Amendment 0001 to W9128F-09-R-0033.

View the file

Other files for this federal contract opportunity

Other files attached to Contract Awards, newest first.
File Type Posted
Am_0004.pdf PDF
Q A R-0033.doc DOC document
Am_0003.pdf PDF
Am_0002.pdf PDF
09R0033-updated.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SCPIDT (SMALL CONSTRUCTION PROJECT INDEFINITE DELIVERY TYPE) at NORTH DAKOTA.

See attached documentation for content of the amendment to the RFP.

Date for receipt of Proposal Revisions is 14 APR 2009 at 1400 hours Central Time.

Government Point of Contact: Cheryl Bunting at (402)-995-2078.

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

MODIFICATION OF CONTRACTS/ORDER

NO.

E. IMPORTANT: Contractor

15B. CONTRACTOR/OFFEROR

is not, copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

is extended, B.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-

TRACT ORDER NO. IN ITEM 10A.

2. AMENDMENT/MODIFICATION NO.

6. ISSUED BY

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) is required to sign this document and return

15A. NAME AND TITLE OF SIGNER (Type or print)

PAGE OF PAGES 1. CONTRACT ID CODE

5. PROJECT NO. (If applicable) 4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE

7. ADMINISTERED BY (If other than Item 6)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY

16C. DATE SIGNED

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10B. DATED (SEE ITEM 13)

CODE CODE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

is not ex-copies to the issuing office.

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

(Signature of person authorized to sign) (Signature of Contracting Officer)

USAPPC V1.00

10A.

30-105-02

See Item 6US ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA, NE 68102-4901

CODE

W9128F

FACILITY CODE

J 1

0001 19 MAR 2009

W9128F-09-R-0033

13 MAR 2009

19 MAR 2009

Am #0001 - 2 (Continuation SF 30)

DEPARTMENT OF THE ARMY

Omaha District, Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901

:NOTICE: Failure to acknowledge : Solicitation No. W9128F 09 R 0033 :all amendments may cause rejec- :

:tion of the offer. See FAR : Date of Issue: 13 MAR 2009 :52.215-1 of Section 00 21 00 : Date of Receiving Proposals:

14 APR 2009

Amendment No. 0001 19 March 2009

SUBJECT: Amendment No. 0001 to Request for Proposal Solicitation Package for SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SMALL CONSTRUCTION PROJECT INDEFINITE DELIVERY TYPE (SCPIDT) CONTRACT in NORTH DAKOTA.

Solicitation No. W9128F 09 R 0033.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.)

(1) Section 00 22 00, to the end of this section add the attachment “DD Form 2631, Performance Evaluation (Architect- Engineer)” which is included as an attachment to this amendment.

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged. If the proposals have been mailed prior to receiving this amendment, you will notify the office where proposals are received, in the specified manner, immediately of its receipt and of any changes in your proposal occasioned thereby.

a. Hand-Carried Proposals shall be delivered to the U.S. Army Corps of Engineers, Omaha District, Contracting Division, 1616 Capitol Avenue, Omaha, Nebraska 68102-4901.

b. Mailed Proposals shall be addressed as noted in Item 8 on Page 00 11 00-1 of Standard Form 1442.

3. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 14 APR 2009.

Attachments:

DD Form 2631 “Performance Evaluation (Architect-Engineer)” as listed in item 1.a.(1)

Am #0001 - 3 (Continuation SF 30)

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

19 March 2009

JML/2186

PERFORMANCE EVALUATION

(ARCHITECT-ENGINEER)

A-E CONTRACTOR I.D. NUMBER

(For ACASS use only)

1. A-E CONTRACT NUMBER

2. CONSTRUCTION CONTRACT NUMBER

IMPORTANT: Be sure to complete back of form. If additional space is necessary for any item, use Remarks section on back.

3. TYPE OF EVALUATION

a. PHASE OF COMPLETION b. COMPLETION (X one) c. X IF APPLICABLE

INTERIM ( %) FINAL DESIGN

ENGINEERING

SERVICES CONSTRUCTION

TERMINATION

(Explain in Remarks)

4. PROJECT

NUMBER

5. DELIVERY

ORDER NO.(S)

(if applicable)

6. NAME AND ADDRESS OF A-E CONTRACTOR 7a. PROJECT TITLE AND LOCATION

7b. DESCRIPTION OF PROJECT IF NOT EXPLAINED BY TITLE

8. NAME, ADDRESS AND PHONE NUMBER OF OFFICE RESPONSIBLE FOR:

a. SELECTION OF A-E CONTRACTOR

c. ADMINISTRATION OF A-E CONTRACT

b. NEGOTIATION/AWARD OF A-E CONTRACT

d. ADMINISTRATION OF CONSTRUCTION CONTRACT

9. A-E CONTRACT DATA (Items 9d thru 9g are not applicable during construction unless there are modifications to the A-E contract.)

a. TYPE OF WORK (Design, study, etc.) b. TYPE OF CONTRACT

FIRM FIXED-PRICE

COST-REIMBURSEMENT

INDEFINITE DELIVERY/INDEFINITE QUANTITY (ID/IQ)

OTHER (Specify)

c. PROJECT COMPLEXITY

DIFFICULT ROUTINE

d. CONTRACT OR TASK ORDER AMOUNT

(1) INITIAL FEE

(2) CONTRACT OR TASK ORDER MODIFICATIONS

NO. AMOUNT

(3) TOTAL FEE

e. CONTRACT OR TASK ORDER AWARD DATE f. NEGOTIATED CONTRACT OR TASK ORDER

COMPLETION DATE (or number of days) (Including extensions)

g. ACTUAL CONTRACT OR TASK ORDER COMPLETION DATE (or number of days)

10. CONSTRUCTION CONTRACT DATA (Not applicable at completion of design or engineering services not involving construction.)

a. CONSTRUCTION COSTS

b. DATA AT TIME OF CONSTRUCTION COMPLETION (Completion date

(1) CONSTRUCTION MODIFICATIONS

(2) CONSTRUCTION MODIFICATIONS ARISING FROM DESIGN

DEFICIENCIES

(1) AUTHORIZED CONSTRUCTION COST

(2) A-E ESTIMATE FOR BID ITEMS

AWARDED

(3) AWARD AMOUNT

NUMBER TOTAL COST

11. A-E LIABILITY NONE UNDETERMINED PENDING $ SETTLEMENT $

12. OVERALL RATING 13. RECOMMENDED FOR FUTURE CONTRACTS?

EXCEPTIONAL

VERY GOOD

SATISFACTORY

MARGINAL

UNSATISFACTORY YES CONDITIONALLY

NO (Explain "No" or "Conditionally" in Remarks.)

14a. NAME, TITLE AND OFFICE OF RATING OFFICIAL

TELEPHONE NUMBER:

15a. NAME, TITLE AND OFFICE OF REVIEWING OFFICIAL

TELEPHONE NUMBER:

b. SIGNATURE c. DATE b. SIGNATURE c. DATE (Official Report date)

AGENCY USE: (Distribution, etc.)

PREVIOUS EDITION IS OBSOLETE. Exception to SF 1421 Approved by GSA/IRMS 11-92.

WHS/DIOR, Apr 99

DD FORM 2631, APR 1999 (EG)

TASK ORDER UNDER ID/IQ

16. QUALITY OF A-E SERVICES BY DISCIPLINE (Completion mandatory for both DESIGN and CONSTRUCTION phases and Engineering Services)

a. DISCIPLINES (If applicable)

DESIGN/SERVICES CONSTRUCTION

16b. DISCIPLINE, NAME AND ADDRESS OF KEY CONSULTANT(S) (If applicable)

Architectural Structural Civil

Mechanical Electrical Fire Protection

Surveying, Mapping, & Geospatial Information Svcs.

Cost Estimating

Value Engineering Environmental Engineering Geotechnical Engineering

Master Planning Hydrology

Chemical Engineering Geology Chemistry

Risk Assessment Safety/Occupational Health Hydrographic Surveying

Plans Clear and Detailed Sufficiently

Drawings Reflect True Conditions

Plans/Specs Accurate and Coordinated

Design Constructibility

Cooperativeness and Responsiveness

Timeliness and Quality of Processing Submittals

Product & Equipment Selections Readily Available

Timeliness of Answers to Design Questions

Field Consultation and Investigations

Quality of Construction Support Services

17. DESIGN PHASE OR ENGINEERING SERVICES (Quality of A-E Services Evaluation) ATTRIBUTES (If applicable)

18. HOW MANY 100% FINAL RESUBMITTALS WERE REQUIRED BECAUSE OF POOR A-E

PERFORMANCE?

19. CONSTRUCTION PHASE (Quality of A-E Services Evaluation)

EXCEP-

TIONAL

VERY

GOOD

SATIS-

FACTORY MARGINAL UNSATIS-

FACTORY

ATTRIBUTES (If applicable)

20. REMARKS (Attach additional sheet(s) or documentation if necessary)

DD FORM 2631 (BACK), APR 1999

EXCEP-

TIONAL

VERY

GOOD

SATIS-

FACTORY MARGINAL UNSATIS-

FACTORY

Thoroughness of Site Investigation/Field Analysis

Quality Control Procedures and Execution

Plans/Specs Accurate and Coordinated

Plans Clear and Detailed Sufficiently

Management and Adherence to Schedules

Meeting Cost Limitations

Suitability of Design or Study Results

Solution Environmentally Suitable

Cooperativeness and Responsiveness

Quality of Briefing and Presentations

Innovative Approaches/Technologies

Implementation of Sm. Business Subcontracting Plan

EXCEP-

TIONAL

VERY

GOOD

SATIS-

FACTORY MARGINAL UNSATIS-

FACTORY

EXCEP-

TIONAL

VERY

GOOD

SATIS-

FACTORY MARGINAL UNSATIS-

FACTORY

S30
am_0001narrative