Unrestricted MATOC - DB and DBB URMATOC2021

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 08/16 DESCRIPTION OF WORK

01 32 00 03/17 PROJECT SCHEDULE

01 33 00 03/17 SUBMITTAL PROCEDURES

01 33 39.00 10 12/17 ADVANCED MODELING (BIM/CIM/GIS/CAD)

REQUIREMENTS

01 35 26 11/20 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 03/17 RMS3 - CONTRACTOR MODE (RMS3/CM)

01 45 04 11/16 CONTRACTOR QUALITY CONTROL

01 50 00 11/20 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19 11/15 TEMPORARY ENVIRONMENTAL CONTROLS

01 62 35 03/17 RECYCLED / RECOVERED MATERIALS

01 74 19 02/19, CHG 1: 08/20 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 05/19 CLOSEOUT SUBMITTALS

01 90 00 01/18 MISCELLANEOUS PROVISIONS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

(Am-0005)

Unrestricted MATOC - DB and DBB URMATOC2021

1.19 WATER AND ENERGY CONSERVATION

The Contractor is responsible for water and energy conservation at the job site and shall appoint an individual responsible for ensuring compliance.

The designated individual shall check the jobsite at the close of business each day to ensure all lights, utilities, and equipment are properly secured, turned off and powered down.

1.20 ELECTRONIC FILES

All paper documents submitted to the government, including, but not limited to meeting minutes, bonds, insurance certificates, correspondence, weekly payrolls, proposals, accident reports, submittals, etc shall be accompanied by an electronic copy of the document in pdf format at the same time that the paper document is submitted. The PDF copy shall be identical to the paper copy including signatures where applicable. The file name shall consist of the document type/name, subject and document date. Electronic files may be submitted on CD, DVD, email, DODSafe or via

RMS. Include a list of the documents included in the electronic submittal.

1.21 MILITARY INSTALLATION ACCESS

a. Contractors shall understand and comply with the installation access requirements in order to perform work on the installations. If the contractor chooses not to participate in the installation access requirement system, access will be limited, and all contractor personnel will be subject to standard access control procedures, security screenings and/or vehicle inspections. Additionally, access to the installation could be denied by the United States Government for noncompliance. Installation access requirements are subject to change, and the contractor is responsible for all associated costs.

b. AUTOMATED INSTALLATION ENTRY (AIE) for Army Projects Access to Fort

Shafter, Aliamanu Military Reservation, Schofield Barracks, Wheeler

Army Airfield, Tripler Army Medical Center, Pililaau Army Recreation

Area, and Helemano Military Reservation. The current system of record on Army Installations is the AIE system. As part of the Installation access requirements, background checks of contractor personnel may be required, and any costs and time impacts are the responsibility of the contractor. A state or federal ID card is required for access. Provide a list of contractor employees to the Contracting Officer

Representative within 14 calendar days prior to required installation access. The list must include full name, date of birth, social security number, the duration of contract if known (dates).

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

SECTION 01 90 00 Page 13

Section 01 90 00 Page 14

Special Contract Requirements - To be provided as applicable, in accordance with individual task order(s).

S-1 POTENTIAL FOR ASBESTOS ABATEMENT (NOV 1998)

The Government is uncertain as to the presence of asbestos in the building(s) or structure(s) to be worked on by the Contractor. If asbestos is discovered during the work, it will be handled in accordance with statement entitled, “PRICE ADJUSTMENT FOR CONTINGENT SCOPE OF WORK", found in Section 01 90 00 of this solicitation, S-14.

[End of Statement]

S-2 ASBESTOS ABATEMENT (AUG 1996)

Asbestos abatement is part of the scope of work for the proposed contract. Refer to paragraphs entitled, "ASBESTOS --- (OCCUPATIONAL HEALTH AND ENVIRONMENTAL)" in Section 01 90 00, S-18 and applicable sections of the technical specifications and drawings. The Contractor shall inform responsible representatives of their insurer(s)/surety(ies) that asbestos abatement is required for the proposed contract.

[End of Statement]

S-19A U.S. ARMY CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS MANUAL, EM 385-

1-1 (AUG 2002)

This paragraph applies to contracts and purchase orders that require the contractor to comply with EM 385-1-1 (e.g., contracts that include the Accident Prevention clause at FAR 52.236-13 and/or other safety provisions.)

The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.

Per EM 385-1-1 (latest version) Contractors shall ensure timely accident reporting is strictly adhered to. PODR 265 will be completed within 24 hours of all accidents (excluding first aid injuries). ENG 3394 forms will be completed within 5 days of lost time accident and forwarded to the Contracting Officer or Contracting Officer Representative.

All accidents will be reported through the Honolulu District, Safety Office, (808) 835-4009 within 24 hours of the incident.

[End of Statement]

S-19.2 PERFORMANCE OF WORK BY THE CONTRACTOR - ITEMIZATION

In connection with the Contract Clause in Section 00 72 00, entitled, "LIMITATIONS ON SUBCONTRACTING," the successful bidder must furnish the Contracting Officer within 30 calendar days after award the items of work which it will perform with its own forces and the estimated cost of those items. [FAR 36.501 and FAR 19.508(e)]

[End of Statement]

S-36.18 ACCIDENT PREVENTION PLAN (DEC 1998)

Within 15 days after receipt of Notice of Award of the contract, and at least 7 days prior to the preconstruction conference, four copies of the Accident Prevention Program shall be submitted to the Contracting Officer for review and acceptance. The program shall consist of the following forms and documents:

Section 01 90 00 Page 15

(a) An executed POD Form 248-R Rev (1 Jun 98), Accident Prevention Program, Administrative Plan.

(b) An executed POD Form 184-R Rev (16 Oct 98), Activity Hazard Analysis. (At the Contracting Officer's discretion, the Contractor may submit its Activity Hazard Analysis only for the first phase of construction provided that it is accompanied by an outline of the remaining phases of construction. All remaining phases shall be submitted and accepted prior to the beginning of work in each phase.)

(c) A copy of company policy statement of accident prevention and any other guidance statements normally provided new employees.

Contractor shall not commence physical work at the site until the program has been accepted by the Contracting Officer, or his authorized representative. In developing and implementing its Accident Prevention Program, the Contractor is also responsible for reviewing Section 1 of the most current edition of US Army Corps of Engineers Safety and Health Requirements Manual, Engineer Manual 385-1-1. [See paragraph entitled, SAFETY STANDARDS, in Section 01 90 00, S-19.

[End of Statement]

S-36.33 NOTIFICATION TO OFFERORS – ACCESS TO MILITARY INSTALLATIONS (JULY 2004)

All vehicle operators must be prepared to provide a valid driver’s license, vehicle registration, certificate of insurance and current safety inspection to the security guard prior to entry to the Installation. Offerors should anticipate a delay in entering the Installation and allow sufficient time when attending a site visit or pre-proposal conference or hand delivering an offer.

S-36.37 COST LIMITATION - JUNE 1999

The contract award for design and construction shall not exceed $_________ for this project. Offerors are under no obligation to approach this amount.

S-36.38 COST LIMITATION - TARGET CEILING - JUNE 1999

The target ceiling for contract award for design and construction is $___________, based on the funds made available for this project. The Government cannot guarantee that additional funds will be made available for award.

Offerors are under no obligation to approach this ceiling.

S-102 CONTRACTOR SUPPLY and USE OF ELECTRONIC SOFTWARE FOR PROCESSING DAVIS- BACON ACT CERTIFIED LABOR PAYROLLS (April 2011)

The contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8, PAYROLLS AND BASIC RECORDS and FAR 52.222-13, COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONS.

If the contractor elects to use an electronic Davis-Bacon payroll processing system, then the contractor shall be

Section 01 90 00 Page 16 responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Davis-Bacon and related Act regulations. When the contractor uses an electronic Davis-Bacon payroll system, the electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. If the contractor chooses to use an electronic Davis-Bacon payroll system, then the contractor shall obtain and provide electronic system access to the Government, as required to comply with the Davis-Bacon and related Act regulations over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.

The contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria: commercially available; compliant with appropriate Davis Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records (format at http://www.rmssupport.com/guides.aspx) for export in an Excel spreadsheet to be imported into the contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's Resident Management System (RMS); demonstrated security of data and data entry rights; ability to produce contractor-certified electronic versions of weekly payroll data; ability to identify erroneous entries and track the data/time of all versions of the certified Davis Bacon payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Davis-Bacon payroll processing system shall be provided to the Government during contract closeout.

All contractor-incurred costs related to the contractor's provision and use of an electronic payroll processing service shall be included in the contractor's price for the overall work under the contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services shall not be a separately bid/proposed or reimbursed item under this contract.

S-8 UTILITY OUTAGES

Utility outages shall be as hereinafter specified, unless otherwise indicated or specified. Interruptions to existing utilities shall be held to a minimum. Outages to facilitate connections to existing systems shall be scheduled to take place during periods of minimum demand. The Contractor shall submit a planned schedule of outages to the Contracting Officer for proper coordination with existing facilities, and shall notify the Contracting Officer in writing not less than 90 days in advance of the intended interruptions. [Electrical outages are classified based on the power sources, size, and point of termination. Outage request may required earlier notice depending on the classification of the outage]. Planned schedule of outages shall include specific dates, times, and anticipated duration of proposed outages. In the event the proposed outages interfere with station operations, the Contracting Officer will consider or offer alternate dates and/or times. Outages may be permitted during off-peak hours, hours of darkness, weekends, and holidays, at no additional cost to the Government. Work shall be planned to minimize outages. No utility outage will be permitted until the Contractor receives written approval from the Contracting Officer.

S-9 SIGNAL LIGHTS

The Contractor shall display signal lights and conduct its operation in accordance with the General Regulations of the Department of the Army and of the Coast Guard governing lights and day signals to be displayed by towing vessels with tows on which no signals can be displayed, vessels working on wrecks, dredges, and vessels engaged in

Section 01 90 00 Page 17 laying cables or pipe or in submarine or bank protection operations, lights to be displayed on dredge pipe lines, and day signals to be displayed by vessels of more than 65 feet in length moored or anchored in a fairway or channel, and the passing by other vessels of floating plant working in navigable channels, as approved by the Secretary of the Army (33 C.F.R. 201.1-201.16) and the Commandant, U.S. Coast Guard (33 C.F.R. 80.18-80.31a and 33 C.F.R.

95.51-95.70).

S-10 Little Fire Ant Avoidance

USAG-HI aims to ensure that the Little Fire Ant (LFA), Wasmannia punctata, an invasive species that was recently introduced to the State of Hawaii, does not become established on U.S. Army installations. LFA has the potential to infest homes and cause painful stings on both adults and children. The LFA also stings pets, such as dogs or cats on their eyes, which has the potential to cause blindness.

All new USAG-HI landscaping projects must be sourced from LFA free nurseries. For confidentiality reasons, the Hawaii Department of Health has not published a formal list of nurseries that are not fire ant free. However, the agency has disclosed that these nurseries are located in the Waimanalo area on the Windward coast of Oahu.

Therefore, it is strongly recommended that the covered persons not purchase or install any landscaping products purchased from the Waimanalo area until further notice.

Prior to purchasing the landscaping materials required for this contract, contact the Directorate of Public Works Natural Resource Program (NRP), at 655-9189 or 655-9191, to obtain an approval certificate for the project.

Once the landscaping materials are installed, provide NRP personnel access to survey and inspect the newly landscaped sites. The purpose of the inspection is to look for LFA. If LFA are found, the contractor who installed the plants must provide the labor and funding to remove the LFA. Under these circumstances, the responsible party may only use pest management controls that comply with the current USAG-HI Pest Management Plan and obtain approval from the Installation Pest Management Coordinator (IPMC) prior to any treatment. A copy of the Pest Management Plan may be obtained at Building 104 on Wheeler Army Airfield from the Pest Management Program Manager, 656-3093. The IPMC can provide guidance on how to comply with the Pest Management Plan.

S-11 - Hawaiian Hoary Bat Pupping Season

During the bat pupping season, 1 June to 15 September, there shall be no cutting or trimming of any tree over 15 feet tall.

S-14 PRICE ADJUSTMENT FOR CONTINGENT SCOPE OF WORK

As of the time this contract is awarded, the Government is uncertain as to presence of asbestos in the buildings or any other structures to be worked on by the Contractor. Upon discovering presence of asbestos in any part of the structures, the Contractor shall notify the Government thereof as soon as practicable. Upon becoming aware of presence of asbestos in any part of the structures through the contractor's notice or otherwise, the Government shall modify the contract for asbestos abatement and make an equitable adjustment to the contract price as called under the contract clause entitled Changes.

Section 01 90 00 Page 18

S-17 ASBESTOS --- (OCCUPATIONAL HEALTH AND ENVIRONMENTAL)

The Government is uncertain on the presence of asbestos at the time of award. The following paragraphs only apply if asbestos is discovered during the performance of the work. Refer to paragraph entitled PRICE ADJUSTMENT FOR CONTINGENT SCOPE OF WORK in Section 01 90 00, S-14 for procedural information upon discovery of asbestos.

(a) THE CONTRACTOR IS WARNED THAT EXPOSURE TO AIRBORNE ASBESTOS HAS BEEN

ASSOCIATED WITH FOUR DISEASES: LUNG CANCER, CERTAIN GASTROINTESTINAL CANCERS,

PLEURAL OR PERITONEAL MESOTHELIOMA AND ASBESTOSIS. Studies indicate there are significantly increased health dangers to persons exposed to asbestos who smoke and further, to family members and other persons who become indirectly exposed as a result of the exposed worker bringing asbestos-laden work clothing home to be laundered.

(b) The Contractor is advised that friable and/or nonfriable asbestos containing material has been identified in area(s) where contract work is to be performed. Friable asbestos containing material means any material that contains more than 1 percent asbestos by weight that hand pressure can crumble, pulverize or reduce to powder when dry. Nonfriable asbestos containing materials do not release asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition or other similar activities.

(c) Care must be taken to avoid releasing, or causing to be released, asbestos fibers into the atmosphere where they may be inhaled or ingested. The Occupational Safety and Health Administration (OSHA) has set standards at 29 CFR 1910.1001, for exposure to airborne concentrations of asbestos, fibers, methods of compliance, medical surveillance, housekeeping procedures and other measures that must be taken when working with or around asbestos containing materials which release airborne asbestos fibers at concentrations in excess of those established 29 CFR

1910.1001. 29 CFR 1910.1001 has been identified as applicable to construction (29 CFR 1926.55 gases, vapors, fumes, dusts and mists). The Environmental Protection Agency (EPA) has established standards at 40 CFR 61.140- 156 for the control of asbestos emissions to the environment and the handling and disposal of asbestos wastes.

(d) When contract work activities are carried out in locations where the potential exists for exposure to airborne asbestos fibers as described in paragraph (b), or where asbestos waste will be generated, the Contractor shall assure that all measures necessary to provide effective protection to persons from exposure to asbestos fibers (and prevention of contamination to property, materials, supplies, equipment and the internal and external environment) are effectively instituted.

(e) As a minimum, the Contractor shall comply with the provisions of 29 CFR 1910.1001 and 1926.55; 49 CFR 72.101, 172.200-204, 172.316, 173.1090; 40 CFR 61.140-156; and any state implementing hazardous waste under the Resources Conservation and Recovery Act (RCRA) requirements and any other applicable federal, state or local requirements.

(f) In addition to the information required in Contract Clause, ACCIDENT PREVENTION, of this contract, the Contractor's Accident Prevention Plan must also fully address the following topics, and at the Contractor's option may include additional information as applicable.

(1) Medical Surveillance: (29 CFR 1910.1001(J)).

(2) Employee training: Prior to beginning work in asbestos containing material area(s) (29 CFR 1910.1001 and 29

CFR 1910.134).

(3) Respiratory protection: (29 CFR 1910.1001 and 29 CFR 1910.134)

(4) Personal protective clothing and equipment: (29 CFR 1910.1001(d)). The use of compressed air to remove asbestos from workers' clothing is prohibited. The Contractor shall specify the type of change room, wash facilities and laundering facilities as applicable.

Section 01 90 00 Page 19

(5) Airborne asbestos monitoring: 29 CFR 1910.1001(f)). Specify the monitoring and analytical procedures to be used before, during, and after completion of contract work in areas where asbestos containing materials are located.

All asbestos monitoring shall be conducted under the guidance of an industrial hygienist certified by the American Board of Industrial Hygiene. Samples shall be analyzed by an American Industrial Hygiene Association (AIHA) accredited laboratory proficient in the analysis of asbestos and asbestos containing materials. Turn around time from end of sampling period to review of results of analyses by Contractor shall be no longer than 72 hours.

(6) Housekeeping: (29 CFR 1910.1001(h)). Dry sweeping of contract work areas contaminated with asbestos containing material is prohibited. The Contractor shall specify methods and materials used to package asbestos containing waste and plan to control any incidental airborne release or spill of asbestos containing material.

(7) Methods of compliance: (29 CFR 1910.1001(c)). Contractor shall include procedures relating to engineering controls, local exhaust ventilation, particular tools to be used and work practices (1910.1001(c)). Specify methods, materials and equipment to be used to prevent asbestos contamination to property, materials, supplies, equipment and the internal and external environment during maintenance, renovation or other contract activities. Local Exhaust ventilation equipment including power operated tools equipped with local exhaust ventilation shall conform with the Standard Fundamentals Governing the Design and Operation of Local Exhaust Systems ANSI Z9.2 latest revised edition. Describe the type of high-efficiency filtered (HEPA) vacuum cleaners that shall be used to vacuum asbestos containing materials. Describe methods and materials to be used to assure all asbestos containing material will be thoroughly wetted by use of a wetting agent and water before removal and that airborne asbestos dust will be kept to a minimum.

(8) Methods and materials to be used to decontaminate any property, materials, supplies, equipment and the environment if asbestos contamination results. (29 CFR 1910.1001(c)).

(9) Recordkeeping procedures. (29 CFR 1910.1001(i) and 1910.20).

(10) Specific description of packaging, marking and shipping conveyances to be used to transport asbestos containing waste from the generation point to a storage or disposal facility in compliance with Department of Transportation requirements. (49 CFR 172.101, 172.200-204, 176,316, 173.1090).

(11) Emergency procedures that would be taken if an accident of spill of asbestos containing material occurs during the transport of asbestos containing waste. (40 CFR 61.20-25).

(12) Methods and equipment used to off load and bury asbestos containing waste control airborne emissions at the burial site. (40 CFR 61.20-25).

(g) The Contractor shall complete and return to the Contracting Officer within 15 working days after the completion of all airborne asbestos monitoring conducted under this contract, a 'Summarization of Airborne Asbestos Sampling Results' form (ENG Form 4921-R, Jan 86) provided by the Government. NOTE: This completed summarization form is to be used by the US Army Corps of Engineers for statistical information purposes and does not relieve the Contractor from his recordkeeping requirements as described in 29 CFR 1910.1001(i) and 1910.20.

S-18 ASBESTOS --- (OCCUPATIONAL HEALTH AND ENVIRONMENTAL)

(a) THE CONTRACTOR IS WARNED THAT EXPOSURE TO AIRBORNE ASBESTOS HAS BEEN

ASSOCIATED WITH FOUR DISEASES: LUNG CANCER, CERTAIN GASTROINTESTINAL CANCERS,

PLEURAL OR PERITONEAL MESOTHELIOMA AND ASBESTOSIS. Studies indicate there are significantly increased health dangers to persons exposed to asbestos who smoke and further, to family members and other persons who become indirectly exposed as a result of the exposed worker bringing asbestos-laden work clothing home to be laundered.

Section 01 90 00 Page 20

(b) The Contractor is advised that friable and/or nonfriable asbestos containing material has been identified in area(s) where contract work is to be performed. Friable asbestos containing material means any material that contains more than 1 percent asbestos by weight that hand pressure can crumble, pulverize or reduce to powder when dry. Nonfriable asbestos containing materials do not release asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition or other similar activities.

(c) Care must be taken to avoid releasing, or causing to be released, asbestos fibers into the atmosphere where they may be inhaled or ingested. The Occupational Safety and Health Administration (OSHA) has set standards at 29 CFR 1910.1001, for exposure to airborne concentrations of asbestos, fibers, methods of compliance, medical surveillance, housekeeping procedures and other measures that must be taken when working with or around asbestos containing materials which release airborne asbestos fibers at concentrations in excess of those established 29 CFR

1910.1001. 29 CFR 1910.1001 has been identified as applicable to construction (29 CFR 1926.55 gases, vapors, fumes, dusts and mists). The Environmental Protection Agency (EPA) has established standards at 40 CFR 61.140- 156 for the control of asbestos emissions to the environment and the handling and disposal of asbestos wastes.

(d) When contract work activities are carried out in locations where the potential exists for exposure to airborne asbestos fibers as described in paragraph (b), or where asbestos waste will be generated, the Contractor shall assure that all measures necessary to provide effective protection to persons from exposure to asbestos fibers (and prevention of contamination to property, materials, supplies, equipment and the internal and external environment) are effectively instituted.

(e) As a minimum, the Contractor shall comply with the provisions of 29 CFR 1910.1001 and 1926.55; 49 CFR 72.101, 172.200-204, 172.316, 173.1090; 40 CFR 61.140-156; and any state implementing hazardous waste under the Resources Conservation and Recovery Act (RCRA) requirements and any other applicable federal, state or local requirements.

(f) In addition to the information required in Contract Clause, ACCIDENT PREVENTION, of this contract, the Contractor's Accident Prevention Plan must also fully address the following topics, and at the Contractor's option may include additional information as applicable.

(1) Medical Surveillance: (29 CFR 1910.1001(J)).

(2) Employee training: Prior to beginning work in asbestos containing material area(s) (29 CFR 1910.1001 and 29

CFR 1910.134).

(3) Respiratory protection: (29 CFR 1910.1001 and 29 CFR 1910.134)

(4) Personal protective clothing and equipment: (29 CFR 1910.1001(d)). The use of compressed air to remove asbestos from workers' clothing is prohibited. The Contractor shall specify the type of change room, wash facilities and laundering facilities as applicable.

(5) Airborne asbestos monitoring: 29 CFR 1910.1001(f)). Specify the monitoring and analytical procedures to be used before, during, and after completion of contract work in areas where asbestos containing materials are located.

All asbestos monitoring shall be conducted under the guidance of an industrial hygienist certified by the American Board of Industrial Hygiene. Samples shall be analyzed by an American Industrial Hygiene Association (AIHA) accredited laboratory proficient in the analysis of asbestos and asbestos containing materials. Turn-around time from end of sampling period to review of results of analyses by Contractor shall be no longer than 72 hours.

(6) Housekeeping: (29 CFR 1910.1001(h)). Dry sweeping of contract work areas contaminated with asbestos containing material is prohibited. The Contractor shall specify methods and materials used to package asbestos containing waste and plan to control any incidental airborne release or spill of asbestos containing material.

(7) Methods of compliance: (29 CFR 1910.1001(c)). Contractor shall include procedures relating to engineering controls, local exhaust ventilation, particular tools to be used and work practices (1910.1001(c)). Specify methods, materials and equipment to be used to prevent asbestos contamination to property, materials, supplies, equipment

Section 01 90 00 Page 21 and the internal and external environment during maintenance, renovation or other contract activities. Local Exhaust ventilation equipment including power operated tools equipped with local exhaust ventilation shall conform with the Standard Fundamentals Governing the Design and Operation of Local Exhaust Systems ANSI Z9.2 latest revised edition. Describe the type of high-efficiency filtered (HEPA) vacuum cleaners that shall be used to vacuum asbestos containing materials. Describe methods and materials to be used to assure all asbestos containing material will be thoroughly wetted by use of a wetting agent and water before removal and that airborne asbestos dust will be kept to a minimum.

(8) Methods and materials to be used to decontaminate any property, materials, supplies, equipment and the environment if asbestos contamination results. (29 CFR 1910.1001(c)).

(9) Recordkeeping procedures. (29 CFR 1910.1001(i) and 1910.20).

(10) Specific description of packaging, marking and shipping conveyances to be used to transport asbestos containing waste from the generation point to a storage or disposal facility in compliance with Department of Transportation requirements. (49 CFR 172.101, 172.200-204, 176,316, 173.1090).

(11) Emergency procedures that would be taken if an accident of spill of asbestos containing material occurs during the transport of asbestos containing waste. (40 CFR 61.20-25).

(12) Methods and equipment used to off load and bury asbestos containing waste control airborne emissions at the burial site. (40 CFR 61.20-25).

(g) The Contractor shall complete and return to the Contracting Officer within 15 working days after the completion of all airborne asbestos monitoring conducted under this contract, a 'Summarization of Airborne Asbestos Sampling Results' form (ENG Form 4921-R, Jan 86) provided by the Government. NOTE: This completed summarization form is to be used by the US Army Corps of Engineers for statistical information purposes and does not relieve the Contractor from his recordkeeping requirements as described in 29 CFR 1910.1001(i) and 1910.20.

(h) An industrial hygiene asbestos survey was conducted in the contract work area(s) to identify the presence of asbestos containing materials as described in paragraph (b) above. The data collected is contained in the ASBESTOS SURVEY REPORT found at the end of this section.

(i) The industrial hygiene asbestos survey described in paragraph (h) may not have identified all asbestos containing materials in the contract work area(s). When contract work area(s) appear to have asbestos containing material not identified in the ASBESTOS SURVEY REPORT, the Contractor shall conduct an asbestos survey to identify such material(s) in a manner similar to that described in the ASBESTOS SURVEY REPORT.

S-19 SAFETY STANDARDS

a. The successful offeror will be required to comply with Chapter 396 of the Hawaii Occupational Safety and Health Act (OSHA) standards and Title 12 Department of Labor and Industrial Relations, Subtitle 8 Division of Occupational Safety and Health, Part 2 General Industry Standards as well as with the Corps of Engineers Manual 385-1-1, Safety and Health Requirements Manual (latest version). [Title 29, CFR, Chap 18, Part 1910 (OSHA)]

b. The successful offeror shall attend the Honolulu District’s Effective Planning in Accident Prevention Training Course held quarterly or view the course video within 60 days after award of the contract. Confirmation of having taken the course shall be forwarded to the Contracting Officer Representative by a letter signed by the President of the Company.

Section 01 90 00 Page 22

S-22 VALIDATION OF COMMERCIAL ANALYTICAL CHEMISTRY LABORATORIES FOR U.S. ARMY

ENGINEER CORPS OF ENGINEERS' (USACE) HAZARDOUS, TOXIC & RADIOACTIVE WASTE (HTRW)

PROJECTS (FEB 2002)

Laboratories must be Corps validated laboratories and must be validated for project specific parameters and matrices prior to analyzing any samples under contract as part of the USACE HTRW Program execution. Laboratories must be revalidated every eighteen months if they are actively supporting USACE projects.

Initial laboratory validations require eight to twelve weeks, depending on the responsiveness of the laboratory.

Revalidation usually requires less time.

S-23.1 EMERGENCY PLANNING COMMUNITY RIGHT TO KNOW ACT (EPCRA)

EXTREMELY HAZARDOUS SUBSTANCES (EHS), CERCLA HAZARDOUS SUBSTANCES, AND

OTHER OSHA HAZARDOUS CHEMICALS (November 2012)

This applies to any contractor utilizing EPCRA EHS, CERCLA hazardous substances, and other OSHA hazardous chemicals in performance of any work while on any US Army Garrison, Hawaii (USAG-HI) installations. The EPCRA EHS are defined in EPA document EPA 550-B-98-017, Title III List of Lists, Consolidated List of Chemicals Subject to the Emergency Planning and Community Right to Know Act and Section 112(r) of the Clean Air Act Amended available at the following web address: http://epa.gov/emergencies/tools.htm#lol.

Contractors are responsible to know what chemicals they use or transport on USAG-HI Installations that are contained on the lists. For locations of these chemicals stored on USAG-HI Installations, the Contractors may request data by contacting the Directorate of Public Works (DPW), Environmental Division (ED) at 656-2878.

The Contractor shall provide contract description, period of contract performance, and contract number. A data base of locations storing hazardous substances meeting the requirements of this paragraph will be forwarded upon review and approval of the Contractors request.

(1) Reporting. All spills of substances containing EPCRA, EHS, and CERCLA hazardous substances, and OSHA hazardous chemicals will immediately be reported to the DPW, Emergency Spill Response Line at 656-1111. The Contracting Officer must also be notified during the first business hour immediately after discovery of the release.

In addition, all waste developed resulting from EPCRA EHS, CERCLA hazardous substances, and other OSHA hazardous chemicals being utilized will be reported to the DPW, ED at 656-2878.

(2) All Contractors Utilizing Substances Containing EPCRA EHS, CERCLA hazardous substances, and other OSHA hazardous chemicals will perform the following prior to contract start.

(a) Review the Installation Spill Contingency Plan and the Installation Hazardous Waste Management Plan available at the DPW ED. Upon review, the contractor or designated responsible employee shall sign a certification statement that they have reviewed and understand the contents of these documents.

(b) Provide a list of all EPCRA EHS, CERCLA hazardous substances, and other OSHA hazardous chemicals projected to be utilized (estimated quantities), storage locations and the Material Safety Data Sheets to the

DPW ED.

(c) The Contractor shall provide a copy of their Spill Response/Contingency Plan and copies related training certificates.

(3) Contractor Caused Spills or Waste Generated from Substances Containing EPCRA EHS, CERCLA Hazardous Substances, and OSHA Hazardous Chemicals.

(a) All spills caused by the Contractor will be cleaned up under supervision of the contractor and a qualified hazardous materials spill response company, at no cost to the government and in accordance with all applicable laws and regulations to the satisfaction of the Contracting Officer and the DPW ED.

Section 01 90 00 Page 23

(b) Contractor shall accomplish all spill notifications as required by the Contracting Officer, the U.S.

Environmental Protection Agency, State of Hawaii to the Hazard Evaluation Emergency Response Office, Local Emergency Response Commission and National Response Center.

(c) The Contractor shall pay for disposal costs (no cost to the government) for all contaminated materials/debris to include but not limited to soil, sorbent materials, disposable equipment and other materials contaminated by the spill. The Contractor shall sign the uniform hazardous waste manifests and secure a provisional EPA identification number (if required). Ensure that all aspects of management and disposal of wastes are in accordance with all applicable laws and regulations.

S-23.2 ASBESTOS PROHIBITION & CERTIFICATION (SEP 2000)

a. Materials or products containing more than one percent asbestos shall not be used in this project. The

Contracting Officer, at any time prior to acceptance of the work, or during the period designated for warranty of the work, if any, may reject materials and products that contain asbestos in excess of one percent, and direct the removal of such materials and products from the jobsite, at the sole expense of the contractor, and without additional time granted for performance of the work. After completion of this contract, if asbestos (exceeding 1%) is discovered in the products or materials (excluding items permitted by the exception) installed by the contractor, the Government reserves the right to direct the Contractor to perform asbestos abatement and restoration work, as required, at the Contractors' sole cost. Asbestos abatement work (removal and disposal of asbestos-containing materials and products) shall be accomplished in accordance with currently applicable United States Government and State of Hawaii standards for such work.

"Exception: Where suitable asbestos-free (equal to or less than 1% asbestos) substitutes do not exist for a material or product, the contractor may use a material or product containing asbestos in excess of 1%, with the prior written approval of the Contracting Officer. The Contractor shall submit a written request for such substitution, accompanied by a certification from the manufacturer of the material or product that shall set forth, in specific detail, the amount of asbestos present in the material or product. When available, laboratory analysis of the material or product for asbestos content shall be included with the submittal."

b. The Government may conduct asbestos testing on suspected asbestos-containing materials and products excluding items permitted by the "Exception", and such testing will be conducted at the expense of the Government. However, wherever destructive testing is required, or a material or product must be utilized by the Government for testing, the Contractor, shall, at its own expense, repair or replace the material or product, or the item of work that has been disturbed by testing, if the test results confirm presence of asbestos exceeding 1%. In the event test results indicate 1% or less asbestos content or complete absence of asbestos, the Contractor shall restore the test site to its original condition and the cost of restoration work, as approved by the Contracting Officer, shall be borne by the Government.

c. As a minimum, the Contractor shall furnish manufacturer's certification for the items listed below, excluding items permitted by the "Exception", certifying that they are asbestos free or do not contain asbestos in excess of 1%, as applicable. However, when presence of asbestos is suspected in other products and materials used in this project, the Contractor shall be required to provide such certification for those additional items when so directed by the Contracting Officer. Asbestos certification shall be required for the items applicable to this project only.

1. Vinyl sheet/vinyl tile flooring, including accessories and adhesives

2. Insulation materials including facing

3. Gaskets for piping and duct work

4. Acoustical Tiles

5. Firestopping materials

Section 01 90 00 Page 24

6. Fireproofing materials

7. Special Coating, including factory applied coatings, on sheetmetal roofing and siding

8. Wallboard for all interior and exterior applications including joint compounds

9. Adhesives (other than Item 1) used in the project

10. Tape materials used in the project

11. Roofing and Siding, nonmetallic

12. Felt materials and cushion materials

13. Pre-mixed mortars, grouts, leveling compounds, fillers, and other cementitious materials

14. Caulking and sealing materials

d. All submittals shall be accompanied by a certification from the manufacturer of the material or product that the material or product is asbestos-free; or shall set forth, in specific detail, the amount of asbestos present in the material or product. Documentary evidence of laboratory analysis of the material or product for asbestos content, conducted by an independent testing laboratory accredited for asbestos analysis by either the American Industrial Hygiene Association (AIHA) or the National Voluntary Laboratory Accreditation Program (NVLAP) administered by the National Institute of Standards and Technology (NIST).

e. The Contractor shall implement asbestos awareness and require all subcontractors, vendors, and suppliers to furnish materials and products free of asbestos except where and exception is warranted. The Contractor shall require all subcontractors, vendors, and suppliers to provide manufacturers certifications and data to support the exception. The request for exception shall be provided in writing to the Contracting Officer 30 days prior to commencement of any field work related to that product for which the exception is sought for the project.

f. The Contractor shall monitor all subcontractors, vendors, and suppliers to ensure asbestos containing building materials are not used in the project except those permitted by the Exception.

g. Recording

(1) The Contractor shall annotate on the as-built drawings the location where asbestos containing building materials and products have been used. The annotation shall contain the material and quantity.

(2) Where projects are completed using no asbestos, the Contractor shall prepare and sign a Certification of Asbestos Free Facility. The certification shall contain the project name, contract number, date of certification, and Contractor’s name. The certificate shall state that, to the best of Contractor’s knowledge, the facility has been completed without the use of asbestos containing building materials and products. The certification shall be signed by the company president or principal or by an individual authorized to sign for the president or principal.

S-28.6 REQUIRED INSURANCE

A. The contractor shall provide and maintain, during the entire performance of this contract, at least the following kinds and amounts of insurance pursuant to the clause in Section 00 72 00 entitled "Insurance--Work On A Government Installation":

Type Amount

1. Comprehensive General Liability $500,000 per occurrence

2. Comprehensive Automobile Liability:

Section 01 90 00 Page 25

(a) Bodily Injury or Death $200,000 per person

$500,000 per occurrence

(b) Property Damage $20,000 per occurrence

B. Additionally the contractor shall provide, before commencing performance under this contract, such workers' compensation insurance or security as the Defense Base Act (42 U.S.C. 1651, et seq.) requires and continue to maintain it until performance is completed pursuant to the clause in 01 90 00 entitled "Workers' Compensation Insurance (Defense Base Act)".

C. Before commencing performance under this contract, the contractor shall submit to the Contracting Officer a written certification that the insurance or security required under the foregoing paragraphs has been obtained along with the evidence thereof.

D. The contractor shall insert this clause in all subcontracts under this contract.

E. The Certificate Holder for both the Prime’s and Subcontractors' Certificates of Insurance shall be the U.S. Army Engineer District, Honolulu, Fort Shafter, Hawaii 96858-5440.

S-28.7 REQUIRED INSURANCE (Aug 2004)

(The following is applicable when work is performed on a government installation.)

The minimum insurance requirements, pursuant to Section 00 72 00, Contract Clause, "INSURANCE - - WORK ON A GOVERNMENT INSTALLATION" of this contract, are:

Workers' Compensation and Employer's Liability Insurance - Minimum coverage of $100,000.

Comprehensive General Liability Insurance - Minimum coverage of $500,000 per occurrence.

Automobile Liability Insurance

(1) Bodily Injury: Minimum coverage of $200,000 per person and $500,000 per occurrence.

(2) Property Damage: Minimum coverage of $20,000 per occurrence.

The Contractor shall insert the substance of this clause in subcontracts under this contract that require work on a Government installation.

The Certificate Holder for both the Prime’s and Subcontractors' Certificates of Insurance shall be the U.S. Army Engineer District, Honolulu, Fort Shafter, Hawaii 96858-5440. [FAR 28.306 and 28.307-2]

S-28.7A REQUIRED INSURANCE (Aug 2004)

The minimum insurance requirements, pursuant to Section 00 72 00, Contract Clause, "INSURANCE - - WORK ON A GOVERNMENT INSTALLATION" of this contract, as applied to [insert project title] are:

Workers' Compensation and Employer's Liability Insurance - Minimum coverage of $100,000.

Section 01 90 00 Page 26

Comprehensive General Liability Insurance - Minimum coverage of $500,000 per occurrence.

Automobile Liability Insurance

(1) Bodily Injury: Minimum coverage of $200,000 per person and $500,000 per occurrence.

(2) Property Damage: Minimum coverage of $20,000 per occurrence.

The Contractor shall insert the substance of this clause in subcontracts under this contract.

The Certificate Holder for both the Prime’s and Subcontractors' Certificates of Insurance shall be the U.S.

Army Engineer District, Honolulu, Fort Shafter, Hawaii 96858-5440. [FAR 28.306 and 28.307-2]

S-28.14 WORKERS COMPENSATION INSURANCE (DEFENSE BASE ACT) - CONSTRUCTION (OCT

2009)

(a) This Special Contract Requirement supplements FAR Clause 52.228-3 Workers' Compensation Insurance (Defense Base Act).

(b) The contractor agrees to procure Defense Base Act (DBA) insurance pursuant to the terms of the contract between the U.S. Army Corps of Engineers (USACE) and CNA Insurance unless the contractor has a DBA self-insurance program approved by the Department of Labor. Proof of this self-insurance shall be provided to the Contracting Officer. The contractor shall submit proof of a valid DBA Insurance policy with CNA Insurance for the Prime and their Subcontractor's at every tier prior to performance of the contract. The current rate under the USACE and JCC-I/A contract is $6.00 per $100 of compensation for construction.

(c) The contractor agrees to insert a Special Contract Requirement substantially the same as this one in all subcontracts (at every tier) to which DBA is applicable.

(d) Should the rates for DBA insurance coverage increase or decrease during the performance of this contract, USACE shall modify the contract accordingly. However, the revised rates will not be applicable until the Contractor's or Subcontractor's DBA Insurance policy is due to be renewed.

(e) Premiums will be reimbursed only if coverage is purchased through the USACE mandatory requirements DBA contract administered by CNA Insurance and their Managing Broker, Rutherfoord International.

(f) Claims Reporting - The Contractor shall make timely Defense Base Act insurance claims on behalf of each employee who is injured or killed in the course of their employment under this contract, and shall ensure that similar language is in each Subcontractor's contract. The Contractor's Safety Officer shall, in addition to any other duties required to be performed under the contract, perform the following:

(i) Make timely Defense Base Act insurance claims on behalf of each employee who is injured or killed in the course of their employment under this contract; and

(ii) Make monthly written reports to the Contracting Officer, Administrative Contracting Officer, and the District/Center Safety and Occupational Health Manager, providing the names of each such injured or deceased employee, the circumstances surrounding each injury or death, the dates of each injury or death, the date the insurance claim was made on behalf of each employee, and the current status of each claim.

The District/Center Safety and Occupational Health Manager POC is:

POHSafetyOffice@usace.army.mil

Section 01 90 00 Page 27

(g) Failure to comply and purchase Defense Base Act (DBA) Insurance in accordance with FAR Clauses

52.228-3 Workers' Compensation Insurance (Defense Base Act), from the U.S. Army Corps of Engineers mandatory Insurance Carrier/Broker (CNA Insurance/Rutherfoord International) for the Prime and all of the

Subcontractors at every tier, shall be considered a material breech and could cause your contract to be terminated for default/cause.

[End of Statement]

S-36.5 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

1. This provision specifies the procedure for determination of time extensions for unusually severe weather in accordance with the contract clause entitled DEFAULT (FIXED-PRICE CONSTRUCTION). In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

a. The weather experienced at the project site during the contract period must be found to…