INDUSTRIAL WASTE WATER TREATMENT PLANT at IOWA AAP, MIDDLETOWN, IOWA
Solicitation number
W9128F08R0031
Issued by

View the file

Other files

File Type Posted
am_0005.pdf PDF
am_0004.pdf PDF
am_0003.pdf PDF
am_0001.pdf PDF
W9128F-08-R-0031.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

INDUSTRIAL WASTEWATER TREATMENT PLANT, LINE 4A

PN 65008

IOWA AAP, MIDDLETOWN, IOWA

See attached documentation for content of the amendment to the RFP.

Date for receipt of Proposal Revisions is 17 JUNE 2008 at 1400 hours.

Government Point of Contact: Barbara Young at (402) 995-2069.

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

MODIFICATION OF CONTRACTS/ORDER

NO.

E. IMPORTANT: Contractor

15B. CONTRACTOR/OFFEROR

is not, copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

is extended, B.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-

TRACT ORDER NO. IN ITEM 10A.

2. AMENDMENT/MODIFICATION NO.

6. ISSUED BY

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) is required to sign this document and return

15A. NAME AND TITLE OF SIGNER (Type or print)

PAGE OF PAGES 1. CONTRACT ID CODE

5. PROJECT NO. (If applicable) 4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE

7. ADMINISTERED BY (If other than Item 6)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY

16C. DATE SIGNED

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10B. DATED (SEE ITEM 13)

CODE CODE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

is not ex-copies to the issuing office.

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

(Signature of person authorized to sign) (Signature of Contracting Officer)

USAPPC V1.00

10A.

30-105-02

See Item 6U.S. ARMY CORPS OF ENGINEERS, OMAHA DISTRICT

CONTRACTING OFFICE

106 SOUTH 15TH STREET

OMAHA, NE 68102-1618

CODE

W9128F

FACILITY CODE

J 1

0002 29 MAY 2008

W9128F-08-R-0031

6 MAY 2008

29-May-2008

Am #0002 - 1

Am #0002 - 2 (Continuation SF 30)

DEPARTMENT OF THE ARMY

Omaha District, Corps of Engineers 106 South 15th Street Omaha, Nebraska 68102-1618 :NOTICE: Failure to acknowledge : Solicitation No. W9128F 08 R 0031 :all amendments may cause rejec- :

:tion of the offer. See FAR : Date of Issue: 6 MAY 2008 :52.215-1 of Section 00 21 00 : NEW Date of Receiving Proposals:

17 JUN 2008

Amendment No. 0002 29 May 2008

SUBJECT: Amendment No. 0002 to Request for Proposal Solicitation Package for Design and Construction of Industrial Waste Water Treatment Plant, Line 4A at Iowa Army Ammunition Plant, Middletown, IA.

Solicitation No. W9128F 08 R 0031.

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.)

(1) Standard Form SF 1442, Page 00 11 00-1, delete date and time of receiving proposals shown and substitute "17 JUN 2008" at "1400".

(2) Section 00 22 00, page 11, paragraph 5.5.1.1, in the third sentence (“Firms are requested...http://www.ppirs.gov”) of the first paragraph, delete http://www.ppirs.gov” and substitute “http://www.cpars.csd.disa.mil/ccassmain.htm”.

(3) Section 00 22 00, page 12, paragraph 5.5.1.1, in the second sentence (“Additional information about...web page.”) of the second paragraph, delete “http://www.ppirs.gov” and substitute

(4) Section 00 22 00, page 12, paragraph 5.5.1.2, in the third sentence (“Firms are requested...http://www.ppirs.gov”) of the first paragraph, delete http://www.ppirs.gov” and substitute

(5) Section 00 22 00, page 12, paragraph 5.5.1.2, in the second sentence (“Additional information about...web page.”) of the second paragraph, delete “http://www.ppirs.gov” and substitute

(6) Section 00 22 00, page 16, paragraph 5.7.3, in the second paragraph, delete the last sentence (“Allow 20 calendar...design submittal.”) and substitute “Allow 30 calendar days review by Government (prior to review conference) for each design submittal.”

Am #0002 - 3 (Continuation SF 30)

(7) Section 01 30 00.24, add General Wage Decision IA080010 (Building) dated 5/2/08 to the end of this section.

(8) Section 01 30 00.24, page 13, paragraph 1.25, delete the contents of this paragraph and substitute the following:

“1.25 WAGE RATE APPLICATION

1.25.1 Heavy/Sewer Schedule

Applicable to all work required beyond 5 feet outside the building or structure.

1.25.2 Building Schedule

Applicable to work required within 5 feet outside the building or structure lines."

(9) Section 01 30 00.24, page 9, paragraph 1.18, delete this paragraph in its entirety and substitute “Not Used”.

(10) Section 01 30 00.24, delete the attachment “Drawing C- 8.10” in its entirety.

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged. If the proposals have been mailed prior to receiving this amendment, you will notify the office where proposals are received, in the specified manner, immediately of its receipt and of any changes in your proposal occasioned thereby.

a. Hand-Carried Proposals shall be delivered to the U.S. Army Corps of Engineers, Omaha District, Contracting Division (Room 301), 106 South 15th Street, Omaha, Nebraska 68102-1618.

b. Mailed Proposals shall be addressed as noted in Item 8 on Page 00010-1 of Standard Form 1442.

3. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 17 JUN 2008.

Attachments:

General Wage Decision IA080010, dated 5/2/08, listed in 1.a.(1) above

U.S. Army Engineer District, Omaha Corps of Engineers 106 South 15th Street Omaha, Nebraska 68102-1618

29 May 2008

JDW/2186

IA080010 - 1 Am_0002 5/29/2008

General Decision Number: IA080010 05/02/2008 IA10

Superseded General Decision Number: IA20070010

State: Iowa

Construction Type: Building

County: Des Moines County in Iowa.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up and including 4 stories.)

Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 04/04/2008 3 05/02/2008

IA080010 - 2 Am_0002

* CARP1260-006 05/01/2008

Rates Fringes

CARPENTER

Zone 3......................$ 22.61 10.33

ELEC0231-001 12/01/2007

Rates Fringes

ELECTRICIAN......................$ 25.81 10.82

ELEV0033-001 01/01/2008

Rates Fringes

ELEVATOR MECHANIC................$ 34.51 16.285

FOOTNOTE:

a. Employer contributes 8% of basic hourly rate for over 5 years service and 6% of basic hourly rate for under 5 years service as Vacation Pay Credit.

b. 8 Paid Holidays - New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

ENGI0150-018 06/01/2007

Rates Fringes

Cranes:

Cranes, Dragline, Tower Crane.......................$ 26.15 16.90

PREMIMUM PAY:

Cranes with attachments four (4) cu. yd. and over, with one hundred (100) feet of boom or over, or cranes with fifty

(50) ton or rated lifting capacity shall receive an additional seventy-five cents (.75) per hour.

Cranes with one hundred and fifty (150) feet of boom or over, or one hundred (100) ton or over rated lifting capacity, or cranes with attachments of six (6) cubic yards or over will receive an additional Fifty Cents ($.50) per hour over the aforementioned rate or $1.25 per hour over the otherwise applicable per hour rate.

Tower cranes or cranes with two hundred (200) feet, of boom or over shall receive an additional forty cents (.40) per hour over the aforementioned rate, or one dollar and fifty cents ($1.50) per hour over the otherwise applicable rate.

IA080010 - 3 Am_0002

IRON0577-001 06/01/2007

Rates Fringes

Ironworkers:.....................$ 22.00 13.81

LABO1238-001 05/01/1998

Rates Fringes

Laborers:

BRICK MASON TENDERS.........$ 14.00 4.61

PAIN0081-013 05/01/2007

Rates Fringes

Painters:

Brush & Roller, Spray, Sandblast Structural Steel, Pipes, Swing Stage, Bridges, Elevated Tanks, Flag Poles, Vessels and Steeple Jacks...............$ 22.10 5.00

PLUM0125-002 05/01/2007

Rates Fringes

PLUMBER/PIPEFITTER (Including HVAC Work).......................$ 30.65 10.67

SFIA0669-001 04/01/2008

Rates Fringes

SPRINKLER FITTER.................$ 29.61 14.30

SHEE0091-011 06/01/2007

Rates Fringes

Sheet Metal Worker...............$ 24.35 15.63

SUIA1998-001 08/27/1998

Rates Fringes

BRICKLAYER.......................$ 13.53

CEMENT MASON/CONCRETE FINISHER...$ 13.02 1.79

Heat and Frost Insulator.........$ 9.44

Laborer, Unskilled...............$ 9.68 2.50

IA080010 - 4 Am_0002

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

IA080010 - 5 Am_0002

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .