1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
AM-0004 16 Sep 2016
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
Contracting Division USACE, Honolulu District Bldg 252 (CECT-POH)
Ft Shafter, HI 96858-5440
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
W9128A-16-B-0005
9B. DATED (SEE ITEM 11)
8/15/16
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [ X ] is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
FY15 OMA Pkg A-015, Repair First Floor, Building 107, Wheeler Army Airfield, Oahu, Hawaii
See Page 2 of 2 Pages
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Am-0004 Standard Form 30
IFB No. W9128A-16-B-0005 Page 2 of 2 Pages
Item No. 14 (Continued)
1. CHANGES TO SPECIFICATIONS. The revision mark "(Am-0004)" is shown on each page.
a. NEW SECTIONS. The following are new pages to the solicitation.
Section 00 73 00 – Appendix G, Requests for Information #17 through 24
2. The Bid Opening date remains UNCHANGED. (See Am-0002, SF 1442, Page 1, Block 13A).
FY15 OM Pkg A‐015, Repair First Floor, Building 107, Wheeler Army Airfield, Oahu, Hawaii W9128A‐16‐B‐0005
RFI # Question Response
The item of concern is Section 07 41 13 – Metal Roof Panels, paragraph 1.8.3 – Metal Roof
System Installer Warranty. We request that the requirement for a “Contractors Twenty (20)
Year No Penal Sum Warranty for Non-Structural Metal Roof System” and the provision of a separate bond shall be removed. This paragraph should be amended to read the installer warranty period shall be for two (2) years.
The paragraph shall be amended to read, "the installer warranty period shall be for two (2) years."
The exterior steel stairway (New Elevator / East Side ) will probably be removed at the beginning of the project. The only full access during construction, would be only the Exterior
Stairway on the West Side of the Building
At a minimum a means of egress (to the ground) on the east side of the building must be provided during construction. The stairs shall not be permanent and shall match the type of construction, width, guardrail/ handrail heights, rise and run of the existing stairway. Removing the ability to exit from the east side of the building will not be allowed.
Can double-wall FRP piping be installed in lieu of the steel pipe inside of FRP containment pipe? Steel pipe has a tendency to corrode with condensation moisture when inside a containment pipe. Also, it increases the chance of future leaks.
No. Bid in accordance with plans and specifications.
Regarding section 08 11 16 para 1.2.3, revisions to the requirements may need to be made.
Manufacturer cannot meet 8 lb water infiltration test for pair of doors. If possible, we would like to ask for a modification of this selection based on the manufacturer's recommendation.
Bid in accordance with plans and specifications.
For Aluminum anodic coating, there are different finishes between doors and windows as shown below: Finish: 08 51 13: Parra 2.2.6.1 Calls Out Finish to meet 1.2 mls. 08 11 16:
Parra 2.3.8.1 Calls out to meet .7mls. It seems that the storefront door frame thickness is lower than the Window units. Please confirm if this coating is correct.
Confirmed.
The response to RFI Question #9 regarding the request for the burial depth of the existing electrical duct did not answer my question. I am requesting the burial depth of the existing electrical duct. The answer provided only stated how many inches of separation is required for concrete jacketed ducts and non-jacketed ducts.
Bid in accordance with plans and specifications.
Response to RFI Question #9: It also does not provide information on whether or not the existing ducts are concrete jacketed.
Bid in accordance with plans and specifications.
24 Insulated glass unit SolarBan clear 90 will not meet SHGC (max .0025) - please advise.
The SHGC shall be revised to read "0.25 maximum". Historical considerations shall also be observed and the windows shall match those exhibited by
Building 108
Section 00 73 00, Appendix G, Requests for Information ‐ Page 1 (Am‐0004)
| SF30 - AM-0004 |
| Section 00 73 00, Appendix G, RFIs |