AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FY18 Repair North Drainage, Secondary Electrical Lines and Telecommunications, Pohakuloa Training Area (PTA), Island of Haw aii, Haw aii

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128A18B0005

X 9B. DATED (SEE ITEM 11)

15-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

Am-0001

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Aug-2018

CODE

CECT - CONTRACTING DIVISION

USACE, HONOLULU DISTRICT

BLDG 252 (CECT-POH)

FT. SHAFTER HI 96858-5440

W9128A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9128A18B0005 Am-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0001)” is shown on each revised page.

a. REVISED SECTIONS. The following are revised pages to the solicitation. Changes are marked in “*” asterisks.

Standard Form 1442 – Page 1 Section 00 10 00 – Page 2 Section 00 72 00 – Page 7 Section 01 90 00 – Pages 19, 21, 22

b. DELETED SECTIONS. The following sections are deleted in its entirety.

Section 00 21 13, Attachment A – Site Visit Meeting Location

c. NEW SECTIONS. The following are new pages to the solicitation.

Section 00 21 13, Attachment A – Site Visit Meeting Location (Meeting location updated)

2. The bid opening date remains UNCHANGED (see SF1442, Page 1, Block 13A).

FY18 Repair North Drainage, Secondary Electrical Lines and Telecommunications, Pohakuloa Training Area (PTA), Hawaii

X

COLIN K WAKI 808-835-4393

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

15-Aug-2018

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance within _______7 calendar days and complete it within ________875 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 18 Sep 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CECT - CONTRACTING DIVISION

USACE, HONOLULU DISTRICT

BLDG 252 (CECT-POH)

FT. SHAFTER HI 96858-5440

W9128A

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX: TEL: TEL: FAX:

W9128A18B0005 69

(Am-0001)

W9128A-18-B-0005

Section 00 10 00 – Page 2

4. By submission of a price under OPTIONS, the Bidder agrees that the Government may exercise the OPTION(S) at the time of award, or at any time within 90 calendar days following the date of the award of the basic contract.

5. See Section 00 21 13, FAR 52.204-7 System for Award Management (Oct 2016), regarding registration in the SAM database. Failure to register in the SAM database will make the apparent low Bidder ineligible for award. Bidders must have and/or maintain an active registration with the System for Award Management (SAM) website. To register in SAM, go to http://www.sam.gov.

6. Each Bidder must submit the following documents. Failure to submit all required documents may result in the apparent low Bidder being considered non-responsive.

a. SF 1442 (pages 1 and 2) including acknowledging all amendments.

b. Bid Schedule

c. Bid Guarantee (See SF 1442, Block 13B and Clause No. 52.228-1, Bid Guarantee, in

Section 00 72 00)

d. Section 00 45 00, Representations and Certifications

e. Section 00 45 00 - Representations & Certifications, Appendix A - SF LLL, Disclosure of

Lobbying Activities

7. All Bidders shall provide one (1) copy of the entire bid on a CD within seven (7) calendar days after the date of bid opening.

8. The magnitude of the construction project is between $10,000,000 and $25,000,000.

9. SITE VISIT. The clauses at 52.236-2 Differing Site Conditions, and 52.236-3 Site Investigations and Conditions Affecting the Work, will be included in this contract.

Accordingly, offerors are urged and expected to inspect the site where the work will be performed.

a. Interested parties must provide the following information for each individual planning to attend the site visit: Full Name, Last 4-digits of their Social Security Number, and Name of Company. The information shall be submitted to the Government Point of Contact, Mr. Lance Sewake, via email at lance.m.sewake@usace.army.mil by no later than August 21, 2018 1200 Hours, Hawaii Standard Time.

b. On the day of the site visit, participants will be required to provide a current driver’s license. All vehicles shall have a current registration, safety check, valid insurance, and if renting a vehicle, the rental agreement. Contractors are suggested to wear a hat, sun glasses, and long sleeve shirt for sun and wind protection. Please also bring your own water.

Section 00 21 13, Attachment A - Site Visit Meeting Location j3pp9lms Callout Meet at Bldg. 95 j3pp9lms Callout Park in gravel area j3pp9lms Callout Overflow parking j3pp9lms Line j3pp9lms Line j3pp9lms Line j3pp9lms Line

W9128A18B0005

Section 00 72 00 – Page 7

(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.

(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.

(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.

(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.

(xii) Identify, report, and correct information and information system flaws in a timely manner.

(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.

(xiv) Update malicious code protection mechanisms when new releases are available.

(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.

(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.

(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.

(End of clause)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 875 calendar days. The time stated for completion shall include final cleanup of the premises.

The contract performance period will not be increased if an option is exercised.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,187 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination

Section 01 90 00 Page 19

S-36.12 PROJECT SIGN (March 2007)

Two (2) project signs shall be fabricated and erected at a location designated by the Contracting Officer.

The signs shall be constructed as shown in EP 310-1-6a, dated 01 Jun 06, pages 16-1 thru 16-4, copy of which is provided at the end of this section (Appendix A). The signs shall be erected as soon as possible and within 15 days after the date of notice to proceed. Upon completion of the project, the sign shall be removed and disposed of.

[End of Statement]

S-36.17 EQUIPMENT EXPENSE RATES IN NEGOTIATED ACTIONS (AUG 2018)

Whenever a contract or modification of contract price is negotiated, the Contractor's cost proposals for equipment ownership and operating expenses shall be determined in accordance with the requirements of Special Contract Requirements statement, entitled "EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE," of this solicitation. EP 1110-1-8 "Construction Equipment Ownership and Operating Expense Schedule" is available at http://www.usace.army.mil/inet/usace-docs/eng-pamphlets/ep1110-1-8(vol10)/toc.htm for State of Hawaii (Region 10) and at http://www.usace.army.mil/inet/usace-docs/eng-pamphlets/ep1110-1-8(vol12)/toc.htm for Kwajalein Island, Roi-Namur Island, and Meck Island (Area 12), including Guam, American Samoa, and Johnston Island). [FAR 31.105(d)(2)(i) and UAI 31.105(d)(2)(i)(B)].

[End of Statement]

S-36.20 PERFORMANCE OF WORK BY THE CONTRACTOR - DEFINED (NOV 1998)

(a) "Work," means physical work activities, involving any of the trades required to directly place the construction required by the contract. It also includes physical activities that directly support the work, such as: (1) warehousing; (2) maintenance of equipment; (3) procurement and transportation of supplies or construction materials to the site for use by the contractor; (4) procuring, transporting and providing equipment for use by the contractor; (5) logistical activities that directly support the contractor's employees; and (6) similar activities. The meaning of the term does not include: (1) physical work performed by subcontractors; (2) procurement and transportation of supplies or construction materials to the site for use by subcontractors; (3) procuring, transporting and providing equipment for use by subcontractors; logistical activities undertaken by subcontractors for the benefit of contractor or subcontractor employees; (4) superintendence, quality control, clerical or similar activities; or (5) other activities of a similar nature.

Work will be quantified in terms of its monetary cost to the contractor, and will be compared to the total direct costs that the contractor incurs in performing the contract.

(b) "On the site" means the area within the construction limits depicted or described in the contract drawings or specifications. Activities such as transportation, maintenance and logistics that take place outside of the construction limits depicted or described are still "on the site," if in direct support of activities within the construction limits.

(c) "The contractor's own organization" means those individuals who are employed and paid by the contractor, whether full or part time. If a joint venture or partnership, members (and their paid employees) of the joint venture or partners are considered part of "the contractor's own organization." If a corporation, wholly-owned subsidiary elements of the corporation and their paid employees, are

Section 01 90 00 Page 21

Contracting Officer will prepare a request for vehicle registration to the Provost Marshal. Upon receipt of the signed request the contractor shall report directly to the Provost Marshal for vehicle registration. Contractor employees must report in person for registration of their POVs. The following documents will be required to be presented to the Provost Marshal for vehicle registration:

a. Contracting Officer’s request for vehicle registration.

b. Valid Vehicle registration

c. Valid Certificate of Insurance

d. Current Safety Inspection

e. Valid driver’s license

4. At any time contractor employees (or subcontractor employees) are operating contractor-owned vehicles on an Army Installation, they shall have in their possession a letter signed by a corporate officer authorizing the individual to drive the vehicle.

5. The Contracting Officer and the Provost Marshal office shall be notified of any changes in vehicles within three business days of the change.

6. In the event the Provost Marshal issues extended passes for vehicles, lost passes shall be reported immediately, in writing, to the appropriate Provost Marshal Office, in order to obtain new passes.

Notification shall include all circumstances surrounding the loss of the original passes. All vehicle passes issued shall be returned to the Provost Marshal upon completion of the contract, termination of an employee or discontinued use of the registered vehicles.

7. Failure to follow the procedures outlined above may result in delays in entering Army Installations.

The Government is not responsible for any adverse impact on the contractor or its operation as a result of delays due to the failure to register vehicles.

[End of Statement]

52.231-5000 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE.

EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (MAR 1995) — EFARS

(a) This clause does not apply to terminations. See 52.249-5000, Basis for settlement of proposals and FAR Part 49.

(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region [insert Roman numeral for the appropriate region of the schedule]. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.

Section 01 90 00 Page 22

(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-

36. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.

(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the small purchase threshold, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.

(End of clause) *

SF30
1442 - Page 1
00 10 00 - Page 2
00 21 13, Att. A Site Visit Meeting Location
00 72 00 - Page 7
01 90 00 - Pages 19, 21, 22

File details come from the government source that posted it.