AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Renovation of Building 2091, Schofield Barracks, Haw aii
See continuation page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128A18B0006
X 9B. DATED (SEE ITEM 11)
19-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
Am-0004
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Sep-2018
CODE
CECT - CONTRACTING DIVISION
USACE, HONOLULU DISTRICT
BLDG 252 (CECT-POH)
FT. SHAFTER HI 96858-5440
W9128A 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128A18B0006 Am-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0004)” is shown on each revised page.
a. NEW SECTIONS. The following are new pages to the solicitation.
Section 00 60 00, Appendix A – Requests for Information (#13-19) Section 00 60 00, Appendix C – As Built Roof Plan Document E1899010
2. CHANGES TO DRAWINGS.
a. REVISED DRAWINGS. The following revised drawings replace like-numbered drawings and are issued herewith.
Sheet ID Sheet No. Mark Revision Date AS101 43 of 173 4 09/11/18
3. The bid opening date remains UNCHANGED (see SF1442, Page 1, Block 13A).
Renovation of Building 2091 Schofield Barracks, Hawaii
RFI # References Question Government Response 13 Reference typical continuous box beam detail A1-S511 which shows two typical conditions for the anchoring of the continuous box beam on the existing roof. To eliminate the guess work in pricing this detail please provide locations for the conditions without existing light weight concrete infill and the condition with light weight concrete infill.
The "condition with existing light weight concrete fill" applies at all locations of Drawing S-511, Detail A1.
14 What is the thickness of the existing light weight concrete fill on top of the existing concrete topping. If it varies, please provide the range.
Design drawings do not indicate a specific thickness of the existing lightweight concrete; however, Section 00 60 00, Appendix C, per Am-0004, As-Built roof plan document E1899010 from 1967 indicates 2 1/2" thickness with varying slope info. The lightweight thickness based on As-Built info could range from:
minimum 2-1/2" + 1-5/8" = 4-1/8" at low points (roof edge) increasing to 2-1/2" + 6" = 7-1/2" at high points (top ridge).
15 Please confirm, is temporary fence required around the entire perimeter of the construction site? There is no reference to ‘temporary’ or ‘construction’ fence found on the bidding documents.
A temporary fence is required around the entire perimeter of the construction site. Please see revise Drawing AS101, per Am-0004.
16 is the exterior walls (cmu, stucco) to be painted PT5?. If so, is there a wainscot PT6?
For the stucco portions, there is a typical PT5 upper and PT6 lower callout at the south elevation, applicable for portions at south and west elevations. Please see the callouts for PT5 and PT6 at drawing grid area G1 on Sheet A-201.
17 Has the Government applied for or obtained any NPDES permits for the Building 2091 project?
NPDES permit is not applicable to this project.
18 If an NPDES permit is required for storm water, who is responsible to obtain/pay for this permit?
NPDES permit is not applicable to this project.
19 Are their two folding panel partitions that are parallel with each other with a corridor between them or is just one partition with a split track.
It is only one folding partition assembly, with one track (see Drawing A-505, Detail F3), and half of the panels stacked on each end which will meet together at midpoint to close.
Section 00 60 00, Appendix A (Am‐0004)
Section 00 60 00, Appendix C (Am-0004)
| 18-B-0006 Am-0004 |
| 00 60 00, App A RFIs 13-18 |
| 00 60 00, App C As-Built |