Amendment 0004 to W9128F-09-R-0033. Questions and Answers as of 16 April 2009.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q A R-0033.doc | DOC document | |
| Am_0003.pdf | ||
| Am_0002.pdf | ||
| Am_0001.pdf | ||
| 09R0033-updated.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
0004 16-Apr-2009
W9128F
U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
1616 CAPITOL AVE.
OMAHA, NE 68102-4901
See Item 6
W9128F-09-R-0033
13-MAR-2009
SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SCPIDT (SMALL CONSTRUCTION PROJECT INDEFINITE DELIVERY TYPE) at NORTH DAKOTA.
See attached documentation for content of the amendment changes
Date for receipt of Proposals is 20 April 2009 at 1400 hours Central Time.
Government Point of Contact: Cheryl Bunting (402) 995-2078
16-Apr-2009
Am #0004 - 1
Am #0004 - 2 (Continuation SF 30)
DEPARTMENT OF THE ARMY
Omaha District, Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901
:NOTICE: Failure to acknowledge : Solicitation No. W9128F 09 R 0033 :all amendments may cause rejec- :
:tion of the offer. See FAR : Date of Issue: 13 MAR 2009 :52.215-1 of Section 00 21 00 : NEW Date of Receiving Proposals:
20 APR 2009
Amendment No. 0004 16 April 2009
SUBJECT: Amendment No. 0004 to Request for Proposal Solicitation Package for SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SMALL CONSTRUCTION PROJECT INDEFINITE DELIVERY TYPE (SCPIDT) CONTRACT in NORTH DAKOTA.
Solicitation No. W9128F 09 R 0033.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged. If the proposals have been mailed prior to receiving this amendment, you will notify the office where proposals are received, in the specified manner, immediately of its receipt and of any changes in your proposal occasioned thereby.
a. Hand-Carried Proposals shall be delivered to the U.S. Army Corps of Engineers, Omaha District, Contracting Division, 1616 Capitol Avenue, Omaha, Nebraska 68102-4901.
b. Mailed Proposals shall be addressed as noted in Item 8 on Page 00 11 00-1 of Standard Form 1442.
3. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 20 APR 2009.
Attachment(s):
For Information Only – Contractor Questions and Answers
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
16 April 2009
JML/2186
Questions & Answers As of 16 April 2009 W9128F-09-R-0033
1. I have in-house labor costs for benefits and payroll taxes set up as a separate pool in my overhead rate. Should these costs be a percentage of the direct labor or a percentage of the gross revenues?
Answer - the costs should be a percentage of direct labor
2. I have a shop/equipment pool and a subcontract managing pool also. Should these be a percentage of the gross revenues?
Answer - they should be a percentage of the benefitting cost, so the subcontract managing pool would be a percentage of subcontract costs while shop/equipment pool would be a percentage of whatever benefits from that, which is probably material or the cost of shop labor.
3. On the Sample Project Abbreviated Bid Schedule, do we fill in separate overhead rate?
Answer – The Proposing Schedule in Section 00 11 00 (Amendment 0002) has a breakout for both the overhead rate and the G&A rate. On the Sample Project Bid Schedule, we are only asking for G&A. Complete both pricing sheets.
4. What does Line E (Field Office Overhead) of $90,000 represent?
Answer: The Government chose to provide this number because field office overhead can be calculated a number of different ways.
5. Is there a requirement for a cost breakdown of our estimate in addition to the four pages allowed in Paragraph 2 of Attachment 2 Sample Project Description?
Answer: Proposers can use a maximum of four pages to provide any and all assumptions and plans used in developing the pricing.
6. On Attachment 1 of Amendment # 5 paragraph 1.3 the final sentence reads the design submittals shall include a 30%, 90% and corrected 100% "For Construction" submittal, how I should show or provide this on a sample project?
Answer: The government is going to assume that your design cost, stated on line A, does includes those three submittals costs, per the statement in section 1.3.