Spreader Room | Dust, vacuum, sweep, remove trash, damp mop. | X | ||||||||||||||||
| 9 | Office 1 & Office 2 | Remove trash | X | ||||||||||||||||
| Sweep, damp mop | X | ||||||||||||||||||
| 10 | Janitorial Room | Vacuum, sweep, remove trash, damp mop, clean plumbing. | X | ||||||||||||||||
| 11 | Computer Room | Dust, vacuum, sweep, remove trash, damp mop. | X | ||||||||||||||||
| ATTACHMENT 3-6, PAGE 2 OF 2 |
Elev. 1703
| ATTACHMENT 3-7: POWER PLANT - REQUIREMENTS | |||||||||||||||||||
| FLOOR 4, (GENERATOR FLOOR), ELEVATION 1703 | |||||||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun | Annual - 2018 - Feb | Annual - 2019 - Feb | Annual - 2020 - Feb | Annual - 2021 - Feb | Annual - 2022 - Feb |
| 1 | Assembly Bay | Dust , sweep, remove trash | X | ||||||||||||||||
| Damp mop, buff. | X | ||||||||||||||||||
| Clean windows, spot clean wall tiles and baseboards | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip and Wax | X | X | X | ||||||||||||||||
| 2 | Generator Bay 1 | Dust, sweep, remove trash. | X | X | |||||||||||||||
| Damp mop, buff. | X | ||||||||||||||||||
| Clean windows, spot clean walls tiles and baseboards. | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip and Wax | X | X | X | ||||||||||||||||
| 3 | Stair No. 8 (Elev. 1703 to 1684) | Sweep, damp mop stairs, spot clean walls. Handrails- wash down and clean. | X | X | |||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| 4 | Generator Bays 2, 3, 4, & 5 | Dust, sweep, remove trash, damp mop, buff. | X | ||||||||||||||||
| Clean wall tiles and baseboards. Spot clean walls. | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip and Wax | X | X | X | ||||||||||||||||
| 5 | Other Stairs (Generator Room) | Dust, vacuum, sweep, damp mop. Handrails - wash down and clean. | X | ||||||||||||||||
| ATTACHMENT 3-7, PAGE 1 OF 1 |
Elev. 1703
| ATTACHMENT 3-8: POWER PLANT - REQUIREMENTS | |||||||||||||||||||
| FLOOR 4, (CONTROL ROOM, ETC.) , ELEVATION 1703 | |||||||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun | Annual - 2018 - Feb | Annual - 2019 - Feb | Annual - 2020 - Feb | Annual - 2021 - Feb | Annual - 2022 - Feb |
| 1 | Vestibule No. 2 | Dust, vacuum, sweep, remove trash. | X | ||||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| Buff. | X | ||||||||||||||||||
| Spot clean walls & doors. Clean bugs out of light fixture. | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax & buff. | X | X | X | ||||||||||||||||
| 2 | Restroom & First Aid Room | Vacuum, sweep, remove trash, clean plumbing, damp mop, clean mirrors, dust | X | ||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip and Wax | X | X | X | ||||||||||||||||
| 3 | Meter Room | Dust, vacuum, sweep, remove trash, damp mop. | X | ||||||||||||||||
| 4 | Vestibule No. 1 | Dust, vacuum, sweep. | X | X | |||||||||||||||
| Damp mop, clean windows. | X | X | |||||||||||||||||
| Buff. | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax and buff. | X | X | X | ||||||||||||||||
| 5 | Lunch Room | Dust, vacuum, sweep, remove trash, clean plumbing, microwave, wipe top of stove, wipe down refrigerator doors. | X | ||||||||||||||||
| Damp mop, wipe off top of refrigerator. | X | ||||||||||||||||||
| Clean refrigerator & oven. | X | ||||||||||||||||||
| Clean walls and cupboard doors. | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| 6 | Rest Room (Control Room) | Sweep, remove trash, clean plumbing, damp mop. Spot clean walls. | X | ||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| ATTACHMENT 3-8, PAGE 1 OF 3 | |||||||||||||||||||
| 7 | Service Passage | Dust, vacuum, sweep, remove trash, clean drinking fountain. | X | ||||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| Buff, clean light fixtures | X | ||||||||||||||||||
| Wash down walls from floor to ceiling | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax and buff. | X | X | X | ||||||||||||||||
| 8 | Control Room | Dust, vacuum, sweep, remove trash, wipe chairs | X | ||||||||||||||||
| Clean glass above control desk, vacuum chairs | X | ||||||||||||||||||
| Damp mop laminite | X | ||||||||||||||||||
| 9 | Electric Shop & Office | Remove trash | X | ||||||||||||||||
| Dust, vacuum, sweep | X | ||||||||||||||||||
| Office - vacuum chairs | X | ||||||||||||||||||
| 10 | Exit to Transformer Deck | Sweep/vacuum, damp mop, clean glass | X | ||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax, and buff. | X | X | X | ||||||||||||||||
| 11 | Public Lobby | Dust, vacuum, sweep, remove trash, damp mop, clean windows, mirrors/glass, fountain. | X | X | |||||||||||||||
| Spot clean walls, vacuum chairs, buff. | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| 12 | Men's & Women's Restroom | Dust, vacuum, sweep, remove trash, damp mop, clean windows, mirrors, glass. | X | ||||||||||||||||
| Buff. | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax and buff. | X | X | X | ||||||||||||||||
| ATTACHMENT 3-8, PAGE 2 OF 3 | |||||||||||||||||||
| 13 | Observation Room | Dust, vacuum, sweep, remove trash, damp mop, mirrors, display glass, clean fountain. Wash down and clean all handrails. | X | X | |||||||||||||||
| Buff, Clean glass looking into control room (* Mon OR Tue) | *X | *X | |||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax and buff. | X | X | X | ||||||||||||||||
| 14 | Stair No. 2 (Elev. 1703-1717.25) | Dust (handrails and top of tile), vacuum, sweep, damp mop stairs, spot clean walls. | X | ||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax, and buff. | X | X | X | ||||||||||||||||
| 15 | Janitorial Closet | Damp mop, clean plumbing. | X | ||||||||||||||||
| 16 | Safety Storage Room | Dust, vacuum, sweep, damp mop. | X | ||||||||||||||||
| 17 | Vault | Dust, vacuum, sweep, damp mop. | X | ||||||||||||||||
| 18 | Relay Room | Dust, vacuum. | X | ||||||||||||||||
| ATTACHMENT 3-8, PAGE 3 OF 3 |
Elev. 1717.25
| ATTACHMENT 3-9: POWER PLANT - REQUIREMENTS | |||||||||||||||||||
| FLOOR 5, ELEVATION 1717.25 | |||||||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun | Annual - 2018 - Feb | Annual - 2019 - Feb | Annual - 2020 - Feb | Annual - 2021 - Feb | Annual - 2022 - Feb |
| 1 | Corridor | Dust, vacuum, sweep, remove trash, clean fountains. | X | ||||||||||||||||
| Damp Mop | X | ||||||||||||||||||
| Buff. | X | ||||||||||||||||||
| Clean wall tiles. | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| 2 | Kitchen | Dust, vacuum, sweep, remove trash, clean plumbing and counter, microwave, empty and rinse coffee pot. | X | ||||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| Refrigerator - clean inside and out, wipe down cupboards. | X | ||||||||||||||||||
| 3 | Supplies | Dust, sweep, remove trash. | X | ||||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| ATTACHMENT 3-9, PAGE 1 OF 2 | |||||||||||||||||||
| 4 | Restrooms (Men's & Women's) | Dust, sweep, remove trash, clean plumbing. | X | ||||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax & buff. | X | X | X | ||||||||||||||||
| 5 | Office Areas & Copier Room | Dust, vacuum, remove trash. | X | ||||||||||||||||
| Vacuum chairs. | X | ||||||||||||||||||
| 6 | Stair No. 2 (Elev. 1717.25 to 1730.25) | Dust, vacuum, sweep. | X | ||||||||||||||||
| Damp mop, spot clean wall tiles. Wash down and clean all handrails. | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| 7 | Stair No. 1 (Elev. 1703 to 1717.25) | Dust, vacuum, sweep, damp mop.Wash down and clean all handrails. | X | X | |||||||||||||||
| Clean wall tiles . | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax and buff. | X | X | X | ||||||||||||||||
| 8 | Fan Room No. 1 | Sweep, damp mop. | X | ||||||||||||||||
| ATTACHMENT 3-9, PAGE 2 OF 2 |
Elev. 1730.25
| ATTACHMENT 3-10: POWER PLANT - REQUIREMENTS | |||||||||||||||||||
| FLOOR 6, ELEVATION 1730.25 | |||||||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun | Annual - 2018- Feb | Annual - 2019 - Feb | Annual - 2020 - Feb | Annual - 2021 - Feb | Annual - 2022 - Feb |
| Dust, vacuum, sweep, damp mop, clean glass. | X | X | |||||||||||||||||
| Clean wall tile. | X | ||||||||||||||||||
| Maintenance Wax | X | X | X | X | |||||||||||||||
| Strip, wax and buff. | X | ||||||||||||||||||
| 2 | Conference Room | Dust, vacuum, sweep, remove trash, clean fountain, damp mop, clean glass. | X | ||||||||||||||||
| Clean wall tile, vacuum chairs | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax and buff. | X | X | X | ||||||||||||||||
| 3 | Restrooms (Men's & Women's) | Dust, vacuum, sweep, remove trash, clean plumbing, damp mop. | X | X | |||||||||||||||
| Maintenance Wax | X | X | X | X | |||||||||||||||
| Strip, wax & buff. | X | ||||||||||||||||||
| 4 | Print Room | Remove trash | X | ||||||||||||||||
| Dust, vacuum | X | ||||||||||||||||||
| Vacuum chairs. | X | ||||||||||||||||||
| 5 | Corridor | Dust, sweep. | X | ||||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| Maintenance Wax | X | X | X | ||||||||||||||||
| Strip, wax and buff. | X | X | |||||||||||||||||
| 6 | Stair No. 1 (Elev. 1717.25 to 1730.25) | Dust, vacuum, sweep, damp mop. Clean and wash all handrails. | X | ||||||||||||||||
| Spot clean walls . | X | ||||||||||||||||||
| Maintenance Wax | X | X | X | X | |||||||||||||||
| Strip, wax and buff. | X | ||||||||||||||||||
| 7 | Janitorial Closet | Damp mop, scrub, clean plumbing. | X | ||||||||||||||||
| 8 | Storage Rooms | Dust, vacuum, sweep, remove trash, damp mop. | X | ||||||||||||||||
| ATTACHMENT 3-10, PAGE 1 OF 1 |
Intake Structure
| ATTACHMENT 3-11: INTAKE STRUCTURE - REQUIREMENTS | |||||||||||||||||||
| INTAKE STRUCTURE | |||||||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun | Annual - 2013 - Feb | Annual - 2014 - Feb | Annual - 2015 - Feb | Annual - 2016 - Feb | Annual - 2017 - Feb |
| 1 | Restroom | Dust, vacuum, sweep, remove trash, clean plumbing, walls, stalls, mirror, damp mop. | X | ||||||||||||||||
| 2 | Office | Remove trash, dust vacuum, vacuum or wipe chairs, sweep, damp mop | X | ||||||||||||||||
| 3 | Water Treament Room, Diesel Generator Room, Air Compressor Room | Sweep and damp mop | X | ||||||||||||||||
| 4 | Main Level & Balcony | Sweep and damp mop | X | ||||||||||||||||
| ATTACHMENT 3-11, PAGE 1 OF 1 |