01 22 00 00 26.pdf

PDF 15 KB Posted

Attached to
RECOVERY--59--PROJECT NUMBER 6400, Garrison Dam, Lake Sakakawea, ND
Solicitation number
W9128F-09-T-0096
Issued by

About this file

New Section - Measurement and Payment

View the file

Other files

File Type Posted
18Nov2009revised_33_75_19_SF6_Breakers.pdf PDF
W9128F-09-T-0096-00002.pdf PDF
01 11 10 00 26.pdf PDF
01 42 00 00 10.pdf PDF
W9128F-09-T-0096-P00001.pdf PDF
33 75 19 00 26.pdf PDF
01 33 00 00 10.pdf PDF
01 30 60 00 26.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Garrison Breakers

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 26

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 GENERAL INFORMATION

1.2 MEASUREMENT

1.2.1 General

1.2.2 Job

1.3 PAYMENT

1.3.1 Base Work

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 22 00.00 26 Page 1

SECTION 01 22 00.00 26

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 GENERAL INFORMATION

The payment for work described in the following “MEASUREMENT AND PAYMENT” paragraphs shall constitute full compensation for work required under the cited Bid Items, and such work shall include all items incidental to completion of the required work, whether specifically mentioned in these specifications or not. In the event any work is required by the specifications sections or by the drawings and not specifically mentioned in the measurement and payment paragraphs, separate or direct payment will not be made and all costs thereof are incidental to and included in the contract prices and payments for all items listed in the price schedule.

The word "provided" shall be understood to mean "furnished and installed" when used in this section or elsewhere in the technical sections.

1.2 MEASUREMENT

1.2.1 General

Items measured as a lump sum (LS) will be measured for payment as a lump sum in the locations indicated. This measurement includes all incidental work and materials such as fittings, fasteners, and electrical materials that are necessary to make a complete installation. Unless the payment item paragraph makes a specific exception of any item, incidental items will not be measured under any other item even though there is another listing for the work or material.

1.2.2 Job

The measurement for items listed as "JOB" include all labor and materials to completely provide the listed item.

1.3 PAYMENT

1.3.1 Base Work

a. Price Item 0001; Design, Manufacture, Test and Deliver SF6 Gas Circuit Breakers, 115 kV, 1,200 Amperes, 40 kAIC, Assemblies and Associated Appurtenances.

Payment for Price Item 0001 will be paid for at the contract unit price in SECTION 00 41 00. This price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for thirteen (13) 115 kV 1,200 Ampere SF6 circuit breakers as described in SECTION 33 75 19.00 26, including delivery of the circuit breaker assemblies and appurtenances FOB to the Garrison Dam Powerhouse, Riverdale, North Dakota.

b. Price Item 0002; Design, Manufacture, Test and Deliver SF6 Gas Circuit Breakers, 230 kV, 2,000 Amperes, 40 kAIC, Assemblies and Associated Appurtenances.

SECTION 01 22 00.00 26 Page 2

Payment for Price Item 0002 will be paid for at the contract unit price in SECTION 00 41 00. This price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for eleven

(11) 230 kV 2,000 Ampere SF6 circuit breakers as described in SECTION 33 75 19.00 26, including delivery of the circuit breaker assemblies and appurtenances FOB to the Garrison Dam Powerhouse, Riverdale, North Dakota.

c. Price Item 0003; Perform Factory Tests on All Breakers

Payment for Price Item 0003 will be paid for at the contract unit price in SECTION 00 41 00. This price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for performing these tests on all twenty-four (24) high voltage SF6 circuit breakers as described in SECTION 33 75 19.00 26.

d. Price Item 0004; Furnish Accessories and Spare Parts

Payment for Price Item 0004 will be paid for at the contract unit price in SECTION 00 41 00. This price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for the high voltage SF6 circuit breaker accessories and spare parts as described in SECTION 33 75 19.00 26.

e. Price Item 0005; Furnish Operations and Maintenance Data

Payment for Price Item 0005 will be paid for at the contract unit price in SECTION 00 41 00. This price and payment shall be full compensation for furnishing all labor, materials, and services for Operations and Maintenance Manuals and As-Built Drawings for the high voltage SF6 circuit breaker accessories and spare parts as described in SECTIONS 01 30 60.00 26.00 25 and 33 75 19.00 26.

f. Price Item 0006; Contract Data

Item is not separately priced, and includes the proposal and contract data listed in the Contract Clauses paragraph 52.212-2

EVALUATION--COMMERCIAL ITEMS (JAN 1999).

PART 2 PRODUCTS

(NOT USED)

PART 3 EXECUTION

(NOT USED)

-- End of Section --

SECTION 01 22 00.00 26 Page 3

File details come from the government source that posted it. Updated .