Am #0001 - 2

DEPARTMENT OF THE ARMY

Omaha District, Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901

:NOTICE: Failure to acknowledge : Solicitation No. W9128F 08 R 0024 :all amendments may cause rejec- :

:tion of the offer. See FAR : Date of Issue: 13 May 2008 :52.215-1 of Section 00 21 00 : Date of Receiving Proposals:

16 Jun 2008

Amendment No. 0001 20 May 2008

SUBJECT: Amendment No. 0001 to Request for Proposal Solicitation Package for Construction of:

Multiple Award Task Order Contract (MATOC) for Construction Missouri River Recovery Program:

Task Order No 0001: Fish And Wildlife Mitigation, Tyson Bend Project, Missouri River, Iowa & Nebraska

Solicitation No. W9128F 08 R 0024.

TO: Prospective Proposers and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.)

(1) Section 007200 Page 20, Clause 22 FAR 52.216-18 add “ See

Section 00 73 00 for contract dates.”

(2) Section 007200 Page 20, Clause 23 FAR 52.216-19 add “See

Section 00 73 00 for limits on task orders.”

(3) Section 007200 Page 110, add the following clause:

“1.34 FAR 52.216-27 Single or Multiple Awards (Oct 1995)" as follows:

The Government may elect to award multiple delivery order contracts or task order contracts for the same or similar supplies or services to two to five sources under this solicitation.”

(4) Section 007300 Page 2, paragraph 1.1, lines 1 and 2, delete

"Missouri River Mitigation Project" and substitute "Missouri River Recovery Project".

(5) Section 007300 Page 3, paragraph 1.4, Insert the following

Subparagraph (d):

“ (d) Contracting Officers from the U.S. Army Corps of Engineers, Kansas City District and Omaha District are authorized to place task orders under the resulting contract.”

(6) Section 007300 Page 3, paragraph 1.5.3, delete incomplete

Am #0001 - 3 sentence reading: "The Contractor is not obligated to honor."

(7) Section 007300 Page 3, paragraph 1.5, Insert the following

Subparagraph 1.5.5:

“1.5.5 GEOGRAPHIC LIMITATIONS

Projects could be accomplished in either the Omaha District or Kansas City District boundaries, in the states of Iowa, Kansas, Missouri, Nebraska, or South Dakota. All work will be done within the Missouri River main channel, the Missouri River flood plain, and the lower portions of larger tributaries, between Gavins Point Dam, SD and the mouth of the river near St. Louis, MO.”

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages as noted below. The substituted pages are revised and reissued with this amendment.

Pages Deleted Pages Substituted or Added

--- Attachment To Section 00 22 00 Attachment #1: Construction Materials, Products, Equipment, And Systems

(Tyson Bend Package) (Tyson Bend Package) Pages 00010-3 thru 00010-5 Pages 00010-3 thru 00010-5

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the Standard Form 1442. All other conditions and requirements of the request for proposal remain unchanged. If the proposals have been mailed prior to receiving this amendment, you will notify the office where proposals are received, in the specified manner, immediately of its receipt and of any changes in your proposal occasioned thereby.

a. Hand-Carried Proposals shall be delivered to the U.S. Army Corps of Engineers, Omaha District, Contracting Division, 1616 Capitol Ave, Omaha NE 68102-4901, Omaha, Nebraska 68102-1618.

b. Mailed Proposals shall be addressed as noted in Item 8 on Page 00010-1 of Standard Form 1442.

3. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 16 Jun 2008.

Attachments:

Attachment to Section 00 22 00 Standard Form 1442 Pages 00010-3 thru 00010-5 (Tyson Bend)

U.S. Army Engineer District, Omaha Corps of Engineers 1616 Capitol Ave Omaha NE 68102-4901

20 May 2008

MFS/2184

Attachment #1 Am #0001 Section 00 22 00

Attachment #1

CONSTRUCTION MATERIALS, PRODUCTS, EQUIPMENT, AND SYSTEMS

Equipment Type Manufacturer Make Model

00010-3 Am #0001

PRICING SCHEDULE

Item Estimated Unit No. Description Quantity Unit Price Amount

BASIC (Backwater Area)

0001 Entire work, complete, for clearing and grubbing as shown on the drawings and in the specifications 4.0 Acre $_________ $__________

0002. Entire work, complete, for quarried stone as shown on the drawings and in the specifications 4,400 Tons $ _________ $__________

0003 Entire work, complete, for excavation as shown on the drawings and in the specifications 613,800 CY $_________ $__________

0004 Mobilization/Demobilization of Marine Equipment as shown on the drawings and in the specifications L.S. Job - $___________

0005 All remaining work for the Basic work (excluding Options 1 and 2 below) L.S. Job - $__________

TOTAL BASIC $______________________

Option 1 (Main Chute STA 0+00 to 92+34)

0006 Entire work, complete, for clearing and grubbing as shown on the drawings and in the specifications 3.0 Acre $_________ $__________

0007 Entire work, complete, for quarried stone as shown on the drawings and in the specifications 7,100 Tons $ _________ $__________

00010-4 Am #0001

0008 Entire work, complete, for excavation as shown on the drawings and in the specifications 129,800 CY $_________ $__________

0009 All remaining work for The Option 1 (excluding Basic and Option 2 below) L.S. Job - $__________

TOTAL OPTION (Items 0006 thru 0009) 1 $______________________

OPTION 2 (Main Chute STA 92+34 to 133+00 & Access Road)

0010 Entire work, complete, for clearing and grubbing as shown on the drawings and in the specifications 6.0 Acre $_________ $__________

0011 Entire work, complete, for quarried stone as shown on the drawings and in the specifications 4,650 Tons $ _________ $__________

0012 Entire work, complete, for excavation as shown on the drawings and

In the specifications 282,100 CY $_________ $__________

0013 Entire work, complete, for embankment as shown on the drawings and in the specifications 7,400 CY $_________ $__________

0014 All remaining work for Option 2 L.S. Job - $__________

TOTAL OPTION 2 (Items 0010 thru 0014) $______________________

TOTAL AMOUNT: BASIC PLUS OPTION 1 PLUS OPTION 2 $______________________

Notes:

1. The quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to Contract Clauses "Variation in Estimated Quantity."

00010-5 Am #0001

2. Prices must be entered for all items of the schedule. Total amount submitted without prices being entered on individual items will be rejected. Extensions will be subject to verification by the Government. In case of variation between the unit prices and the extensions, the unit prices will be considered the proposal. In case of variation between the individual item prices and the total amount, the individual prices will be considered the proposal.

3. A modification to a proposal which provides for a single adjustment to the total amount should state the application of the adjustment to each respective unit price and lump sum price affected. If the modification is not so apportioned, the single adjustment will be applied to Item No. 0005.

4. See Section 01500 MEASUREMENT AND PAYMENT for additional information.