Amendment_0001 _Drawings _W9128F-16-B-0016.pdf

PDF 6 MB Posted

Attached to
Powerhouse Lighting Upgrades, Garrison Dam, ND Federal contract opportunity
Solicitation number
W9128F-16-B-0016
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

Amendment 0001 - Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Powerhouse Lighting Upgrades, Garrison Dam, ND, newest first.
File Type Posted
Abstract _W9128F-16-B-0016 _GA_Powerplant_Lighting_Upgrades.xls XLS spreadsheet
Amendment_0001 _Specs _W9128F-16-B-0016.pdf PDF
Garrison_Powerhouse_Lighting_Dwgs.pdf PDF
Solicitation _W9128F-16-B-0016 _GA_Power_Plant_Lighting_Upgrades.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

/0

/2

:1

E-100

E L E

C T

R

IC

A L N

O T

E S S

H E

T

W F -1

-B -0

OMAHA DISTRICT

M R

M C

P O

W E

R L

IG

H T

IN

G U

P G

R A

D

M C

O M

A H

A D

IS

T R

IC

T G

A R

R

IS

O N D

A M

N D

A H

A

N E

B R

A S

K A

G

E -1

.d g n

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

/0

/2

A N

S I

GENERAL INSTALLATION NOTES (EL SHEETS)

COMPONENTS SHOWN ON THE SHEETS.

ASSUMED TO BE A 5% OF REMOVAL AND REPLACEMENT OF THE ELECTRICAL

12. FOR ALL SHEETS "AS NEEDED BASIS" FOR CONTRACTING PURPOSES CAN BE

THE GOVERNMENT.

CONSTRUCTION MUST BE REPAIRED BY THE CONTRACTOR AT NO EXPENSE TO

DAMAGE OF LOSS OF FUNCTION SHOWN TO TO HAVE OCCURED DURING

SURVEY TO THE CONTRACTING OFFICER OR HIS REPRESENTATIVE. ANY

EQUIPMENT PRIOR TO CONSTRUCTION. PROVIDE A WRITTEN COPY OF THIS

AND RECORD THE LOCATION OF ANY NON-FUNCTIONAL OR DAMAGED ELECTRIAL

RECEPTACLES, CONTACTORS, CONDUIT, AND CONDUCTORS TO DETERMINE

CONSTRUCTION INCLUDING BUT NOT LIMITED TO LIGHT FIXTURES,

ALL EXISTING ELECTRICAL EQUIPMENT WITHIN THE BOUNDS OF THE

11. IN THE PRESENCE OF THE CONTRACTING OFFICER, PERFORM A SURVEY OF

MINIMUM.

TO THE ATTENTION OF THE CONTRACTING OFFICER AND SHALL BE HELD TO A

SHALL REMAIN OPERATIONAL. ANY DISRUPTIONS NEEDED SHALL BE BROUGHT

10. ALL ELECTRICAL SYSTEMS NOT WITHIN CURRENT CONSTRUCTION AREA

OFFICER TO ENSURE MINIMAL INTERRUPTIONS OF STATION OPERATIONS.

9. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE CONTRACTING

OR ADJACENT TO THE DAM SITE.

8. CONTRACTOR SHALL COMPLY WITH OPERATIONAL PROCEDURES WHILE ON

MARKING SHALL BE CONTRACTORS RESPONSIBILITY.

THIS PROJECT. ALL CIRCUIT IDENTIFICATION, MARKING, AND MAINTENANCE OF

PRIOR TO ANY EXCAVATION OR CONSTRUCTION WITHIN THE BOUNDARIES OF

7. THE CONTRACTOR SHALL FIELD VERIFY, LOCATE AND TAG ALL UTILITIES

APPROVED BY GARRISON DAM OPERATIONS MANAGEMENT.

TO A MINIMUM. NO CIRCUITS SHALL BE LEFT NON-OPERATIONAL UNLESS

6. OUTAGES REQUIRED FOR CONNECTION OF THE NEW CIRCUITS SHALL BE KEPT

ANY WORK.

5. CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS PRIOR TO BEGINNING

MEET THE SATISFACTION OF THE CONTRACTING OFFICER.

REPLACED BY THE CONTRACTOR AT NO EXPENSE TO THE GOVERNMENT AND

DELETED IN THE PROCESS OF THIS CONSTRUCTION SHALL BE REPAIRED OR

FEEDER, OR EQUIPMENT THAT IS SEVERED, DISCONNECTED, DAMAGED OR

OTHERWISE NOTED. ALL ELECTRICAL POWER, LIGHTING, OR AUXILIARY CIRCUIT,

4. EXISTING ELECTRICAL SYSTEMS (NOT SHOWN) SHALL REMAIN, UNLESS

BY THE CONTRACTOR AND GIVEN TO THE GOVERNMENT.

3. ALL EXISTING LAMPS FROM REMOVED LIGHT FIXTURES SHALL BE REMOVED

2. CONDUIT SHALL REMAIN IN PLACE UNLESS OTHERWISE NOTED.

1. ALL CONDUCTORS BETWEEN LIGHTS TO BE REPLACED SHALL BE REMOVED.

GENERAL DEMOLITION NOTES (ED1XX SHEETS)

INSTALLATION LEGEND DEMOLITION LEGEND

SHEET. SEE GENERAL INSTALLATION NOTE 9.

SPD. SPDD INSTALLATION INSTRUCTIONS ARE PROVIDED ON THIS

EXISTING LIGHTING PANEL. ONLY NEW WORK IS INSTALLATION OF

RECEPTACLE TO BE WATERTIGHT.

NEW 110V RECEPTACLE, GFCI WITH A NEMA 4X ENCLOSURE.

NEW 110V RECEPTACLE, GFCI.

EXISTING SWITCH IS TO BE PROTECTED IN PLACE.

INSTALL ONLY IF SPECIFIED IN THE SHEET NOTES, OTHERWISE

NEW SWITCH, SEE UFGS 26 51 00 FOR MORE INFORMATION.

CURVED LINE IS FOR THE GROUND.

CONDUCTOR. LONE LINE IS THE NEUTRAL FOR THE CIRCUIT.

UNLESS OTHERWISE NOTED. SHORT LINE IS POWER LINE

NEW CONDUCTOR INSTALLATION INSIDE OF EXISTING CONDUIT,

RECEPTACLE IS TO BE PROTECTED IN PLACE.

NOTES INSTRUCT FOR REMOVAL AND REPLACEMENT, OTHERWISE

RECEPTACLE (MULTIPLE TYPES) TO BE REMOVED IF SPECIFIC SHEET

SHEET NOTES, OTHERWISE SWITCH IS TO BE PROTECTED IN PLACE.

SWITCH TO BE REMOVED IF INSTRUCTION IS GIVEN IN THE SPECIFIC

NOTES.

PROTECTED IN PLACE AS INSTRUCTED ON THE SHEET SPECIFIC

GROUND. CONDUCTORS AND CONDUIT TO BE REMOVED OR

NEUTRAL FOR THE CIRCUIT. THE CONDUIT WAS USED FOR THE

IS EXISTING POWER LINE CONDUCTOR. LONE LINE IS THE EXISTING

EXISTING CONDUCTORS INSIDE OF EXISTING CONDUIT. SHORT LINE

THESE ON ALL ED SHEETS UNLESS OTHERWISE NOTED.

EXISTING LIGHT FIXTURE, VARIOUS FIXTURES. REMOVE ALL OF

S

S

AND INSTALL AS SHOWN ON THE DRAWINGS FOR THESE SHEETS.

ELECTRCITIANS. IF OPTION IS AWARDED CONTRACTOR SHALL REMOVE, SUPPLY,

CONTACTORS, AND RECEPTABLES TO BE INSTALLED BY POWERHOUSE

7. BASE CONTRACT IS TO SUPPLY LIGHT FIXTURES, CONDUCTOR WIRE, LIGHTING

6. ELEVATION 1684.0 FEET FOR THESE SHEETS

CIRCUITS RENOVATED UNDER THIS BASE CONTRACT.

5. IF OPTION AWARDED, RECORD AND REMOVE LIGHTING CONTACTORS FOR

ED101-ED109.

4. IF OPTION IS AWARDED, REMOVE RECEPTACLES AS SHOWN ON SHEETS

SHOWN FOR SHEETS ED101-ED109.

3. IF OPTION IS AWARDED, REMOVE ALL EXISTING WIRE TO LIGHTS REMOVED AS

OTHERWISE NOTED.

ON AN AS NEEDED BASIS ONLY. ASSUME 3/4" RIGID STEEL CONDUIT UNLESS

CONDUIT FEEDING AFFECTED CIRCUITS IN THIS CONTRACT. REPLACE CONDUIT

2. IF OPTION IS AWARDED, FOR SHEETS, ED101-ED109, PROTECT IN PLACE ALL

SHOWN ON SHEETS ED101 - ED109.

1. IF OPTION IS AWARDED, REMOVE LIGHT FIXTURES ONLY FOR ALL LIGHTS

POWER & CONTROL TUNNELS

POWERHOUSE THIRD FLOOR

(SHEETS ED100 - ED109)

SHEET SPECIFIC DEMOLITION NOTES

AND INSTALL AS SHOWN ON THE DRAWINGS FOR THESE SHEETS.

NOTE 5 ABOVE. IF OPTION IS AWARDED CONTRACTOR SHALL REMOVE, SUPPLY,

CONTRACT SHALL ALSO PROVIDE LIGHTING CONTACTORS AS PRESRIBED IN

RECEPTABLES TO BE INSTALLED BY POWERHOUSE ELECTRCITIANS. BASE

7. BASE CONTRACT IS TO SUPPLY LIGHT FIXTURES, CONDUCTOR WIRE, AND

6. ELEVATION 1684.0 FEET FOR THESE SHEETS

CONTACTORS IN A NEMA 4X RATED ENCLOSURE.

CONTRACT ON SHEETS EL101-EL109. PROVIDE NEMA STYLE LIGHTING

5. PROVIDE CONTACTORS FOR THE CIRCUITS RENOVATED UNDER THIS

INFORMATION.

EXISTING REMOVED RECEPTACLES. REFERENCE ED101-ED109 FOR REMOVAL

RECEPTACLES. MOUNT ALL RECEPACLES IN THE SAME LOCATION OF THE

BY POWERHOUSE ELECTRICTION. IF OPTION IS AWARDED PROVIDE AND INSTALL

4. PROVIDE RECEPTACLES AS SHOWN ON SHEETS EL101-EL109 TO BE INSTALLED

EL101-EL110. ASSUME (2) #12 AWG UNLESS OTHERWISE NOTED.

PROVIDE AND INSTALL ALL NEW WIRE TO NEW LIGHTS AS SHOWN FOR SHEETS

TO BE INSTALLED BY POWERHOUSE ELECTRICIAN. IF OPTION IS AWARDED,

3. PROVIDE ALL NEW WIRE TO NEW LIGHTS AS SHOWN FOR SHEETS EL101-EL109

OTHERWISE NOTED.

ON AN AS NEEDED BASIS ONLY. ASSUME 3/4" RIGID STEEL CONDUIT UNLESS

CONDUIT FEEDING AFFECTED CIRCUITS IN THIS CONTRACT. REPLACE CONDUIT

2. IF OPTION IS AWARDED, FOR SHEETS, EL101-EL109, PROTECT IN PLACE ALL

FIXTURES. REFERENCE ED101-ED109 FOR REMOVAL INFORMATION.

LIGHT FIXTURES IN THE SAME LOCATION OF THE EXISTING REMOVED LIGHT

AND INSTALL LIGHT FIXTURES AS SHOWN ON SHEETS EL101-EL109. MOUNT ALL

INSTALLED BY POWERHOUSE ELECTRICIAN. IF OPTION IS AWARDED, PROVIDE

1. PROVIDE LIGHT FIXTURES AS SHOWN ON SHEETS EL101-EL109 TO BE

POWER & CONTROL TUNNELS

POWERHOUSE THIRD FLOOR

(SHEETS EL100 - EL109)

SHEET SPECIFIC INSTALLATION NOTES

ERECTION BAY

POWERHOUSE FOURTH FLOOR

(SHEETS ED121 - ED123)

SHEET SPECIFIC DEMOLITION NOTES

ERECTION BAY

POWERHOUSE FOURTH FLOOR

(SHEETS EL121 - EL123)

SHEET SPECIFIC INSTALLATION NOTES

ABOVE.

THE DRAWINGS FOR THESE SHEETS IN ACCORDANCE WITH NOTES 1,2, & 3

AWARDED CONTRACTOR SHALL REMOVE, SUPPLY, AND INSTALL AS SHOWN ON

RECEPTABLES TO BE INSTALLED BY POWERHOUSE ELECTRCITIANS. IF OPTION IS

7. BASE CONTRACT IS TO SUPPLY LIGHT FIXTURES, CONDUCTOR WIRE, AND

CEILING. CEILING ELEVATION 1772.37.

5. ELEVATION 1703.0 FEET FOR THESE SHEETS. LIGHTS ARE MOUNTED NEAR

UNDER THIS BASE CONTRACT.

4. RECORD AND REMOVE LIGHTING CONTACTORS FOR CIRCUITS RENOVATED

OTHERWISE NOTED.

CONDUCTOR WIRE ON AN AS NEEDED BASIS ONLY. ASSUME #12 AWG UNLESS

TO LIGHTS REMOVED AS SHOWN FOR SHEETS ED121-ED123. REPLACE

3. IF OPTION IS AWARDED, PROTECT IN PLACE ALL EXISTING CONDUCTOR WIRES

OTHERWISE NOTED.

ON AN AS NEEDED BASIS ONLY. ASSUME 3/4" RIGID STEEL CONDUIT UNLESS

CONDUIT FEEDING AFFECTED CIRCUITS IN THIS CONTRACT. REPLACE CONDUIT

2. IF OPTION IS AWARDED, FOR SHEETS, ED121-ED123, PROTECT IN PLACE ALL

SHOWN ON SHEETS ED121 - ED123.

1. IF OPTION IS AWARDED, REMOVE LIGHT FIXTURES ONLY FOR ALL LIGHTS

ABOVE FOR THESE SHEETS.

INSTALL AS SHOWN ON THE DRAWINGS IN ACCORDANCE WITH NOTES 2 & 3

ONLY. IF OPTION IS AWARDED CONTRACTOR SHALL REMOVE, SUPPLY, AND

CONDUCTOR WIRE, CONDUIT, AND RECEPTACLES ON AN AS NEEDED BASIS

POWERHOUSE ELECTRCITIANS. BASE CONTRACT SHALL SUPPLY ONLY

6. BASE CONTRACT IS TO SUPPLY LIGHT FIXTURES ONLY TO BE INSTALLED BY

CEILING. CEILING ELEVATION 1772.37.

5. ELEVATION 1703.0 FEET FOR THESE SHEETS. LIGHTS ARE MOUNTED NEAR

CONTACTORS IN A NEMA 4X RATED ENCLOSURE.

CONTRACT ON SHEETS EL121-EL123. PROVIDE NEMA STYLE LIGHTING

4. PROVIDE CONTACTORS FOR THE CIRCUITS RENOVATED UNDER THIS

ASSUME #12 AWG CONDUCTORS UNLESS OTHERWISE NOTED.

CONDUCTOR WIRE TO NEW LIGHTS AS SHOWN FOR SHEETS EL121-EL123.

3. IF OPTION IS AWARDED, ON AN AS NEEDED BASIS ONLY PROVIDE NEW

OTHERWISE NOTED.

ON AN AS NEEDED BASIS ONLY. ASSUME 3/4" RIGID STEEL CONDUIT UNLESS

CONDUIT FEEDING AFFECTED CIRCUITS IN THIS CONTRACT. REPLACE CONDUIT

2. IF OPTION IS AWARDED, FOR SHEETS, EL121-EL123, PROTECT IN PLACE ALL

FIXTURES. REFERENCE ED121-ED123 FOR REMOVAL INFORMATION.

LIGHT FIXTURES IN THE SAME LOCATION OF THE EXISTING REMOVED LIGHT

AND INSTALL LIGHT FIXTURES AS SHOWN ON SHEETS EL121-EL123. MOUNT ALL

INSTALLED BY POWERHOUSE ELECTRICIAN. IF OPTION IS AWARDED, PROVIDE

1. PROVIDE LIGHT FIXTURES AS SHOWN ON SHEETS EL121-EL123 TO BE

G

G-WP

A

M

G

E N

E R

A L R

E V

IS

IO

N /0

/2

S L

O

PANELS (1L, 2L, 3L, & 4L) SHOWN ON THE DRAWING.

THERE ARE A TOTAL OF 4 CONTACTORS LOCATED NEAR EACH OF THE LIGHTING

CONTACTORS SERVING THE SPILLWAY CATWALK LIGHTS (SHEET ED162 & EL162)

AND CONTROL TUNNEL LIGHTING SEE SHEET EL560 & EL561. FOR THE LIGHTING

CONTACTOR COILS. FOR LOCATIONS OF CONTACTORS THAT SERVE THE POWER

EMERGENCY LIGHTING RELAY COIL. AC CONTACTORS ARE LISTED AS

CONTACTORS ON THE ONE LINE DIAGRAM. DC CONTACTORS ARE LISTED AS

CAPACITY. SEE SHEET EL566 FOR LOCATION OF NORMAL AND EMERGENCY

SHALL BE SIZED FOR THE NEW LOAD PLUS AN ADDITIONAL 10% SPARE

18. FOR ALL SHEETS: ANY CONTACTORS TO BE INSTALLED IN THIS PROJECT

WLGF FSCROUSE-HINDS GFCI RECEPTACLE COVER, HORIZONTAL P/N

WLGF FSVCROUSE-HINDS GFCI RECEPTACLE COVER, VERTICAL P/N

GFTWRST20GY HUBBELL COMMERCIAL GFCI, P/N

17. NEW RECEPTACLES SHALL BE NEMA 4X RATED SIMILAR TO THE FOLLOWING:

MOUNTING HEIGHTS.

AND LIGHTING CONTACTORS SHALL BE INSTALLED AT EXISTING LOCATIONS AND

16. FOR ALL SHEETS, ALL NEW RECEPTACLES, LIGHTSWITCHES, LIGHT FIXTURES,

NUMBER AND PANEL NUMBER.

15. ALL SPLICE BOXES SHALL BE IDENTIFIED WITH A LABEL PROVIDING CIRCUIT

THE WALL.

LABEL SHALL BE INSTALLED ON THE COVER. LABEL SHALL NOT BE INSTALLED ON

A LABEL PROVIDED INDICATING THE CIRCUIT NUMBER AND PANEL NUMBER.

14. FOR ALL SHEETS, ALL NEW RECEPTACLES AND LIGHT SWITCHES SHALL HAVE

AREAS. REFERENCE UFGS 26 20 00 FOR MORE INFORMATION.

PENSTOCK TUNNELS, POWER AND CONTROL TUNNELS, AND SURGE TANK

WATER PROOF RATED: THIRD FLOOR OF THE POWER HOUSE, PENSTOCK AREA,

RECEPTACLES TO BE INSTALLED IN THE FOLLOWING AREAS ARE TO BE GFCI AND

13. FOR ALL SHEETS ALL NEW RECEPTACLES SHALL BE GFCI. THE NEW

COMPONENTS SHOWN ON THE SHEETS.

ASSUMED TO BE A 5% OF REMOVAL AND REPLACEMENT OF THE ELECTRICAL

12. FOR ALL SHEETS "AS NEEDED BASIS" FOR CONTRACTING PURPOSES CAN BE

MINIMUM.

TO THE ATTENTION OF THE CONTRACTING OFFICER AND SHALL BE HELD TO A

SHALL REMAIN OPERATIONAL. ANY DISRUPTIONS NEEDED SHALL BE BROUGHT

11. ALL ELECTRICAL SYSTEMS NOT WITHIN CURRENT CONSTRUCTION AREA

10. REFERENCE SHEET EL501 FOR FIXTURE SYMBOLS ON FIXTURE SCHEDULE.

IEEE, INDUSTRY STANDARD, AND UFGS REQUIREMENTS.

SEPARATE CONTRACTOR SUPPLIED BOX ADJACENT TO THE LIGHTING PANEL IAW

UNLESS THERE IS NO AVAILABLE SPACE, THEN SPD's SHALL BE INSTALLED IN A

REQUIREMENTS. ALL SPD's SHALL BE INSTALLED IN THE LIGHTING PANEL

SPEC 26 20 00, PARAGRAPH 2.18 FOR MORE INFORMATION ON SPD

INTEGRATED SPD WHEREVER ACCESSIBILITY IS FEASIBLE. REFERENCE UFGS

THE SPD TO SERVE THE LOAD OF THE ENTIRE LIGHTING PANEL. PROVIDE

LIGHTING PANEL THAT THIS CONTRACT AFFECTS THE LIGHTING CIRCUITS. SIZE

9. CONTRACTOR SHALL PROVIDE A SURGE PROTECTIVE DEVICE (SPD) FOR EACH

OFFICER TO ENSURE MINIMAL INTERRUPTIONS OF STATION OPERATIONS.

8. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE CONTRACTING

OR ADJACENT TO THE DAM SITE.

7. CONTRACTOR SHALL COMPLY WITH OPERATIONAL PROCEDURES WHILE ON

MARKING SHALL BE CONTRACTOR'S RESPONSIBILITY.

THIS PROJECT. ALL CIRCUIT IDENTIFICATION, MARKING, AND MAINTENANCE OF

PRIOR TO ANY EXCAVATION OR CONSTRUCTION WITHIN THE BOUNDARIES OF

6. THE CONTRACTOR SHALL FIELD VERIFY, LOCATE AND TAG ALL UTILITIES

APPROVED BY GARRISON DAM OPERATIONS MANAGEMENT.

TO A MINIMUM. NO CIRCUITS SHALL BE LEFT NON-OPERATIONAL UNLESS

5. OUTAGES REQUIRED FOR CONNECTION OF THE NEW CIRCUITS SHALL BE KEPT

ANY WORK.

4. CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS PRIOR TO BEGINNING

MEET THE SATISFACTION OF THE CONTRACTING OFFICER.

REPLACED BY THE CONTRACTOR AT NO EXPENSE TO THE GOVERNMENT AND

DELETED IN THE PROCESS OF THIS CONSTRUCTION SHALL BE REPAIRED OR

FEEDER, OR EQUIPMENT THAT IS SEVERED, DISCONNECTED, DAMAGED OR

OTHERWISE NOTED. ALL ELECTRICAL POWER, LIGHTING, OR AUXILIARY CIRCUIT,

3. EXISTING ELECTRICAL SYSTEMS (NOT SHOWN) SHALL REMAIN, UNLESS

THE DRAWING.

2. ALL CONDUIT RUNS SHALL HAVE CONDUCTORS INSTALLED AS SHOWN ON

LOCATION OF LIGHTS FIXTURES.

1. CONTRACTOR SHALL ENSURE CORRECT ORIENTATION, SPACING, AND

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps

/0

/2

E-101

E

C T

R

IC

A L N

O T

E S S

H E

F -1

-B -0

M C

P O

W E

R L

IG

H T

IN

G U

P G

R A

D

M C

O M

A H

A D

IS

T R

IC

T G

A R

R

IS

O N D

A M

A H

A

N E

B R

A S

E -1

.d g n

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

/0

/2

A N

S

EL131-EL137.

CONDUCTOR WIRE, AND RECEPTABLES AS SHOWN ON SHEETS ED131-ED137 AND

6. BASE CONTRACT IS TO REMOVE, SUPPLY, AND INSTALL LIGHT FIXTURES,

5. FLOOR ELEVATION 1654.0 FEET FOR THESE SHEETS

EL131-EL137.

RECEPTABLES IN PLACE OF THE REMOVED RECEPTACLE AS SHOWN ON SHEETS

4. REMOVE RECEPTACLES AS SHOWN ON SHEETS ED131-ED137. PROVIDE NEW

AFF AS SHOWN FOR SHEETS ED131-ED137.

3. REMOVE ALL EXISTING CONDUCTOR WIRE TO LIGHTS REMOVED UNDER 20'

ED131-ES137. ASSUME 1-1/4" RIGID STEEL CONDUIT UNLESS OTHERWISE NOTED.

ED131-ED137. NEW CONDUIT SHALL BE PROVIDED AS SHOWN ON SHEETS

2. REMOVE ALL CONDUITS UNDER 20' AFF IN THIS CONTRACT FOR SHEETS,

1. REMOVE LIGHT FIXTURES FOR ALL LIGHTS SHOWN ON SHEETS ED131 - ED137

PENSTOCK AREA

(SHEETS ED131 - ED137)

SHEET SPECIFIC DEMOLITION NOTES

BRACED TO PENSTOCK.

OTHER ARES THAT REQUIRE ADDITIONAL BRACING. CONDUIT SHALL NOT BE

SHALL BE INSTALLED FROM THE FLOOR BETWEEN THE PENSTOCKS AND ANY

8. FOR NEW CONDUIT TO BE INSTALLED ANY SUPPORTS FOR THE CONDUIT

EL131-EL137.

CONDUCTOR WIRE, AND RECEPTABLES AS SHOWN ON SHEETS ED131-ED137 AND

7. BASE CONTRACT IS TO REMOVE, SUPPLY, AND INSTALL LIGHT FIXTURES,

OTHERWISE NOTED.

EACH PENSTOCK. ALL RECEPTACLES SHALL BE MOUNTED AT 3' AFF UNLESS

PENSTOCKS SHALL BE MOUNTED 1' MINIMUM OVER THE CIRCUMFERENCE OF

INSTALLED AT 12' AFF UNLESS OTHERWISE NOTED. CONDUIT PASSING BETWEEN

6. ALL NEW LIGHT FIXTURES, AND CONDUIT FEEDING LIGHT FIXTURES SHALL BE

5. FLOOR ELEVATION 1654.0 FEET FOR THESE SHEETS

INFORMATION.

GFCI IN A NEMA 4X RATED ENCLOSURE. REFERENCE ED131-ED137 FOR REMOVAL

RECEPACLES AT REMOVED RECEPTACLE LOCATIONS. RECEPTACLES SHALL BE

4. PROVIDE RECEPTACLES AS SHOWN ON SHEETS EL131-EL137. MOUNT ALL

ES131-ES137. ASSUME #6 AWG, #6AWG GROUND UNLESS OTHERWISE NOTED.

3. PROVIDE ALL NEW WIRE TO NEW LIGHTS AS SHOWN FOR SHEETS

UNLESS OTHERWISE NOTED.

PENSTOCK AREA SHALL BE ASSUMED TO BE 1-1/4" RIGID STEEL CONDUIT

20' AFF IN THIS CONTRACT FOR THE PENSTOCK AREAS. NEW CONDUIT FOR THE

2. FOR SHEETS, EL131-EL137, ABANDON ALL ALL CONDUITS AND WIRING ABOVE

REFERENCE ED131-ED137 FOR REMOVAL INFORMATION.

LIGHT FIXTURES NO HIGHER THAN 12' AFF AS SHOWN ON THE DRAWINGS.

1. PROVIDE LIGHT FIXTURES AS SHOWN ON SHEETS EL131-EL137. MOUNT ALL

PENSTOCK AREA

(SHEETS EL131 - EL137)

SHEET SPECIFIC INSTALLATION NOTES

SURGE TANK BASE AREA

(SHEETS ED141 - ED146)

SHEET SPECIFIC DEMOLITION NOTES

SURGE TANK BASE AREA

(SHEETS EL141 - EL146)

SHEET SPECIFIC INSTALLATION NOTES

SURGE TANK MIDDLE LEVEL

(SHEETS ED151 - ED153)

SHEET SPECIFIC DEMOLITION NOTES

SURGE TANK MIDDLE LEVEL

(SHEETS EL151 - EL153)

SHEET SPECIFIC INSTALLATION NOTES

SPILLWAY BUILDING

(SHEET ED161)

SHEET SPECIFIC DEMOLITION NOTES

SPILLWAY BUILDING

(SHEETS EL161)

SHEET SPECIFIC INSTALLATION NOTES

SHEETS ED141-ED146 AND EL141-EL146.

OF REMOVE, SUPPLY, AND INSTALL NEW CONDUCTOR WIRE AS SHOWN ON

EL141-EL146. THE OPTION CONTRACT IS TO PROVIDE THE ADDITIONIAL SCOPE

LIGHT SWITCHES, AND RECEPTACLES AS SHOWN ON SHEETS ED141-ED146 AND

7. BASE CONTRACT IS TO REMOVE, SUPPLY, AND INSTALL LIGHT FIXTURES,

6. FLOOR ELEVATION 1710.0 FEET FOR THESE SHEETS

NEMA 4X RATED ENCLOSURE.

CONTRACT ON SHEETS. PROVIDE NEMA STYLE LIGHTING CONTACTORS IN A

5. PROVIDE CONTACTORS FOR THE CIRCUITS RENOVATED UNDER THIS

INFORMATION.

GFCI IN A NEMA 4X RATED ENCLOSURE. REFERENCE ED141-ED146 FOR REMOVAL

RECEPACLES AT REMOVED RECEPTACLE LOCATIONS. RECEPTACLES SHALL BE

4. PROVIDE RECEPTACLES AS SHOWN ON SHEETS EL141-EL146. MOUNT ALL

EL141-EL146. ASSUME #8 AWG CONDUCTORS UNLESS OTHERWISE NOTED.

AND RECEPTACLES AS SHOWN ON AN ADD NEEDED BASIS ONLY FOR SHEETS

3. IF OPTION IS AWARDED, PROVIDE NEW CONDUCTOR WIRE TO NEW LIGHTS

CONDUIT UNLESS OTHERWISE NOTED.

BASIS ONLY. NEW CONDUIT SHALL BE ASSUMED TO BE 3/4" RIGID STEEL

CONDUIT AS SHOWN. NEW CONDUIT SHALL BE PROVIDED ON AN AS NEEDED

2. IF OPTION IS AWARDED, FOR SHEETS, EL141-EL146, PROTECT IN PLACE ALL

DRAWINGS. REFERENCE ED141-ED146 FOR REMOVAL INFORMATION.

LIGHT FIXTURES IN REMOVED LIGHT FIXTURE LOCATIONS AS SHOWN ON THE

1. PROVIDE LIGHT FIXTURES AS SHOWN ON SHEETS EL141-EL146. MOUNT ALL

SHEETS ED141-ED146 AND EL141-EL146.

OF REMOVE, SUPPLY, AND INSTALL NEW CONDUCTOR WIRE AS SHOWN ON

EL141-EL146. THE OPTION CONTRACT IS TO PROVIDE THE ADDITIONIAL SCOPE

LIGHT SWITCHES, AND RECEPTACLES AS SHOWN ON SHEETS ED141-ED146 AND

7. BASE CONTRACT IS TO REMOVE, SUPPLY, AND INSTALL LIGHT FIXTURES,

6. FLOOR ELEVATION 1710.0 FEET FOR THESE SHEETS

UNDER THIS BASE CONTRACT.

5. RECORD AND REMOVE LIGHTING CONTACTORS FOR CIRCUITS RENOVATED

EL141-EL146.

RECEPTABLES IN PLACE OF THE REMOVED RECEPTACLE AS SHOWN ON SHEETS

4. REMOVE RECEPTACLES AS SHOWN ON SHEETS ED141-ED146. PROVIDE NEW

SHEETS ED141-ED146.

NEEDED BASIS ONLY TO LIGHTS AND RECEPTACLES REMOVED AS SHOWN FOR

3. IF OPTION IS AWARDED, REMOVE ALL EXISTING CONDUCTOR WIRE ON AN AS

ASSUME 3/4" RIGID STEEL CONDUIT UNLESS OTHERWISE NOTED.

PROVIDED AS SHOWN ON AN AS NEEDED BASIS ON SHEETS EL141-EL146.

ONLY IN THIS CONTRACT FOR SHEETS, ED141-ED146. NEW CONDUIT SHALL BE

2. IF OPTION IS AWARDED, REMOVE ALL CONDUITS ON AN AS NEEDED BASIS

1. REMOVE LIGHT FIXTURES FOR ALL LIGHTS SHOWN ON SHEETS ED141 - ED146

ED151-ED153 AND EL151-EL153.

SUPPLY, AND INSTALL NEW CONDUCTOR WIRE AS SHOWN ON SHEETS

OPTION CONTRACT IS TO PROVIDE THE ADDITIONIAL SCOPE OF REMOVE,

RECEPTACLES AS SHOWN ON SHEETS ED151-ED153 AND EL151-EL153. THE

6. BASE CONTRACT IS TO REMOVE, SUPPLY, AND INSTALL LIGHT FIXTURES AND

5. FLOOR ELEVATION 1735.0 FEET FOR THESE SHEETS

INFORMATION.

GFCI IN A NEMA 4X RATED ENCLOSURE. REFERENCE ED151-ED153 FOR REMOVAL

RECEPACLES AT REMOVED RECEPTACLE LOCATIONS. RECEPTACLES SHALL BE

4. PROVIDE RECEPTACLES AS SHOWN ON SHEETS EL151-EL153. MOUNT ALL

AWG CONDUCTORS UNLESS OTHERWISE NOTED.

SHOWN ON AN ADD NEEDED BASIS ONLY FOR SHEETS EL151-EL153. ASSUME #8

3. IF OPTION IS AWARDED, PROVIDE NEW CONDUCTOR WIRE TO NEW LIGHTS AS

CONDUIT UNLESS OTHERWISE NOTED.

BASIS ONLY. NEW CONDUIT SHALL BE ASSUMED TO BE 3/4" RIGID STEEL

CONDUIT AS SHOWN. NEW CONDUIT SHALL BE PROVIDED ON AN AS NEEDED

2. IF OPTION IS AWARDED, FOR SHEETS, EL151-EL153, PROTECT IN PLACE ALL

DRAWINGS. REFERENCE ED151-ED153 FOR REMOVAL INFORMATION.

LIGHT FIXTURES IN REMOVED LIGHT FIXTURE LOCATIONS AS SHOWN ON THE

1. PROVIDE LIGHT FIXTURES AS SHOWN ON SHEETS EL151-EL153. MOUNT ALL

ED151-ED153 AND EL151-EL153.

SUPPLY, AND INSTALL NEW CONDUCTOR WIRE AS SHOWN ON SHEETS

OPTION CONTRACT IS TO PROVIDE THE ADDITIONIAL SCOPE OF REMOVE,

RECEPTACLES AS SHOWN ON SHEETS ED151-ED153 AND EL151-EL153. THE

6. BASE CONTRACT IS TO REMOVE, SUPPLY, AND INSTALL LIGHT FIXTURES AND

5. FLOOR ELEVATION 1735.0 FEET FOR THESE SHEETS

EL151-EL153.

RECEPTABLES IN PLACE OF THE REMOVED RECEPTACLE AS SHOWN ON SHEETS

4. REMOVE RECEPTACLES AS SHOWN ON SHEETS ED151-ED153. PROVIDE NEW

REMOVED AS SHOWN FOR SHEETS ED151-ED153.

3. IF OPTION IS AWARDED, REMOVE ALL EXISTING CONDUCTOR WIRE TO LIGHTS

ASSUME 3/4" RIGID STEEL CONDUIT UNLESS OTHERWISE NOTED.

PROVIDED AS SHOWN ON AN AS NEEDED BASIS ON SHEETS ED151-ED153.

ONLY IN THIS CONTRACT FOR SHEETS, ED151-ED153. NEW CONDUIT SHALL BE

2. IF OPTION IS AWARDED, REMOVE ALL CONDUITS ON AN AS NEEDED BASIS

1. REMOVE LIGHT FIXTURES FOR ALL LIGHTS SHOWN ON SHEETS ED151 - ED153

SHOWN ON SHEET ED161 & EL161.

AND RECEPTACLES AS SHOWN FOR POWERHOUSE ELECTRICIAN TO INSTALL AS

5. BASE CONTRACT IS TO SUPPLY ONLY LIGHT FIXTURES, CONDUCTOR WIRE,

REFERENCE ED161 FOR REMOVAL INFORMATION.

LOCATIONS. RECEPTACLES SHALL BE GFCI IN A NEMA 4X RATED ENCLOSURE.

ELECTRICIAN SHALL MOUNT ALL RECEPACLES AT REMOVED RECEPTACLE

4. PROVIDE RECEPTACLES AS SHOWN ON SHEETS EL161. POWERHOUSE

SHEETS EL161. ASSUME #12 AWG CONDUCTORS UNLESS OTHERWISE NOTED.

NEEDED BASIS ONLY TO BE INSTALLED BY POWERHOUSE ELECTRICIAN FOR

3. PROVIDE NEW CONDUCTOR WIRE TO NEW LIGHTS AS SHOWN ON AN ADD

ASSUMED TO BE 3/4" RIGID STEEL CONDUIT UNLESS OTHERWISE NOTED.

TO BE INSTALLED BY THE POWERHOUSE ELECTRICIAN. NEW CONDUIT SHALL BE

CONDUIT SHALL BE PROVIDED AND INSTALLED ON AN AS NEEDED BASIS ONLY

2. FOR SHEET EL161, PROTECT IN PLACE ALL CONDUIT AS SHOWN. NEW

INFORMATION.

LOCATIONS AS SHOWN ON THE DRAWINGS. REFERENCE ED161 FOR REMOVAL

ELECTRICIAN SHALL MOUNT ALL LIGHT FIXTURES IN REMOVED LIGHT FIXTURE

1. PROVIDE LIGHT FIXTURES AS SHOWN ON SHEETS EL161. POWERHOUSE

SHOWN ON SHEET ED161.

AND RECEPTACLES AS SHOWN FOR POWERHOUSE ELECTIRCIAN TO REMOVE AS

5. BASE CONTRACT IS TO ONLY SUPPLY LIGHT FIXTURES, CONDUCTOR WIRE,

BE REMOVED BY POWERHOUSE ELECTRICIAN AS SHOWN ON SHEET EL161.

4. PROVIDE NEW RECEPTABLES IN PLACE OF THE EXISTING RECEPTACLES TO

NOTED.

SHEET ED161. FOR NEW CONDUCTOR ASSUME #12 AWG UNLESS OTHERWISE

3. PROTECT IN PLACE ALL EXISTING CONDUCTOR WIRE TO LIGHTS SHOWN ON

ASSUME 3/4" RIGID STEEL CONDUIT UNLESS OTHERWISE NOTED.

AS NEEDED BASIS IN THIS CONTRACT FOR SHEET ED161. FOR NEW CONDUIT

2. PROTECT IN PLACE ALL CONDUITS. PROVIDE REPLACEMENT CONDUIT ON AN

1. REMOVE LIGHT FIXTURES FOR ALL LIGHTS SHOWN ON SHEET ED161

/0

/2

A M

G

E N

E R

A L R

E V

IS

IO

N

S L

O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps

/0

/2

E-102

E

C T

R

IC

A L N

O T

E S S

H E

F -1

-B -0

M C

P O

W E

R L

IG

H T

IN

G U

P G

R A

D

M C

O M

A H

A D

IS

T R

IC

T G

A R

R

IS

O N D

A M

A H

A

N E

B R

A S

E -1

.d g n

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

/0

/2

A N

S

LIGHT FIXTURES, RECEPTACLES, AND LIGHT CONTACTORS.

LIGHT CONTACTORS. OPTION CONTRACT IS TO REMOVE, SUPPLY, AND INSTALL

7. BASE CONTRACT IS TO ONLY SUPPLY LIGHT FIXTURES, RECEPTACLES, AND

6. REFERENCE ONE LINE FOR SPILLWAY ON SHEET EL551.

UNDER THIS BASE CONTRACT.

5. RECORD AND REMOVE LIGHTING CONTACTORS FOR CIRCUITS RENOVATED

RECEPTACLE.

CATWALK AND PROVIDE NEW RECEPTABLES IN PLACE OF THE REMOVED

4. IF OPTION AWARDED, REMOVE ANY RECEPTACLES ALONG THE SPILLWAY

AWG UNLESS OTHERWISE NOTED.

ONLY IN THIS CONTRACT FOR SHEET ED162. FOR NEW CONDUCTOR ASSUME #12

LIGHTS. ONLY REMOVE AND REPLACE CONDUCTORS ON AN AS NEEDED BASIS

3. IF OPTION AWARDED, PROTECT IN PLACE ALL EXISTING CONDUCTOR WIRE TO

OTHERWISE NOTED.

ED162. FOR NEW CONDUIT ASSUME 3/4" RIGID STEEL CONDUIT UNLESS

AND REPLACE CONDUIT ON AN AS NEEDED BASIS IN THIS CONTRACT FOR SHEET

2. IF OPTION AWARDED, PROTECT IN PLACE ALL CONDUITS AND ONLY REMOVE

THE WEST STAIRCASE CONTROLLED SEPARATE LIGHT SWITCH.

CONTACTORS, TOTAL OF 57 MACHINERY LIGHTS, AND 6 WALKWAY LIGHTS TO

TWO SWITCHES AT EACH END OF THE SPILLWAY CATWALK WITH 3 LIGHTING

REPRESENTED ON SHEET ED162: A TOTAL OF 92 CATWALK LIGHT FIXTURES WITH

1. IF OPTION AWARDED, THE FOLLOWING SHALL BE REMOVED WHICH IS

SPILLWAY CATWALK

(SHEET ED162)

SHEET SPECIFIC DEMOLITION NOTES

LIGHT FIXTURES, RECEPTACLES, AND LIGHT CONTACTORS.

LIGHT CONTACTORS. OPTION CONTRACT IS TO REMOVE, SUPPLY, AND INSTALL

7. BASE CONTRACT IS TO ONLY SUPPLY LIGHT FIXTURES, RECEPTACLES, AND

6. REFERENCE ONE LINE FOR SPILLWAY ON SHEET EL551.

STYLE, NEMA 4X RATED ENCLOSURE.

OPTION AWARDED, PROVIDE AND INSTALL LIGHTING CONTACTORS, NEMA

BE NEMA STYLE LIGHTING CONTACTORS IN A NEMA 4X RATED ENCLOSURE. IF

CONTRACT ON SHEETS TO BASE ELECTRICIAN. LIGHTING CONTACTORS SHALL

5. PROVIDE CONTACTORS FOR THE CIRCUITS RENOVATED UNDER THIS

REMOVAL INFORMATION.

SHALL BE GFCI IN A NEMA 4X RATED ENCLOSURE. REFERENCE ED162 FOR

MOUNT ALL RECEPACLES AT REMOVED RECEPTACLE LOCATIONS. RECEPTACLES

4. IF OPTION AWARDED, PROVIDE RECEPTACLES FOR THE SPILLWAY CATWALK.

AWG UNLESS OTHERWISE NOTED.

ONLY IN THIS CONTRACT FOR SHEET EL162. FOR NEW CONDUCTOR ASSUME #12

LIGHTS. ONLY REMOVE AND REPLACE CONDUCTORS ON AN AS NEEDED BASIS

3. IF OPTION AWARDED, PROTECT IN PLACE ALL EXISTING CONDUCTOR WIRE TO

OTHERWISE NOTED.

EL162. FOR NEW CONDUIT ASSUME 3/4" RIGID STEEL CONDUIT UNLESS

AND REPLACE CONDUIT ON AN AS NEEDED BASIS IN THIS CONTRACT FOR SHEET

2. IF OPTION AWARDED, PROTECT IN PLACE ALL CONDUITS AND ONLY REMOVE

THE WEST STAIRCASE CONTROLLED SEPARATE LIGHT SWITCH.

CONTACTORS, TOTAL OF 57 MACHINERY LIGHTS, AND 6 WALKWAY LIGHTS TO

TWO SWITCHES AT EACH END OF THE SPILLWAY CATWALK WITH 3 LIGHTING

REPRESENTED ON SHEET EL162: A TOTAL OF 92 CATWALK LIGHT FIXTURES WITH

1. IF OPTION AWARDED, THE FOLLOWING SHALL BE PROVIDED WHICH IS

SPILLWAY CATWALK

(SHEETS EL162)

SHEET SPECIFIC INSTALLATION NOTES

INTAKE STRUCTURE LOWER LEVEL

(SHEETS ED171 - ED174)

SHEET SPECIFIC DEMOLITION NOTES

INTAKE STRUCTURE LOWER LEVEL

(SHEETS EL171 - EL174)

SHEET SPECIFIC INSTALLATION NOTES

INTAKE STRUCTURE UPPER LEVEL

(SHEETS ED181 - ED183)

SHEET SPECIFIC DEMOLITION NOTES

INTAKE STRUCTURE UPPER LEVEL

(SHEETS EL181 - EL183)

SHEET SPECIFIC INSTALLATION NOTES

PENSTOCK TUNNEL

(SHEETS ED191-ED192)

SHEET SPECIFIC DEMOLITION NOTES

PENSTOCK TUNNELS

(SHEETS EL191-EL192)

SHEET SPECIFIC INSTALLATION NOTES

SHOWN ON SHEETS ED171-ED174 AND EL171-EL174.

INSTALL LIGHT FIXTURES, CONDUCTOR WIRE, CONDUIT, AND RECEPTACLES AS

CONTRACT IS TO PROVIDE THE ADDITIONIAL SCOPE OF REMOVE, SUPPLY, AND

EL171-EL174 FOR POWERHOUSE ELECTRICIAN TO INSTALL. THE OPTION

CONDUIT, AND RECEPTACLES AS SHOWN ON SHEETS ED171-ED174 AND

6. BASE CONTRACT IS TO ONLY SUPPLY LIGHT FIXTURES, CONDUCTOR WIRE,

5. FLOOR ELEVATION 1865.0 FEET FOR THESE SHEETS

ENCLOSURE. REFERENCE ED171-ED174 FOR REMOVAL INFORMATION.

RECEPTACLE LOCATIONS. RECEPTACLES SHALL BE GFCI IN A NEMA 4X RATED

SHOWN ON SHEETS EL171-EL174. MOUNT ALL RECEPACLES AT REMOVED

NEMA 4X RATED ENCLOSURE. IF OPTION AWARDED, PROVIDE RECEPTACLES AS

POWERHOUSE ELECTRICIAN TO INSTALL. RECEPTACLES SHALL BE GFCI IN A

4. PROVIDE RECEPTACLES AS SHOWN ON SHEETS EL171-EL174 FOR

OTHERWISE NOTED.

BASIS ONLY FOR SHEETS EL171-EL174. ASSUME #6 AWG CONDUCTORS UNLESS

INSTALL NEW CONDUCTOR WIRE TO NEW LIGHTS AS SHOWN ON AN ADD NEEDED

POWERHOUSE ELECTRICIAN TO INSTALL. IF OPTION AWARDED, PROVIDE AND

3. PROVIDE CONDUCTOR WIRE AS SHOWN ON SHEETS EL171-174 FOR

UNLESS OTHERWISE NOTED.

BASIS ONLY. NEW CONDUIT SHALL BE ASSUMED TO BE 1" RIGID STEEL CONDUIT

CONDUIT AS SHOWN. NEW CONDUIT SHALL BE PROVIDED ON AN AS NEEDED

2. IF OPTION AWARDED, FOR SHEETS, EL171-EL174, PROTECT IN PLACE ALL

DRAWINGS. REFERENCE ED171-ED174 FOR REMOVAL INFORMATION.

FIXTURES IN REMOVED LIGHT FIXTURE LOCATIONS AS SHOWN ON THE

INSTALL LIGHT FIXTURES AS SHOWN ON SHEETS EL171-EL174. MOUNT ALL LIGHT

POWERHOUSE ELECTRICIAN TO INSTALL. IF OPTION AWARDED, PROVIDE AND

1. PROVIDE LIGHT FIXTURES AS SHOWN ON SHEETS EL171-174 FOR

ONLY.

ED171-ED174 SHALL BE REMOVED AND REPLACED ON AN AS NEEDED BASIS

ED171-ED174. EXISTING CONDUIT OUTSIDE OF THE HATCHED AREAS ON SHEETS

CONDUIT BETWEEN LIGHTS ONLY IN THE HATCHED AREAS SHOWN ON SHEETS

ED171-ED174 AND EL171-EL174. OPTION CONTRACT SHALL COMPLETELY REMOVE

FIXTURES, CONDUCTOR WIRE, AND RECEPTACLES AS SHOWN ON SHEETS

PROVIDE THE ADDITIONIAL SCOPE OF REMOVE, SUPPLY, AND INSTALL LIGHT

POWERHOUSE ELECTRICIAN TO REMOVE. THE OPTION CONTRACT IS TO

AND RECEPTACLES AS SHOWN ON SHEETS ED171-ED174 AND EL171-EL174 FOR

6. BASE CONTRACT IS TO ONLY SUPPLY LIGHT FIXTURES, CONDUCTOR WIRE,

5. FLOOR ELEVATION 1865.0 FEET FOR THESE SHEETS.

RECEPTACLE AS SHOWN ON SHEETS EL171-EL174.

ED171-ED174. PROVIDE NEW RECEPTABLES IN PLACE OF THE REMOVED

4. IF OPTION AWARDED, REMOVE RECEPTACLES AS SHOWN ON SHEETS

CONTRACT FOR SHEET ED162.

REMOVE AND REPLACE CONUCTOR WIRE ON AN AS NEEDED BASIS IN THIS

IN PLACE ALL OTHER CONDUCTOR WIRE TO LIGHTS REMOVED AND ONLY

REMOVED AS SHOWN IN THE HATCH AREAS FOR SHEETS ED171-ED174. PROTECT

3. IF OPTION AWARDED, REMOVE ALL EXISTING CONDUCTOR WIRE TO LIGHTS

UNLESS OTHERWISE NOTED.

SHEETS ED171-ED174. FOR NEW CONDUIT ASSUME 3/4" RIGID STEEL CONDUIT

AND REPLACE CONDUIT ON AN AS NEEDED BASIS IN THIS CONTRACT FOR

2. IF OPTION AWARDED, PROTECT IN PLACE ALL CONDUITS AND ONLY REMOVE

SHEETS ED171 - ED174

1. IF OPTION AWARDED, REMOVE LIGHT FIXTURES FOR ALL LIGHTS SHOWN ON

SHEETS ED191-ED192 AND EL191-EL192

CONDUITS, CONDUCTOR WIRES, RECEPTACLES, AND SWITCHES AS SHOWN ON

4. BASE CONTRACT IS TO REMOVE, SUPPLY, AND INSTALL LIGHT FIXTURES,

ACROSS THE PENSTOCK TUNNEL.

THREE POLE CIRCUIT BREAKER. THE CIRCUITS ARE INTERLEAVED UNIFORMLY

3. NOTE THAT THREE CIRCUITS SHARE A NEURTAL AND ARE PROTECTED BY A

ILLUSTRATED ON THESE SHEETS.

TUNNELS. NOTE THAT A SHORTENED VERSION OF THE LIGHTING CIRCUITS ARE

2. SHEETS EL191 & EL192 ARE REPRESENTATIVE OF FIVE SIMILAR PENSTOCK

OTHERWISE NOTED.

ASSUME 1-1/4" RIGID STEEL CONDUIT AND #6AWG CONDUCTORS UNLESS

AND SWITCHES FOR ALL LIGHTING CIRCUITS SHOWN ON SHEETS EL191-EL192.

1. PROVIDE LIGHT FIXTURES, CONDUITS, CONDUCTOR WIRES, RECEPTACLES,

SHEETS ED191-ED192 AND EL191-EL192.

CONDUITS, CONDUCTOR WIRES, RECEPTACLES AND SWITCHES AS SHOWN ON

3. BASE CONTRACT IS TO REMOVE, SUPPLY, AND INSTALL LIGHT FIXTURES,

ILLUSTRATED ON THESE SHEETS.

TUNNELS. NOTE THAT A SHORTENED VERSION OF THE LIGHTING CIRCUITS ARE

2. SHEETS ED191 & ED192 ARE REPRESENTATIVE OF FIVE SIMILAR PENSTOCK

OTHERWISE NOTED.

ASSUME 1-1/4" RIGID STEEL CONDUIT AND #6AWG CONDUCTORS UNLESS

AND SWITCHES FOR ALL LIGHTING CIRCUITS SHOWN ON SHEETS ED191-ED192.

1. REMOVE LIGHT FIXTURES, CONDUITS, CONDUCTOR WIRES, RECEPTACLES,

SURGE TANK EXTERIOR

(SHEETS ED200-ED206)

SHEET SPECIFIC DEMOLITION NOTES

SURGE TANK EXTERIOR

(SHEETS EL200-EL206)

SHEET SPECIFIC INSTALLATION NOTES

ED201-ED206 AND EL201-EL206.

INSTALL LIGHT FIXTURES AND RECEPTACLES AS SHOWN ON SHEETS

CONTRACT IS TO PROVIDE THE ADDITIONIAL SCOPE OF REMOVE, SUPPLY, AND

ED201-ED206 FOR POWERHOUSE ELECTRICIAN TO INSTALL. THE OPTION

5. BASE CONTRACT IS TO ONLY SUPPLY LIGHT FIXTURES AS SHOWN ON SHEETS

RECEPTACLE AS SHOWN ON SHEETS EL201-EL206.

ED200-ED206. PROVIDE NEW RECEPTABLES IN PLACE OF THE REMOVED

4. IF OPTION IS AWARDED, REMOVE RECEPTACLES AS SHOWN ON SHEETS

CONDUCTOR ASSUME #6 AWG UNLESS OTHERWISE NOTED.

BASIS ONLY IN THIS CONTRACT FOR SHEETS ED201-ED206. FOR NEW

TO LIGHTS. ONLY REMOVE AND REPLACE CONDUCTORS ON AN AS NEEDED

3. IF OPTION IS AWARDED, PROTECT IN PLACE ALL EXISTING CONDUCTOR WIRE

UNLESS OTHERWISE NOTED.

SHEETS ED201-ED206. FOR NEW CONDUIT ASSUME 1-1/4" RIGID STEEL CONDUIT

AND REPLACE CONDUIT ON AN AS NEEDED BASIS IN THIS CONTRACT FOR

2. IF OPTION IS AWARDED, PROTECT IN PLACE ALL CONDUITS AND ONLY REMOVE

SHOWN ON SHEETS ED201-ED206

1. IF OPTION IS AWARDED, REMOVE ONLY LIGHT FIXTURES FOR ALL LIGHTS

ED201-ED206 AND EL201-EL206.

INSTALL LIGHT FIXTURES AND RECEPTACLES AS SHOWN ON SHEETS

CONTRACT IS TO PROVIDE THE ADDITIONIAL SCOPE OF REMOVE, SUPPLY, AND

EL201-EL206 FOR POWERHOUSE ELECTRICIAN TO INSTALL. THE OPTION

5. BASE CONTRACT IS TO ONLY SUPPLY LIGHT FIXTURES AS SHOWN ON SHEETS

INFORMATION.

GFCI IN A NEMA 4X RATED ENCLOSURE. REFERENCE ED201-ED206 FOR REMOVAL

RECEPACLES AT REMOVED RECEPTACLE LOCATIONS. RECEPTACLES SHALL BE

INSTALL RECEPTACLES AS SHOWN ON SHEETS EL201-EL206. MOUNT ALL

POWERHOUSE ELECTRICIAN TO INSTALL. IF OPTION IS AWARDED, PROVIDE AND

4. PROVIDE RECEPTACLES AS SHOWN ON SHEETS EL201-EL206 FOR

EL201-EL206. ASSUME #6 AWG CONDUCTORS UNLESS OTHERWISE NOTED.

WIRE TO NEW LIGHTS AS SHOWN ON AN ADD NEEDED BASIS ONLY FOR SHEETS

TO INSTALL. IF OPTION IS AWARDED, PROVIDE AND INSTALL NEW CONDUCTOR

NEEDED BASIS ONLY FOR SHEETS EL201-EL206 FOR POWERHOUSE ELECTRICIAN

3. PROVIDE NEW CONDUCTOR WIRE TO NEW LIGHTS AS SHOWN ON AN ADD

CONDUIT UNLESS OTHERWISE NOTED.

BASIS ONLY. NEW CONDUIT SHALL BE ASSUMED TO BE 1-1/4" RIGID STEEL

CONDUIT AS SHOWN. NEW CONDUIT SHALL BE PROVIDED ON AN AS NEEDED

2. IF OPTION IS AWARDED, FOR SHEETS EL201-EL206, PROTECT IN PLACE ALL

DRAWINGS. REFERENCE ED201-ED206 FOR REMOVAL INFORMATION.

FIXTURES IN REMOVED LIGHT FIXTURE LOCATIONS AS SHOWN ON THE

INSTALL LIGHT FIXTURES AS SHOWN ON SHEETS EL201-EL206. MOUNT ALL LIGHT

POWERHOUSE ELECTRICIAN TO INSTALL. IF OPTION IS AWARDED, PROVIDE AND

1. PROVIDE LIGHT FIXTURES AS SHOWN ON SHEETS EL201-EL206 FOR

RECEPTACLES AS SHOWN ON SHEETS ED181-ED183 AND EL181-EL183.

INSTALL LIGHT FIXTURES, CONDUCTOR WIRE (AS NEEDED BASIS), AND

CONTRACT IS TO PROVIDE THE ADDITIONAL SCOPE OF REMOVE, SUPPLY, AND

EL181-EL183 FOR POWERHOUSE ELECTRICIAN TO INSTALL. THE OPTION

NEEDED BASIS), AND RECEPTACLES AS SHOWN ON SHEETS ED181-ED183 AND

6. BASE CONTRACT IS TO ONLY SUPPLY LIGHT FIXTURES, CONDUCTOR WIRE (AS

5. FLOOR ELEVATION 1865.0 FEET FOR THESE SHEETS

INFORMATION.

GFCI IN A NEMA 4X RATED ENCLOSURE. REFERENCE ED181-ED183 FOR REMOVAL

RECEPACLES AT REMOVED RECEPTACLE LOCATIONS. RECEPTACLES SHALL BE

INSTALL RECEPTACLES AS SHOWN ON SHEETS EL181-EL183. MOUNT ALL

POWERHOUSE ELECTRICIAN TO INSTALL. IF OPTION IS AWARDED, PROVIDE AND

4. PROVIDE RECEPTACLES AS SHOWN ON SHEETS EL181-EL183 FOR

EL181-EL183. ASSUME #6 AWG CONDUCTORS UNLESS OTHERWISE NOTED.

NEW LIGHTS AS SHOWN ON AN ADD NEEDED BASIS ONLY FOR SHEETS

3. IF OPTION IS AWARDED, PROVIDE AND INSTALL NEW CONDUCTOR WIRE TO

UNLESS OTHERWISE NOTED.

BASIS ONLY. NEW CONDUIT SHALL BE ASSUMED TO BE 1" RIGID STEEL CONDUIT

CONDUIT AS SHOWN. NEW CONDUIT SHALL BE PROVIDED ON AN AS NEEDED

2. IF OPTION IS AWARDED, FOR SHEETS, EL181-EL183, PROTECT IN PLACE ALL

DRAWINGS. REFERENCE ED181-ED183 FOR REMOVAL INFORMATION.

FIXTURES IN REMOVED LIGHT FIXTURE LOCATIONS AS SHOWN ON THE

INSTALL LIGHT FIXTURES AS SHOWN ON SHEETS EL181-EL183. MOUNT ALL LIGHT

POWERHOUSE ELECTRICIAN TO INSTALL. IF OPTION IS AWARDED, PROVIDE AND

1. PROVIDE LIGHT FIXTURES AS SHOWN ON SHEETS EL181-EL183 FOR

ED181-ED183 AND EL181-EL183.

FIXTURES, CONDUCTOR WIRE, AND RECEPTACLES AS SHOWN ON SHEETS

PROVIDE THE ADDITIONIAL SCOPE OF REMOVE, SUPPLY, AND INSTALL LIGHT

POWERHOUSE ELECTRICIAN TO REMOVE. THE OPTION CONTRACT IS TO

AND RECEPTACLES AS SHOWN ON SHEETS ED181-ED183 AND EL181-EL183 FOR

6. BASE CONTRACT IS TO ONLY SUPPLY LIGHT FIXTURES, CONDUCTOR WIRE,

5. FLOOR ELEVATION 1865 FEET FOR THESE SHEETS.

RECEPTACLE AS SHOWN ON SHEETS EL181-EL183.

ED181-ED183. PROVIDE NEW RECEPTABLES IN PLACE OF THE REMOVED

4. IF OPTION IS AWARDED, REMOVE RECEPTACLES AS SHOWN ON SHEETS

ED181-ED183.

CONDUCTOR WIRE ON AN AS NEEDED BASIS IN THIS CONTRACT FOR SHEET

LIGHTS AND RECEPTACLES REMOVED AND ONLY REMOVE AND REPLACE

3. IF OPTION IS AWARDED, PROTECT IN PLACE ALL OTHER CONDUCTOR WIRE TO

UNLESS OTHERWISE NOTED.

SHEETS ED181-ED183. FOR NEW CONDUIT ASSUME 3/4" RIGID STEEL CONDUIT

AND REPLACE CONDUIT ON AN AS NEEDED BASIS IN THIS CONTRACT FOR

2. IF OPTION IS AWARDED, PROTECT IN PLACE ALL CONDUITS AND ONLY REMOVE

SHEETS ED181 - ED183

1. IF OPTION IS AWARDED, REMOVE LIGHT FIXTURES FOR ALL LIGHTS SHOWN ON

/0

/2

A M

G

E N

E R

A L R

E V

IS

IO

N S

L O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

35L-3

11'-1.8"

.5

33'-5"

.4

.8

.3

.3

.3

.2

.1

.7

.4

35L-7 35L-3

34L-2

S

S

34L35L

35L-7

35L-3

34L-2

S S

S

SS

S

S

S S

35L-7 35L-3

34L-2

33L-7 33L-3

32L-12 32L-11 31L-7 31L-332L-10

32L-132L-8

32L-9

S S S S S S S S

S

SSS S S

SSS

S

SSS S

S

S S

33L 32L 31L

34L35L

35L-7

35L-3

34L-2

S S

S

S

S SSS

S

S

SSS

S

S S S141

/0

/2

ED141

E

C T

R

IC

A L D

E M

O L

IT

IO

N P

L

F -1

-B -0

S U

R G

E T

A N

K B

A S

E A

R E

M C

P O

W E

R L

IG

H T

IN

G U

P G

R A

D

M C

O M

A H

A D

IS

T R

IC

T G

A R

R

IS

O N D

A M

A H

A

N E

B R

A S

E

D .d g n

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

/0

/2

A N

S

T C

H L

IN

E S

H E

E T E

D

MATCHLINE SHEET ED144

4. FOR SURGE TANK AREA LIGHTING PANEL SCHEDULES REFERENCE AS-BUILT SHEET EL555.

3. FOR SURGE TANK AREA LIGHTING SECTIONS AND DETAILS REFERENCE AS-BUILT SHEET EL554

2. SEE SHEET E-101 FOR SHEET SPECIFIC ELECTRICAL DEMOLITION NOTES.

1. SEE SHEET E-100 FOR GENERAL ELECTRICAL DEMOLITION NOTES.

GENERAL NOTE:

SCALE 1" = 1000'

KEY PLAN

0 4' 8' 12'

3/16" = 1'-0"

1 SEE MIRRORRED SECTION VIEW C-C LOCATED ON SHEET EL554

KEYED NOTES:

A

M G

E N

E R

A L R

E V

IS

IO

N S

/0

/1

S

L O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

11'-4.9"12'-0.6" 12'-1.1"

.4

15'-7.8"

.8

.7

.8

6'-7.9"

16'-11.3"

.1

.8

.8

.3

.4

" 1

.5

.1

6'-8.6"

6'-4.3"

.6

33L-7 33L-3

32L-12 32L-11 32L-10

32L-8

32L-9

SS S

SS

S

SSS

33L 32L

SSS

S

35L-7 35L-3

34L-2

33L-7 33L-3

32L-12 32L-11 31L-7 31L-332L-10

32L-132L-8

32L-9

S S S S S S S S

S

SSS S S

SSS

S

SSS S

S

S S

33L 32L 31L

34L35L

35L-7

35L-3

34L-2

S S

S

S

S SSS

S

S

SSS

S

S S S141

/0

/2

ED142

E

C T

R

IC

A L D

E M

O L

IT

IO

N P

L

F -1

-B -0

S U

R G

E T

A N

K B

A S

E A

R E

B

M C

P O

W E

R L

IG

H T

IN

G U

P G

R A

D

M C

O M

A H

A D

IS

T R

IC

T G

A R

R

IS

O N D

A M

A H

A

N E

B R

A S

E

D .d g n

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

/0

/2

A N

S

T C

H L

IN

E S

H E

E T E

D

MATCHLINE SHEET ED145

M A

T C

H L

IN

E S

H E

E T E

D

4. FOR SURGE TANK AREA LIGHTING PANEL SCHEDULES REFERENCE AS-BUILT SHEET EL555.

3. FOR SURGE TANK AREA LIGHTING SECTIONS AND DETAILS REFERENCE AS-BUILT SHEET EL554

2. SEE SHEET E-101 FOR SHEET SPECIFIC ELECTRICAL DEMOLITION NOTES.

1. SEE SHEET E-100 FOR GENERAL ELECTRICAL DEMOLITION NOTES.

GENERAL NOTE:

SCALE 1" = 1000'

KEY PLAN

0 4' 8' 12'

3/16" = 1'-0"

SEE EL554 SECTION C-C

SECTION C-C

SEE EL554

1 SECTION VIEW LOCATED ON SHEET EL554

KEYED NOTES:

A

M

G

E N

E R

A L R

E V

IS

IO

N /0

/2

S L

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

6'-5.1"

16'-9.2"

.6 " 1

.9

13'-11.9" 14'-2" 6'-5.1" 16'-2" 16'-7.6" 6'-8.4" 13'-11.7" 14'-2.2"

3'-2.5"

16'-3.1" 6'-6.6" 14'-1.8"

SS

SS151152 153

/0

/2

ED152

E

C T

R

IC

A L D

E M

O L

IT

IO

N P

L

F -1

-B -0

S U

R G

E T

A N

K M

ID

D

L E L

E V

E L A

R E

M C

P O

W E

R L

IG

H T

IN

G U

P G

R A

D

M C

O M

A H

A D

IS

T R

IC

T G

A R

R

IS

O N D

A M

A H

A

N E

B R

A S

E

D .d g n

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

/0

/2

A N

S

T C

H L

IN

E S

H E

E T E

D

SCALE 1" = 1000'

KEY PLAN

4. FOR SURGE TANK LIGHTING PANEL SCHEDULES REFERENCE AS-BUILT SHEET EL555.

3. FOR SURGE TANK SECTIONS AND DETAILS REFERENCE AS-BUILT SHEET EL554.

2. SEE SHEET E-101 FOR SHEET SPECIFIC ELECTRICAL DEMOLITION NOTES.

1. SEE SHEET E-100 FOR GENERAL ELECTRICAL DEMOLITION NOTES.

GENERAL NOTE:

M A

T C

H L

IN

E S

H E

E T E

D

0 4' 8' 12'

3/16" = 1'-0"

1 SECTION VIEW LOCATED ON SHEET EL554

KEYED NOTES:

A

M

G

E N

E R

A L R

E V

IS

IO

N /0

/2

S L

O

UP

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

9'-7.4"

.8

.2

.3

.9

4'-10.3"

.4

.2

.3

4'-9"

4'-9.8"

.8

.4

.9

.2

.4

.5

.7

.8

.5

.2

9'-7.9"

1L-1

1L-3

1L-4

1L-61L-7 3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

S

S S

S S

S

S

1L

UP TO 1L-2

UP TO 1L-2

DOWN TO 1L-2

1L-5

1L-5

1L-5

1L-5

1L-2

S S

S

1L-1

1L-3

1L-4

1L-61L-7 3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

S

S S

S S

S

S

1L

UP TO 1L-2

UP TO 1L-2

DOWN TO 1L-2

1L-5

1L-5

1L-5

1L-5

1L-2

S

S161

/0

/2

ED161

E

C T

R

IC

A L D

E M

O L

IT

IO

N P

L

F -1

-B -0

S P

IL

L W

A Y A

R

M C

P O

W E

R L

IG

H T

IN

G U

P G

R A

D

M C

O M

A H

A D

IS

T R

IC

T G

A R

R

IS

O N D

A M

A H

A

N E

B R

A S

E

D .d g n

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

/2

/2

A N

S

2. SEE SHEET E-101 FOR ELECTRICAL DEMOLITION SPECIFCI SHEET NOTES.

1. SEE SHEET E-100 FOR ELECTRICAL DEMOLITION NOTES.

GENERAL NOTE:

SCALE 1" = 1000'

KEY PLAN

PLAN ELEV. 1842.0 PLAN ELEV. 1825.0

0 4' 8' 12'

3/16" = 1'-0"

A

M

G

E N

E R

A L R

E V

IS

IO

N /0

/2

S L

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

17'-0.9" 16'-0"

17'-0.9" 16'-0"

17'-0.9" 16'-0"

17'-0.9" 16'-0"

3'-9.9"

.7

16'-0" 16'-0" 16'-0" 16'-0" 16'-0"

16'-0" 16'-0" 16'-0" 16'-0" 16'-0"

16'-0" 16'-0" 16'-0" 16'-0" 16'-0"

16'-0" 16'-0" 16'-0" 16'-0" 16'-0"

SECTION 1

SECTION 2

SECTION 3

SECTION 4

S E

C T

IO

N

M A

T C

H L

IN

C T

IO

N

M A

T C

H L

C T

IO

N

M A

T C

H L

C T

IO

N

M A

T C

H L

C T

IO

N

M A

T C

H L

C T

IO

N

M A

T C

H L

14 FIXTURES SPACED AT 16'

LIGHTING PANEL 2L

SPILLWAY CATWALK

S

14 FIXTURES SPACED AT 16'

S

S

14 FIXTURES SPACED AT 16'

LIGHTING PANEL 3L

SPILLWAY CATWALK

S

14 FIXTURES SPACED AT 16'

LIGHTING PANEL 4L

SPILLWAY CATWALK

1L

14 FIXTURES SPACED AT 16'

LIGHTING PANEL 2L

SPILLWAY CATWALK

S

14 FIXTURES SPACED AT 16'

S

S

14 FIXTURES SPACED AT 16'

LIGHTING PANEL 3L

SPILLWAY CATWALK

S

14 FIXTURES SPACED AT 16'

LIGHTING PANEL 4L

SPILLWAY CATWALK

1L

/0

/2

ED162

E

C T

R

IC

A L D

E M

O L

IT

IO

N P

L

F -1

-B -0

S P

IL

L W

A Y C

A T

W A

M C

P O

W E

R L

IG

H T

IN

G U

P G

R A

D

M C

O M

A H

A D

IS

T R

IC

T G

A R

R

IS

O N D

A M

A H

A

N E

B R

A S

E

D .d g n

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

/0

/2

A N

S

5. LIGHTING PANEL 1L IS SHOWN ON SHEET ED161 AND EL161.

RECEPTACLE TO BE REMOVED NOT SHOWN. ASSUME ONE AT EVERY GATE CONTROLLER. SEE SHEET ED161 FOR REMOVAL.

4. ON THIS SHEET ASSUME A TOTAL OF NEW 15 RECEPTACLES TO BE INSTALLED IN THE PLACE OF THE EXISTING

3. FOR SPILLWAY CATWALK ONE LINE DIAGRAM REFERENCE AS-BUILT SHEET EL551.

2. SEE SHEET E-102 FOR SHEET SPECIFIC ELECTRICAL DEMOLITION NOTES.

1. SEE SHEET E-100 FOR GENERAL ELECTRICAL DEMOLITION NOTES.

GENERAL NOTE:

SCALE 1" = 1000'

KEY PLAN

0 4' 8' 12'

3/16" = 1'-0"

G

E N

E R

A L R

E V

IS

IO

N /0

/2

S L

O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

201202

/0

/2

ED201

E

C T

R

IC

A L D

E M

O L

IT

IO

N P

L

F -1

-B -0

S U

R G

E T

A N

K E

X T

E R

IO

R A

R E

M C

P O

W E

R L

IG

H T

IN

G U

P G

R A

D

M C

O M

A H

A D

IS

T R

IC

T G

A R

R

IS

O N D

A M

A H

A

N E

B R

A S

E

D .d g n

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

/0

/2

A N

S

T C

H L

IN

E S

H E

E T E

D

MATCHLINE SHEET ED204

3. NO LIGHTING DEMOLITION OR NEW WORK IS ON THIS SHEET.

2. SEE SHEET E-102 FOR SHEET SPECIFIC ELECTRICAL DEMOLITION NOTES.

1. SEE SHEET E-100 FOR GENERAL ELECTRICAL DEMOLITION NOTES.

GENERAL NOTE:

SCALE 1" = 1000'

KEY PLAN

0 4' 8' 12'

3/16" = 1'-0"

A

M

G

E N

E R

A L R

E V

IS

IO

N /0

/2

S L

O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

201202

/0

/2

ED204

E

C T

R

IC

A L D

E M

O L

IT

IO

N P

L

F -1

-B -0

S U

R G

E T

A N

K E

X T

E R

IO

R A

R E

M C

P O

W E

R L

IG

H T

IN

G U

P G

R A

D

M C

O M

A H

A D

IS

T R

IC

T G

A R

R

IS

O N D

A M

A H

A

N E

B R

A S

E

D .d g n

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

/0

/2

A N

S

T C

H L

IN

E S

H E

E T E

D

MATCHLINE SHEET ED201

4. FOR SURGE TANK LIGHTING PANEL SCHEDULES REFERENCE AS-BUILT SHEET EL555.

3. FOR SURGE TANK LIGHTING SECTIONS AND DETAILS REFERENCE AS-BUILT SHEET EL554.

2. SEE SHEET E-102 FOR SHEET SPECIFIC ELECTRICAL DEMOLITION NOTES.

1. SEE SHEET E-100 FOR GENERAL ELECTRICAL DEMOLITION NOTES.

GENERAL NOTE:

SCALE 1" = 1000'

KEY PLAN

0 4' 8' 12'

3/16" = 1'-0"

A

M

G

E N

E R

A L R

E V

IS

IO

N /0

/2

S L

O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

25'-7.4"

.3

.9

.4

" 5

.1

E

K

E E EG-WRG-WR G-WR G-WR

K

21L-2, 10

21L-3, 8

21L-5, 9

21L-4, 7

22L-1, 6

22L-3, 8

22L-2, 10

22L-5, 9

22L-4, 7

21L 22L

21L-1, 6

E

E

E

E

K

E E E

E

E

E E

E

E

E

EE

EEE

E

E

G-WR G-WR

G-WR

G-WR

G-WR

G-WRG-WR

G-WR G-WR

G-WR G-WR

G-WR

G-WR

G-WR G-WR

G-WR

G-WR

G-WR G-WR

G-WR G-WR

G-WR G-WR

G-WR G-WR G-WR G-WR G-WR G-WR

G-WR

G-WR

G-WR

G-WR

G-WRG-WRG-WR

E

E

E

E E

E

E

E

E

E E

E

E

E E E

E

E

E

E

EE

22L-11

K

134 135 136

133132131

/0

/2

EL131

E

C T

R

IC

A L L

IG

H T

IN

G P

L

F -1

-B -0

P E

N S

T O

C K A

R E

M C

P O

W E

R L

IG

H T

IN

G U

P G

R A

D

M C

O M

A H

A D

IS

T R

IC

T G

A R

R

IS

O N D

A M

A H

A

N E

B R

A S

E

L .d w g

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

/0

/2

A N

S

T C

H L

IN

E S

H E

E T E

L

MATCHLINE SHEET EL134

6. LIGHT FIXTURE E ALTITUDE ANGLE IS +45° TO THE HORIZONTAL PLANE.

5. LIGHT FIXTURE E AZIMUTH ANGLE IS PERPENDICULAR TO MOUNTING SURFACE.

4. FOR PENSTOCK AREA CONTROL AND WIRING DIAGRAMS REFERENCE AS-BUILT SHEET EL565.

3. FOR PENSTOCK AREA SECTIONS AND DETAILS REFERENCE AS-BUILT SHEET EL564

2. SEE SHEET E-101 FOR SHEET SPECIFIC ELECTRICAL INSTALLATION NOTES.

1. SEE SHEET E-100 FOR GENERAL ELECTRICAL INSTALLATION NOTES.

GENERAL NOTE:

SCALE 1" = 1000'

KEY PLAN

0 4' 8' 12'

3/16" = 1'-0"

M G

E N

E R

A L R

E V

IS

IO

N S

/0

/1

S

L O

1 FIELD VERIFY LOCATION AND INSTALL IN EXISTING LOCATION

KEYED NOTES:

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

11'-1.8"

.5

33'-5"

.4

.8

.3

.3

.3

.2

.1

.7

.4

S

S

S

34L-1

34L-3

34L

K K

K

K K

K K

K

K

K

KK

KK

K

K

K

K K

K

F

F

K

G-WRG-WRG-WR

G-WR G-WR

S S S

S

K K

K

K K

K K

K

K

K

KK

K

K

K

K K

K

F

F

K

G-WR G-WR

35L

KK G-WRG-WR

34L-2

K

K

K

K

K

K

K

K

K

G-WR

K

S

3G-WR

S

35L-3 35L-7

S S

3 3

35L-6

S

S

4 SS

33L-3 32L-12

32L-11

31L-7

31L-3

32L-10

32L-1

32L-8

32L-9

S

S

S

SSSS

S

S

S S S

S S

S S

S S

S S

S S S

34L-1 32L-632L-5

34L-3

S S S S 33L 32L

31L 34L

K

K

K

K

K

K

K

K

K

K K

K K

K

K

K

KK

KK

K

K

K

K K

K

F

F F

F

K K

K

K K

K

K

K

K

K

K

K

K

K

K

K

K K

K K K

K

K

K

K

K

K

K

K

K

K

K

K

G-WR G-WR G-WR G-WR

G-WRG-WR

G-WRG-WR

G-WRG-WRG-WRG-WR

G-WR G-WR

G-WR G-WR

G-WR

G-WR

K

K

K K K K

K

K

K

G-WR

G-WR

G-WR G-WR

G-WR G-WR G-WR G-WR

G-WR G-WR

K

K

K

K

K

K

K

K

K

K

K

K

K

S S S

S

K K

K

K K

K K

K

K

K

KK

K

K

K

K K

K

F

F

K

G-WR G-WR

35L

KK G-WRG-WR

34L-2

S

K

K

K

K

K

K

K

S

K

K

K

K

K

K

K

K

K

K

K

F

FF

FK

K

K

K

K

K

K K

K

K

K

K

K

K

K

K

K

K

K

K

K

K

K

K

G-WR

K

S

3G-WR

S

K

K

K

K

S

K

S

S 4

S3

S

F 4 4

32L-4

K

K

33L-7

KK

S

35L-3 35L-7

S S

3 3

35L-6

S

S

4 SS

FF141

/0

/2

EL141

E

C T

R

IC

A L L

IG

H T

IN

G P

L

F -1

-B -0

S U

R G

E T

A N

K B

A S

E A

R E

M C

P O

W E

R L

IG

H T

IN

G U

P G

R A

D

M C

O M

A H

A D

IS

T R

IC

T G

A R

R

IS

O N D

A M

A H

A

N E

B R

A S

E

L .d w g

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

/0

/2

A N

S

T C

H L

IN

E S

H E

E T E

L

MATCHLINE SHEET EL144

4. FOR SURGE TANK AREA LIGHTING PANEL SCHEDULES REFERENCE AS-BUILT SHEET EL555.

3. FOR SURGE TANK AREA LIGHTING SECTIONS AND DETAILS REFERENCE AS-BUILT SHEET EL554

2. SEE SHEET E-101 FOR SHEET SPECIFIC ELECTRICAL INSTALLATION NOTES.

1. SEE SHEET E-100 FOR GENERAL ELECTRICAL INSTALLATION NOTES.

GENERAL NOTE:

SCALE 1" = 1000'

KEY PLAN

0 4' 8' 12'

3/16" = 1'-0"

1 MIRRORED SECTION VIEW C-C LOCATED ON SHEET EL554

KEYED NOTES:

A

M G

E N

E R

A L R

E V

IS

IO

N S

/0

/1

S

L O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

11'-4.9"12'-0.6" 12'-1.1"

.4

15'-7.8"

.8

.7

.8

6'-7.9"

16'-11.3"

.1

.8

.8

.3

.4

" 1

.5

.1

6'-8.6"

6'-4.3"

.6

33L-3 32L-12

32L-11

32L-10

32L-1

32L-8

32L-9

S S

S S

S S

S S

S

32L-632L-5

S S S S 33L 32L

K

K

K

K

F

F

K

K

K K

K

K

K

K

K

K K

K K K

K

K

K

K

K

K

K

K

G-WRG-WR

G-WRG-WR

G-WR

K

K

K K

G-WR G-WR

G-WR G-WR G-WR G-WR

G-WR

K

K

K

F

FK

K

K

K

K

K

K

K

S

K

S

S 4

S3

S

4 4

32L-4

K

K

33L-7

KK

FF

33L-3 32L-12

32L-11

31L-7

31L-3

32L-10

32L-1

32L-8

32L-9

S

S

S

SSSS

S

S

S S S

S S

S S

S S

S S

S S S

34L-1 32L-632L-5

34L-3

S S S S 33L 32L

31L 34L

K

K

K

K

K

K

K

K

K

K K

K K

K

K

K

KK

KK

K

K

K

K K

K

F

F F

F

K K

K

K K

K

K

K

K

K

K

K

K

K

K

K

K K

K K K

K

K

K

K

K

K

K

K

K

K

K

K

G-WR G-WR G-WR G-WR

G-WRG-WR

G-WRG-WR

G-WRG-WRG-WRG-WR

G-WR G-WR

G-WR G-WR

G-WR

G-WR

K

K

K K K K

K

K

K

G-WR

G-WR

G-WR G-WR

G-WR G-WR G-WR G-WR

G-WR G-WR

K

K

K

K

K

K

K

K

K

K

K

K

K

S S S

S

K K

K

K K

K K

K

K

K

KK

K

K

K

K K

K

F

F

K

G-WR G-WR

35L

KK G-WRG-WR

34L-2

S

K

K

K

K

K

K

K

S

K

K

K

K

K

K

K

K

K

K

K

F

FF

FK

K

K

K

K

K

K K

K

K

K

K

K

K

K

K

K

K

K

K

K

K

K

K

G-WR

K

S

3G-WR

S

K

K

K

K

S

K

S

S 4

S3

S

F 4 4

32L-4

K

K

33L-7

KK

S

35L-3 35L-7

S S

3 3

35L-6

S

S

4 SS

FF141

/0

/2

EL142

E

C T

R

IC

A L L

IG

H T

IN

G P

L

F -1

-B -0

S U

R G

E T

A N

K B

A S

E A

R E

M C

P O

W E

R L

IG

H T

IN

G U

P G

R A

D

M C

O M

A H

A D

IS

T R

IC

T G

A R

R

IS

O N D

A M

A H

A

N E

B R

A S

E

L .d w g

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

/0

/2

A N

S

T C

H L

IN

E S

H E

E T E

L

MATCHLINE SHEET EL145

M A

T C

H L

IN

E S

H E

E T E

L

4. FOR SURGE TANK AREA LIGHTING PANEL SCHEDULES REFERENCE AS-BUILT SHEET EL555.

3. FOR SURGE TANK AREA LIGHTING SECTIONS AND DETAILS REFERENCE AS-BUILT SHEET EL554

2. SEE SHEET E-101 FOR SHEET SPECIFIC ELECTRICAL INSTALLATION NOTES.

1. SEE SHEET E-100 FOR GENERAL ELECTRICAL INSTALLATION NOTES.

GENERAL NOTE:

SCALE 1" = 1000'

KEY PLAN

0 4' 8' 12'

3/16" = 1'-0"

SECTION C-C

SEE EL554

SEE EL554 SECTION C-C

1 SEE SECTION VIEW C-C LOCATED ON SHEET EL554

KEYED NOTES:

A

M

G

E N

E R

A L R

E V

IS

IO

N /0

/2

S L

O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

6'-8.4"

16'-4.9"

13'-11.7" 14'-2.2" 6'-5.1" 16'-4.6" 16'-7.7" 6'-8.4" 13'-11.9"

G-WR

G-WR G-WR

G-WR

G G

F

LLLLL L

S S

33L-5

32L-7

F F

F

LL

G-WR

G-WR G-WR

G-WR

G-WR

G-WR

G G G G G

G-WR

G-WR

G-WR

G-WRF F F F

F

F

FF

F

F

F

FF

F

F

F F

F

F F

F F

L L L L

L L L L

LLLLL L151152 153

/0

/2

EL151

E

C T

R

IC

A L L

IG

H T

IN

G P

L

F -1

-B -0

S U

R G

E T

A N

K M

ID

D

L E L

E V

E L A

R E

M C

P O

W E

R L

IG

H T

IN

G U

P G

R A

D

M C

O M

A H

A D

IS

T R

IC

T G

A R

R

IS

O N D

A M

A H

A

N E

B R

A S

E

L .d w g

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

/0

/2

A N

S

T C

H L

IN

E S

H E

E T E

L

SCALE 1" = 1000'

KEY PLAN

4. FOR SURGE TANK LIGHTING PANEL SCHEDULES REFERENCE AS-BUILT SHEET EL555.

3. FOR SURGE TANK SECTIONS AND DETAILS REFERENCE AS-BUILT SHEET EL554.

2. SEE SHEET E-101 FOR SHEET SPECIFIC ELECTRICAL INSTALLATION NOTES.

1. SEE SHEET E-100 FOR GENERAL ELECTRICAL INSTALLATION NOTES.

GENERAL NOTE:

0 4' 8' 12'

3/16" = 1'-0"

A

M G

E N

E R

A L R

E V

IS

IO

N S

/0

/1

O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

6'-5.1"

16'-9.2"

.6 " 1

.9

13'-11.9" 14'-2" 6'-5.1" 16'-2" 16'-7.6" 6'-8.4" 13'-11.7" 14'-2.2"

3'-2.5"

16'-3.1" 6'-6.6" 14'-1.8"

S S

33L-5

32L-7

F F

F

LL

G-WR

G-WR

G G

G-WR

G-WRF F

F

F

F

F

FF

F

F

F F

F

F

L L L L

L L

S S

33L-5

32L-7

F F

F

LL

G-WR

G-WR G-WR

G-WR

G-WR

G-WR

G G G G G

G-WR

G-WR

G-WR

G-WRF F F F

F

F

FF

F

F

F

FF

F

F

F F

F

F F

F F

L L L L

/0

/2

EL152

E

C T

R

IC

A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .