W9128A-18-B-0006_-_Drawings_(Part_2_of_3).pdf
PDF 17 MB Posted
- Solicitation number
- W9128A-18-B-0006
About this file
Drawings (Part 2 of 3)
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P
J JJJ
13.
ALL EXPOSED CONDUITS SHALL BE GRC (GALVANIZED RIGID METALLIC
CONDUIT). ALL CONCEALED CONDUITS SHALL BE EMT (ELECTRICAL
METALLIC TUBING). ALL UNDERGROUND CONDUIT SHALL BE PVC SCHEDULE
40 UNLESS NOTED.
12.
7. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS IN ACCORDANCE WITH
THE CONTRACT DOCUMENTS. TESTING SHALL BE DONE IN ACCORDANCE
WITH THE CONTRACT DOCUMENTS.
ALL ELECTRICAL SPLICES BELOW GRADE SHALL BE WATERPROOF.
11.
REPAIR ANY DAMAGE TO EXISTING CONSTRUCTION RESULTING FROM THE
INSTALLATION OF ELECTRICAL ITEMS. THE AREAS REPAIRED SHALL MATCH
THE ADJACENT SURFACES IN TEXTURE AND COLOR.
10.
3. THE CONTRACTOR SHALL FURNISH ALL EQUIPMENT FOR TEMPORARY
CONSTRUCTION POWER AS REQUIRED.
FIRE ALARM/MASS NOTIFICATION SYSTEM GENERAL NOTES:
SHOULD PROJECT CONDITIONS REQUIRE REARRANGEMENT OF WORK, THE CONTRACTOR
SHALL MARK SUCH CHANGES ON THE AS-BUILT DRAWINGS. IF THESE CHANGES REQUIRE
ALTERNATE METHODS TO THOSE SPECIFIED IN THE CONTRACT DOCUMENTS, THE
CONTRACTOR SHALL SUBMIT DRAWINGS SHOWING THE PROPOSED ALTERNATE METHODS
TO THE CONTRACTING OFFICER. THE CONTRACTOR SHALL NOT PROCEED UNTIL
APPROVAL IS OBTAINED FROM THE CONTRACTING OFFICER. REARRANGEMENT OF WORK
FOR THE PURPOSE OF COORDINATION SHALL NOT BE CONSIDERED AN ITEM FOR EXTRA
COST.
THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CONTRACTING OFFICER
BEFORE MAKING ANY PENETRATIONS THROUGH STRUCTURAL MEMBERS OR
FIRE RATED WALLS AND SLABS.
ALL PENETRATIONS THROUGH FIRE BARRIERS SHALL BE FIRE STOPPED TO
MAINTAIN THE INTEGRITY OF THE FIRE BARRIER. FIRE STOPPING MATERIAL
SHALL BE U.L. LISTED.
THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL JUNCTION AND PULL
BOXES REQUIRED FOR THE INSTALLATION OF ELECTRICAL DEVICES AND
EQUIPMENT, WHETHER OR NOT SPECIFICALLY INDICATED ON THE PLANS.
SIZING OF THESE BOXES SHALL BE PER THE NATIONAL ELECTRICAL CODE.
6.
4.
2.
5.
8.
ALL EQUIPMENT SHALL BE CAPABLE OF FITTING IN THE SPACES LOCATED WHILE
MEETING THE MANUFACTURER'S RECOMMENDED ACCESS REQUIREMENTS. REVIEW
ALL PLACES WHERE EQUIPMENT IS TO BE INSTALLED PRIOR TO ORDERING OF
EQUIPMENT AND NOTIFY THE CONTRACTING OFFICER OF ANY INADEQUATE
CLEARANCES OR CONDITIONS THAT WILL PREVENT THE PROPER INSTALLATION,
MAINTENANCE, AND OPERATIONS OF THE EQUIPMENT.
PROVIDE ACCESS PANELS TO ALL CONCEALED TRANSFORMERS, DEVICES,
JUNCTION BOXES AND EQUIPMENT. COORDINATE THE LOCATION OF ACCESS
PANELS TO INSURE THAT THE EQUIPMENT CAN BE MAINTAINED ADEQUATELY.
PROVIDE BLANK COVER PLATES FOR EXPOSED RECESSED JUNCTION
BOXES AFTER REMOVAL OF ITEM NOT BEING REPLACED WITH NEW.
ALL EQUIPMENT, MATERIAL, DEVICE AND WIRING LOCATED
OUTDOORS SHALL BE RATED FOR WET CONDITIONS.
14.
15.
THE CONTRACTOR SHALL COMPLY WITH THE CONSTRUCTION PRACTICES
AND REQUIREMENTS OF THE LATEST EDITION OF THE NATIONAL ELECTRIC
CODE (NFPA 70), NATIONAL ELECTRICAL SAFETY CODE, AMERICAN
ELECTRICIANS HANDBOOK BY CROFT EDISON ELECTRIC INSTITUTE,
APPLICABLE INSTRUCTIONS OF MANUFACTURERS OF EQUIPMENT AND
MATERIALS SUPPLIED FOR THE PROJECT.
1.
9.
ALL WIRING SHALL BE CONCEALED UNLESS OTHERWISE NOTED IN
FINISHED AREAS. CUT AND PATCH EXISTING WALLS AND CEILINGS AS
REQUIRED FOR NEW CONCEALED CONDUIT INSTALLATION.
FIRE ALARM/MASS NOTIFICATION SYSTEM NOTES:
1.
7.
6.
5.
4.
10.
11.
12.
13.
3.
8.
9.
COORDINATE THE EXACT DEVICE LOCATIONS WITH ELECTRICAL AND MECHANICAL
SYSTEM EQUIPMENT AND BUILDING ARCHITECTURAL FEATURES. COORDINATE
FIRE ALARM DEVICES WITH FURNITURE PARTITION LOCATIONS TO ENSURE
DEVICES ARE NOT OBSTRUCTED.
MINIMUM CONDUIT SIZE SHALL BE 3/4"
MINIMUM CIRCUIT PERFORMANCE REQUIREMENTS:
IDC - INITIATING DEVICE CIRCUIT SHALL BE CLASS A
NAC - NOTIFICATION APPLICATION CIRCUIT SHALL BE CLASS A
SLC - SIGNALING LINE CIRCUIT SHALL BE CLASS A
ALL LOOPS SHALL HAVE OUTGOING AND RETURN CONDUCTORS IN SEPARATE
CONDUIT.
CLASS A CIRCUITS SHALL BE INSTALLED SUCH THAT THE OUTGOING AND
RETURN CONDUCTORS ARE SEPARATED 1 FOOT WHERE THE CABLE IS
INSTALLED VERTICALLY AND 4 FEET WHERE THE CABLE IS INSTALLED
HORIZONTALLY. THE OUT GOING AND RETURN CIRCUIT CONDUCTORS ARE
PERMITTED TO BE INSTALLED IN THE SAME CONDUIT FOR A MAXIMUM
DISTANCE OF 10 FEET WHERE THE OUTGOING AND RETURN CONDUCTORS
ENTER OR EXIT THE DEVICE.
"T" TAPPING OF ANY CLASS "A" CIRCUIT IS PROHIBITED.
UPON COMPLETION OF THE INSTALLATION OR ALTERATION, A SATISFACTORY
TEST OF THE ENTIRE SYSTEM SHALL BE MADE IN THE PRESENCE OF THE
CONTRACTING OFFICER REPRESENTATIVE AND FEDERAL FIRE INSPECTOR. ALL
FUNCTIONS OF THE SYSTEM SHALL BE TESTED.
PROVIDE BOOSTER PANELS AS REQUIRED FOR A COMPLETE SYSTEM.
PROVIDE DETECTION (SMOKE DETECTOR) AT ALL PANELS & POWER
EXTENDER PANELS.
ALL EXTERIOR DEVICES SHALL BE WEATHERPROOFED & ALL DEVICES LOCATED
IN WET LOCATIONS SUCH AS SHOWERS SHALL BE WEATHERPROOF TYPE.
MANUAL ACTIVATION DEVICE
(PULL STATION)
AUDIO DEVICEVISUAL OR
COMBINED
AUDIO/VISUAL
DEVICE
MOUNTING/INSTALLATION REQUIREMENTS
ALL CONNECTIONS FOR IDC, NAC, AND SLC CONDUCTORS TO BE MADE USING
SCREWED TERMINAL BLOCKS. (WIRE NUTS ARE PROHIBITED)
"6
K E
Y P
A D
A T
FIRE ALARM
CONTROL
PANEL/MASS
NOTIFICATION
PANEL
B O
T T
O M
O F
D E
V
IC
E
B O
T T
O M
O F
D E
V
IC
E
H A
N D
L E
T O
H A
N D
L E
CLASS A OUTGOING AND RETURN CONDUCTORS TO BE
SEPARATED A MINIMUM OF 12" WHERE THE CABLE IS INSTALLED
VERTICALLY AND 48" WHERE THE CABLE IS INSTALLED
HORIZONTALLY. THE OUTGOING AND RETURN CIRCUIT CONDUCTS
ARE PERMITTED TO BE INSTALLED IN THE SAME CONDUIT FOR A
MAXIMUM DISTANCE OF 10 FEET WHERE THE OUTGOING AND
RETURN CONDUCTS ENTER OR EXIT THE DEVICE
OUTGOING AND RETURN WIRING ARE
NOT PERMITTED TO BE INSTALLED IN
A SINGLE CONDUIT.
14. MASS NOTIFICATION STROBES SHALL BE MARKED "ALERT" AND BE
AMBER IN COLOR.
ALL AUDIBLE AND VISUAL APPLIANCES SHALL BE SYNCHRONIZED AND
PROVIDE THE STANDARD TEMPORAL PATTERN PER NFPA 72.
FIRE ALARM/MASS NOTIFICATION SYSTEM SHALL COMPLY WITH NFPA 70, NFPA 72,
NFPA 90A, ADAAG, ABA, UFAS AND SPECIFICATIONS. PROVIDE A SUPERVISED,
COMBINED AUDIO, FIRE, AND EMERGENCY EVACUATION SYSTEM.
EXTERIOR AUDIBLE DEVICES SHALL MEET THE PUBLIC MODE
AUDIBILITY REQUIREMENTS PER NFPA 72.
15. DUCT DETECTOR SHALL BE COMPATIBLE WITH THE FIRE ALARM SYSTEM.
1" WITH TYPE II COAXIAL CABLE
LIGHTNING ARRESTOR STATIC
DISCHARGE UNIT W/ ENCLOSURE
WALL MOUNTS
1" F/F PULLING ELBOW
BUILDING TRANSCEIVER
ANTENNA CUT TO FREQUENCY BY INSTALLER
16. STROBES SHALL FLASH AT A MINIMUM OF 15 CANDELA UNLESS NOTED OTHERWISE.
FACP/
MNP
THE NUMBER OF DEVICES SHOWN ARE CONCEPTUAL . THE FIRE ALARM SYSTEM
SHOWN IS MINIMUM REQUIRED AND THE FINAL QUANTITY SHALL BE IN ACCORDANCE
WITH THE APPLICABLE CODE, SPECIFICATIONS AND MANUFACTURER'S EQUIPMENT
LISTING. SHOP SUBMITTAL TO SHOW DETAILED DEVICE LOCATIONS IN ACCORDANCE
WITH THE MANUFACTURER'S LISTED INSTALLATION REQUIREMENTS AND WIRE COUNT.
2.
THE NUMBER OF DEVICES SHOWN ARE CONCEPTUAL . THE FIRE ALARM SYSTEM
SHOWN IS MINIMUM REQUIRED AND THE FINAL QUANTITY SHALL BE IN ACCORDANCE
WITH THE APPLICABLE CODE, SPECIFICATIONS AND MANUFACTURER'S EQUIPMENT
LISTING. SHOP SUBMITTAL TO SHOW DETAILED DEVICE LOCATIONS IN ACCORDANCE
WITH THE MANUFACTURER'S LISTED INSTALLATION REQUIREMENTS AND WIRE COUNT.
16.
POWDER ACTUATED FASTENERS, SHOT PINS, AND EXPANSION BOLTS LESS THAN 1/2"
IN DIAMETER SHALL NOT BE PERMITTED IN EXISTING PRECAST CONCRETE ROOF
MEMBERS SUCH AS INVERTED T-GRIDERS, RECTANGULAR BEAMS, AND WEB OR STEM
PORTIONS OF DOUBLE T-GRIDERS. SEE ROOF FRAMING PLANS ON STRUCTURAL
DRAWINGS.
17.
17. ALL CONDUIT, JUNCTION/BACK BOXES, COVERS AND COUPLINGS, WHEN
PROVIDED MUST BE FACTORY PAINTED RED IN UNFINISHED AREAS (E.G.,
ABOVE CEILINGS, MECHANICAL ROOMS, ETC.)
18. ALL CONDUIT, JUNCTION/BACK BOXES, COVERS AND COUPLINGS, WHEN
PROVIDED ARE PERMITTED TO BE PAINTED TO MATCH THE ROOM
FINISHING IN FINISHED AREAS. THE INSIDE COVER OF THE JUNCTION
BOX MUST BE IDENTIFIED AS "FIRE ALARM" AND THE CONDUIT MUST
HAVE PAINTED RED BANDS 3/4" (20 MM) WIDE AT 20 FEET (6M) INTERVALS
AND ON BOTH SIDES OF ALL FLOOR, WALL, AND CEILING PENETRATIONS.
THE PROJECT AND SPECIFICATIONS SHALL REFERENCE THE USAC ENGINEERING
MANUAL (EM), EM-385-1-1 AND NFPA 241, 2013 EDITION AND SHALL FOLLOW THE
REQUIREMENT OF THE INSTALLATION'S FIRE REGULATIONS.
18.
THE CONSTRUCTION (SHOP) DRAWINGS AND CALCULATIONS MUST BE PREPARED BY,
OR PREPARED UNDER THE IMMEDIATE SUPERVISION OF THE QFPE. THE QFPE MUST
AFFIX THEIR PROFESSIONAL ENGINEERING STAMP WITH SIGNATURE TO THE SHOP
DRAWINGS, CALCULATIONS AND MATERIAL DATA SHEETS, INDICATING APPROVAL
PRIOR TO SUBMITTING THE FIRE ALARM SYSTEM SHOP DRAWINGS TO THE DFPE. THE
QFPE MUST MONITOR THE INSTALLATION OF THE FIRE PROTECTION SYSTEMS AND
CERTIFY IN WRITING THAT THE FIRE PROTECTION SYSTEMS HAVE BEEN
CONSTRUCTED AND OPERATE AS INTENDED IN THE DESIGN PLANS AND
SPECIFICATIONS.
19.
THE FIRE ALARM TRANSMITTER SHALL BE MONACO AND THE MASS NOTIFICATION
TRANSCEIVER IS COOPER WAVES 8.
20.
FIRE ALARM/MASS NOTIFICATION PANELFMCP
WP WEATHER PROOF
ADDRESSABLE MONITOR MODULEM
FEP
FIP FIRE ALARM RADIO TRANSCEIVER INTERFACE PANEL
EXIST
SYMBOLS
NEW
DESCRIPTION
MANUAL PULLSTATION
RADIO TRANSCEIVER ANTENNA (SEPARATE FOR MASS AND FIRE ALARM)
FIRE ALARM/MASS NOTIFICATION LEGEND
FIRE ALARM POWER EXTENDER PANEL
PS PRESSURE SWITCH
M
WALL MOUNTED FIRE ALARM/MASS NOTIFICATION SPEAKER
TAMPER SWITCH
FLOW SWITCH
SMOKE DETECTOR, PHOTOELECTRIC
LOCAL OPERATOR'S CONSOLELOC
MASS NOTIFICATION POWER EXTENDER PANELMEP
RAP REMOTE AMPLIFIER PANEL
EMERGENCY HVAC SHUTDOWN SWITCH
F
CEILING MOUNTED MASS NOTIFICATION STROBE WITH AMBER LENSE MARKED "ALERT"
WITH CANDELA RATING NOTED
CEILING MOUNTED FIRE ALARM STROBE WITH CLEAR LENSE MARKED "ALERT"
WITH CANDELA RATING NOTED
XX
XX
CEILING MOUNTED FIRE ALARM/MASS NOTIFICATION SPEAKER/STROBE WITH CLEAR
LENSE MARKED "ALERT" WITH CANDELA RATING NOTED
XX
WALL MOUNTED FIRE ALARM/MASS NOTIFICATION SPEAKER/STROBE WITH CLEAR
LENSE MARKED "ALERT" WITH CANDELA RATING NOTED
MASS NOTIFICATION TRANSCEIVERTRX
PHOTOELECTRIC DUCT SMOKE DETECTOR
XX
C
CEILING MOUNTED FIRE ALARM/MASS NOTIFICATION SPEAKER
C
P
P
P
SURGE SUPPRESSIONTV
FIRE ALARM/MASS NOTIFICATION ANNUNCIATORANN
HS
MM
No. FP 001359
R E G
IS
T E
R
ED
PRO
FESS IONAL
EN
G
IN
E E R
B A R R
Y G .S .
J
IM
O N
F I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O N
S T A
T E
OF CA L I F
O R
N I A
SIGNATURE
JUNE 30, 2019
US Army Corps of Engineers ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
B J
IM
O N
W A
-1 -D
-0
H O
N O
L U
L U
D
IS
T R
IC
T
F O
R T
S H
A F
T E
R H
A W
A
II
U
L R
IC
H
W A
Y
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
I
IN
S
Y N
E R
G Y
E N
G
IN
E E
R I N
G
IN
C
F
O R
T S
T R
E E
T M
A L L S
U
IT
E
H
O N
O L U
L U
H
I
18SB02
OF 173
FA001
F
IR
E A
L A
R M
N O
T E
S A
N D
L E
G E
N D
R S
U S
T E
R
R S
U S
T E
R
B J
IM
O N
M
A Y
RTA SUBMITTAL, DBB, 7 MAY 2018
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G
S E
C O
N D
T
IT
L E
S
B F
A
No. FP 001359
R E G
IS
T E
R
ED
PRO
FESS IONAL
EN
G
IN
E E R
B A R R
Y G .S .
J
IM
O N
F I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O N
S T A
T E
OF CA L I F
O R
N I A
SIGNATURE
JUNE 30, 2019
GENERAL NOTES:
1. CONTRACTOR TO FIELD VERIFY LOCATION OF THE
EXISTING DEVICES AND COMPONENTS.
DEMOLISH ALL EXIST.
FIRE ALARM DEVICES,
PANELS, CONDUITS,
AND COMPONENTS IN
BLDG. 2091
WOMENS
7A
MEN'S
7B
ADCO
CORRIDOR
CLASSROOM
131WAITING
CIVILIAN
ACPL
CPC
STOR
STOR
17A
STOR
COMPUTER RM
INSTRUCTOR
CONTRACT
COORDINATOR
PREVENTION
CORRIDOR
PREVENTION
ASSISTANT
BREAK ROOM
WAITING
MILITARY
TESTING
CIVILIANTOILET
AIBTC
STAFF
COFFEE AREA
FTDTL
BOOTH
TOILET
TOILET
STORAGE
SECURED
STORAGE
STORAGE
STAFF
TOILET
STAFF
JAN
ELECT
LUNCH ROOM
PROGRAM
OFFICE
14B
OFFICE
14A
CLASSROOM #2
ACS
CLASSROOM #1
ACS
PROGRAM
LC STORAGE
19D
LC STORAGE
19E
LC STORAGE
19C
CLOSET
LENDING
CLOSET
19A
LENDING
LC STORAGE
19B
IVC
READINESS
FINANCIAL
ACS
6A
CHIEF
OFFICE
16R
OFFICE
OFFICE
LOBBY
STORAGE
AER FILES
16F
CORRIDOR
4A
CORRIDOR
PROGRAM
ADVOCACY
FAMILY
PROGRAM
ADVOCACY
FAMILY
READINESS
STORAGE
I&R FILES
MGR
I&R
BREAK
2A
COMM
16S
OFFICE
8A
STORAGE
133A
COMM
11E
TOILET
11D
OFFICE
11A
OFFICE
11B
OFFICE
11C
STOR
11F
HALL
11J
FAMILY
STOR
11G
CORRIDOR
4B
CORRIDOR
OFFICE
8E
OFFICE
8D
OFFICE
8C
JAN
7C
ELECT
8B
OFFICE
9A
OFFICE
9B
STOR
11H
MEMBER
FAMILY
EXCEPTIONAL
OFFICE
16A
OFFICE
16B
OFFICE
16C
OFFICE
16D
OFFICE
16E
STORAGE
17B
A A
B
C
D
E
F
B
C
D
E
F
2 3 4 5 6 7 8
3 4 5 6 7 8 9 10 11
2322212019181716
20191817161514
UP
U P
DNDN
DN
DN
D N
DN
DN
US Army Corps of Engineers ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
B J
IM
O N
W A
-1 -D
-0
H O
N O
L U
L U
D
IS
T R
IC
T
F O
R T
S H
A F
T E
R H
A W
A
II
U
L R
IC
H
W A
Y
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
I
IN
S
Y N
E R
G Y
E N
G
IN
E E
R I N
G
IN
C
F
O R
T S
T R
E E
T M
A L L S
U
IT
E
H
O N
O L U
L U
H I
18SB02
OF 173
FD101
F
IR
E A
L A
R M
D E
M O
L
IT
IO
N
P L A
N
R S
U S
T E
R
R S
U S
T E
R
B J
IM
O N
M
A Y
RTA SUBMITTAL, DBB, 7 MAY 2018
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G
3/32" = 1'-0"A1
FIRE ALARM DEMOLITION PLAN
S E
C O
N D
T
IT
L E
S
B F
D
E G
IS
T E
R
ED
PRO
FESS IONAL
EN
G
IN
E E R
B A R R
Y G .S .
J
IM
O N
F I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O N
S T A
T E
OF CA L I F
O R
N I A
SIGNATURE
JUNE 30, 2019
REF.
W
W P P
P2 W
W P
P
P
W
W P
2WWP
L O
C
A N
N
P
2W WP
FEP
MEP
FMCP TRX FIP
P
W
W P
W
W P
P
30 2W
2W WP
2WWP
P
RAP FTR
DN
UP
DN
DN
DN
DN
REF.
W
W P P
P2 W
W P
P
P
W
W P
2WWP
L O
C
A N
N
P
2W WP
FEP
MEP
FMCP TRX FIP
P
W
W P
W
W P
P
30 2W
2W WP
2WWP
P
RAP FTR
AA
BB
CC
DD
EE
FF
M
30 1/2W
C
M
30 1/2W
C
M
C M
1/2W
75 1/2W
C 75
M
75 1/2W
C 75
M
1/2W
C
75 1/2W
C 75
M
75 1/2W
C 75
M
75 1/2W
C 75
M
75 1/2W
C 75
M
75 1/2W
C 75
M
75 1/2W
C
75M
2W
M
2W
M
30 1/2W
C 30
M
C
1/2W
M
C
1/2W
M
1W
75 1/2W
C WP
75WP
M
30 1/2W
C
M
30 1/2W
C 30
M
C
1/2W
75 1/2W
C WP
75WP
M
30 1/2W
C WP
30WP
M
15 1/2W
C 15M
1/2W
C 30 M
2W
M P
M
30 1/2W
C 2W
M 75
30 1/2W
C 30
M
30 1/2W
C
30M
C 1/2W
M
15 1/2W
C 15
M
1/2W
C
M
1/2W
C
75 1/2W
C
75M
30 1/2W
C 30
M
75 1/2W
C
75M
75 1/2W
C
1/2W
C
75 1/2W
M
75C
75 1/2W
M
75C
75 1/2W
M
75C
75 1/2W
M
75C
30 1/2W
C
30M
30 1/2W
C
30M
75 1/2W
C 75
M
75 1/2W
C 75
M 30 1/2W
C
30M
HS 75 1/2W
M
75C
30 1/2W
C 30 M
30 1/2W
C 30
M
30 1/2W
M
30 1/2W
C 30 M
30 1/2W
M
30 1/2W
M
30 1/2W
M
C
C
C F 15
M 15
75 1/2W
C
M
75 1/2W
C
M
30 1/2W
C
30M
1/2W
C
1/2W
C
75 1/2W
C 75
M
30 1/2W
C
M
30 1/2W
C
M
30 1/2W
C M 3015
1/2WC
M 15
30 1/2W
C
M
30 1/2W
C
M
30 1/2W
C
M
P
15 1/2W
C
M
15 1/2W
C
M
1/2W
C
1/2W
C
15 1/2W
C
M
1/2W
C
15 1/2W
C
M
15 1/2W
C
M
1/2W
C
1W
M
P
M
1W
M
1/2W
15 1/2W
C
M
30 1/2W
C
30M
30 1/2W
C
30M
30 1/2W
C
M
1/2W
M
C
C
30 1/2W
C 30
M
15 1/2W C
15M
30 M
1/2W
30 1/2W
C 30
M
30 1/2W
C 30
M
15WP
15WP
F
M
MWP
1/2WWP
MWP
1/2WWP
15WP
15WP
F
M
30 1/2W
C 30
M
30 1/2W
C
30M
30 1/2W
C
30M
30 1/2W
C
30M
30 1/2W
C
30M
30 1/2W
C
30M 75 1/2W
C
75M
WP
WP
75 1/2W
C
75M
WP
WP
15WP
M
WP F
15WP
F
WP M
1/2W
C 30
M
1/2W
C
M 1/2W
C
1/2W
C
M
C 1/2W
M
P
30 1/2W
C
30M
75 1/2W
C
75M
75 1/2W
C 75
M
1/2W
M
C
1/2W
M
75C
1/2W
C
M
1/2W
C
M
1/2W
C
M
30 1/2W
C
M
30 1/2W
C
M
30 1/2W
C
M
30 1/2W
C
M
30 1/2W
C
M
30 1/2W
C
M
30 1/2W
C
M
30 1/2W
C
M
M
1/2W15
CM
1/2W15
C
1/2W
C
M
30 1/2W
C
30M
30 1/2W
C
30M
M
M
1/2W30
C
C
1/2W
M
C
1/2W
M
C 1/2W
M
30 1/2W
C
M
30 1/2W
C
M
75 1/2W
C
M
75 1/2W
C
M
30 1/2W
C
M
C
1/2W
M
75 1/2W
C
M
75 1/2W
C
M
75 M
1W
30 1/2W
C 30
M
75M
WP WP
M
AIM
AIM AIM
AIM
AIM
PS
AIM
P
AOM
AIM
P
AOM
1/2W
C
1/2W
C
1/2W
C
75 1/2W
C 75
M 1/2W
C
75 1/2W
C
M
1/2W
C
75 1/2W
C 75
M 1/2W
C
75 1/2W
C
1/2W
C
75 1/2W
C M
M
1/2W
C
C 1/2W
M
AIM
AOM
AIM
AOM
AIM
AOM
AIM
AOM
AIM
AOM
AIM
AOM
AIM
AOM
AIM
AOM
AA
BB
CC
DD
EE
FF
LOBBY
FIRE ALARM &
SPKR
SECURITY
CORR
SIPRNET
TEAM
MEDIA
SCA
CBRN NCO
CBRN SGM
CBRN OFF
OIC
NCOIC
MECH
M SHOWER
MEN RESROOM
WOMEN
RESROOM
CORR
DIV PAO
OFFICE
TEAM
MEDIA
PA OFF
VTC
BREAK
PROT
CHAPLAIN
MEDIA
CHIEF CHAPL
ASST CHAPL
CORR
TEAM
MEDIA
TRIAL CNSL
TRIAL CNSL
TRIAL CNSL
TRIAL CNSL
TRIAL CNSL
TRIAL CNSL
TRIAL CNSL
MECH
CHIEF ENG
ENG NCO
TR
MEDIA
PSY CHT
CORR
DIV SURGEON
PSYCHT
SURGOEN
MEDIA
TEAM
CH MED OPS
MED OPS
MECH
DIV RETENSION
TEAM
MEDIA
CNSLR
CNSLR
SR CNSLR
MR2 CNSLR
TR
ELECT
JAN
WOMEN
RESROOM
MEN RESTROOM
WOMEN SHOWER
MEN SHOWER
PROVIDE FIRE ALARM/MASS NOTIFICATION
SYSTEM IN ACCORDANCE WITH NEFA 72,
UFC 3-600-01, UFC 4-021-01, AND NFPA 101
MASS NOTIFICATION
ANTENNA
FIRE ALARM ANTENNA
TAMPER SWITCHES AND
PRESSURE SWITCH LOCATED IN
THE FIRE SPRINKLER ROOM
FOR LOCATION OF CIRCUIT BREAKER # AND
PANEL NAME SEE SHEET FA601. FOR PANEL
LOCATION SEE ELECTRICAL SHEET
DIV G8
CG
COFS
DCSM
M
S
GO
ELECT
124 JAN
WOMEN
RESROOM
MEN RESROOM
M SHOWER
SPCL STAFF
DIV CBRNE
105 CMD CNSLR
TRIAL CNSL
DIV SJC-CRIMLAW
Room
RAMP
MCP-OD
DIV SAFTY
MECH
TR
SUPRVSR
MEDIA
THE FIRE ALARM SPEAKER
INSIDE THE LOBBY SHALL DE-
ACTIVATE UPON ACTIVATION OF
THE MICROPHONE ONLY IN THE
LOBBY AREA.
THE FIRE ALARM SPEAKERS
INSIDE THE FIRE ALARM ROOM
SHALL DE-ACTIVATE UPON
ACTIVATION OF THE
MICROPHONE ONLY IN THE FIRE
ALARM ROOM AREA.
THE FIRE ALARM SPEAKERS
INSIDE THE FIRE ALARM ROOM
SHALL DE-ACTIVATE UPON
ACTIVATION OF THE
MICROPHONE ONLY IN THE FIRE
ALARM ROOM AREA.
US Army Corps of Engineers ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
B J
IM
O N
W A
-1 -D
-0
H O
N O
L U
L U
D
IS
T R
IC
T
F O
R T
S H
A F
T E
R H
A W
A
II
U
L R
IC
H
W A
Y
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
I
IN
S
Y N
E R
G Y
E N
G
IN
E E
R I N
G
IN
C
F
O R
T S
T R
E E
T M
A L L S
U
IT
E
H
O N
O L U
L U
H I
18SB02
OF 173
FA101
F
IR
E A
L A
R M
N E
W W
O R
K P
L A
N
R S
U S
T E
R
R S
U S
T E
R
B J
IM
O N
M
A Y
RTA SUBMITTAL, DBB, 7 MAY 2018
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G
3/32" = 1'-0"A1
FIRE ALARM NEW WORK PLAN
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M M
M
M
M M
M
M
M
F
M
F
F
F
F
F
F
M
F
F
F
F
M F
M F
F
F M
F
M
F
F
F
F
F
F
M
M
F
F
M
F
F M
F
F
F
F
F
M
F
F
F M
F
F F
F
F
F
F F
F
F
M
F
F
F
F
M
F
F
F
F
F
F
F
F
F
F
F
F
F
F M
F
F
F
F
F
F
F
F
F
F
M
F
F
F F
F
F
M
F
F
F
F
FF
F
F
M
F
F
F
F
MF
F
F
F
F
F
F M
F F
M F
F
F M
F
F
F
F
F
F
F
F
F S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
FS
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
S
S
SS
S
S
S
S
S
S
S
S
S
S
SS
S
S
S
S S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S SS
S
S
S
S
S
S
S
S
M
M
M
MM
M
F
F
F
F
F
F
F
FIRE ALARM NOTES:
1. PROVIDE INPUT AND OUTPUT MODULES FOR THE
FIRE SMOKE DAMPERS FOR EACH JANITOR'S
CLOSETS, EACH ELECTRICAL ROOMS, EACH MECHANICAL
ROOMS. SEE MECHANICAL DRAWINGS FOR THE LOCATIONS
OF SMOKE DAMPERS. (TOTAL OF 8)
2. PROVIDE DUCT DECTECTORS FOR AHU OVER 2000 CFM,
REFER TO MECHANICAL DRAIWNGS FOR AHU LOCATION.
(TOTAL OF 2)
S E
C O
N D
T
IT
L E
S
B F
A
AIMAIM AIM AIM AIM
AIM AIM
AIM
AIM AIM
FA & SPKR
ROOM
SR CNSLR
MR2 CNSLR
TR
JAN
W. RSTRM
W. SHOWER
DIV RET.
CNSLR
DIV RET.
TEAM
FA & SPKR
MEDIA
CNSLR
M. SHOWER
M. RSTRM
SURGOEN
MEDIA
TEAM
EXTERIOR
MED OPS
DIV SURG.
PSYCHT
CH MED OPS
EXTERIOR
DIV RET.
ELECT
W. RSTRM
MECH
CORR
DIV ENG
TR
RAMP
ENG NCO
DIV ENG
PSYCTH
MEDIA
DIV SURGEON
CORR
TRIAL CNSL
DIV ENG
CHIEF ENG
RAMP
MEDIA
DIV-SJC
TRIAL CNSL
TRIAL CNSL
DIV-SJC
TEAM
TRIAL CNSL
TRIAL CNSL
CORR
DIV SJC
TRIAL CNSL
TRIAL CNSL
EXTERIOR
MECH
TV
FMCP WITH
MICROPHONE
FIP
TV
RAP
TV
FEP
TV
MEP
LOC
ANN
TV
P
C
1/2W 15
C
1/2W 30
C
1/2W 30
C
1/2W 30
C
1/2W
1W
F
C
1/2W 75
C
1/2W 15
WP
1/2W
15WP
F
15WP
C
1/2W 30
C
1/2W 75
C
1/2W 30
C
1/2W 75 1W
WP
C
1/2W 30
C
1/2W 15
WP
1/2W F
15WP
C
1/2W
WP
F
15WP
C
1/2W
C
1/2W 30
C
1/2W 30
1/2W
1/2W
C
1/2W 75
C
1/2W 30
C
1/2W 30
C
1/2W 75
C
1/2W 75
C
1/2W 15
C
1/2W 75
C
1/2W 75
C
1/2W 75
C
1/2W 30
C
1/2W 30
C
1/2W 30
C
1/2W 75
C
1/2W 75
C
1/2W 30
C
1/2W
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
MWPWPWP
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
P P
2W WP 2W WP
WPWP WP WP WP
C
1/2W 30
C
1/2W 30
C
1/2W 30
C
1/2W 30
C
1/2W 30
C
1/2W 30 2W 30
C
1/2W 15
C
1/2W 15
C
1/2W 30
C
1/2W 30
C
1/2W 75
C
1/2W 30
C
1/2W 30
C
1/2W 30
C
1/2W 30
C
1/2W 15
C
1/2W 75
C
1/2W 75
C
1/2W 30
C
1/2W
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
P
1/2W C 2W WP
HS
PS
P
AOM
P
AOM
AOM
AOM AOM
COOPER WAVES 8 MASS
NOTIFICATION TRANSCEIVER
MONACO FIRE ALARM
TRANSMITTER
120/1/60 LOCATED AT PANEL
FA CKT#1 (1P20A BREAKER)
FOR CONT.
SEE
A
FOR CONT.
SEE
A
A
A
A
A
FOR CONT.
SEE
B
FOR CONT.
SEE
B
FOR CONT.SEE
SHEET FA602
C
B
B
B
B
120/1/60 LOCATED AT PANEL
FA CKT#2 (1P20A BREAKER)
120/1/60 LOCATED AT PANEL
FA CKT#3 (1P20A BREAKER)
120/1/60 LOCATED AT PANEL
FA CKT#4 (1P20A BREAKER)
FOR CONT.SEE
SHEET FA602
C
PROVIDE INPUT AND
OUTPUT MODULES FOR
THE SMOKE DAMPERS
PROVIDE INPUT AND
OUTPUT MODULES FOR
THE SMOKE DAMPER
PROVIDE INPUT AND OUTPUT MODULES
FOR THE SMOKE DAMPER
NOT TO SCALEA1
FIRE ALARM ONE LINE DIAGRAM
No. FP 001359
R E G
IS
T E
R
ED
PRO
FESS IONAL
EN
G
IN
E E R
B A R R
Y G .S .
J
IM
O N
F I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O N
S T A
T E
OF CA L I F
O R
N I A
SIGNATURE
JUNE 30, 2019
US Army Corps of Engineers ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
B J
IM
O N
W A
-1 -D
-0
H O
N O
L U
L U
D
IS
T R
IC
T
F O
R T
S H
A F
T E
R H
A W
A
II
U
L R
IC
H
W A
Y
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
I
IN
S
Y N
E R
G Y
E N
G
IN
E E
R I N
G
IN
C
F
O R
T S
T R
E E
T M
A L L S
U
IT
E
H
O N
O L U
L U
H
I
18SB02
OF 173
FA601
F
IR
E A
L A
R M
O N
E L
IN
E
D
IA
G R
A M
R S
U S
T E
R
R S
U S
T E
R
B J
IM
O N
M
A Y
RTA SUBMITTAL, DBB, 7 MAY 2018
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G
S E
C O
N D
T
IT
L E
S
B F
A
AIM
AIM
AIM AIM
AIM
TRIAL CNSL
CORR
EXTERIOR
MEDIA
CHAPLAIN
ASST CHAPTL
PROT
CORR
CORR
VTC
CHAPLAIN
PA OFF
DIV PAO
CORR
DIV SAFETY
CHIEF CHAPL
BREAK
MEDIA
DIV PAO
MEDIA
OFFICE
SUPRVSR
TR
EXTERIOR
MECH
DCSM
COFS
CG
DIV G8
FILES
MECH
M
EXTERIOR
GO
S
CORR
W. SHOWER
CORR
ELECT
EXTERIOR
W. RSTRM
CORR
CBRN OFF
CBRN SGM
SPCL STAFF
CBRN NCO
DIV CBRNE
SCA
NCOIC
OIC
TEAM
MCP-OD
MEDIA
DIV CBRNE
MCP-OD
MEDIA
CORR
SECURITY
FA & SPKR
LOBBY
JAN
M. RSTRM
MECH
EXTERIOR
M. SHOWER
SIPRNET
EXTERIOR
TEAM
DIV CBRNE
C
1/2W 15
C
1/2W 15
C
1/2W 15
C
1/2W 30
C
1/2W 30
C
1/2W 30
C
1/2W 30
C
1/2W 30
C
1/2W 30
C
1/2W 75
C
1/2W 30
C
1/2W 30
C
1/2W 30
C
1/2W 75
C
1/2W 75
C
1/2W 15
C
1/2W 75
C
1/2W 75
C
1/2W
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
P
1/2W C 1/2W C 2W WP 1/2W C1/2W C 1/2W C 1/2W C
C
1/2W 30
C
1/2W 30
C
1/2W 30
C
1/2W 30
C
1/2W 30
C
1/2W 75 2W 75 2W 75
C
1/2W 75
C
1/2W 75
C
1/2W 75
C
1/2W 75
C
1/2W
M
M
M
M
M
M
M
M
M
M
M
M
M
P P
2W WP 1/2W C
C
1/2W 75
C
1/2W 75
C
1/2W 30
C
1/2W 15
C
1/2W 30
C
1/2W 30
C
1/2W 15
C
1/2W 75 1W 75
C
1/2W
WP
M
M
M
M
M
M
M
M
M
M
PP
2W WP 2W WP
WP
WP
WP
C
1/2W 75
C
1/2W 30
C
1/2W 75
C
1/2W 75
C
1/2W 75
C
1/2W 75
C
1/2W 30
C
1/2W 75
C
1/2W 30
C
1/2W 30
C
1/2W 30
C
1/2W 30
C
1/2W F
C
1/2W
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
C
1/2W 75
C
1/2W 30
C
1/2W 15
C
1/2W 15
C
1/2W 30
C
1/2W 75
C
1/2W 75 1W
M
M
M
M
M
M
M
M
P
1/2W C 1/2W C
1/2W C1/2W C 1/2W C 1/2W C
C
1/2W
M
C
1/2W
M
C1/2W
C
1/2W
M
C
1/2W
M
C
1/2W
M
1/2W C 1/2W C
C
1/2W
M
1/2W C
C
1/2W 75
C
1/2W
WP
C
1/2W
WP 2W
2W
M
M
M
M
MWP WP
P
2W WP
AOM
P
C
1/2W 30
C
1/2W 30
C
1/2W
M
M
M
2W WP
AOM
AOM AOM
AOM
C
C
C
C
FOR CONT.
SEE
D
FOR CONT.
SEE
D
FOR CONT.
SEE
E
FOR CONT.
SEE
E
E
E
E
E
FOR CONT.
SEE
F
FOR CONT.
SEE
F
D
D
D
D
FOR CONT.
SEE
G
FOR CONT.
SEE
G
G
G
G
G
F
F
F
F
BACK TO FIRE ALARM PANEL
BACK TO FIRE ALARM PANEL
BACK TO FIRE ALARM PANEL
BACK TO FIRE ALARM PANEL
PROVIDE INPUT AND OUTPUT MODULES
FOR THE SMOKE DAMPER
PROVIDE INPUT AND
OUTPUT MODULES
FOR THE SMOKE
DAMPER
PROVIDE INPUT AND
OUTPUT MODULES
FOR THE SMOKE
DAMPER
PROVIDE INPUT AND
OUTPUT MODULES
FOR THE SMOKE
DAMPER
NOT TO SCALEA1
FIRE ALARM ONE LINE DIAGRAM
No. FP 001359
R E G
IS
T E
R
ED
PRO
FESS IONAL
EN
G
IN
E E R
B A R R
Y G .S .
J
IM
O N
F I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O N
S T A
T E
OF CA L I F
O R
N I A
SIGNATURE
JUNE 30, 2019
US Army Corps of Engineers ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
B J
IM
O N
W A
-1 -D
-0
H O
N O
L U
L U
D
IS
T R
IC
T
F O
R T
S H
A F
T E
R H
A W
A
II
U
L R
IC
H
W A
Y
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
I
IN
S
Y N
E R
G Y
E N
G
IN
E E
R I N
G
IN
C
F
O R
T S
T R
E E
T M
A L L S
U
IT
E
H
O N
O L U
L U
H I
18SB02
OF 173
FA602
F
IR
E A
L A
R M
O N
E L
IN
E
D
IA
G R
A M
R S
U S
T E
R
R S
U S
T E
R
B J
IM
O N
M
A Y
RTA SUBMITTAL, DBB, 7 MAY 2018
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G
S E
C O
N D
T
IT
L E
S
B F
A
EVACUATION
SIGNALS
AUXILIARY FUNCTIONS
TRANSMIT SIGNALS TO
THE FIRE DEPARTMENT
ANNUNCIATION AT
PANEL
* IN THE EVENT OF A CONFLICT BETWEEN THE
SPECIFICATIONS AND THE MATRIX, THE MATRIX SEQUENCE
WILL TAKE PRECEDENCE.
MASS NOTIFICATION SYSTEM ACTIVATION SHALL SILENCE ALL
FIRE ALARM OCCUPANT APPLIANCES UNTIL MASS SYSTEM IS
DEACTIVATED
SPRINKLER RISER OR FLOOR WATER FLOW OR PRESSURE SWITCH
MANUAL PULLSTATION
SMOKE DETECTOR
DUCT SMOKE DETECTOR
SPRINKLER VALVE TAMPER SWITCH
SINGLE BREAK OR GROUND FAULT IN FIRE ALARM CIRCUIT
MASS NOTIFICATION SYSTEM ACTIVATION (AUTO) (SEE NOTE NO.1)IN
IT
IA
T
IO
N
NOTE 1:
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
FIRE ALARM SYSTEM INPUT
S Y S T E M
O U
T P U
T S U
P E R
V
IS
O R
Y S
IG
N
A L
T R
O U
B
LE
S
IG
N A L
A C
T
IV
A T E V
IS
IB
LE
A
N D
A U
D
IB
LE
A
LA
R
M
A N
N U
N C
IA
T O
R
A C
T
IV
A T E V
IS
IB
LE
A
N D
A U
D
IB
LE
S U
P E R
V
IS
O R
Y A
N N
U N
C
IA
T O
R
A C
T
IV
A T E V
IS
IB
LE
A
N D
A U
D
IB
LE
T R
O U
B
LE
A N
N U
N C
IA
T O
R A C
T
IV
A T E A
LL
O
C C
U P A N
T N
O T
IF
IC
A T
IO
N
A P P
LI
A N
C E S
IN
T A K E F
IR
E A
LA
R
M P
R E -R
E C
O R
D E D
M E S S A G
E
(V
IS
U A L
D E V
IC
E S T
O R
E M
A
IN
O N
S O
U N
D
IN
G
A U
D
IB
LE
E
V A C
U A T
IO
N A
LA
R
M T
E M
P O
R A R
Y
A N
D
IM
M E D
IA
T E
LY
D E A C
T
IV
A T E A
LL
O C
C U
P A N
T N
O T
IF
IC
A T
IO
N A
P P
LI
A N
C E S
IN
IT
IA
T
IO
N D
E V
IC
E A
N D
O C
C U
P A N
T N
O T
IF
IC
A T
IO
N
A P P
LI
A N
C E S O
P E R
A T
IO
N M
A
IN
T A
IN
E D
S H
U T D
O W
N
IN
D
IV
ID
U
A L
A
IR
H A N
D
LI
N G
F A N
X
LOW BATTERY X XX
X X
XX
X
F
LO
W S
W
IT
C H
A C
T
IV
A T
IO
N
S M
O K E D
E T E C
T O
R A
C T
IV
A T
IO
N
T E M
P O
R A R
IL
Y D
E -A
C T
IV
E F
IR
E A
LA
R
M
S T R
O B E S A
N D
M E S S A G
E S
X
HVAC SHUTDOWN SWITCH X X X
C
LO
S E S
M O
K E D
A M
P E R
S
X
X
X
X
P U
LL
S
T A T
IO
N A
C T
IV
A T
IO
N
D U
C T D
E T E C
T O
R A
C T
IV
A T
IO
N
X
S H
U T D
O W
N A
LL
A
IR
H
A N
D
LI
N G
U N
IT
S
IN
B
NOT TO SCALEA1
SEQUENCE MATRIX OF OPERATIONS
No. FP 001359
R E G
IS
T E
R
ED
PRO
FESS IONAL
EN
G
IN
E E R
B A R R
Y G .S .
J
IM
O N
F I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O N
S T A
T E
OF CA L I F
O R
N I A
SIGNATURE
JUNE 30, 2019
US Army Corps of Engineers ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
B J
IM
O N
W A
-1 -D
-0
H O
N O
L U
L U
D
IS
T R
IC
T
F O
R T
S H
A F
T E
R H
A W
A
II
U
L R
IC
H
W A
Y
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
I
IN
S
Y N
E R
G Y
E N
G
IN
E E
R I N
G
IN
C
F
O R
T S
T R
E E
T M
A L L S
U
IT
E
H
O N
O L U
L U
H
I
18SB02
OF 173
FA603
F
IR
E A
L A
R M
S E
Q U
E N
C E
M A
T R
IX
O
F O
P E
R A
T
IO
N S
R S
U S
T E
R
R S
U S
T E
R
B J
IM
O N
M
A Y
RTA SUBMITTAL, DBB, 7 MAY 2018
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G
S E
C O
N D
T
IT
L E
S
B F
A
TEMPERATURE RATINGS FOR ALL SPRINKLERS SHALL BE APPROPRIATE FOR THE LOCATION
IN ACCORDANCE WITH NFPA 13. PROVIDE QUICK RESPONSE SPRINKLERS THROUGHOUT THE
FACILITY UNLESS OTHERWISE NOTED. SPRINKLERS WITH O-RINGS ARE NOT PERMITTED.
16. COORDINATE SPRINKLER LINE ROUTING WITH CEILING HEIGHTS AND OTHER
EQUIPMENT, DUCTS, AND PIPING IN THE CEILING. CONTRACTOR SHALL FOLLOW THE
PROPOSED MAIN ROUTING AS MUCH AS POSSIBLE. SPRINKLER PIPE TO BE
CONCEALED ABOVE CEILING S WHERE PRESENT.
PROVIDE LABELS AND VISIBLE IDENTIFICATION INDICATING LOCATION OF ALL FLOOR
CONTROL VALVES, INSPECTOR'S TEST STATIONS; AND FIRE DEPARTMENT
CONNECTIONS.
15.
14. ALL EXTERIOR SPRINKLER HEADS SHALL BE ELECTROLESS NICKEL PTFE (ENT).
13. PROVIDE INSPECTION AND HYDROSTATIC TEST AND SUBMIT CONTRACTOR'S MATERIAL
AND TEST CERTIFICATES FOR ABOVE GROUND AND UNDERGROUND PIPING IN
ACCORDANCE WITH NFPA 13. PRIOR TO HYDROSTATIC TEST, THE CONTRACTOR SHALL
PERFORM AN AIR PRESSURE TEST TO LOCATE ANY POTENTIAL LEAKAGE.
FIRE SPRINKLER SYSTEM NOTES:
1. FIRE SPRINKLER SYSTEM SHALL COMPLY WITH NFPA 13, NFPA 13R, NFPA 24, AND THE
CONTRACT SPECIFICATIONS.
ALL DEVICES AND EQUIPMENT SHALL BE UL LISTED OR FM APPROVED.10.
11.
12.
FIRE PROTECTION GENERAL NOTES:
PROPERLY FIRE STOP ALL PENETRATIONS THROUGH FIRE RATED WALLS, FLOORS,
OR PARTITIONS WITH A UL APPROVED SYSTEM APPROPRIATE FOR THE
PENETRATION TYPE AND FIRE RATING IN ACCORDANCE WITH MANUFACTURER'S
INSTALLATION INSTRUCTIONS. FIRE STOP ALL PENETRATIONS BETWEEN FLOORS.
4.
3.
2.
1.
FIRE PROTECTION UNDERGROUND NOTES:
THE ENTIRE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS
OF THE NATIONAL FIRE PROTECTION ASSOCIATION CODE, NATIONAL ELECTRICAL
CODE, AND ALL OTHER AGENCIES HAVING JURISDICTION.
THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO COVER THE COMPLETE
INSTALLATION OF SYSTEMS TO FUNCTION AS DESCRIBED AND SPECIFIED. THE
OMISSION OF REFERENCE TO ANY NECESSARY ITEM OF LABOR OR MATERIAL SHALL
NOT RELIEVE THE CONTRACTOR FROM PROVIDING SUCH LABOR AND MATERIAL.
ALL EQUIPMENT SHALL BE CAPABLE OF FITTING INTO THE SPACES ALLOCATED
WHILE MEETING THE MANUFACTURER'S RECOMMENDED ACCESS
REQUIREMENTS. REVIEW ALL SPACES WHERE EQUIPMENT IS TO BE INSTALLED
PRIOR TO ORDERING OF EQUIPMENT AND NOTIFY THE CONTRACTING OFFICER
OF ANY INADEQUATE CLEARANCES OR CONDITIONS THAT WILL PREVENT THE
PROPER INSTALLATION, MAINTENANCE, AND OPERATION OF THE EQUIPMENT.
PROVIDE SHOP DRAWINGS FOR THE LAYOUT OF FIRE SPRINKLER AND FIRE
ALARM SYSTEMS SHOWING COORDINATION OF ALL WORK WITH ALL OTHER
TRADES, INCLUDING PLUMBING, AIR CONDITIONING, CONTROLS, ELECTRICAL
AND COMMUNICATION SYSTEMS. COORDINATION DRAWINGS SHALL OVERLAY
HVAC, PLUMBING, FIRE SPRINKLER, ELECTRICAL AND FIRE ALARM SYSTEMS,
AND ALL CONFLICTS BETWEEN TRADES SHALL BE NOTED AND RESOLVED.
VERIFY AND COORDINATE ALL ROOF, WALL AND FLOOR PENETRATIONS WITH
THE STRUCTURAL AND ARCHITECTURAL DRAWINGS AND NOTIFY THE GENERAL
CONTRACTOR OF ANY CONFLICTS PRIOR TO START OF CONSTRUCTION.
OBTAIN APPROVAL FROM THE STRUCTURAL ENGINEER BEFORE MAKING ANY
PENETRATIONS THROUGH STRUCTURAL MEMBERS, WALLS AND SLABS.
TONE AND LOCATE ALL UTILITY LINES OR OTHER INTERFERENCES IN AREAS OF
PROPOSED TRENCH WORK PRIOR TO START OF EXCAVATION. REPAIR OR PAY
FOR ALL DAMAGES TO EXISTING UTILITIES.
DRAWINGS DO NOT ATTEMPT TO SHOW EXACT DETAILS OF PIPING. PROVIDE
OFFSETS AS NECESSARY TO AVOID LOCAL OBSTRUCTIONS OR INTERFERENCE
WITH OTHER TRADES. REVIEW ALL PIPING AND DUCT RUNS PRIOR TO
FABRICATION AND IMMEDIATELY NOTIFY THE GENERAL CONTRACTOR OF ANY
INTERFERENCE AND/OR LACK OF ADEQUATE CLEARANCES.
SHOULD PROJECT CONDITIONS REQUIRE REARRANGEMENT OF WORK, MARK
SUCH CHANGES ON THE AS-BUILT DRAWINGS AND NOTIFY THE GENERAL
CONTRACTOR. IF THESE CHANGES REQUIRE ALTERNATE METHODS TO THOSE
APPROVED BY THE CONTRACT DOCUMENTS, SUBMIT SHOP DRAWINGS SHOWING
THE PROPOSED ALTERNATE METHODS TO THE GENERAL CONTRACTOR FOR
REVIEW. DO NOT PROCEED UNTIL REVIEWED.
REPAIR ANY DAMAGE TO EXISTING CONSTRUCTION RESULTING FROM THE
INSTALLATION OF MECHANICAL ITEMS. THE AREAS REPAIRED SHALL MATCH
THE ADJACENT SURFACES IN TEXTURE AND COLOR.
SEISMICALLY BRACE ALL EQUIPMENT AND PIPING IN ACCORDANCE WITH THE
SPECIFICATIONS. PROVIDE ZONE-OF-INFLUENCE CALCULATIONS
1.
2.
4.
3.
6.
5.
10.
9.
8.
7.
12.
11.
UNDERGROUND FIRE PROTECTION WATER LINE DESIGN AND INSTALLATION SHALL BE IN
ACCORDANCE WITH NFPA 24 AND THE SPECIFICATIONS.
ALL DEVICES AND EQUIPMENT SHALL BE LISTED IN UL FPED OR FM P7825a FOR
UNDERGROUND FIRE SERVICE.
PIPING SHALL BE DUCTILE IRON WITH A RATED WORKING PRESSURE OF 150 PSI
CONFORMING TO AWWA C151, WITH CEMENT MORTAR LINING CONFORMING TO
AWWA C104. MINIMUM BURIAL DEPTH OF PIPE SHALL BE 3 FEET.
PROVIDE PROPER THRUST RESTRAINT AT ALL CHANGES IN DIRECTION OF PIPE.
LOCATION: FROM RFP DOCUMENTS
FLOW AT RESIDUAL PRESSURE
RESIDUAL PRESSURE
STATIC PRESSURE
WATER SUPPLY AT TIME OF DESIGN4.
8.
7. PROVIDE EARTHQUAKE PROTECTION (SWAY BRACING) IN ACCORDANCE WITH NFPA 13.
USE A HORIZONTAL FORCE FACTOR OF HALF THE WEIGHT OF THE WATER FILLED
PIPE.
PROVIDE SURGE RESTRAINT CLIPS ON ALL HANGAR RINGS USED IN END OF BRANCH
LINE RESTRAINT. PROVIDE END OF BRANCH RESTRAINT FOR ALL BRANCH LINES OVER
4 FEET OR WHERE SUBJECT TO DAMAGE OR WHERE UPWARD OR LATERAL MOVEMENT
OF THE SYSTEM PIPING WOULD RESULT IN DAMAGE TO THE SPRINKLER THROUGH
IMPACT AGAINST THE BUILDING STRUCTURE, EQUIPMENT, OR FINISH MATERIALS.
SPRINKLER PIPING SHALL BE: ACCORDANCE WITH SPECIFICATIONS
ALL DRAINS AND EXTERIOR PIPING SHALL BE COPPER OR EPOXY COATED SCHEDULE 40 BLACK STEEL.
THE CONTRACTOR SHALL COMPLY WITH OSHA 29 CFR 1910.36 AND 29 CFR 1910.37.
THE FIRE SPRINKLER SYSTEM SHOWN IS CONCEPTUAL . THE EQUIPMENT IS SHOWN IN
SUGGESTED LOCATIONS, FINAL QUANTITY AND LAYOUT SHALL BE IN ACCORDANCE WITH
APPLICABLE CODES, MANUFACTURER'S RECOMMENDATIONS, AND EQUIPMENT LISTING.
SHOP SUBMITTALS SHALL SHOW SPRINKLER DETAILS IN ACCORDANCE WITH NFPA 13 AND
THE MANUFACTURER'S EQUIPMENT LISTING INSTALLATION REQUIREMENTS.
2.
5. SPRINKLER DESIGN REQUIRED PRESSURE (RESIDUAL) SHALL BE BASED ON A MINIMUM
10% OR 10 PSI SAFETY FACTOR, WHICH EVER IS GREATER
ACCORDANCE WITH THE FOLLOWING CRITERIA:
THE WET-PIPE SYSTEM SHALL BE HYDRAULICALLY DESIGNED AND INSTALLED IN6.
AUTOMATIC SPRINKLER PROTECTION IS REQUIRED THROUGHOUT THE ENTIRE BUILDING
IN ACCORDANCE WITH NFPA 13.
3.
17. PROVIDE SPRINKLER GUARDS ON THE SPRINKLER HEADS IN ELECTRICAL ROOMS,
STORAGE ROOMS, TELECOM ROOMS, AND MECHANICAL ROOMS.
9.
18.
1400 GPM
32 PSI
70 PSI
LIGHT HAZARD (OFFICES, CORRIDORS, COMMON ROOMS, RESTROOMS, AND DWELLING UNITS )
DESIGN DENSITY: .10 GPM/sf LIGHT HAZARD
DESIGN AREA: 1500 sf
HOSE STREAM: 250 GPM
DURATION: 60 MINUTES
SPRINKLER: QUICK RESPONSE CONCEALED PENDENT AND SIDEWALL SPRINKLERS. USE
RESIDENTIAL CONCEALED PENDENT AND SIDEWALL SPRINKLERS FOR DWELLING UNITS.
ORDINARY HAZARD GROUP 1 (MECHANICAL, STORAGE, JANITORIAL, AND ELECTRICAL)
DESIGN DENSITY: .20 GPM/sf ORDINARY HAZARD
DESIGN AREA: 2500 sf OR LARGEST ROOM
HOSE STREAM: 250 GPM
DURATION: 60 MINUTES
SPRINKLER: QUICK RESPONSE UPRIGHT AND PENDENT
PROVIDE LABELS AND VISIBLE IDENTIFICATION INDICATING LOCATION OF ALL FLOOR
CONTROL VALVES, INSPECTOR'S TEST STATIONS; AND FIRE DEPARTMENT
CONNECTIONS.
19. LOCATE ALL FIRE PROTECTION RISER PIPING AT LEAST 12' FORM ANY EXTERIOR
WALL FOR BLAST SAFETY.
THE CONTRACTOR SHALL PAINT THE FIRE SPRINKLER PIPES RED AND SHALL
PROVIDE PAINTING LABELS ON THE PIPE, SEE SPECIFICATIONS FOR MORE MORE
INFORMATION ON THE LABELING.
COORDINATE CONNECTION OF THE FIRE SPRINKLER SUPERVISORY DEVICES WITH
THE FIRE ALARM CONTRACTOR. THE FIRE SPRINKLER CONTRACTOR SHALL PROVIDE
THE FLOW AND TAMPER SWITCHES AND THE FIRE ALARM CONTRACTOR SHALL
INSTALL AND CONNECT TO THE FIRE ALARM SYSTEM.
20.
21.
POWDER ACTUATED FASTENERS, SHOT PINS, AND EXPANSION BOLTS LESS THAN 1/2"
IN DIAMETER SHALL NOT BE PERMITTED IN EXISTING PRECAST CONCRETE ROOF
MEMBERS SUCH AS INVERTED T-GRIDERS, RECTANGULAR BEAMS, AND WEB OR STEM
PORTIONS OF DOUBLE T-GRIDERS. SEE ROOF FRAMING PLANS ON STRUCTURAL
DRAWINGS.
13.
THE PROJECT AND SPECIFICATIONS SHALL REFERENCE THE USAC ENGINEERING
MANUAL (EM), EM-385-1-1 AND NFPA 241, 2013 EDITION AND SHALL FOLLOW THE
REQUIREMENT OF THE INSTALLATION'S FIRE REGULATIONS.
14.
PORTABLE FIRE EXTINGUISHERS SHALL COMPLY WITH NFPA 10 AND SPECIFICATIONS.
ALL FIRE EXTINGUISHERS SHALL HAVE A MINIMUM CLASS 4A:60B:C RATING &
SHALL BE DRY CHEMICAL TYPE UNLESS NOTED OTHERWISE.
FIRE EXTINGUISHER NOTES:
1.
2.
THE CONSTRUCTION (SHOP) DRAWINGS AND CALCULATIONS MUST BE PREPARED BY,
OR PREPARED UNDER THE IMMEDIATE SUPERVISION OF THE QFPE. THE QFPE MUST
AFFIX THEIR PROFESSIONAL ENGINEERING STAMP WITH SIGNATURE TO THE SHOP
DRAWINGS, CALCULATIONS AND MATERIAL DATA SHEETS, INDICATING APPROVAL
PRIOR TO SUBMITTING THE FIRE EXTINGUISHING SYSTEM SHOP DRAWINGS TO THE
DFPE. THE QFPE MUST MONITOR THE INSTALLATION OF THE FIRE PROTECTION
SYSTEMS AND CERTIFY IN WRITING THAT THE FIRE PROTECTION SYSTEMS HAVE BEEN
CONSTRUCTED AND OPERATE AS INTENDED IN THE DESIGN PLANS AND
SPECIFICATIONS.
15.
TYP.
FDC
F
WET-PIPE FS RISER
FIRE SPRINKLER PIPING
SPRINKLER CROSS MAIN END CAP
TYPICAL
FIRE DEPARTMENT CONNECTION
POC POINT OF CONNECTION
FIRE SPRINKLER LEGEND
DESCRIPTIONABBRV.SYMBOL
FS FIRE SPRINKLER
TS TAMPER SWITCH
GATE VALVEGV
OS&Y OUTSIDE STEM AND YOKE
FLOW SWITCHFSFS
INDICATING BUTTERFLY VALVE-
MAIN DRAIN DISCHARGE
NORMALLY CLOSEDN.C.
FLOOR CONTROL ASSEMBLYFCA
TS
PS ALARM PRESSURE SWITCHPS
LEGEND
LIGHT HAZARD: CORRIDORS,
OFFICES, COMMON ROOMS,
RESTROOMS.
DESIGN
DENSITY
OCCUPANCY CLASSIFICATION
.10 GPM/SF
DESIGN
AREA
1500 SF
MAX. SPRINKLER
SPACING
HOSE
ALLOWANCE
250 GPM
DURATION
60 MIN.225 SF
ORDINARY HAZARD:
MECHANICAL ROOMS,
ELECTRICAL ROOMS, JANITOR
ROOMS, STORAGE ROOMS.
.20 GPM/SF 2500 SF 250 GPM 60 MIN.130 SF
No. FP 001359
R E G
IS
T E
R
ED
PRO
FESS IONAL
EN
G
IN
E E R
B A R R
Y G .S .
J
IM
O N
F I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O N
S T A
T E
OF CA L I F
O R
N I A
SIGNATURE
JUNE 30, 2019
US Army Corps of Engineers ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
B J
IM
O N
W A
-1 -D
-0
H O
N O
L U
L U
D
IS
T R
IC
T
F O
R T
S H
A F
T E
R H
A W
A
II
U
L R
IC
H
W A
Y
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
I
IN
S
Y N
E R
G Y
E N
G
IN
E E
R I N
G
IN
C
F
O R
T S
T R
E E
T M
A L L S
U
IT
E
H
O N
O L U
L U
H
I
18SB02
OF 173
FX001
F
IR
E S
P R
IN
K
L E
R N
O T
E S
A N
D L
E G
E N
D
R S
U S
T E
R
R S
U S
T E
R
B J
IM
O N
M
A Y
RTA SUBMITTAL, DBB, 7 MAY 2018
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G
S E
C O
N D
T
IT
L E
S
B F
X
E G
IS
T E
R
ED
PRO
FESS IONAL
EN
G
IN
E E R
B A R R
Y G .S .
J
IM
O N
F I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O N
S T A
T E
OF CA L I F
O R
N I A
SIGNATURE
JUNE 30, 2019
EXIST. FIRE HYDRANT
SEE SHTS. FX101 AND FA101 FOR
THE BLDG. 2091 NEW FIRE
SPRINKLER AND FIRE ALARM/MASS
NOTIFICATION WORK
B2091
6" FS RISER W/ BACKFLOW
PREVENTER SEE SHEET
FX101 FOR
CONTINUATION
6" FS MAIN FOR CONT.
SEE CIVIL DWGS.
FIRE DEPT. AND TEST HEADER
CONNECTION MONUMENT WITH
FIRE DEPARTMENT
CONNECTION, SEE CIVIL SHEET
C-503 FOR DETAILS AND FINAL
LOCATION
F I R
E D
E P
T . A
C C
E S
S R
D
4" FDC/TEST HEADER
MAIN TO MONUMENT.
FOR CONT. SEE CIVIL
DRAWINGS
WATER GONG
NEW FIRE HYDRANT SEE CIVIL
FOR MORE DETAIL
PROVIDE CHECK VALVE ON
THE VERTICAL PIPE FOR THE
FDC CONNECTION
PROVIDE GATE VALVE ON
THE VERTICAL PIPE FOR THE
TEST HEADER CONNECTION.
VALE SHALL BE CHAINED AND
LOCKED.
GENERAL NOTES:
1. FIRE DEPARTMENT CONNECTION SHALL BE WITHIN
150 FEET OF THE NEAREST FIRE HYDRANT. FIRE
DEPARTMENT SHALL BE PLACED ON THE EDGE OF
THE SIDEWALK BEHIND THE EXISTING 3 FOOT HIGH
WALL IN FRONT OF THE PARKING LOT. FIRE
HYDRANT SHALL BE CLEARLY VISIBLE.
2. THE FIRE HYDRANT SPACING IS WITHIN 350 FEET.
3. THE BACKFLOW PREVENTER SHALL BE INSTALLED
ON THE FIRE SPRINKLER RISER.
4. THE POST INDICATING VALVE SHALL BE PROVIDED
BY CIVIL.
5. THE MONUMENT SHALL BE INSTALLED WITHIN 20
FEET FROM THE FIRE DEPARTMENT ACCESS ROAD.
DN DN
DN
DN
DN
DN
DN
DN
DN
DN
US Army Corps of Engineers ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
B J
IM
O N
W A
-1 -D
-0
H O
N O
L U
L U
D
IS
T R
IC
T
F O
R T
S H
A F
T E
R H
A W
A
II
U
L R
IC
H
W A
Y
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
I
IN
S
Y N
E R
G Y
E N
G
IN
E E
R I N
G
IN
C
F
O R
T S
T R
E E
T M
A L L S
U
IT
E
H
O N
O L U
L U
H I
18SB02
OF 173
FS101
F
IR
E S
P R
IN
K
L E
R S
I T E
P L A
N
R S
U S
T E
R
R S
U S
T E
R
B J
IM
O N
M
A Y
RTA SUBMITTAL, DBB, 7 MAY 2018
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G
1" = 20'-0"A1
FIRE SPRINKLER SITE PLAN
S E
C O
N D
T
IT
L E
S
B F
S
E G
IS
T E
R
ED
PRO
FESS IONAL
EN
G
IN
E E R
B A R R
Y G .S .
J
IM
O N
F I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O N
S T A
T E
OF CA L I F
O R
N I A
SIGNATURE
JUNE 30, 2019
DN
UP
DN
DN
DN
DN
REF.
AA
BB
CC
DD
EE
FF
LOBBY
FIRE ALARM &
SPKR
SECURITY
CORR
SIPRNET
TEAM
MEDIA
SCA
CBRN NCO
CBRN SGM
CBRN OFF
OIC
NCOIC
MECH
WOMEN
RESROOM
M SHOWER
MEN RESROOM
WOMEN
RESROOM
CORR
COFS
TR
DIV PAO
OFFICE
TEAM
MEDIA
148 PA OFF
VTC
BREAK
PROT
CHAPLAIN
MEDIA
CHIEF CHAPL
ASST CHAPL
CORR
TEAM
MEDIA
TRIAL CNSL
TRIAL CNSL
TRIAL CNSL
TRIAL CNSL
TRIAL CNSL
TRIAL CNSL
TRIAL CNSL
TRIAL CNSL
MECH
CHIEF ENG
ENG NCO
TR
MEDIA
PSY CHT
CORR
DIV SURGEON
PSYCHT
178SURGOEN
MEDIA
TEAM
CH MED OPS
MED OPS
MECH
DIV RETENSION
TEAM
MEDIA
CNSLR
CNSLR
SR CNSLR
MR2 CNSLR
TR
ELECT
JAN
WOMEN
RESROOM
MEN RESTROOM
WOMEN SHOWER
MEN SHOWER
6" FIRE SPRINKLER RISER
WITH WATER GONG FOR
DETAIL B1 ON SEE SHEET
FX501
6"
6"
6" FIRE MAIN, SEE
CIVIL FOR CONT.4"
TO FIRE DEPARTMENT AND
TEST HEADER CONNECTION
MONUMENT. SEE CIVIL FOR
CONTINUATION
HAZARD CATEGORY
LIGHT HAZARD
ORDINARY HAZARD
PROVIDE FIRE SPRINKLER
COVERAGE IN ACCORDANCE WITH
NFPA 13 AND UFC 3-600-01 FOR ALL
AREAS INSIDE THE BOUNDARY
CMD CNSLR
CG
DCSM
DIV G8
M
S
GO
ELECT
JAN
SPCL STAFF
CORR
MECH
DIV CBRNE
DIV SAFTY
SUPRVSR
MEDIA
DIV SJC-CRIMLAW
RAMP
Room
MCP-OD
MEDIA
TEAM
US Army Corps of Engineers ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
B J
IM
O N
W A
-1 -D
-0
H O
N O
L U
L U
D
IS
T R
IC
T
F O
R T
S H
A F
T E
R H
A W
A
II
U
L R
IC
H
W A
Y
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
I
IN
S
Y N
E R
G Y
E N
G
IN
E E
R I N
G
IN
C
F
O R
T S
T R
E E
T M
A L L S
U
IT
E
H
O N
O L U
L U
H I
18SB02
OF 173
FX101
F
IR
E S
P R
IN
K
L E
R N
E W
W O
R K
P L A
N
R S
U S
T E
R
R S
U S
T E
R
B J
IM
O N
M
A Y
RTA SUBMITTAL, DBB, 7 MAY 2018
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G
3/32" = 1'-0"A1
FIRE SPRINKLER NEW WORK PLAN
S E
C O
N D
T
IT
L E
S
B F
X
O E
S P
N E
C L O
O E
S E N
P C L O
NOTES:
1. PROVIDE SPRINKLER PIPE CLEARANCES IN ACCORDANCE
WITH NFPA 13.
PLASTIC WATERPROOF
CEMENT IN NON-FIRE
RATED WALLS (TYP)
SPRINKLER
WHEN BELL RINGS
CALL
FIRE DEP'T OR POLICE
FIRE ALARM
NOTES:
1. SIGN SHALL BE MOUNTED ADJACENT TO FIRE
ALARM BELL.
2. SIMILAR WORDING ON WATER MOTOR ALARM GONG
SHALL BE ACCEPTABLE INSTEAD OF A SEPERATE SIGN.
MINERAL WOOL
BATT INSULATION
(TYP)
STEEL SLEEVE,
AS REQUIRED WALL ASSEMBLY
(CONCRETE, CMU,
OR GYPSUM BOARD)
6" RISER
PROVIDE FOUR WAY SEISMIC
BRACE AT TOP OF RISER
FLEXIBLE GROOVED
COUPLING (TYP)
PRESSURE GAGE W/
COCK (TYP)
WATER OPERATED ALARM GONG
LOCATED OUTSIDE OF BUILDING
ALARM CONTACTOR
(PRESSURE SWITCH)
PLUG COCK WITH
LEVER
RETARD CHAMBER
DRIP CUP
ANGLE VALVE (TYP)
DRAIN TO GRADE
ALARM VALVE
24"
MAX.
6"x6"x4" TEE
FIRE SPRINKLER
ALARM SIGN, SEE
OS & Y GATE VALVE
MANUAL SHUT-OFF
W/ SEAL SHUT-OFF &
TAMPER SWITCH
DOUBLE CHECK
VALVE
TO FDC/TEST
HEADER MONUMENT
SEE SHEET C-503
FOR DETAIL ON THE
MONUMENT
TS
TS
THRUST BLOCK
FLEXIBLE COUPLING
12"
FLOOR LINE
3/4" BITMUS COATED
TIE RODS
D3
FS501
(WET PIPE SYSTEM)
**NOTES:
PROVIDE 1" INSPECTORS TEST AND
DRAIN WITH PRESSURE RELIEF VALVE
THE TEST HEADER SHALL BE ROUTED
UNDERGROUND TO THE TEST HEADER MONUMENT
1. THE FIRE DEPARTMENT CONN. SHALL BE ROUTED
UNDERGROUND TO THE FDC MONUMENT
SEE CIVIL DRAWINGS FOR THE DETAIL ON THE
FIRE DEPARTMENT CONNECTION MONUMENT
3.
2.
PROVIDE ANNULAR CLEARANCE PER NFPA
13 REQUIREMENTS. PROVIDE SLEEVE PER
SPECIFICATION 21 13 13.00 10.
SCALE: NOT TO SCALE
FIRE SPRINKLER RISER DETAIL
B1
SCALE: NOT TO SCALE
SPRINKLER FIRE ALARM SIGN DETAIL
D3
SCALE: NOT TO SCALE
TYPICAL PIPE AND CONDUIT THRU WALL DETAIL
C3
No. FP 001359
R E G
IS
T E
R
ED
PRO
FESS IONAL
EN
G
IN
E E R
B A R R
Y G .S .
J
IM
O N
F I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O
NF
I R
E
P R O T E C T
I O N
S T A
T E
OF CA L I F
O R
N I A
SIGNATURE
JUNE 30, 2019
US Army Corps of Engineers ®
SHEET
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
B J
IM
O N
W A
-1 -D
-0
H O
N O
L U
L U
D
IS
T R
IC
T
F O
R T
S H
A F
T E
R H
A W
A
II
U
L R
IC
H
W A
Y
S C
H O
F
IE
L D
B A
R R
A C
K S
O
A H
U H
I
IN
S
Y N
E R
G Y
E N
G
IN
E E
R I N
G
IN
C
F
O R
T S
T R
E E
T M
A L L S
U
IT
E
H
O N
O L U
L U
H
I
18SB02
OF 173
FX501
F
IR
E S
P R
IN
K
L E
R D
E T
A
IL
S
R S
U S
T E
R
R S
U S
T E
R
B J
IM
O N
M
A Y
RTA SUBMITTAL, DBB, 7 MAY 2018
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G
S E
C O
N D
T
IT
L E
S
B F
X
D
COTG; FCO
PLUMBING LEGEND
SYMBOL ABBREV. DESCRIPTION
SANITARY SOIL, SEWER OR WASTE PIPING BELOW FLOOR OR GRADESS OR W
VENT PIPINGV
CW COLD WATER PIPING
CLEANOUT; WALL CLEANOUTCO; WCO
CLEANOUT TO GRADE; FLOOR CLEANOUT
CONDENSATE DRAIND
CONTINUATIONCONT.
EXISTING SANITARY SOIL, SEWER OR WASTE PIPING BELOW FLOOR OR GRADE(E)SS OR
(E)W
EXISTING VENT PIPING(E)V
(E)CW EXISTING COLD WATER PIPING
EXISTING(E) OR
EXIST.
AIR-HANDLING UNITAHU
HW HOT WATER PIPING
FD FLOOR DRAIN
DOWNDN.
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
PLUMBING LEGEND
SYMBOL ABBREV. DESCRIPTION
HOSE BIBBHB
LAV LAVATORY
ACCESSIBLE LAVATORYA-LAV
S.P. STATIC PRESSURE
T&P TEMPERATURE & PRESSURE RELIEF VALVE
U.C. UNDER CUT
UNION
VTR VENT THRU ROOF
WITHW/
WC WATER CLOSET
ACCESSIBLE WATER CLOSETA-WC
SHOWERSH
URINALUR
POINT-OF-CONNECTIONP.O.C.
POINT-OF-REMOVALP.O.R.
ACCESSIBLE URINALA-UR
SHEETSHT.
ACCESSIBLE SHOWERA-SH
GENERAL NOTES:
1. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS PRIOR TO FABRICATION, INSTALLATION
AND COMMENCEMENT OF ALL WORK TO BE PERFORMED. COORDINATE ALL WORK TO BE
PERFORMED WITH OTHER TRADES. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER
OF ANY MAJOR DEVIATIONS OR DISCREPANCIES IN THE PLANS AND SPECIFICATIONS.
2. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO COVER THE COMPLETE
INSTALLATION OF SYSTEMS TO FUNCTION AS DESCRIBED AND SPECIFIED. THE OMISSION
OF REFERENCE TO ANY NECESSARY ITEM OF LABOR OR MATERIAL SHALL NOT RELIEVE
THE CONTRACTOR FROM PROVIDING SUCH LABOR AND MATERIAL.
3. ALL EQUIPMENT SHALL BE CAPABLE OF FITTING INTO THE SPACES ALLOCATED WHILE
MEETING THE MANUFACTURER'S RECOMMENDED ACCESS/CLEARANCE REQUIREMENTS.
4. VERIFY AND COORDINATE ALL WALL, FLOOR AND ROOF PENETRATIONS.
5. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER TRADES AND FIELD
CONDITIONS AFFECTED BY THIS INSTALLATION PRIOR TO, COMMENCING AND DURING
CONSTRUCTION.
6. TONE AND/OR SCOPE TO LOCATE EXISTING UNDER SLAB WASTE AND VENT PIPING TO
VERIFY LOCATION PRIOR TO SAW CUTTING OF EXISTING CONCRETE SLAB.
7. TONE AND LOCATE ALL UTILITY LINES OR OTHER INTERFERENCES IN AREAS OF
PROPOSED TRENCH WORK PRIOR TO START OF EXCAVATION.
8. DRAWINGS DO NOT ATTEMPT TO SHOW EXACT DETAILS OF PIPING AND DUCTWORK.
PROVIDE OFFSETS AS NECESSARY TO AVOID LOCAL OBSTRUCTIONS OR INTERFERENCE
WITH OTHER TRADES. REVIEW ALL PIPING AND DUCT RUNS PRIOR TO FABRICATION AND
IMMEDIATELY NOTIFY THE CONTRACTING OFFICER OF ANY INTERFERENCE AND/OR LACK
OF ADEQUATE CLEARANCES.
9. SHOULD PROJECT CONDITIONS REQUIRE REARRANGEMENT OF WORK, MARK SUCH
CHANGES ON THE AS-BUILT DRAWINGS. IF THESE CHANGES REQUIRE ALTERNATE
METHODS TO THOSE APPROVED BY THE CONTRACT DRAWINGS, SUBMIT SHOP DRAWINGS
SHOWING THE PROPOSED ALTERNATE METHODS TO THE CONTRACTING OFFICER FOR
REVIEW. DO NOT PROCEED UNTIL REVIEW.
10. POWDER ACTUATED FASTENERS, SHOT PINS, AND EXTENSION BOLTS LESS THAN 1/2"
IN DIAMETER SHALL NOT BE PERMITTED IN EXISTING PRECAST CONCRETE ROOF MEMBERS
SUCH AS INVERTED T-GIRDERS, RECTANGULAR BEAMS, AND WEB OR STEM PORTIONS OF
DOUBLE T-GIRDERS. SEE ROOF FRAMING PLANS ON STRUCTURAL DRAWINGS.
M
W
PROFESSIONAL
A
S H
A
SIIA , .U
N
ENGINEER
No. 7624-M
LICENSED
.A
YU
.K H
This work was prepared by me or under my supervision.
US Army Corps of Engineers ®
SHEET OF
US
A
RM
Y
CO
RP
S O
F
EN
G
IN
EE
RS
D R
A W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
C H
E C
KE
D B
Y:
AN
S I
D
IS
SU
E D
AT
E :
C O
N
TR
AC
T
N O
SO
L I
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
17384
P-001
18SB02
PL
U
M
BI
N G
L E G
EN
D
U
LR
IC
H
W
AY
SC
H O
FI
EL
D B
AR
R
AC
KS
, O
AH
U , H
I H
O N
O L U
LU
D
IS
TR
IC
T
F O R
T
SH
AF
TE
R , H
AW
AI
I
M C
E
IN
TE
R
N
AT
IO
N
AL
, I
N C
S
. B
ER
ET
AN
IA
S
TR
EE
T
ST
E
H
O N
O
LU
LU
, H
AW
AI
I 9
D N
JA SHD
N
M
AY
. W
A-
-D
-0
SHFI
R
ST
T
IT
LE
SE
C
O N
D T
IT
LE
RTA SUBMITTAL, DBB, 7 MAY 2018
R
EN
O
VA
TI
O
N O
F
BU
IL
D
IN
G
. 18
SB
P-
EXIST. 2" CW TO
REMAIN, FOR POINT
OF REMOVAL IN
BLDG., SEE
REMOVE EXIST. PLUMBING
FIXTURES & ASSOCIATED
WASTE, VENT & WATER
PIPING WITHIN THIS AREA,
UNLESS NOTED OTHERWISE
EXIST. 4" WASTE LINE
TO REMAIN, FOR POINT
OF REMOVAL IN
BLDG., SEE
EXIST. 4" WASTE
LINE TO REMAIN,
FOR POINTOF
REMOVAL IN
BLDG., SEE
EXIST. 6" WASTE
LINE TO REMAIN
EXIST. 4" WASTE
LINE TO REMAIN
EXIST. 4" CW TO
REMAIN, CAP IN
WALL
REMOVE EXIST.
ABANDONED GAS
PIPING, CUT & CAP
6" ABOVE FLOOR
REMOVE EXIST.
ABANDONED GAS
PIPING ALONG WALL
IN IT'S ENTIRETY
EXIST. FOS & FOR
PIPING TO REMAIN,
CAP IN WALL
P-402
EXIST. COTG
TO REMAIN
P-102
POINT OF
REMOVAL
EXIST. FCO
TO REMAIN
P-402
WOMENS
7A
MEN'S
7B
ADCO
CORRIDOR
CLASSROOM
131WAITING
CIVILIAN
ACPL
CPC
STOR
STOR
17A
STOR
COMPUTER RM
INSTRUCTOR
CONTRACT
COORDINATOR
PREVENTION
CORRIDOR
PREVENTION
ASSISTANT
BREAK ROOM
WAITING
MILITARY
TESTING
CIVILIANTOILET
AIBTC
STAFF
COFFEE AREA
FTDTL
BOOTH
TOILET
TOILET
STORAGE
SECURED
STORAGE
STORAGE
STAFF
TOILET
STAFF
JAN
ELECT
LUNCH ROOM
PROGRAM
OFFICE
14B
OFFICE
14A
CLASSROOM #2
ACS
CLASSROOM #1
ACS
PROGRAM
LC STORAGE
19D
LC STORAGE
19E
LC STORAGE
19C
CLOSET
LENDING
CLOSET
19A
LENDING
LC STORAGE
19B
IVC
READINESS
FINANCIAL
ACS
6A
CHIEF
OFFICE
16R
OFFICE
OFFICE
LOBBY
STORAGE
AER FILES
16F
CORRIDOR
4A
CORRIDOR
PROGRAM
ADVOCACY
FAMILY
PROGRAM
ADVOCACY
FAMILY
READINESS
STORAGE
I&R FILES
MGR
I&R
BREAK
2A
COMM
16S
OFFICE
8A
STORAGE
133A
COMM
11E
TOILET
11D
OFFICE
11A
OFFICE
11B
OFFICE
11C
STOR
11F
HALL
11J
FAMILY
STOR
11G
CORRIDOR
4B
CORRIDOR
OFFICE
8E
OFFICE
8D
OFFICE
8C
JAN
7C
ELECT
8B
OFFICE
9A
OFFICE
9B
STOR
11H
MEMBER
FAMILY
EXCEPTIONAL
OFFICE
16A
OFFICE
16B
OFFICE
16C
OFFICE
16D
OFFICE
16E
STORAGE
17B
A A
B
C
D
E
F
B
C
D
E
F
2 3 4 5 6 7 8
3 4 5 6 7 8 9 10 11
2322212019181716
20191817161514
UP
UP
DNDN
DN
DN
DN
DN
DN
M
W
PROFESSIONAL
A
S H
A
SIIA , .U
N
ENGINEER
No. 7624-M
LICENSED
.A
YU
.K H
This work was prepared by me or under my supervision.
US Army Corps of Engineers ®
SHEET OF
US
A
RM
Y
CO
RP
S O
F
EN
G
IN
EE
RS
D R
A W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
C H
E C
KE
D B
Y:
AN
S I
D
IS
SU
E D
AT
E :
C O
N
TR
AC
T
N O
SO
L I
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
17385
PD101
18SB02
D
EM
O
LI
TI
O
N P
L U M
BI
N
G F
LO
O
R P
LA
N
U
LR
IC
H
W
AY
SC
H O
FI
EL
D B
AR
R
AC
KS
, O
AH
U , H
I H
O N
O L U
LU
D
IS
TR
IC
T
F O R
T
SH
AF
TE
R , H
AW
AI
I
M C
E
IN
TE
R
N
AT
IO
N
AL
, I
N C
S
. B
ER
ET
AN
IA
S
TR
EE
T
ST
E
H
O N
O
LU
LU
, H
AW
AI
I 9
D N
JA SHD
N
M
AY
. W
A-
-D
-0
SHFI
R
ST
T
IT
LE
SE
C
O N
D T
IT
LE
RTA SUBMITTAL, DBB, 7 MAY 2018
R
EN
O
VA
TI
O
N O
F
BU
IL
D
IN
G
3/32" = 1'-0"1 DEMOLITION PLUMBING FLOOR PLAN
SB
PD
M
W
PROFESSIONAL
A
S H
A
SIIA , .U
N
ENGINEER
No. 7624-M
LICENSED
.A
YU
.K H
This work was prepared by me or under my supervision.
UP
UP
DN
REF.
UP
F.E.C
FD FD
SPCL STAFF
FILES
MEDIA
PA OFF
149 CHAPLAIN
CHIEF CHAPL
ASST CHAPL
VTC
DIV PAO
DIV SAFTY
SUPRVSR
MECH
OFFICE
DCSM
CG
130 COFS
DIV G8
M
S
CORR
PROT
BREAK
MCP-OD
OIC
TEAM
MEDIA
ELECT
W RESTROOM
M RESTROOM
M SHOWER
MECH
CBRN OFF
CBRN SGM
CBRN NCO
SCA
NCOIC
MEDIA
TEAM
LOBBY
DIV CBRNE
TR
SECURITY
SIPRNET
CO
RR
CO
RR
P-401
NEW 2 1/2" CW
LINE AT CEILING
M
AT
C H
L
IN
E, F
O R
C O
N
TI
N U
AT
IO
N S
EE
D
W G
. P -1
3/4" HOSE BIBB W/
VAC. BREAKER &
SHUT-OFF VALVE
3/4" HOSE BIBB W/
VAC. BREAKER &
SHUT-OFF VALVE
P-13
3/4" HOSE BIBB W/
VAC. BREAKER &
SHUT-OFF VALVE
P-12
(P-12)
P-12
P-12
P-12
GO
CORR
JAN
MEDIA
3/4" HOSE BIBB
W/ VACUUM
BREAKER & SHUT-
OFF VALVE
BALL VALVE
REDUCED PRESSURE
BACKFLOW
PREVENTOR
PRESSURE
REGULATING VALVE
WATER METER
1" CW LINE DN.
BELOW GRADE
3/4" CW LINE TO
EXPANSION TANK
AT CHILLER
P-11
3/4" HOSE BIBB
W/ VACUUM
BREAKER & SHUT-
OFF VALVE
3/4" HOSE BIBB
W/ VACUUM
BREAKER & SHUT-
OFF VALVE
AA
BB
CC
DD
EE
FF
US Army Corps of Engineers ®
SHEET OF
US
A
RM
Y
CO
RP
S O
F
EN
G
IN
EE
RS
D R
A W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
C H
E C
KE
D B
Y:
AN
S I
D
IS
SU
E D
AT
E :
C O
N
TR
AC
T
N O
SO
L I
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
17386
P-101
18SB02
N
EW
P L U
M
BI
N G
F L O
O R
P
LA
N
D
O M
ES
T I
C
U
LR
IC
H
W
AY
SC
H O
FI
EL
D B
AR
R
AC
KS
, O
AH
U , H
I H
O N
O L U
LU
D
IS
TR
IC
T
F O R
T
SH
AF
TE
R , H
AW
AI
I
M C
E
IN
TE
R
N
AT
IO
N
AL
, I
N C
S
. B
ER
ET
AN
IA
S
TR
EE
T
ST
E
H
O N
O
LU
LU
, H
AW
AI
I 9
D N
JA SHD
N
M
AY
. W
A-
-D
-0
SHFI
R
ST
T
IT
LE
SE
C
O N
D T
IT
LE
RTA SUBMITTAL, DBB, 7 MAY 2018
R
EN
O
VA
TI
O
N O
F
BU
IL
D
IN
G
1/8" = 1'-0"1
NEW PLUMBING FLOOR PLAN 1 -
DOMESTIC
KEY PLAN
NOT TO SCAL
SB
P-
PROFESSIONAL
A
S H
A
SIIA , .U
N
ENGINEER
No. 7624-M
LICENSED
.A
YU
.K H
This work was prepared by me or under my supervision.
DN
DN
UP
FD
CORR
DIV SJC-CRIMLAW
TEAM
MECH
CHIEF ENG
TRIAL CNSL
TRIAL CNSL
DIV SJC-CRIMLAW
TRIAL CNSL
TRIAL CNSL
ELECT
W RESTROOM
M RESTROOM
PSYCHT
TEAM
MECH
MED OPS
183 CH MED OPS
CNSLR
CNSLR
190SR CNSLR
MR2 CNSLR
TR
CMD CNSLR
DIV RETENSION
MEDIA
MEDIA
WOMEN SHOWER
MEN SHOWER
TRIAL CNSL
TRIAL CNSL
FIRE ALARM &
SPKR
JAN
CO
RR
CO
RR
P-401
2 1/2" CW
LINE AT
CEILING
M
AT
C H
L
IN
E, F
O R
C O
N
TI
N U
AT
IO
N S
EE
D
W G
. P -1
3/4" HOSE BIBB W/
VAC. BREAKER &
SHUT-OFF VALVE
3/4" HOSE BIBB W/
VAC. BREAKER &
SHUT-OFF VALVE
2 1/2" CW LINE, FOR
CONT. & COORDINATION
SEE CIVIL DWG.
2 1/2" CW LINE DN.
BELOW CONC.
WALKWAY
3/4" HOSE BIBB W/
VAC. BREAKER &
SHUT-OFF VALVE
3/4" HOSE BIBB W/
VAC. BREAKER &
SHUT-OFF VALVE
3/4" HOSE BIBB W/
VAC. BREAKER &
SHUT-OFF VALVE
2 1/2" CW
LINE, FOR
CONTINUATION
SEE 1/P-101
1/2" HW LINE, FOR
CONTINUATION
SEE 1/P-101
P-12
P-12
P-12
P-12
MEDIA
RAMP
P-12
TRIAL CNSL
168 PSY CHT
TEAM
LOBBY
SURGEON
SURGEON
DIV
ENGINEER
DIV
AA
BB
CC
DD
EE
FF
MEDIA
ENG NCO
US Army Corps of Engineers ®
SHEET OF
US
A
RM
Y
CO
RP
S O
F
EN
G
IN
EE
RS
D R
A W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
C H
E C
KE
D B
Y:
AN
S I
D
IS
SU
E D
AT
E :
C O
N
TR
AC
T
N O
SO
L I
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
17387
P-102
18SB02
N
EW
P L U
M
BI
N G
F L O
O R
P
LA
N
D
O M
ES
T I
C
U
LR
IC
H
W
AY
SC
H O
FI
EL
D B
AR
R
AC
KS
, O
AH
U , H
I H
O N
O L U
LU
D
IS
TR
IC
T
F O R
T
SH
AF
TE
R , H
AW
AI
I
M C
E
IN
TE
R
N
AT
IO
N
AL
, I
N C
S
. B
ER
ET
AN
IA
S
TR
EE
T
ST
E
H
O N
O
LU
LU
, H
AW
AI
I 9
D N
JA SHD
N
M
AY
. W
A-
-D
-0
SHFI
R
ST
T
IT
LE
SE
C
O N
D T
IT
LE
RTA SUBMITTAL, DBB, 7 MAY 2018
R
EN
O
VA
TI
O
N O
F
BU
IL
D
IN
G
1/8" = 1'-0"1
NEW PLUMBING FLOOR PLAN 2 -
DOMESTIC
KEY PLAN
NOT TO SCALE
SB
P-
PROFESSIONAL
A
S H
A
SIIA , .U
N
ENGINEER
No. 7624-M
LICENSED
.A
YU
.K H
This work was prepared by me or under my supervision.
UP
UP
DN
REF.
F.E.C
FD FD
P-402
EXIST. 4" WASTE LINE
BELOW FLOOR SLAB
M
AT
C H
L
IN
E, F
O R
C O
N
TI
N U
AT
IO
N S
EE
D
W G
. P -1
P-13
2" CO
UNDERSINK
CG
COFS
DIV G8
DCSM
S
M
MECH
W RESTROOM
M RESTROOM
121 M SHOWER
W SHOWER
SPCL STAFF
DIV CBRNE
CBRN OFF
CBRN SGM
CBRN NCO
SIPRNET
LOBBY
SECURITY
DIV CBRNE
SCA
MEDIA
TEAM
MCP-OD
112NCOIC
OIC
TEAM
114 MEDIA
CORR
MEDIA
CHAPLAIN
PA OFF
MEDIA
FILES
147OFFICE
MECH
SUPRVSR
TR
DIV SAFTY
PROT
ASST CHAPL
CHIEF CHAPL
VTC
DIV PAO
2" WASTE LINE
BELOW FLOOR SLAB,
FOR CONTINUATION
SEE DWG. 1/P-104BREAK
EXIST.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.