AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY18 Repair North Drainage, Secondary Electrical Lines and Telecommunications, Pohakuloa Training Area (PTA), Island of Haw aii, Haw aii
See continuation page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128A18B0005
X 9B. DATED (SEE ITEM 11)
15-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
Am-0005
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Sep-2018
CODE
CECT - CONTRACTING DIVISION
USACE, HONOLULU DISTRICT
BLDG 252 (CECT-POH)
FT. SHAFTER HI 96858-5440
W9128A 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128A18B0005 Am-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0005)” is shown on each revised page.
a. REVISED SECTIONS. The following are revised pages to the solicitation. Changes are marked in “*” asterisks.
Section 01 90 00 – Page 17
b. DELETED SECTIONS. The following section are deleted in its entirety.
Section 00 72 00, Attachment A – Davis Bacon Wage Rates
c. NEW SECTIONS. The following are new pages to the solicitation.
Section 00 60 00, Appendix A – Requests for Information (#4-49) Section 00 60 00, Appendix C – Subsurface Investigation Report, FY14 Install Drainage System, Pohakuloa
Training Area, Hawaii Section 00 60 00, Appendix D – Geotechnical Engineering Exploration and Percolation Testing, Renovate
Buildings 139, 140, 149 and 188, Pohakuloa Training Area, Hawaii Section 00 60 00, Appendix E – Concept Drawing CU001 - Geotechnical Boring and Percolation Test Location Section 00 72 00, Attachment A – Davis Bacon Wage Rates
2. CHANGES TO DRAWINGS.
a. NEW DRAWINGS. The following new drawings are issued herewith.
Sheet ID Sheet No. Title
CG109A 14A of 216 GRADING PLAN (OPTION 1)
b. REVISED DRAWINGS. The following revised drawings replace like-numbered drawings and are issued herewith.
Sheet ID Sheet No. Mark Revision Date
GI002 02 of 216 5 09/07/2018 G-101 04 of 216 5 09/07/2018 CG101 05 of 216 5 09/07/2018 CG102 06 of 216 5 09/07/2018 CG104 09 of 216 5 09/07/2018 CG107 12 of 216 5 09/07/2018 CG108 13 of 216 5 09/07/2018 CG109 14 of 216 5 09/07/2018 CU102 17 of 216 5 09/07/2018 CU104 19 of 216 5 09/07/2018 CU107 22 of 216 5 09/07/2018 CU108 23 of 216 5 09/07/2018 CU407 31 of 216 5 09/07/2018 CU408 32 of 216 5 09/07/2018 CU501 42 of 216 5 09/07/2018 CU503 44 of 216 5 09/07/2018 CU507 48 of 216 5 09/07/2018 CU508 49 of 216 5 09/07/2018 E-102 62 of 216 5 09/07/2018 E-114 74 of 216 5 09/07/2018 E-117 77 of 216 5 09/07/2018
W9128A18B0005 Am-0005
E-602 173 of 216 5 09/07/2018 E-603 174 of 216 5 09/07/2018 E-604 175 of 216 5 09/07/2018 E-605 176 of 216 5 09/07/2018 E-606 177 of 216 5 09/07/2018 E-607 178 of 216 5 09/07/2018 E-608 179 of 216 5 09/07/2018 E-609 180 of 216 5 09/07/2018 E-610 181 of 216 5 09/07/2018 E-611 182 of 216 5 09/07/2018 E-612 183 of 216 5 09/07/2018 E-613 184 of 216 5 09/07/2018 E-614 185 of 216 5 09/07/2018 E-615 186 of 216 5 09/07/2018
3. The bid opening date remains UNCHANGED (see SF1442, Page 1, Block 13A).
FY18 Repair North Drainage Secondary Electrical Lines and Telecommunications Pohakuloa Training Area (PTA), Island of Hawaii, Hawaii
RFI # References Question Issued Response 4 Please provide the remaining grading limits with proposed and existing grades for the Channel B on Sheet CG109. Profile on Sheet CU409 does not show the grading required beyond Sta.
11+00 and it will also be more accurate to determine the quantities using the grading plans instead of the profile.
Please see new Drawing CG109A, per Am-0005, which shows remaining grading limits.
5 Please provide the grading limits for Sheets CG101 to CG102. Please see revised Drawing CG101, per Am-0005. Grading limits added.
6 Please provide the proposed grades at Channel A inlet area on Sheet CG104.
Please see revised Drawing CU407, per Am-0005, riprap basin grades shown in profile for Drain Line "C". Please see notes on revised Drawings CG104 and CU104, per Am-0005, grades verification required for system pending location and invert at culvert connection.
7 Section 26 08 00 Apparatus Inspection and Testing
Section 26 08 00 Apparatus Inspection and Testing calls for NETA ATS (International Electrical Testing Association Acceptance Testing Specifications) Section 26 08 00 Part
1.4.1 Qualifications. "Contractor shall engage the services of a qualified testing organization to provide inspection, testing, calibration, and adjustment of the electrical distribution system and generation equipment listed in paragraph entitled "Acceptance Tests and Inspections" herein. Organization shall be independent of supplier, manufacturer, and installer of the equipment. The organization shall be a first tier subcontractor.
No work required by this section of the specification shall be performed by a second tier subcontractor". A search of the NETA certifications website shows no individual or company in Hawaii with NETA accreditation. Please confirm whether or not an NETA Accredited company is required for this work.
A NETA accredited company is required.
8 Please confirm there are no commissioning requirements for electrical and communications work.
Confirmed.
9 Since this is a small business set aside, please advise if there are any similar restrictions or limitations as it pertains to sub-contractors.
Other limitations for subcontractors exist. Please see Section 00 72 00, FAR Clause 52.219-14 Limitations on Subcontracting.
Section 00 60 00, Appendix A (Am‐0005)
10 Will test boring results be provided for this RFP? If not will contractors be allowed to perform boring?
Please see new Section 00 60 00, Appendices C, D, and E, included in Am-0005, for additional reports and drawings from other PTA projects.
The Contractor can perform its own boring.
11 Does the power cabling on base belong to PTA or HELCO? If it belongs to HELCO will the new underground cabling belong to PTA or HELCO?
All base electrical cable belongs to the Army. The demark point is the Army switchgear. HELCO owns cabling before it and Army owns after it.
12 Does the telecomm cabling on base belong to PTA or Hawaiian Telcom? If it belongs to Hawaiian Telcom, will the new underground cable belong to PTA or Hawaiian Telcom?
The ownership of the cabling is divided between PTA and Hawaiian Telcom. All new underground cable will belong to
PTA.
13 Will removal and disposal of the utility poles be required where all facilities are vacated?
Removal and disposal of utility poles are not covered by this contract.
14 Does the Buy American requirement (section 52.225-12) have a minimum acceptable threshold percentage or will anything less than 100% require exceptions as laid out in the section?
There are currently no exceptions. The Contractor must comply with Section 00 72 00, FAR Clause 52.225-11 Buy American--Construction Materials Under Trade Agreements, after the contract is awarded.
15 Will contractors be responsible for disposal of all cabling or will the Army perform salvage.
Contractor is responsible for disposal of all removed cabling.
Army will not perform salvage.
16 Sheet E-521 is showing PVC coated GRS conduit stubbing up into the transformers. No detail is provided for the switchboards. Sheets E-212 thru E-216 is showing the stub ups into both the transformers and the switchboards to be PVC. Since these conduits are underneath the transformer and switchboard and not exposed to physical damage is it acceptable to use sch 40 PVC? Per utility co. requirements (HELCO) sch 40 pvc stub ups underneath transformer pads is what they require and use. Metal conduit not required for Utility co stub ups into transformers.
Use of Schedule 40 PVC stub ups underneath transformers and switchboards is acceptable
17 Sheets E-602 thru E-615 "Secondary Distribution System, One Line Diagram-sheets 1 of 14 is showing a typical single phase feeder of 2"C, 3-1/C #2, 1-1/C #6G to Bldg T-129. Per Note 5 it states "Connect conductor to two poles of three pole breaker at switchboard. Pull the unused cable to the disconnect and pigtail at both ends for future use". If we are to pigtail the unused cable for future use should we be pulling in another phase conductor making it 4-1/C #2, 1-1/C #6G? This is typical for sheets E-602 thru E-615.
Plese see Drawings E-602 through E-615, per Am-0005.
18 Sheet E-530 Riser Pole Detail shows 5" pvc sch 40 conduit at riser pole. Are the elbows coming up the riser pole and the first length of conduit required to be RMC conduit then transition to schedule 40 pvc? Or will PVC as shown be good to go?
The elbows coming up the riser pole and the first length of conduit can be Schedule 40 PVC.
19 Sheet E-002/Electrical General Notes #3
"…If these changes require alternate methods to those specified in the contract documents, submit drawings showing the proposed alternate methods to the contracting officer for review and approval.
We have reservations to this statement. We may or may not be able to suggest alternate methods, but the responsibility shall be by the Designer of record to design complete and code compliant system.
If changes are required, the Contractor must submit a variance to the plans and specifications for Government approval.
20 Sheet E-101/Note #4 "…Provide tracer wire circuit in conduits."
Please provide electrical drawings indicating Tracer Wire Circuiting.
The tracer wire circuits shall be between communications maintenance holes. Where innerduct is to be run between the communications maintenance holes, Drawing E-101, Note 6 has the requirement for it to be detectable. For path of the communications ductbanks, please see revised Drawings E- 114 and E-117, per Am-0005; and Drawings E-115, E-116, and E-118 through E-124, per the original solicitation.
21 Sheet E102/Sheet Keyed Notes #3
"Not in contract. Coordinate with other contractors during project planning and execution."
Several Key Note #3 are indicated on E102 along with demo hash marks. These are conflicting. Please advise on work scope required.
Please see revised Drawing E-102, per Am-0005.
22 Spec section 26 20 00 /
3.1.11 Grounding and
Bonding
"Provide in accordance with NFPA 70. Ground exposed, non-current-carrying metallic parts of electrical metallic raceway system, grounding conductor in metallic and nonmetallic raceways, telecommunications system grounds, grounding conductor of nonmetallic sheathed cables, and neutral conductor of wiring systems...."
Can we assume the existing Electrical Systems comply and we are only responsible for new installations as shown on plans? If we are required to install new Grounding and Bonding for existing systems, please indicate all systems with locations at individual bldgs that are affected, on Electrical Plans.
Grounding and bonding requirements listed in Section 26 20 00, Paragraph 3.1.11, are for new installations and not upgrading existing systems.
23 Spec section 26 20 00 /
3.1.11 Grounding and
Bonding
" …Interconnect all grounding media in or on the structure to provide a common ground potential. This includes Lightning Protection, electrical service, telecommunications system grounds, as well as underground metallic piping systems. Make interconnection to the gas line on the customer's side of the meter. Use main size lightning conductors for interconnecting these grounding systems to the lightning protection system....."
Electrical Plans do not indicate structures having Lightning Protection Systems. Please indicate on Electrical Plans which bldgs have Lightning Protection Systems. Also will the Lightning Protection Systems need new UL certifications due to alterations?
There are no structures in the project that have lightning protection systems.
24 Spec section 33 71 02 /
3.6.1 Requirements
"…Provide a #4/0 AWG bare copper grounding conductor below medium-voltage distribution duct banks. Bond bare copper grounding conductor to ground rings (loops) in all manholes and to ground rings (loops) at all equipment slabs (pads)...."
Electrical Plans do not indicate this conductor. If required, please indicate on Electrical Plans. Also confirm no conductor required on Secondary Electrical duct banks.
The requirement for providing a #4/0 AWG bare copper grounding conductor does not apply to the secondary distribution systems in this project.
25 Spec section 33 71 02 /
3.6.6 Multiple Conduits
spec stating conduit separation between Power and Telephone is 12". Sheet E301 / note #1, states "..3" separation between Power and Telephone when encased and 12" separation when not encased." Some Power and Telephone duct packages run parallel.
Should we decide to include both systems in 1 trench, what would be the separation required? Please advise which conditions we are to follow.
If the electrical and communications conduits are concrete encased, the separation between the conduits shall be 3 inches. If they are not encased in concrete, they shall be separated by 12 inches.
26 Utility Pole removal is mentioned in Spec Section 00 10 00 / CLIN 0001 description and Sheet E-002/Suggested Sequence of Work Notes #8. Electrical Plans for Secondary Distribution Removal (E102 thru E113) do not indicate which poles are to be demo' ed. Sheets E115, E117 thru E120, E124, indicate pole removal by others.
Please clarify scope of work.
Removal and disposal of utility poles are not covered by this contract.
27 Sheets E217 thru E219 show electrical Equipment Elevations.
Please indicate to which buildings these elevations apply. We will need to account for additional works.
Drawings E-217 through E-219 are typical for all buildings in the project.
28 Sheet E602 indicate feeders to individual buildings with 3 feeder conductors plus ground wire. Individual buildings have note 5 indicating "connecting to 2 poles of 3 pole breakers in switchboard.
Pull the unused cable to the disconnect and pigtail at both ends for future use."
Should the individual buildings with note 5 indicate 4 feeder conductors (3 phase + neutral) plus ground wire? This occurs on Secondary Distribution System One Line Diagrams thru out.
Please confirm the amount of conductors required.
Please see revised Drawings E-602 through E-615, per Am- 0005.
29 Sheet E602 / Note 4 "Contractor shall check to see if existing disconnect can be used for termination."
If found cannot be used for termination, how are we proceed? If new disconnect required, will contractor be able to price at additional costs? This note appears on other Secondary Distribution 1-Line sheets.
Assume that disconnects are in working condition.
30 Sheet E602 indicate new 2"conduit and wire to Pole P-229. Could not identify location of Pole P-229 on Secondary Distribution & Communication Plans.
Please identify Pole P-229 location.
Please see revised Drawing E-114, per Am-0005, for location of Pole P-229 (A2).
31 Sheet E602 indicate new 2"conduit and wire from Pole P-229 to USGS Seismic Monitoring Station Poha. Could not identify location of USGS Seismic Monitoring Station Poha on Secondary Distribution & Communication Plans.
Please identify USGS Seismic Monitoring Station Poha location.
Please see revised Drawing E-114, per Am-0005, for location of USGS Seismic Monitoring Station POHA (A1).
32 Sheet E603 indicate new 2"conduit and wire to Pole E-2-231. Could not identify location of Pole E-2-231 on Secondary Distribution & Communication Plans.
Please identify Pole E-2-231 location.
Please see revised Drawing E-114, per Am-0005, for location of Pole E-2-231 (C2).
33 Sheet E603 indicate new 2"conduit and wire to Pole across Mauna Kea Loop. Could not identify location of Pole across Mauna Kea Loop on Secondary Distribution & Communication Plans.
Please identify Pole across Mauna Kea Loop1 location.
The pole across Mauna Kea Loop is located on Drawing E- 115, Detail A2. Please see revised Drawing E-114, per Am- 0005, for secondary connection.
34 Sheet E604 indicate new 2"conduit and wire to Pole -211 and Pole across E-1-209. Could not identify location of Pole -211 and Pole across E-1-209 on Secondary Distribution & Communication Plans.
Please identify Pole -211 and Pole across E-1-209 locations.
The pole across E-1-209 is located on Drawing E-116, Detail B3. Pole E-1-211 is located on Drawing E-117, Detail A2.
35 Sheet E605 indicate new 2"conduit and wire to 2 street lights without ID's out of EHH-1 SB8. Could not identify location of 2 street lights without ID's out of EHH-1 SB8 on Secondary Distribution & Communication Plans.
Please identify 2 street lights locations.
Please see revised Drawing E-605, per Am-0005.
36 Sheet E606 indicate new 2"conduit and wire to Pole #30. Could not identify location of Pole #30 on Secondary Distribution & Communication Plans.
Please identify Pole #30 location.
Please see revised Drawing E-117, per Am-0005 for the location of Pole P-30.
37 Sheet E607 indicate new 2"conduit and wire to 2 street lights without ID's out of EHH-3-SB12. Could not identify location of 2 street lights without ID's out of EHH-3-SB12 on Secondary Distribution & Communication Plans.
Please identify 2 street lights locations.
Please see revised drawing E-607, per Am-0005. There is one street light on Drawing E-115, Detail C5 which is out of EHH-3-
SB12.
38 Sheet E607, Switchboard 12 feeders indicate 3-1/c 500Kcmil. There seems to be typo on amount of conductors.
Please confirm we are to provide 4-1/c 500Kcmil conductors.
Please see revised Drawing E-607, per Am-0005.
39 Sheet E610 indicate new 2"conduit and wire to street light without ID out of EHH-1 SB17. Could not identify location of street light without ID out of EHH-1 SB17 on Secondary Distribution & Communication Plans.
Please identify street light location.
Please see Drawing E-120, Detail D1 for the location of the street light located on Pole E-2-242.
40 Sheet E613 indicate new wiring to EHH-1-SB20 then on to T-50 (Recycling Center). Could not identify location of second EHH-1- SB20 and T-50 on Secondary Distribution & Communication Plans.
Please confirm second EHH-1-SB20 should be EHH-2-SB20. Please identify T-50 bldg location.
Please see revised Drawing E-613, per Am-0005. EHH-1- SB20, 3'x5' was changed to EHH-2-SB20, 3'x5'. EHH-2-20 is shown on Drawing E-122, Detail A4.
41 Sheet E614 indicate new wiring to P-18. Could not identify location of P-18 on Secondary Distribution & Communication Plans.
Please identify P18 location.
Please see revised Drawing E-614, per Am-0005. Pole P-18 was changed to Pole E-18. Pole E-18 is shown on Drawing E- 121, Detail D2.
42 Sheet E615 indicate new 2"conduit and wire to street light and Old Guard Shack out of EHH-1-SB21. Could not identify location of street light and Old Guard Shack out of EHH-1-SB212 on Secondary Distribution & Communication Plans.
Please identify street light and Old Guard Shack locations.
The Old Guard Shack and street light out of EHH-1-SB21 are located on Drawing E-124, Detail D4.
43 Sheet E-521 is showing PVC coated GRS conduit stubbing up into the transformers. No detail is provided for the switchboards. Sheets E-212 thru E-216 is showing the stub ups into both the transformers and the switchboards to be PVC. Since these conduits are underneath the transformer and switchboard and not exposed to physical damage is it acceptable to use sch 40 PVC? Per utility co. requirements (HELCO) sch 40 pvc stub ups underneath transformer pads is what they require and use. Metal conduit not required for Utility co stub ups into transformers.
Use of Schedule 40 PVC stub ups underneath transformers and switchboards is acceptable.
44 Sheets E-602 thru E-615 "Secondary Distribution System, One Line Diagram-sheets 1 of 14 is showing a typical single phase feeder of 2"C, 3-1/C #2, 1-1/C #6G to Bldg T-129. Per Note 5 it states "Connect conductor to two poles of three pole breaker at switchboard. Pull the unused cable to the disconnect and pigtail at both ends for future use". If we are to pigtail the unused cable for future use should we be pulling in another phase conductor making it 4-1/C #2, 1-1/C #6G? This is typical for sheets E-602 thru E-615.
Please see revised Drawings E-602 through E-615, per Am- 0005.
45 Is there any chance that the bid date be postponed a week or so?
No.
46 Section 26 08 00 Apparatus Inspection and Testing is calling out for NETA ATS (International Electrical Testing Association Acceptance Testing Specifications) Section 26 08 00 Part 1.4.1 Qualifications. "Contractor shall engage the services of a qualified testing organization to provide inspection, testing, calibration, and adjustment of the electrical distribution system and generation equipment listed in paragraph entitled "Acceptance Tests and Inspections" herein. Organization shall be independent of supplier, manufacturer, and installer of the equipment. The organization shall be a first tier subcontractor. No work required by this section of the specification shall be performed by a second tier subcontractor".
We are planning to exclude this section in its entirety. Can you send in an RFI? I believe there is none such organization here in Hawaii? Perhaps for bidding purposes an allowance dollar amount can be given to Generals to include in their bid?
A NETA accredited company is required for the work in Section 26 08 00.
47 Please reference “Gabion Mattress Swale” detail on Sheet CU501. Please confirm 12” thick, Class 1 riprap is not mortared.
Please see revised Drawing CU501, per Am-0005. Detail callout revised to specify "placed" riprap.
48 Drain Line F is shown to be much longer on Sheet CU408 than on Sheet CG108, please clarify.
Please see revised Drawing CU408, per Am-0005. Revised Drain Line "F" profile.
49 Trench Drain E is marked as Option 3 on Sheet CG102 and CU102, please confirm if Trench Drain E will be part of Option 3.
Please see revised Drawings CG102 and CU102, per Am- 0005. Option 3 notation was an error and has been deleted from the callout.
Section 00 60 00, Appendix C - Page 1
(Am-0005)
Section 00 60 00, Appendix C - Page 2
Section 00 60 00, Appendix C - Page 3
Section 00 60 00, Appendix C - Page 4
Section 00 60 00, Appendix C - Page 5
Section 00 60 00, Appendix C - Page 6
Section 00 60 00, Appendix C - Page 7
Section 00 60 00, Appendix C - Page 8
Section 00 60 00, Appendix C - Page 9
Section 00 60 00, Appendix C - Page 10
Section 00 60 00, Appendix C - Page 11
Section 00 60 00, Appendix C - Page 12
Section 00 60 00, Appendix C - Page 13
Section 00 60 00, Appendix C - Page 14
Section 00 60 00, Appendix C - Page 15
Section 00 60 00, Appendix C - Page 16
Section 00 60 00, Appendix C - Page 17
Section 00 60 00, Appendix C - Page 18
Section 00 60 00, Appendix C - Page 19
Section 00 60 00, Appendix C - Page 20
Section 00 60 00, Appendix C - Page 21
Section 00 60 00, Appendix C - Page 22
Section 00 60 00, Appendix C - Page 23
Section 00 60 00, Appendix C - Page 24
Section 00 60 00, Appendix C - Page 25
Section 00 60 00, Appendix C - Page 26
Section 00 60 00, Appendix C - Page 27
Section 00 60 00, Appendix C - Page 28
Section 00 60 00, Appendix C - Page 29
Section 00 60 00, Appendix C - Page 30
Section 00 60 00, Appendix C - Page 31
Section 00 60 00, Appendix C - Page 32
Section 00 60 00, Appendix C - Page 33
Section 00 60 00, Appendix C - Page 34
Section 00 60 00, Appendix C - Page 35
Section 00 60 00, Appendix C - Page 36
Section 00 60 00, Appendix C - Page 37
Section 00 60 00, Appendix C - Page 38
Section 00 60 00, Appendix C - Page 39
Section 00 60 00, Appendix C - Page 40
Section 00 60 00, Appendix C - Page 41
Section 00 60 00, Appendix C - Page 42
Section 00 60 00, Appendix C - Page 43
Section 00 60 00, Appendix C - Page 44
Section 00 60 00, Appendix C - Page 45
Section 00 60 00, Appendix C - Page 46
Section 00 60 00, Appendix C - Page 47
Section 00 60 00, Appendix C - Page 48
Section 00 60 00, Appendix C - Page 49
Section 00 60 00, Appendix C - Page 50
Section 00 60 00, Appendix C - Page 51
Section 00 60 00, Appendix C - Page 52
Section 00 60 00, Appendix C - Page 53
Section 00 60 00, Appendix C - Page 54
Section 00 60 00, Appendix C - Page 55
Section 00 60 00, Appendix C - Page 56
Section 00 60 00, Appendix C - Page 57
Section 00 60 00, Appendix C - Page 58
Section 00 60 00, Appendix C - Page 59
Section 00 60 00, Appendix C - Page 60
Section 00 60 00, Appendix C - Page 61
Section 00 60 00, Appendix C - Page 62
Section 00 60 00, Appendix C - Page 63
Section 00 60 00, Appendix C - Page 64
Section 00 60 00, Appendix C - Page 65
Section 00 60 00, Appendix C - Page 66
Section 00 60 00, Appendix C - Page 67
| 18-B-0005 Am-0005 |
| 00 60 00, Att A - RFIs (4-49) |
| 00 60 00, App C - Subsurface Investigation Report |
| 00 60 00, App D - GEE and Percolation Tests PTA |
| 6311-10(E)DraftingPlates.pdf |
| 1 |
| 2 |
| 6311-10(E)Appendix_A.pdf |
| SOIL |
| ROCK |
| Log Reports |
| 6311-10(E)Appendix_B.pdf |
| GRAIN |
| DIRECT 1 |
| DIRECT 2 |
| CBR |
| 00 60 00, App E - Geotech Boring Location |
| 00 72 00, Att A - Davis Bacon Wage Rates 07SEP2018 |
| 01 90 00 - Page 17 |
File details come from the government source that posted it.