am_0001.pdf
PDF 5 MB Posted
- Solicitation number
- W9128F08R0031
About this file
Amendment 1 - Industrial Wastewater Treatment Plant
View the file
Other files
| File | Type | Posted |
|---|---|---|
| am_0005.pdf | ||
| am_0004.pdf | ||
| am_0003.pdf | ||
| am_0002.pdf | ||
| W9128F-08-R-0031.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
INDUSTRIAL WASTEWATER TREATMENT PLANT, LINE 4A
PN 65008
FORT CARSON, COLORADO
See attached documentation for content of the amendment to the RFP.
Date for receipt of Proposal Revisions is 5 JUNE 2008 at 1400 hours.
Government Point of Contact: Barbara Young at (402) 995-2069.
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
MODIFICATION OF CONTRACTS/ORDER
NO.
E. IMPORTANT: Contractor
15B. CONTRACTOR/OFFEROR
is not, copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer tended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
is extended, B.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-
TRACT ORDER NO. IN ITEM 10A.
2. AMENDMENT/MODIFICATION NO.
6. ISSUED BY
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) is required to sign this document and return
15A. NAME AND TITLE OF SIGNER (Type or print)
PAGE OF PAGES 1. CONTRACT ID CODE
5. PROJECT NO. (If applicable) 4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE
7. ADMINISTERED BY (If other than Item 6)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY
16C. DATE SIGNED
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10B. DATED (SEE ITEM 13)
CODE CODE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
is not ex-copies to the issuing office.
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
(Signature of person authorized to sign) (Signature of Contracting Officer)
USAPPC V1.00
10A.
30-105-02
See Item 6US ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
106 SOUTH 15TH STREET
OMAHA, NE 68102
CODE
W9128F
FACILITY CODE
J 1
0001 9 MAY 2008
W9128F-08-R-0031
6 MAY 2008
9 MAY 2008
Am #0001 - 2 (Continuation SF 30)
DEPARTMENT OF THE ARMY
Omaha District, Corps of Engineers 106 South 15th Street Omaha, Nebraska 68102-1618
:NOTICE: Failure to acknowledge : Solicitation No. W9128F 08 R 0031 :all amendments may cause rejec- :
:tion of the offer. See FAR : Date of Issue: 6 MAY 2008 :52.215-1 of Section 00 21 00 : Date of Receiving Proposals:
5 JUN 2008
Amendment No. 0001 9 May 2008
SUBJECT: Amendment No. 0001 to Request for Proposal Solicitation Package for Design and Construction of Industrial Waste Water Treatment Plant, Line 4A at Iowa Army Ammunition Plant, Middletown, IA.
Solicitation No. W9128F 08 R 0031.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Attachment 2, on the cover sheet, delete “(FOR INFORMATION
ONLY)”.
(2) After Attachment 2, add the attached For Information Only drawings as Attachment 3 to this solicitation:
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged. If the proposals have been mailed prior to receiving this amendment, you will notify the office where proposals are received, in the specified manner, immediately of its receipt and of any changes in your proposal occasioned thereby.
a. Hand-Carried Proposals shall be delivered to the U.S. Army Corps of Engineers, Omaha District, Contracting Division (Room 301), 106 South 15th Street, Omaha, Nebraska 68102-1618.
b. Mailed Proposals shall be addressed as noted in Item 8 on Page 00010-1 of Standard Form 1442.
3. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 5 JUN 2008.
Attachments:
Attachment 3: For Information Only drawings listed in 1.a.(2)
Am #0001 - 3 (Continuation SF 30)
U.S. Army Engineer District, Omaha Corps of Engineers 106 South 15th Street Omaha, Nebraska 68102-1618
9 May 2008
JDW/2186
Amendment #0001
ATTACHMENT 3
DRAWINGS (FOR INFORMATION ONLY)
4A-G-S601 CONCRETE VAULT AND TREATMENT TANK RENOVATION
(SHEET 1 OF 2)
4A-G-S601 CONCRETE VAULT AND TREATMENT TANK RENOVATION
(SHEET 2 OF 2)
E-9 LIGHTING, POWER, GROUND, AND LIGHTNING
PROTECTION PLANS
E-11 PROCESS BUILDING POWER PLAN
E-22 MAINTENANCE AND INERT PARTS POWER PLAN
E-28 PANEL SCHEDULES
E-29 PANEL SCHEDULES AND RISER DIAGRAMS
E-30 PANEL SCHEDULES
E-33 ONE-LINE DIAGRAM
E-34 ONE-LINE DIAGRAM
M-12 SUMP DETAILS
M-16 DETAILS
M-22 CONTROLS
File details come from the government source that posted it. Updated .