About this file

Am-0006

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FY18 Repair North Drainage Secondary Electrical Lines and Telecommunications, Pohakuloa Training Area (PTA), Island of Haw aii, Haw aii

See continuation page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128A18B0005

X 9B. DATED (SEE ITEM 11)

15-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

Am-0006

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Sep-2018

CODE

CECT - CONTRACTING DIVISION

USACE, HONOLULU DISTRICT

BLDG 252 (CECT-POH)

FT. SHAFTER HI 96858-5440

W9128A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9128A18B0005 Am-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0006)” is shown on each revised page.

a. REVISED SECTIONS. The following are revised pages to the solicitation. Changes are marked in “*” asterisks or in strikethrough and bold.

Section 33 71 01 – Page 7 Section 33 72 02 – Page 28

b. NEW SECTIONS. The following are new pages to the solicitation.

Section 00 60 00, Appendix A – Requests for Information (#50-65)

2. CHANGES TO DRAWINGS.

a. REVISED DRAWINGS. The following revised drawings replace like-numbered drawings and are issued herewith.

Sheet ID Sheet No. Mark Revision Date E-116 76 of 214 6 9/12/18 E-117 77 of 214 6 9/12/18 E-118 78 of 214 6 9/12/18 E-119 79 of 214 6 9/12/18 E-605 176 of 214 6 9/12/18 E-606 177 of 214 6 9/12/18 E-607 178 of 214 6 9/12/18 E-609 180 of 214 6 9/12/18 E-612 183 of 214 6 9/12/18

3. The bid opening date remains UNCHANGED (see SF1442, Page 1, Block 13A).

FY18 Repair North Drainage Secondary Electrical Lines and Telecommunications Pohakuloa Training Area (PTA), Island of Hawaii, Hawaii

RFI # References Question Issued Response 50 Section 04 20 00 Unit Masonry, Paragraph 2.3 UNIT PAVERS Concrete Pavers: Provide solid, interlocking paving units, ASTM C936, made from normal-weight aggregates.

Section 33 40 00 Storm Drainage Utilities Paragraph 2.6 PERMEABLE

PAVERS

Permeable pavers shall be recycled high density polyethylene (100% post-consumer), black with a UV stabilizer, and dimensionally stable for a temperature range of -58 to 194 degrees Fahrenheit. Pavers shall have a 0.01% moisture absorption, be non-toxic, harmless to plants, animals, and microorganisms, and be made of an inert material and groundwater neutral.

Drawing plans call for Concrete Pavers, see CU 503 and calls out concrete unit pavers.

I did not see permeable high density polyethylene pavers called out on the drawings.

Are we to use concrete pavers?

Permeable pavers specified in Section 33 40 00 and shown on detail in revised Drawing CU507, per Am-0005. It is called out for use only at the fire lanes (detail revised Drawing CU507, per Am-0005).

Concrete pavers called out at reclaim areas on revised Drawings CG101 and CG104, per Am-0005 and Drawing CG105, per the original solicitation.

Detail for concrete pavers shown on revised Drawing CU503, per Am-0005, and specified in Section 04 20 00.

51 Are there optical loss test parameters for the fiber cable? The TIA-526-7 spec only provides test procedures.

Please refer to Section 33 82 00 paragraph 3.2.1

52 Plans or specs do not show what the existing and new wood pole are. Please advise height and class of existing and new wood poles that are required. If no information can be provided for bidding purposes will a 50' class III wood pole be acceptable?

Please see revised Section 33 71 01, Paragraph 2.2. Poles shall be 50 foot, Class III, wooden poles.

53 Plans or specs do not show what the existing and new wood pole are. Please advise height and class of existing and new wood poles that are required. If no information can be provided for bidding purposes will a 50' class III wood pole be acceptable?

Sheet E-530 Riser Pole Detail shows 5" pvc sch 40 conduit at riser pole. Are the elbows coming up the riser pole and the first length of conduit required to be RMC conduit then transition to schedule 40 pvc? Or will PVC as shown be good to go?

Please see revised Section 33 71 01, Paragraph 2.2. Poles shall be 50 foot, Class III, wooden poles. The elbows coming up the riser pole and the first length of conduit can be Schedule 40 PVC. Schedule 40 is in an industry standard designation for pipe thickness. The designation used for both PVC and steel pipe is in this project.

54 Sheet E116 indicate conduit to unidentified bldg adjacent to Bldg T-197. Sheet E604 (one-line) does not show separate feeder to unidentified bldg. Please identify bldg and confirm feeder required. If feeder required, please indicate on E604.

The unidentified building is T-196/T-197. The feeder is shown going to T-196/T-197 (Note 4) on revised Drawing E-604, Detail A2, per Am-0005. Please see revised Drawing E-116, per Am-0006.

Section 00 60 00, Appendix A (Am‐0006)

55 Sheet E117 is showing Handhole EHH-3 SB8, but no size indicated. Per sheet E605 (one-line) the Handhole is shown as 5'x7'. Please confirm Handhole EHH-3 SB8 on sheet E117 is a 5'x7'.

Please see Drawing E-117, per Am-0006. The size of EHH-3- SB8 is 5'x7'.

56 Sheet E117 is showing 2 Street Lights being fed from Switchboard 11. Sheet E606 (one-line) for Switchboard 11 indicate 1 Street Light only. Will we be able to use Spare 20A 1P breaker or is another breaker required? Please indicate scope on E606.

Please see revised Drawing E-606, per Am-0006, for clarification of scope

57 Sheet E605, Switchboard 8 is feeding new 2"conduit and wire to a Refrigeration Unit. Could not identify location of Refrigeration Unit on Secondary Distribution & Communications Plans. Please identify Refrigeration Unit location.

Please see revised Drawing E-117, per Am-0006, for the location of the existing refrigeration unit

58 Sheet E605 indicate feeders for Bldgs T-102-1 and T-102-2 to Switchboard 10. When referring to sheet E118, Bldgs T-102- 11 and T-102-2 are not identified. Please identify Bldgs T-102- 1 and T-102-2 on E118 or other Secondary Distribution plans.

Please see revised Drawing E-118, per Am-0006, for Bldg T- 102.

59 Sheet E605 indicate feeders for Bldgs T-102-1, T-102-2, T-103 with 2"C, 3-1/C #2, 1-1/C #6G to Switchboard 10. When referring to Switchboard 10 on sheet E606 the feeders are 3"C, 3-1/C #350kcmil, 1-1/C #2G. Please confirm we are to provide 3"C, 3-1/C #350kcmil, 1-1/C #2G to Bldgs T-102-1, T-102-2, T- 103.

Please see revised Drawings E-605 and E-606, per Am-0006, for clarification.

60 Sheet E605 indicate feeders for Bldgs T-177 with 2"conduit and 4-1C #3/0 and 1-1C #2G also referring to Switchboard 18 on E611. Please confirm we are to follow Switchboard 18 one-line on E612 with 2.5"conduit and 3-1C #4/0 and 1-1C #1G.

Please see revised Drawings E-605 and E-612, per Am-0006, for clarification.

61 Sheet E607 indicate new 2"conduit and wire to Bldg T-230.

Sheet E119 does not show conduit routing and termination point to Bldg T-230. Please indicate conduit routing to Bldg T- 230 on sheet E119.

Please see revised Drawing E-119, per Am-0006, for conduit routing to Bldg T-230.

62 Sheet E607 indicate new 2"conduit and wire to Pole with new Box then using existing wiring to Bldg T-95. Sheet E119 does not show conduit routing to Pole with Box. Please indicate conduit routing to Pole with Box on sheet E119. Also please indicate type of Box required at Pole.

Please see revised Drawing E-607, per Am-0006, for clarification of the type of box required.

63 Sheet E607 indicate new 2"conduit with 3-1/C #250kcmil and 1- 1/C #1G to Bldg T-230. Note #7 also implies extra phase conductor. 2"conduit will not accommodate 3#250 and #1G, let alone the extra phase conductor. Please confirm to use 3"conduit if no extra phase conductor required or 3.5"conduit if extra phase conductor required.

Please see revised Drawing E-607, per Am-0006, for clarification.

64 Sheet E119 indicate conduit between new Pole and existing Pole E-2-239. Sheet E609 (one-line) does not show this conduit. Please indicate on sheet E609 conduit and wire required.

The wire between the new pole and existing pole shall be run overhead so there is no conduit required. Please see revised Drawings E-119 and E-609, per Am-0006, for clarification.

65 Please confirm we are to provideTelecommunication "Fiber only". Telephone cabling shall be done by owners vendor. All previous projects @PTA had military vendor ATT do all Telephone work.

Contractor will need to run both fiber optic and copper cables according to project requirements. They will need to coordinate with both NEC and the current telecommunication service provider when installing the communications cables.

18-B-0005 Am-0006
00 60 00, App A RFIs (50-65)