Specs-W9128F-16-B-0007-RTA-Construct-Addition_B1134-Missile-Maintenance-WSA.pdf

PDF 8 MB Posted

Attached to
Bldg 1134 Millile Maintenance
Solicitation number
W9128F-16-B-0007
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
B1134_Pictures.pdf PDF
Am_0002.pdf PDF
Am_0001r.pdf PDF
Am_0001.pdf PDF
Plans-W9128F-16-B-0007-RTA-Construct-Addition_B1134-Missile-Maintenance-WSA.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

(FOR CONSTRUCTION CONTRACT)

Advertisement

SOLICITATION NO. W9128F-16-B-0007

CONSTRUCT ADDITION B1134

MISSILE MAINTENANCE - WSA

QJVF143101

MINOT AFB, North Dakota

PREPARED BY:

Burns & McDonnell Engineering Company, INC

MINNEAPOLIS-ST. PAUL

Bloomington, Minnesota

PREPARED FOR:

U.S. Army Corps of Engineers, Omaha District

May 2016

This page was intentionally left blank for duplex printing.

00 01 00 PROJECT TABLE OF CONTENTS - 1

CONSTRUCTION

OF

CONSTRUCT ADDITION B1134 MISSILE MAINTENANCE –WSA

QJVF143101

MINOT AFB, NORTH DAKOTA

PROJECT TABLE OF CONTENTS

NOTE: WHERE CONFLICTS IN PROJECT SPECIFICATIONS EXIST, THE MORE STRINGENT

REQUIREMENTS WILL GOVERN.

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

00 10 00 SOLICITATION/CONTRACT FORM (SF 1442) AND CLIN BIDDING

SCHEDULE

00 21 00 INSTRUCTIONS TO OFFERORS (IFB)

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 72 00 GENERAL CONDITIONS (CONTRACT CLAUSES - IFB)

00 73 00 SUPPLEMENTARY CONDITIONS (SPECIAL CONTRACT

REQUIREMENTS)

DIVISION 01 – GENERAL REQUIREMENTS

01 30 00.24 OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS

AF103 AF FORM 103 – BASE CIVIL ENGINEERING WORK CLEARANCE

REQUEST

SIGNAT PROJECT SIGN DETAILS

ND160039 GENERAL WAGE DECISION (BUILDING)

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

REGISTER SUBMITTAL REGISTER

E4025 ENG FORM 4025 TRANSMITTAL FORM

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 41 26.06 24 (NORTH DAKOTA) NPDES PERMIT REQUIREMENTS FOR STORM

WATER DISCHARGES FROM CONSTRUCTION SITES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.00 10AT SAMPLE CONTRACTOR QUALITY CONTROL REPORT (QCR)

01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 62 35 RECYCLED/RECOVERED MATERIALS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 36.00 24 WARRANTY OF CONSTRUCTION

01 78 39.00 24 AS-BUILT DRAWINGS

01 78 39.00 24AT MODIFICATIONS AND TITLEBLOCK EXAMPLES

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 – CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

00 01 00 PROJECT TABLE OF CONTENTS - 2

DIVISION 03 – CONCRETE (CONTINUED)

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

DIVISION 05 – METALS

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16 LAMINATE CLAD ARCHITECTURAL CASEWORK

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 BITUMINOUS DAMPPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 42 13 METAL WALL PANELS

07 51 13 BUILT-UP ASPHALT ROOFING

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 – OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 36 13 SECTIONAL OVERHEAD DOORS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL LOUVERS

DIVISION 09 – FINISHES

09 06 90 COLOR SCHEDULE

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 13 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 67 23.14 CHEMICAL RESISTIVE RESINOUS FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 – SPECIALTIES

10 10 00 VISUAL COMMUNICATIONS SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 44 16 FIRE EXTINGUISHERS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

00 01 00 PROJECT TABLE OF CONTENTS - 3

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST

SYSTEMS

23 05 15 COMMON PIPING FOR HVAC

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC

23 11 25 FACILITY GAS PIPING

23 23 00 REFRIGERANT PIPING

23 82 00.00 20 TERMINAL HEATING AND COOLING UNITS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 32 11 SOIL SURFACE EROSION CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE

COURSE

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 30 00 SANITARY SEWERS

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 23.19 MONORAILS

APPENDICES

APPENDIX A GEOTECHNICAL REPORT

-- End of Project Table of Contents --

00 10 00 - 1

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W9128F-16-B-0007

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

08 JUN 2016

PAGES OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

7. ISSUED BY CODE CT 8. ADDRESS OFFER TO

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Contracting Division (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Attn: CONTRACTING DIVISION (CENWO-CT) 1616 Capitol Ave

9. FOR INFORMATION

CALL:

A. NAME

Dawn Barnett

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(402) 995-2091

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

The offeror hereby agrees to do all work described in the documents entitled:

CONSTRUCT ADDITION B1134 MISSILE MAINTENANCE - WSA

QJVF 143101

MINOT AFB, NORTH DAKOTA

RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442) AND SECTION 00 45 00.

THIS SOLICITATION IS UNRESTRICTED AND IS OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPITATION

11. The Contractor shall begin performance within _10_________ calendar days and complete it within _____420_ calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (_________)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and ___0____ copies to perform the work required are due at the place specified in Item 8 by__1400___ (hour) local time 14 JUL 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than ___60_____ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101

STANDARD FORM 1442(REV. 4-85)

Prescribed by GSA FAR(48 CFR) 53.236-1(d)

00 10 00 - 2

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

DUNS Number:

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within 60 calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement

AMOUNTS

ENTIRE WORK COMPLETE $__________________

Contractor’s Fax No.____________ CAGE CODE ________________ Contractor’s E-Mail address_______________

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

U.S. Army Engineer District, Omaha 1616 Capitol Ave.

USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,

(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

STANDARD FORM 1442 BACK (REV. 4-85)

00 10 00 - 3

CONTRACT LINE ITEM BIDDING SCHEDULE

ITEM NO. DESCRIPTION QUANTITY UNIT AMOUNT

BASIC ITEMS

Entire work to complete Construct Addition B1134 Missile Maintenance, WSA QJVF143101, Minot AFB, ND

Job

1 L.S.

TOTAL AMOUNT $________________________________

NOTES:

1. Bid prices must be entered for all items of the schedule. Total amounts submitted without bid prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the lump-sum prices and the total amount, the lump-sum prices will be considered the bid price submitted.

2. A modification to a bid which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump-sum price affected. If the modification is not so apportioned, the single adjustment will be applied to Item No. 0001.

Construct Addition B1134 Missile Maint-WSA QJVF143101, Minot AFB MIA8

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 21 00

INSTRUCTIONS TO OFFERORS (IFB)

4/16

PART 1 GENERAL

1.1 (FAR 52.204-7) SYSTEM FOR AWARD MANAGEMENT (JUL 2013)

1.2 (FAR 52.204-16) COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING

(JUL 2015

1.3 (FAR 52.204-18) COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE

(JUL 2015)

1.4 (FAR 52.211-2) AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA

ITEM DESCRIPTIONS LISTED IN THE ACQUISITION STREAMLINING AND

STANDARDIZATION INFORMATION SYSTEM (ASSIST) (APR 2014)

1.5 (FAR 52.214-3) AMENDMENTS TO INVITATIONS FOR BIDS (DECEMBER 1989)

1.6 (FAR 52.214-4) FALSE STATEMENTS IN BIDS (APRIL 1984)

1.7 (FAR 52.214-5) SUBMISSION OF BIDS (MAR 1997).

1.8 (FAR 52.214-6) EXPLANATION TO PROSPECTIVE BIDDERS (APRIL 1984)

1.9 (FAR 52.214-7) LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF

BIDS (NOV 1999).

1.10 (FAR 52.214-18) PREPARATION OF BIDS CONSTRUCTION (APRIL 1984)

1.11 (FAR 52.214-19) CONTRACT AWARD SEALED BIDDING CONSTRUCTION (AUG

1996).

1.12 (FAR 52.214-34) SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR

1991)

1.13 (FAR 52.214-35) SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)

1.14 (FAR 52.216-1) TYPE OF CONTRACT (APR 1984).

1.15 FAR 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS-SECONDARY SITE

OF THE WORK (MAY 2014)

1.16 *FAR 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT-CONSTRUCTION

MATERIALS (MAY 2014) (Applicable with FAR 52.225-9)

1.17 (FAR 52.232-18) AVAILABILITY OF FUNDS (APR 1984).

1.18 (FAR 52.233 2) SERVICE OF PROTEST (SEPT 2006).

1.19 (FAR 52.236-27) SITE VISIT (CONSTRUCTION) (FEB 1995).

1.20 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE

(FEB 1998)

1.21 (DFARS 252.204-7008) COMPLIANCE WITH SAFEGUARDING COVERED

DEFENSE INFORMATION CONTROLS (DEC 2015)

1.22 (Local Provision) ARITHMETIC DISCREPANCIES.

1.23 GENERAL BIDDING INFORMATION

1.23.1 MAILED BIDS AND HAND-CARRIED BIDS

1.23.2 SOLICITATION RESTRICTIONS

1.23.3 BASIS FOR AWARD

1.23.4 DESCRIPTION OF WORK

1.23.5 ESTIMATED CONSTRUCTION COST

1.23.6 CADD AND ELECTRONIC DESIGN FILES (PROVIDED)

1.24 INFORMATION FOR MODIFYING BIDS.

1.25 BID GUARANTEE.

1.26 PERFORMANCE AND PAYMENT BONDS.

1.27 COPIES OF SOLICITATION DOCUMENT AND AMENDMENTS

DOCUMENT 00 21 00 Page 1

1.28 OPTIONS

1.29 AVAILABILITY OF SUPPLIERS

1.30 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

1.31 NOTICE REGARDING BUY AMERICAN STATUTE

1.32 FEDERAL, STATE AND LOCAL TAXES

1.33 BIDDER'S QUESTIONS AND COMMENTS.

1.33.1 BIDDER INQUIRY

1.33.2 PLAN HOLDER'S LIST

1.34 AVAILABILITY OF BID RESULTS (Local Clause/Provision)

1.35 PRE-AWARD SURVEY INFORMATION (Local Provision) (Sep 93)

1.36 JOINT VENTURE AGREEMENTS

1.37 SUBCONTRACTING PLAN/SUBCONTRACTING GOALS REGARDING THE UTILIZATION

OF SMALL BUSINESS CONCERNS

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section Table of Contents --

DOCUMENT 00 21 00 Page 2

SECTION 00 21 00

INSTRUCTIONS TO OFFERORS (IFB)

4/16

PART 1 GENERAL

1.1 (FAR 52.204-7) SYSTEM FOR AWARD MANAGEMENT (JUL 2013)

(a) Definitions. As used in this provision-

"Data Universal Numbering System (DUNS) number" means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

"Data Universal Numbering System +4 (DUNS+4) number" means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.)

This 4-character suffix may be assigned at the discretion of the business concern to establish additional System for Award Management records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

"Registered in the System for Award Management database" means that-

(1) The offeror has entered all mandatory information, including the DUNS number or the DUNS+4 number, the Contractor and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see Subpart 4.14) into the SAM database;

(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in the SAM database;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide TIN validation to the Government as a part of the SAM registration process;

and

(4) The Government has marked the record "Active".

(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation "DUNS" or "DUNS +4" followed by the DUNS or DUNS +4 number that identifies the offeror's name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number-

(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror

DOCUMENT 00 21 00 Page 3 does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company Physical Street Address, City, State, and

Zip Code.

(iv) Company Mailing Address, City, State and Zip Code

(if separate from physical).

(v) Company Telephone Number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) Offerors may obtain information on registration at https://www.acquisition.gov.

(End of provision)

1.2 (FAR 52.204-16) COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL

(a) Definition. As used in this provision –

“Commercial and Government Entity (CAGE) code” means –

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Contractor and Government Entity (CAGE) Branch to identify a commercial or Government entity; or

(2) An identifier assigned by a member of the North Atlantic

Treaty Organization (NATO) or by the NATO Support Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Contractor and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as an NCAGE code.

(b) The Offeror shall enter its CAGE code in its offer with its name and address or otherwise include it prominently in its proposal. The CAGE code entered must be for that name and address. Enter “CAGE” before the number. The CAGE code is required prior to award.

DOCUMENT 00 21 00 Page 4

(c) CAGE codes may be obtained via–

(1) Registration in the System for Award Management (SAM) at www.sam.gov. If the Offeror is located in the United States or its outlying areas and does not already have a CAGE code assigned, the DLA Contractor and Government Entity (CAGE) Branch will assign a CAGE code as a part of the SAM registration process. SAM registrants located outside the United States and its outlying areas shall obtain a NCAGE code prior to registration in SAM (see paragraph (c)(3) of this provision).

(2) The DLA Contractor and Government Entity (CAGE) Branch. If registration in SAM is not required for the subject procurement, and the offeror does not otherwise register in SAM, an offeror located in the United States or its outlying areas may request that a CAGE code be assigned by submitting a request at http://www.dlis.dla.mil/cage_welcome.asp.

(3) The appropriate country codification bureau. Entities located outside the United States and its outlying areas may obtain an NCAGE code by contacting the Codification Bureau in the foreign entity’s country if that country is a member of NATO or a sponsored nation. NCAGE codes may be obtained from the NSPA if the foreign entity's country is not a member of NATO or a sponsored nation. Points of contact for codification bureaus and NSPA, as well as additional information on obtaining NCAGE codes, are available at http://www.dlis.dla.mil/nato/ObtainCAGE.asp.

(d) Additional guidance for establishing and maintaining CAGE codes is available at http://www.dlis.dla.mil/cage_welcome.asp.

(e) When a CAGE Code is required for the immediate owner and/or the highest-level owner by 52.204-17 or 52.212-3(p), the Offeror shall obtain the respective CAGE Code from that entity to supply the CAGE Code to the Government.

(f) Do not delay submission of the offer pending receipt of a CAGE code.

(End of provision)

1.3 (FAR 52.204-18) COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL

2015)

(a) Definition. As used in this clause–

“Commercial and Government Entity (CAGE) code” means–

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Contractor and Government Entity (CAGE) Branch to identify a commercial or government entity, or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Contractor and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as an NCAGE code.

(b) Contractors shall ensure that the CAGE code is maintained throughout the life of the contract. For contractors registered in the

DOCUMENT 00 21 00 Page 5

System for Award Management (SAM), the DLA Contractor and Government Entity (CAGE) Branch shall only modify data received from SAM in the CAGE master file if the contractor initiates those changes via update of its SAM registration. Contractors undergoing a novation or change-of-name agreement shall notify the contracting officer in accordance with Subpart 42.12. The contractor shall communicate any change to the CAGE code to the contracting officer within 30 days after the change, so that a modification can be issued to update the CAGE code on the contract.

(c) Contractors located in the United States or its outlying areas that are not registered in SAM shall submit written change requests to the DLA Contractor and Government Entity (CAGE) Branch. Requests for changes shall be provided on a DD Form 2051, Request for Assignment of a Commercial and Government Entity (CAGE) Code, to the address shown on the back of the DD Form 2051. Change requests to the CAGE master file are accepted from the entity identified by the code.

(d) Contractors located outside the United States and its outlying areas that are not registered in SAM shall contact the appropriate National Codification Bureau or NSPA to request CAGE changes. Points of contact for National Codification Bureaus and NSPA, as well as additional information on obtaining NCAGE codes, are available at http://www.dlis.dla.mil/nato/ObtainCAGE.asp.

(e) Additional guidance for maintaining CAGE codes is available at http://www.dlis.dla.mil/cage_welcome.asp.

(End of clause)

1.4 (FAR 52.211-2) AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA ITEM

DESCRIPTIONS LISTED IN THE ACQUISITION STREAMLINING AND STANDARDIZATION

INFORMATION SYSTEM (ASSIST) (APR 2014)

(a) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:

(1) ASSIST (https://assist.dla.mil/online/start);

(2) Quick Search (http://quicksearch.dla.mil/);

(3) ASSISTdocs.com (http://assistdocs.com).

(b) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by-

(1) Using the ASSIST Shopping Wizard (http://assist.dla.mil/wizard/index.cfm);

(2) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or

(3) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone (215) 697-2667/2179, Facsimile (215) 697-1462.

(End of provision)

1.5 (FAR 52.214-3) AMENDMENTS TO INVITATIONS FOR BIDS (DECEMBER 1989)

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.

(b) Bidders shall acknowledge receipt of any amendment to this solicitation (1) by signing and returning the amendment, (2) by identifying the amendment number and date in the space provided for this purpose on the form for submitting a bid, (3) by letter or telegram or (4) by facsimile, if facsimile bids are authorized in the solicitation. The Government must receive the acknowledgment by the time and at the place specified for receipt of bids.

DOCUMENT 00 21 00 Page 6

1.6 (FAR 52.214-4) FALSE STATEMENTS IN BIDS (APRIL 1984)

Bidders must provide full, accurate, and complete information as required by this solicitation and its attachments. The penalty for making false statements in bids is prescribed in 18 U.S.C. 1001.

1.7 (FAR 52.214-5) SUBMISSION OF BIDS (MAR 1997).

(a) Bids and bid modifications shall be submitted in sealed envelopes or packages (unless submitted by electronic means) (1) addressed to the office specified in the solicitation and (2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder.

(b) Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed in subparagraphs (a) (1) and (2) of this provision when delivered to the office specified in the solicitation.

(c) Telegraphic bids will not be considered unless authorized by the solicitation; however, bids may be modified or withdrawn by written or telegraphic notice.

(d) Facsimile bids, modifications, or withdrawals, will not be considered unless authorized by the solicitation.

(e) Bids submitted by electronic commerce shall be considered only if the electronic commerce method was specifically stipulated or permitted by the solicitation.

1.8 (FAR 52.214-6) EXPLANATION TO PROSPECTIVE BIDDERS (APRIL 1984)

Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before the submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders.

1.9 (FAR 52.214-7) LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS

(NOV 1999).

(a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bids (IFB) by the time specified in the IFB. If no time is specified in the IFB, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that bids are due.

(b)(1) Any bid, modification, or withdrawal received at the Government office designated in the IFB after the exact time specified for receipt of bids is "late" and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late bid would not unduly delay the acquisition; and-

(i) If it was transmitted through an electronic commerce

DOCUMENT 00 21 00 Page 7 method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids; or

(ii) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of bids and was under the Government's control prior to the time set for receipt of bids.

(2) However, a late modification of an otherwise successful bid that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(c) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the bid wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(d) If an emergency or unanticipated event interrupts normal Government processes so that bids cannot be received at the Government office designated for receipt of bids by the exact time specified in the IFB and urgent Government requirements preclude amendment of the IFB, the time specified for receipt of bids will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(e) Bids may be withdrawn by written notice received at any time before the exact time set for receipt of bids. If the IFB authorizes facsimile bids, bids may be withdrawn via facsimile received at any time before the exact time set for receipt of bids, subject to the conditions specified in the provision at 52.214-31, Facsimile Bids. A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for receipt of bids, the identity of the person requesting withdrawal is established and the person signs a receipt for the bid.

(End of provision)

1.10 (FAR 52.214-18) PREPARATION OF BIDS CONSTRUCTION (APRIL 1984)

(a) Bids must be--

(1) Submitted on the forms furnished by the Government or on copies of those forms, and

(2) Manually signed. The person signing a bid must initial each erasure or change appearing on any bid form.

(b) The bid form may require bidders to submit bid prices for one or more items on various bases, including--

(1) Lump sum bidding;

(2) Alternate prices;

(3) Units of construction; or

(4) Any combination of subparagraphs (1) through (3) above.

(c) If the solicitation requires bidding on all items, failure to do so will disqualify the bid. If bidding on all items is not required, bidders should insert the words "no bid" in the space provided for any item on which no price is submitted.

(d) Alternate bids will not be considered unless this solicitation authorizes their submission.

DOCUMENT 00 21 00 Page 8

(NOTE: FOR THE PURPOSES OF THIS SOLICITATION, THE WORD "ITEM" SHALL BE

CONSIDERED TO MEAN "SCHEDULE.")

1.11 (FAR 52.214-19) CONTRACT AWARD SEALED BIDDING CONSTRUCTION (AUG 1996).

(a) The Government will evaluate bids in response to this solicitation without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government, considering only price and the price related factors specified elsewhere in the solicitation.

(b) The Government may reject any or all bids, and waive informalities or minor irregularities in bids received.

(c) The Government may accept any item or combination of items, unless doing so is precluded by a restrictive limitation in the solicitation or the bid.

(d) The Government may reject a bid as nonresponsive if the prices bid are materially unbalanced between line items or subline items. A bid is materially unbalanced when it is based on prices significantly less than cost for some work, and prices which are significantly overstated in relation to cost for other work, and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low evaluated bid, of it is so unbalanced as to be tantamount to allowing an advance payment.

1.12 (FAR 52.214-34) SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)

Offers submitted in response to this solicitation shall be in the English language. Offers received in other than English shall be rejected.

(End of provision)

1.13 (FAR 52.214-35) SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)

Offers submitted in response to this solicitation shall be in terms of U.S.

dollars. Offers received in other than U.S. dollars shall be rejected.

(End of provision)

1.14 (FAR 52.216-1) TYPE OF CONTRACT (APR 1984).

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

1.15 FAR 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS-SECONDARY SITE OF

THE WORK (MAY 2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

DOCUMENT 00 21 00 Page 9

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of provision)

1.16 *FAR 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT-CONSTRUCTION

MATERIALS (MAY 2014) (Applicable with FAR 52.225-9)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American-Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at

FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested-

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of provision)

1.17 (FAR 52.232-18) AVAILABILITY OF FUNDS (APR 1984).

Funds are not presently available for this contract. The Government's

DOCUMENT 00 21 00 Page 10 obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made.

No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

1.18 (FAR 52.233 2) SERVICE OF PROTEST (SEPT 2006).

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from District Counsel, 1616 Capitol Avenue, Omaha, Nebraska 68102-4901.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

1.19 (FAR 52.236-27) SITE VISIT (CONSTRUCTION) (FEB 1995).

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) There will be only one opportunity for a site visit. This will be held at Minot AFB, North Dakota, on 30 June 2016 at 9:00 AM, MDT. To register attendance for the site visit, Contractors should contact Dean Sulzer, U.S.

Army Corps of Engineers, Telephone 701-727-6127, e-mail (Dean.D.Sulzer@usace.army.mil). The Contractors will need to provide:

names of persons attending along with name of company, birth date, driver's license and state, and SOCIAL SECURITY NUMBER. Names provided must match EXACTLY the ID each person will use to gain access onto the base.

All attendees shall meet in the clubhouse parking lot of the Roughrider Golf Course: 220 Golf Drive, Minot AFB, ND 58705 by 8:30 AM the day of the visit. Please Note: The Roughrider Golf Course is not actually on the Base proper. The course is just north of the Minot AFB MINOT GATE and south of the Minot AFB MAGIC CITY GATE on the west side of HIGHWAY 83.

A bus will be the only source of transportation onto the base. There will be a 100% ID check before any contractor personnel is allowed on the bus.

Bags will be subject to search.

The site visit will begin at 9:00 AM with a drive-by/windshield tour of the site.

There will be NO PHOTOGRAPHY allowed on base. If an attendee would like photos taken, they shall inform the designated government personnel.

Photos will be taken by that designated personnel and made available to attendees within one week.

All attendees shall gain access to the base via the bus that will be provided. No person shall utilize a current base pass to gain access to the base for this site visit. No person shall drive their personal vehicles on the site visit.

(End of provision)

DOCUMENT 00 21 00 Page 11

1.20 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://acquisition.gov/comp/far/index.html http://www.acq.osd.mil/dpap/ (End of provision)

1.21 (DFARS 252.204-7008) COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE

INFORMATION CONTROLS (DEC 2015)

(a) Definitions. As used in this provision—

“Controlled technical information,” “covered contractor information system,” and “covered defense information” are defined in clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting.

(b) The security requirements required by contract clause 252.204-7012, Covered Defense Information and Cyber Incident Reporting , shall be implemented for all covered defense information on all covered contractor information systems that support the performance of this contract.

(c) For covered contractor information systems that are not part of an information technology (IT) service or system operated on behalf of the Government (see 252.204-7012(b)(1)(ii))—

(1) By submission of this offer, the Offeror represents that it will implement the security requirements specified by National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, “Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations” (see http://dx.doi.org/10.6028/NIST.SP.800-171), not later than December 31, 2017.

(2)(i) If the Offeror proposes to vary from any of the security requirements specified by NIST SP 800-171 that is in effect at the time the solicitation is issued or as authorized by the Contracting Officer, the Offeror shall submit to the Contracting Officer, for consideration by the DoD Chief Information Officer (CIO), a written explanation of—

(A) Why a particular security requirement is not applicable; or

(B) How an alternative but equally effective, security measure is used to compensate for the inability to satisfy a particular requirement and achieve equivalent protection.

DOCUMENT 00 21 00 Page 12

(ii) An authorized representative of the DoD CIO will adjudicate offeror requests to vary from NIST SP 800-171 requirements in writing prior to contract award. Any accepted variance from NIST SP 800-171 shall be incorporated into the resulting contract.

(End of provision)

1.22 (Local Provision) ARITHMETIC DISCREPANCIES.

(a) For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the bidding schedule as submitted by the bidder:

(1) Obviously misplaced decimal points will be corrected;

(2) In case of discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected;

(4) Apparent errors in addition of lump sum and extended prices will be corrected.

(b) For the purposes of bid evaluation, the Government will proceed on the assumption that the bidder intends his bid to be evaluated on the basis of the unit prices, extensions, and totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

1.23 GENERAL BIDDING INFORMATION

(NOTE: FACSIMILE, ELECTRONIC COMMERCE OR TELEGRAPHIC BIDS ARE NOT

AUTHORIZED AND WILL NOT BE ACCEPTED. TELEGRAPHIC MODIFICATIONS OR

WITHDRAWAL OF BIDS ARE AUTHORIZED. FACSIMILE MODIFICATIONS OR WITHDRAWAL

ARE NOT AUTHORIZED.)

Bids shall be either mailed or hand-carried as indicated below. Bid will be PUBLICLY opened at the bid time indicated on Standard Form SF 1442 (Page 00 10 00-1).

1.23.1 MAILED BIDS AND HAND-CARRIED BIDS

a. Mailed bids shall be addressed to the location as indicated on Standard Form SF 1442 (Page 00 10 00-1), Item No. 8.

b. Due to heightened security at Government installations, those bidders who hand carry* their bids shall contact Dawn Barnett, Contract Specialist at 402-995-2091 a minimum of 24 hours prior to delivering to the U.S. Army Corps of Engineer District, Omaha, 1616 Capitol Ave, Omaha, NE (south entrance). Hand-carried means the individual must be able to carry the package on their person. If due to the size, packages or boxes will need to be wheeled in on a cart or dolly, you will be required to go to the dock area located on the northeast side of the facility. After inspection and screening, you will be allowed in the building after presenting valid photo identification.

DOCUMENT 00 21 00 Page 13

c. On the date specified and for thirty (30) minutes prior to time specified on Standard Form SF 1442, Page 00 10 00-1, item 13.A, a Contracting representative will be in the lobby to receive bids. Bid containers (i.e. envelopes, packages, boxes) will be screened for security purposes. At the time specified on Standard SF 1442 Page 00 10 00-1, item 13.A, the designated bid opening official will announce that receipt of bids is closed. Official time will be established by time/stamp clock designated by the contract specialist.

d. Anyone wishing to attend this public opening will be required to present photo identification to sign in and then will be escorted to the facility where bids will be opened. Once bids have been opened, read and recorded, attendees will then be escorted to exit the building.

e. RETURN ADDRESS REQUIREMENTS

Bidder(s) must ensure that ALL mail sent to the Omaha District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc.

ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bid guarantees, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located at 1616 Capital Avenue Omaha, Nebraska 68102-4901 if it does not contain a return mailing address. THERE

WILL BE NO EXCEPTIONS.

*This instruction shall also apply to those bids delivered through a delivery or parcel service.

NOTE: No parking on the street in front of the facility entrances will be allowed. Passenger vehicles will need to locate parking meters or parking garages before delivering bids. Delivery trucks must go to the dock. The vehicle will be inspected and packages screened. After inspection and screening, the delivery person will be allowed into the building after presenting valid photo identification.

1.23.2 SOLICITATION RESTRICTIONS

This solicitation is unrestricted and open to both large and small business participation.

1.23.3 BASIS FOR AWARD

IT IS INTENDED THAT AWARD WILL BE MADE TO ONE BIDDER FOR THE ENTIRE WORK.

1.23.4 DESCRIPTION OF WORK

The scope of this project is to furnish all plant, labor, materials, and equipment and performing all work for Construct Addition to B1134 Missile Maintenance WSA, Minot AFB, North Dakota. Work shall be in accordance with plans and specifications issued with this solicitation.

1.23.5 ESTIMATED CONSTRUCTION COST

The estimated construction cost of this project is between $1,000,000 and $2,500,000.

DOCUMENT 00 21 00 Page 14

1.23.6 CADD AND ELECTRONIC DESIGN FILES (PROVIDED)

If provided, the CADD survey files and other electronic design files are provided on an as-is basis. Any Government provided survey, and the other electronic design files are provided to assist the Contractor in preparing their bid/proposal using their own commercially purchased software. The Contractor shall take all professionally prudent and reasonable actions to verify the accuracy of the data provided and shall assume all liability from the use of these files. The Contractor shall be responsible for obtaining any other software necessary to view the files provided. No other CADD design files will be provided for bid/proposal preparation other than those provided at the time of issue of the solicitation. No assistance in using the files will be provided.

1.24 INFORMATION FOR MODIFYING BIDS.

Bids which have been delivered to the designated bid receiving office may be modified or withdrawn by mail, mailgram, or telegram received at any time before the exact time set for receipt of bids. Modifications or withdrawals sent by mail should be transmitted to the place of bid opening Standard Form SF1442 (Page 00 10 00-1), Item 8. Telephone modifications or withdrawals will not be accepted. All bid modifications or withdrawals must be signed by the bidder or its authorized representative. Any questions regarding these procedures should be directed to the Omaha District's Contracting Division at (402) 995-2091. This number should also be used to verify the receipt of messages.

(NOTE: NOT REQUIRED FOR PROJECTS LESS THAN $100,000)

1.25 BID GUARANTEE.

See General Conditions (Contract Clauses) FAR 52.228-1, BID GUARANTEE. The Bid Guarantee must be submitted on a Standard Form 24 and include original signatures and be accompanied by a Power of Attorney appointing an attorney-in-fact with authority to bind the surety so that, at the time of bid opening, the bond is enforceable against the surety should the bidder fail to meet its obligation.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .