16b5-AM-0001.pdf
PDF 3 MB Posted
- Attached to
- FY15 OMA Pkg A-015, Repair First Floor, Building 107, Wheeler Army Airfield, Oahu, Hawaii
- Solicitation number
- W9128A-16-B-0005
About this file
Am-0001
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF
CONTRACT
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
AM-0001 30 Aug 2016
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
Contracting Division USACE, Honolulu District Bldg 252 (CECT-POH)
Ft Shafter, HI 96858-5440
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
W9128A-16-B-0005
9B. DATED (SEE ITEM 11)
8/15/16
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [ X ] is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
FY15 OMA Pkg A-015, Repair First Floor, Building 107, Wheeler Army Airfield, Oahu, Hawaii
See Page 2 of 2 Pages
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Am-0001 Standard Form 30
IFB No. W9128A-16-B-0005 Page 2 of 2 Pages
Item No. 14 (Continued)
1. CHANGES TO SPECIFICATIONS. The revision mark "(Am-0001)" is shown on each page.
a. REVISED SECTIONS. The following are revised pages to the solicitation. All changes are marked in
BOLD.
Section 00 21 13 – Page 1
Section 00 72 00 – Pages 1, 11, 17, 20 and 22
b. NEW SECTIONS. The following are new pages to the solicitation.
MAIN TABLE OF CONTENTS – Page i
Section 00 10 00 – Page 1
Section 00 72 00 – Page 29
Section 00 72 00 – Appendix A – Wage Rates General Decision Number: HI160001, modification 7 dated
8/19/2016
Section 00 73 00 – Appendix C - Site Visit Sign-in Roster, pages 1 - 3
Section 00 73 00 – Appendix D - Map to Bldg 252 at Ft Shafter, page 1
Section 00 73 00 – Appendix E - Telecom Room Photos, pages 1 to 8
Section 00 73 00 – Appendix F – Updated Bond Forms, pages 1 to 6
Section 00 73 00 – Appendix G – Request For Information #1 and 2
c. DELETED SECTIONS. The following are deleted pages to the solicitation.
MAIN TABLE OF CONTENTS – Pages i, ii and Attachment A
Section 00 10 00 – Page 1
Section 00 72 00 – Appendix A – Wage Rates General Decision Number: HI160001, modification 6 dated
7/29/2016
2. Requests for Information (RFIs) shall be sent to Dayna.N.Matsumura@usace.army.mil and
Kent.A.Tamai@usace.army.mil. The last day to submit RFIs is Wednesday, August 31, 2016 at 10:00 a.m., Hawaii Standard Time
3. The Bid Opening date remains UNCHANGED. (See SF 1442, Page 1, Block 13A).
mailto:Dayna.N.Matsumura@usace.army.mil mailto:Kent.A.Tamai@usace.army.mil
Main Table of Contents i
(Am-0001)
Section 00 01 00 - Table of Contents
MAIN TOC
MAIN TABLE OF CONTENTS
Invitation for Bid (IFB) No. W9128A-16-B-0005, FY15 OMA Pkg A-015 Repair First Floor, Building
107, Wheeler Army Airfield, Oahu, Hawaii
Section 00 10 00 SF 1442 and Bid Schedule
Section 00 21 13 Instructions, Conditions and Notices To Bidders
Section 00 45 00 Representations and Certifications
Appendix A, SF LLL, Disclosure of Lobbying Activities
Section 00 72 00 Contract Clauses
Appendix A – Wage Rates General Decision Number: HI160001
Section 00 73 00 Special Contract Requirements
Appendix A, Project Signs
Appendix B, Signed J&A for Kaba Ilco Locks
Appendix C, Site Visit Sign-in Roster
Appendix D, Map to Bldg 252 at Fort Shafter
Appendix E, Telecom Room Photos
Appendix F, Updated Bond Forms
Appendix G, Requests for Information (RFIs)
Division 1 General Requirements
Division 3 and 35 Technical Requirements
SUBMITTAL OF BIDS:
Bids may be submitted via U.S. Postal Service, Courier Service, or personally delivered as follows:
A. Bids submitted via U.S. Postal Service should be mailed to:
U.S. Army Corps of Engineers, Honolulu District
Contracting Division, ATTN: Dayna Matsumura / Kent Tamai
Building 230, Otake Street
Fort Shafter, Hawaii, 96858-5440
B. Bids submitted via courier service or hand delivered shall be to:
U.S. Army Corps of Engineers, Honolulu District
Contracting Division, ATTN: Dayna Matsumura / Kent Tamai
Building 252, Walker Drive
Fort Shafter, Hawaii, 96858-5440
See Appendix E for a map to Building 252 at Fort Shafter.
Section 00 10 00 – Page 1
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
SECTION 00 10 00
BID SCHEDULE
FY15 OMA PKG A-015
RENOVATE FIRST FLOOR BUILDING 107
WHEELER ARMY AIRFIELD, OAHU, HAWAII
Item
No.
Description Quantity Unit Amount
0001 Renovate First Floor B107 WAAF 1 JOB $_______________
0002 Contract Manpower Reporting 1 JOB $_______________
TOTAL BID SCHEDULE $_______________
NOTE:
1. This procurement method is a Small Business set-aside design-bid-build procurement.
2. Failure to provide a price on all items in the Bid Schedule may cause the bidder to be considered non-responsive.
3. Funds are not presently available for this solicitation. No contract award will be made until appropriated funds are made available. (See Section 00 72 00, Clause 52.232-18)
4. Each Bidder must submit the following documents. Failure to submit all required documents may result in the offer being considered ineligible for award.
a. SF 1442 (pages 1 and 2) including acknowledging all amendments.
b. Bid Schedule
c. Bid Guarantee (See SF1442 Block 13B and Clause No. 52.228-1, Bid Guarantee, in
Section 00 72 00)
d. Section 00 45 00 – Representations & Certification, Appendix A – SF LLL, Disclosure of
Lobbying Activities
5. Bidders shall furnish a copy of its Section 00 45 00 (all and the appendices) and bid bond on a CD with its Bid Schedule.
6. If a bidder elects to submit a Bid Bond, the bidder must use the current SF24 – Bid Bond
(See Section 00 73 00, Appendix E).
7. Bidders must have and/or maintain an active registration with the System for Award
Management (SAM) website. To register in SAM, go to http://www.sam.gov.
http://www.sam.gov/
Section 00 21 13 – Page 1
Section 00 21 13 - Instructions to Bidders
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management JUL 2013
52.214-3 Amendments To Invitations For Bids DEC 1989
52.214-4 False Statements In Bids APR 1984
52.214-5 Submission Of Bids MAR 1997
52.214-6 Explanation To Prospective Bidders APR 1984
52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999
52.214-18 Preparation of Bids-Construction APR 1984
52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996
52.214-27 Price Reduction for Defective Certified Cost or Pricing Data - Modifications - Sealed
Bidding
AUG 2011
52.214-28 Subcontracting Certified Cost Or Pricing Data--Modifications--Sealed Bidding OCT 2010
52.232-13 Notice Of Progress Payments APR 1984
52.232-14 Notice of Availability of Progress Payments Exclusively for Small Business
Concerns
APR 1984
CLAUSES INCORPORATED BY FULL TEXT
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
Any contract awarded as a result of this solicitation will be a DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15
CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed-Price Construction contract resulting from this solicitation.
(End of provision)
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
Section 00 72 00 – Page 1
Section 00 72 00 - General Conditions
52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper
Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal Transactions OCT 2010 52.203-14 Display of Hotline Poster(s) OCT 2015 52.203-16 Preventing Personal Conflicts of Interest DEC 2011 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform
Employees of Whistleblower Rights
APR 2014
52.204-2 Security Requirements AUG 1996 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper MAY 2011 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance JUL 2013 52.204-14 Service Contract Reporting Requirements JAN 2014 52.204-18 Commercial and Government Entity Code Maintenance JUL 2015 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors
Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters JUL 2013 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations NOV 2015 52.210-1 Market Research APR 2011 52.211-13 Time Extensions SEP 2000 52.211-15 Defense Priority And Allocation Requirements APR 2008 52.214-26 Audit and Records--Sealed Bidding OCT 2010 52.214-27 Price Reduction for Defective Certified Cost or Pricing Data - Modifications -
Sealed Bidding
AUG 2011
52.214-28 Subcontracting Certified Cost Or Pricing Data--Modifications--Sealed Bidding
OCT 2010
52.215-2 Audit and Records--Negotiation OCT 2010 52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications OCT 2010 52.215-17 Waiver of Facilities Capital Cost of Money OCT 1997 52.219-8 Utilization of Small Business Concerns OCT 2014 52.219-14 Limitations On Subcontracting NOV 2011 52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards- Overtime Compensation MAY 2014 52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and Related
Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015
Section 00 72 00 – Page 11
(1) The stop-work order results in an increase in the time required for, or in the Contractor's cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to an adjustment within 30 days after the end of the period of work stoppage;
provided, that if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon a proposal at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
(e) The Government's rights to terminate this contract at any time are not affected by action taken under this clause.
(f) If, as the result of the Contractor's intentional or negligent misstatement, misrepresentation, or miscertification, a protest related to this contract is sustained, and the Government pays costs, as provided in FAR 33.102(b)(2) or 33.104(h)(1), the Government may require the Contractor to reimburse the Government the amount of such costs. In addition to any other remedy available, and pursuant to the requirements of Subpart 32.6, the Government may collect this debt by offsetting the amount against any payment due the Contractor under any contract between the Contractor and the Government.
(End of clause)
52.236-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by the DOR (designer of record) which included reviewing as-built drawings provided by the Directorate of Public Works and performing numerous sight surveys. The DOR through sub-consultants also performed 2 borings for geotech information which include soil samples and analysis. Hazardous materials were also analyzed and identified and a topo survey completed by the DOR.
(b) Weather conditions: Tropical. Data on temperature and rainfall may be obtained by from the National Weather Service.
(c) Transportation facilities: The Contractor shall make its own investigation on the condition and availability of public and private roads as well as clearances and restrictions.
(End of clause)
52.249-5000 BASIS FOR SETTLEMENT OF PROPOSALS
Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis under FAR 49.206-2(b). In evaluating a terminations settlement proposal using the total cost basis, the following principles will be applied to determine allowable equipment costs:
(1) Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the contractor's accounting records to determine total actual equipment costs.
(2) If equipment costs have been allocated to a contract using predetermined rates, those charges will be adjusted to actual costs.
Section 00 72 00 – Page 17
252.204-7005 ORAL ATTESTATION OF SECURITY RESPONSIBILITIES (NOV 2001)
(a) Contractor employees cleared for access to Top Secret (TS), Special Access Program (SAP), or Sensitive Compartmented Information (SCI) shall attest orally that they will conform to the conditions and responsibilities imposed by law or regulation on those granted access. Reading aloud the first paragraph of Standard Form 312, Classified Information Nondisclosure Agreement, in the presence of a person designated by the Contractor for this purpose, and a witness, will satisfy this requirement. Contractor employees currently cleared for access to TS, SAP, or SCI may attest orally to their security responsibilities when being briefed into a new program or during their annual refresher briefing. There is no requirement to retain a separate record of the oral attestation.
(b) If an employee refuses to attest orally to security responsibilities, the Contractor shall deny the employee access to classified information and shall submit a report to the Contractor's security activity.
252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (DEC 1991)
(a) Definition.
"Cooperative agreement holder" means a State or local government; a private, nonprofit organization; a tribal organization (as defined in section 4(c) of the Indian Self-Determination and Education Assistance Act (Pub. L. 93- 268; 25 U.S.C. 450 (c))); or an economic enterprise (as defined in section 3(e) of the Indian Financing Act of 1974 (Pub. L. 93-362; 25 U.S.C. 1452(e))) whether such economic enterprise is organized for profit or nonprofit purposes; which has an agreement with the Defense Logistics Agency to furnish procurement technical assistance to business entities.
(b) The Contractor shall provide cooperative agreement holders, upon their request, with a list of those appropriate employees or offices responsible for entering into subcontracts under defense contracts. The list shall include the business address, telephone number, and area of responsibility of each employee or office.
(c) The Contractor need not provide the listing to a particular cooperative agreement holder more frequently than once a year.
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE
GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (OCT 2015)
(a) Unless the Government determines that there is a compelling reason to do so, the Contractor shall not enter into any subcontract in excess of $35,000 with a firm, or a subsidiary of a firm, that is identified in the Exclusions section of the System for Award Management System (SAM Exclusions) as being ineligible for the award of Defense contracts or subcontracts because it is owned or controlled by the government of a country that is a state sponsor of terrorism.
(b) A corporate officer or a designee of the Contractor shall notify the Contracting Officer, in writing, before entering into a subcontract with a party that is identified, in SAM Exclusions, as being ineligible for the award of Defense contracts or subcontracts because it is owned or controlled by the government of a country that is a state sponsor of terrorism. The notice must include the name of the proposed subcontractor and the compelling reason(s) for doing business with the subcontractor notwithstanding its inclusion in SAM Exclusions.
Section 00 72 00 – Page 20
(b) In accordance with 10 U.S.C. 2692, the Contractor is prohibited from storing, treating, or disposing of toxic or hazardous materials not owned by DoD on a DoD installation, except to the extent authorized by a statutory exception to 10 U.S.C. 2692 or as authorized by the Secretary of Defense. A charge may be assessed for any storage or disposal authorized under any of the exceptions to 10 U.S.C. 2692. If a charge is to be assessed, then such assessment shall be identified elsewhere in the contract with payment to the Government on a reimbursable cost basis.
(c) The Contractor shall include the substance of this clause, including this paragraph (c), in all subcontracts that require, may require, or permit a subcontractor access to a DoD installation, at any subcontract tier.
252.225-7005 IDENTIFICATION OF EXPENDITURES IN THE UNITED STATES (JUN 2005)
(a) Definition. United States, as used in this clause, means the 50 States, the District of Columbia, and outlying areas.
(b) This clause applies only if the Contractor is--
(1) A concern incorporated in the United States (including a subsidiary that is incorporated in the United States, even if the parent corporation is not incorporated in the United States); or
(2) An unincorporated concern having its principal place of business in the United States.
(c) On each invoice, voucher, or other request for payment under this contract, the Contractor shall identify that part of the requested payment that represents estimated expenditures in the United States. The identification--
(1) May be expressed either as dollar amounts or as percentages of the total amount of the request for payment;
(2) Should be based on reasonable estimates; and
(3) Shall state the full amount of the payment requested, subdivided into the following categories:
(i) U.S. products--expenditures for material and equipment manufactured or produced in the United States, including end products, components, or construction material, but excluding transportation;
(ii) U.S. services--expenditures for services performed in the United States, including all charges for overhead, other indirect costs, and profit under construction or service contracts;
(iii) Transportation on U.S. carriers--expenditures for transportation furnished by U.S. flag, ocean, surface, and air carriers; and
(iv) Expenditures not identified under paragraphs (c)(3)(i) through (iii) of this clause.
(d) Nothing in this clause requires the establishment or maintenance of detailed accounting records or gives the U.S. Government any right to audit the Contractor’s books or records.
Section 00 72 00 – Page 22
(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payments requests.
(End of clause)
252.232-7008 ASSIGNMENT OF CLAIMS (OVERSEAS) (JUNE 1997)
(a) No claims for monies due, or to become due, shall be assigned by the Contractor unless—
(1) Approved in writing by the Contracting Officer;
(2) Made in accordance with the laws and regulations of the United States of America; and
(3) Permitted by the laws and regulations of the Contractor's country.
(b) In no event shall copies of this contract of any plans, specifications, or other similar documents relating to work under this contract, if marked “Top Secret,” “Secret,” or “Confidential” be furnished to any assignee of any claim arising under this contract or to any other person not entitled to receive such documents. However, a copy of any part or all of this contract so marked may be furnished, or any information contained herein may be disclosed, to such assignee upon the Contracting Officer's prior written authorization.
(c) Any assignment under this contract shall cover all amounts payable under this contract and not already paid, and shall not be made to more than one party, except that any such assignment may be made to one party as agent or trustee for two or more parties participating in such financing. On each invoice or voucher submitted for payment under this contract to which any assignment applies, and for which direct payment thereof is to be made to an assignee, the Contractor shall—
(1) Identify the assignee by name and complete address; and
(2) Acknowledge the validity of the assignment and the right of the named assignee to receive payment in the amount invoiced or vouchered.
(End of clause)
252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
(a) 26 U.S.C. 6331(h) authorizes the Internal Revenue Service (IRS) to continuously levy up to 100 percent of contract payments, up to the amount of tax debt.
(b) When a levy is imposed on a payment under this contract and the Contractor believes that the levy may result in an inability to perform the contract, the Contractor shall promptly notify the Procuring Contracting Officer in writing, with a copy to the Administrative Contracting Officer, and shall provide--
(1) The total dollar amount of the levy;
(2) A statement that the Contractor believes that the levy may result in an inability to perform the contract, including rationale and adequate supporting documentation; and
(3) Advice as to whether the inability to perform may adversely affect national security, including rationale and adequate supporting documentation.
(c) DoD shall promptly review the Contractor's assessment, and the Procuring Contracting Officer shall provide a written notification to the Contractor including--
Section 00 72 00 – Page 29
(AM-0001)
Section 00 72 000 – General Conditions
Clause No. TITLE DATE
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards Oct 2015
52.219-6 Notice of Total Small Business Set-Aside Nov 2011
52.232-18 Availability of Funds Apr 1984
Section 00 72 00, Appendix A – Page 1
APPENDIX A - WAGE RATES
General Decision Number: HI160001 08/19/2016 HI1
Superseded General Decision Number: HI20150001
State: Hawaii
Construction Types: Building, Heavy (Heavy and Dredging), Highway and Residential
Counties: Hawaii Statewide.
BUILDING CONSTRUCTION PROJECTS; RESIDENTIAL CONSTRUCTION
PROJECTS (consisting of single family homes and apartments up to and including 4 stories); HEAVY AND HIGHWAY CONSTRUCTION
PROJECTS AND DREDGING
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least
$10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/08/2016
1 01/15/2016
2 01/22/2016
3 02/05/2016
4 02/26/2016
5 03/18/2016
6 07/29/2016
7 08/19/2016
ASBE0132-001 08/29/2010
Rates Fringes
Asbestos Workers/Insulator
Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems. Also the application of firestopping material for wall openings and
Section 00 72 00, Appendix A – Page 2 penetrations in walls, floors, ceilings and curtain walls...............$ 36.65 22.24
BOIL0627-005 01/01/2013
BOILERMAKER......................$ 35.20 27.35
BRHI0001-001 09/03/2012
BRICKLAYER
Bricklayers and Stonemasons.$ 35.35 22.92
Pointers, Caulkers and
Weatherproofers.............$ 35.60 22.92
BRHI0001-002 09/02/2013
Tile, Marble & Terrazzo Worker
Terrazzo Base Grinders......$ 35.29 23.22
Terrazzo Floor Grinders and Tenders.................$ 32.24 23.22
Tile, Marble and Terrazzo
Workers.....................$ 37.10 23.22
CARP0745-001 08/31/2015
Carpenters:
Carpenters; Hardwood Floor
Layers; Patent Scaffold
Erectors (14 ft. and over); Piledrivers;
Pneumatic Nailers; Wood
Shinglers and Transit and/or Layout Man...........$ 43.90 20.92
Millwrights and Machine
Erectors....................$ 44.15 20.92
Power Saw Operators (2 h.p. and over)..............$ 44.05 20.92
CARP0745-002 08/31/2015
Drywall and Acoustical
Workers and Lathers..............$ 44.15 20.92
ELEC1186-001 02/21/2016
Section 00 72 00, Appendix A – Page 3
Electricians:
Cable Splicers..............$ 48.02 28.74
Electricians................$ 43.65 27.41
Telecommunication worker....$ 26.30 11.58
ELEC1186-002 02/21/2016
Line Construction:
Cable Splicers..............$ 48.02 28.74
Groundmen/Truck Drivers.....$ 32.74 24.07
Heavy Equipment Operators...$ 39.29 26.07
Linemen.....................$ 43.65 27.41
Telecommunication worker....$ 26.30 11.58
ELEV0126-001 01/01/2015
ELEVATOR MECHANIC................$ 53.07 28.38
a. VACATION: Employer contributes 8% of basic hourly rate for
5 years service and 6% of basic hourly rate for 6 months to
5 years service as vacation pay credit.
b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.
ENGI0003-002 08/31/2015
Diver (Aqua Lung) (Scuba))
Diver (Aqua Lung) (Scuba)
(over a depth of 30 feet)...$ 62.50 27.98
Diver (Aqua Lung) (Scuba)
(up to a depth of 30 feet)..$ 53.13 27.98
Stand-by Diver (Aqua Lung)
(Scuba)....................$ 43.75 27.98
Diver (Other than Aqua Lung)
Diver (Other than Aqua
Lung).......................$ 62.50 27.98
Diver Tender (Other than
Aqua Lung)..................$ 40.72 27.98
Stand-by Diver (Other than
Aqua Lung)..................$ 43.75 27.98
Helicopter Work
Airborne Hoist Operator for Helicopter..............$ 42.30 27.98
Co-Pilot of Helicopter......$ 42.44 27.98
Pilot of Helicopter.........$ 42.61 27.98
Power equipment operator -tunnel work
Section 00 72 00, Appendix A – Page 4
GROUP 1....................$ 38.74 27.98
GROUP 2....................$ 38.85 27.98
GROUP 3....................$ 39.02 27.98
GROUP 4....................$ 39.29 27.98
GROUP 5....................$ 39.60 27.98
GROUP 6....................$ 40.25 27.98
GROUP 7....................$ 40.57 27.98
GROUP 8....................$ 40.68 27.98
GROUP 9....................$ 40.79 27.98
GROUP 9A...................$ 41.02 27.98
GROUP 10....................$ 41.08 27.98
GROUP 10A...................$ 41.23 27.98
GROUP 11....................$ 41.38 27.98
GROUP 12....................$ 41.74 27.98
GROUP 12A...................$ 42.10 27.98
Power equipment operators:
GROUP 1....................$ 38.44 27.98
GROUP 2....................$ 38.55 27.98
GROUP 3....................$ 38.72 27.98
GROUP 4....................$ 38.99 27.98
GROUP 5....................$ 39.30 27.98
GROUP 6....................$ 39.95 27.98
GROUP 7....................$ 40.27 27.98
GROUP 8....................$ 40.38 27.98
GROUP 9....................$ 40.49 27.98
GROUP 9A...................$ 40.72 27.98
GROUP 10....................$ 40.78 27.98
GROUP 10A...................$ 40.93 27.98
GROUP 11....................$ 41.08 27.98
GROUP 12....................$ 41.44 27.98
GROUP 12A...................$ 41.80 27.98
GROUP 13....................$ 38.72 27.98
GROUP 13A...................$ 38.99 27.98
GROUP 13B...................$ 39.30 27.98
GROUP 13C...................$ 39.95 27.98
GROUP 13D...................$ 40.27 27.98
GROUP 13E...................$ 40.38 27.98
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Fork Lift (up to and including 10 tons); Partsman
(heavy duty repair shop parts room when needed).
GROUP 2: Conveyor Operator (Handling building material);
Hydraulic Monitor; Mixer Box Operator (Concrete Plant).
GROUP 3: Brakeman; Deckhand; Fireman; Oiler;
Oiler/Gradechecker; Signalman; Switchman; Highline Cableway
Signalman; Bargeman; Bunkerman; Concrete Curing Machine
(self-propelled, automatically applied unit on streets, highways, airports and canals); Leveeman; Roller (5 tons and under); Tugger Hoist.
GROUP 4: Boom Truck or dual purpose "A" Frame Truck (5 tons or less); Concrete Placing Boom (Building Construction);
Dinky Operator; Elevator Operator; Hoist and/or Winch (one drum); Straddle Truck (Ross Carrier, Hyster and similar).
Section 00 72 00, Appendix A – Page 5
GROUP 5: Asphalt Plant Fireman; Compressors, Pumps, Generators and Welding Machines ("Bank" of 9 or more, individually or collectively); Concrete Pumps or Pumpcrete
Guns; Lubrication and Service Engineer (Grease Rack);
Screedman.
GROUP 6: Boom Truck or Dual Purpose "A"Frame Truck (over 5 tons); Combination Loader/Backhoe (up to and including 3/4
cu. yd.); Concrete Batch Plants (wet or dry); Concrete
Cutter, Groover and/or Grinder (self-propelled unit on streets, highways, airports, and canals); Conveyor or
Concrete Pump (Truck or Equipment Mounted); Drilling
Machinery (not to apply to waterliners, wagon drills or jack hammers); Fork Lift (over 10 tons); Loader (up to and including 3 and 1/2 cu. yds); Lull High Lift (under 40 feet); Lubrication and Service Engineer (Mobile); Maginnis
Internal Full Slab Vibrator (on airports, highways, canals and warehouses); Man or Material Hoist; Mechanical Concrete
Finisher (Large Clary, Johnson Bidwell, Bridge Deck and similar); Mobile Truck Crane Driver; Portable Shotblast
Concrete Cleaning Machine; Portable Boring Machine (under streets, highways, etc.); Portable Crusher; Power Jumbo
Operator (setting slip forms, etc., in tunnels); Rollers
(over 5 tons); Self-propelled Compactor (single engine);
Self-propelled Pavement Breaker; Skidsteer Loader with attachments; Slip Form Pumps (Power driven by hydraulic, electric, air, gas, etc., lifting device for concrete forms); Small Rubber Tired Tractors; Trencher (up to and including 6 feet); Underbridge Personnel Aerial Platform
(50 feet of platform or less).
GROUP 7: Crusher Plant Engineer, Dozer (D-4, Case 450, John
Deere 450, and similar); Dual Drum Mixer, Extend Lift;
Hoist and/or Winch (2 drums); Loader (over 3 and 1/2 cu.
yds. up to and including 6 yards.); Mechanical Finisher or
Spreader Machine (asphalt), (Barber Greene and similar)
(Screedman required); Mine or Shaft Hoist; Mobile Concrete
Mixer (over 5 tons); Pipe Bending Machine (pipelines only);
Pipe Cleaning Machine (tractor propelled and supported);
Pipe Wrapping Machine (tractor propelled and supported);
Roller Operator (Asphalt); Self-Propelled Elevating Grade
Plane; Slusher Operator; Tractor (with boom) (D-6, or similar); Trencher (over 6 feet and less than 200 h.p.);
Water Tanker (pulled by Euclids, T-Pulls, DW-10, 20 or 21, or similar); Winchman (Stern Winch on Dredge).
GROUP 8: Asphalt Plant Operator; Barge Mate (Seagoing);
Cast-in-Place Pipe Laying Machine; Concrete Batch Plant
(multiple units); Conveyor Operator (tunnel); Deckmate;
Dozer (D-6 and similar); Finishing Machine Operator
(airports and highways); Gradesetter; Kolman Loader (and similar); Mucking Machine (Crawler-type); Mucking Machine
(Conveyor-type); No-Joint Pipe Laying Machine; Portable
Crushing and Screening Plant; Power Blade Operator (under
12); Saurman Type Dragline (up to and including 5 yds.);
Stationary Pipe Wrapping, Cleaning and Bending Machine;
Section 00 72 00, Appendix A – Page 6
Surface Heater and Planer Operator, Tractor (D-6 and similar); Tri-Batch Paver; Tunnel Badger; Tunnel Mole and/or Boring Machine Operator Underbridge Personnel Aerial
Platform (over 50 feet of platform).
GROUP 9: Combination Mixer and Compressor (gunite); Do-Mor
Loaderand Adams Elegrader; Dozer (D-7 or equal); Wheel and/or Ladder Trencher (over 6 feet and 200 to 749 h.p.).
GROUP 9A: Dozer (D-8 and similar); Gradesetter (when required by the Contractor to work from drawings, plans or specifications without the direct supervision of a foreman or superintendent); Push Cat; Scrapers (up to and including
20 cu. yds); Self-propelled Compactor with Dozer;
Self-Propelled, Rubber-Tired Earthmoving Equipment (up to and including 20 cu. yds) (621 Band and similar); Sheep's
Foot; Tractor (D-8 and similar); Tractors with boom (larger than D-6, and similar).
GROUP 10: Chicago Boom; Cold Planers; Heavy Duty Repairman or
Welder; Hoist and/or Winch (3 drums); Hydraulic Skooper
(Koehring and similar); Loader (over 6 cu. yds. up to and including 12 cu. yds.); Saurman type Dragline (over 5 cu.
yds.); Self-propelled, rubber-tired Earthmoving Equipment
(over 20 cu. yds. up to and including 31 cu. yds.) (637D and similar); Soil Stabilizer (P & H or equal); Sub-Grader
(Gurries or other automatic type); Tractors (D-9 or equivalent, all attachments); Tractor (Tandem Scraper);
Watch Engineer.
GROUP 10A: Boat Operator; Cable-operated Crawler Crane (up to and including 25 tons); Cable-operated Power Shovel, Clamshell, Dragline and Backhoe (up to and including 1 cu.
yd.); Dozer D9-L; Dozer (D-10, HD41 and similar) (all attachments); Gradall (up to and including 1 cu. yd.);
Hydraulic Backhoe (over 3/4 cu. yds. up to and including 2
cu. yds.); Mobile Truck Crane Operator (up to and including
25 tons) (Mobile Truck Crane Driver Required);
Self-propelled Boom Type Lifting Device (Center Mount) (up to and including 25 tons) (Grove, Drott, P&H, Pettibone and similar; Trencher (over 6 feet and 750 h.p. or more); Watch
Engineer (steam or electric).
GROUP 11: Automatic Slip Form Paver (concrete or asphalt);
Band Wagon (in conjunction with Wheel Excavator);
Cable-operated Crawler Cranes (over 25 tons but less than
50 tons); Cable-operated Power Shovel, Clamshell, Dragline and Backhoe (over 1 cu. yd. up to 7 cu. yds.); Gradall
(over 1 cu. yds. up to 7 cu. yds.); DW-10, 20, etc.
(Tandem); Earthmoving Machines (multiple propulsion power units and 2 or more Scrapers) (up to and including 35 cu.
yds.," struck" m.r.c.); Highline Cableway; Hydraulic
Backhoe (over 2 cu. yds. up to and including 4 cu. yds.);
Leverman; Lift Slab Machine; Loader (over 12 cu. yds);
Master Boat Operator; Mobile Truck Crane Operator (over 25 tons but less than 50 tons); (Mobile Truck Crane Driver required); Pre-stress Wire Wrapping Machine; Self-propelled
Section 00 72 00, Appendix A – Page 7
Boom-type Lifting Device (Center Mount) (over 25 tons m.r.c); Self-propelled Compactor (with multiple-propulsion power units); Single Engine Rubber Tired Earthmoving
Machine (with Tandem Scraper); Tandem Cats; Trencher
(pulling attached shield).
GROUP 12: Clamshell or Dipper Operator; Derricks; Drill Rigs;
Multi-Propulsion Earthmoving Machines (2 or more Scrapers)
(over 35 cu. yds "struck"m.r.c.); Operators (Derricks, Piledrivers and Cranes); Power Shovels and Draglines (7 cu.
yds. m.r.c. and over); Self-propelled rubber-tired
Earthmoving equipment (over 31 cu. yds.) (657B and similar); Wheel Excavator (up to and including 750 cu. yds.
per hour); Wheel Excavator (over 750 cu. yds. per hour).
GROUP 12A: Dozer (D-11 or similar or larger); Hydraulic
Excavators (over 4 cu. yds.); Lifting cranes (50 tons and over); Pioneering Dozer/Backhoe (initial clearing and excavation for the purpose of providing access for other equipment where the terrain worked involves 1-to-1 slopes that are 50 feet in height or depth, the scope of this work does not include normal clearing and grubbing on usual hilly terrain nor the excavation work once the access is provided); Power Blade Operator (Cat 12 or equivalent or over); Straddle Lifts (over 50 tons); Tower Crane, Mobile;
Traveling Truss Cranes; Universal, Liebher, Linden, and similar types of Tower Cranes (in the erection, dismantling, and moving of equipment there shall be an additional Operating Engineer or Heavy Duty Repairman);
Yo-Yo Cat or Dozer.
GROUP 13: Truck Driver (Utility, Flatbed, etc.)
GROUP 13A: Dump Truck, 8 cu.yds. and under (water level);
Water Truck (up to and including 2,000 gallons).
GROUP 13B: Water Truck (over 2,000 gallons); Tandem Dump
Truck, over 8 cu. yds. (water level).
GROUP 13C: Truck Driver (Semi-trailer. Rock Cans, Semi-Dump or Roll-Offs).
GROUP 13D: Truck Driver (Slip-In or Pup).
GROUP 13E: End Dumps, Unlicensed (Euclid, Mack, Caterpillar or similar); Tractor Trailer (Hauling Equipment); Tandem
Trucks hooked up to Trailer (Hauling Equipment)
BOOMS AND/OR LEADS (HOURLY PREMIUMS):
The Operator of a crane (under 50 tons) with a boom of 80 feet or more (including jib), or of a crane (under 50 tons) with leads of 100 feet or more, shall receive a per hour premium for each hour worked on said crane (under 50 tons) in accordance with the following schedule:
Section 00 72 00, Appendix A – Page 8
Booms of 80 feet up to but not including 130 feet or
Leads of 100 feet up to but not including 130 feet 0.50
Booms and/or Leads of 130 feet up to but not including 180 feet 0.75
Booms and/or Leads of 180 feet up to and including 250 feet 1.15
Booms and/or Leads over 250 feet 1.50
The Operator of a crane (50 tons and over) with a boom of 180 feet or more (including jib) shall receive a per hour premium for each hour worked on said crane (50 tons and over) in accordance with the following schedule:
Booms of 180 feet up to and including 250 feet 1.25
Booms over 250 feet 1.75
ENGI0003-004 09/01/2015
Dredging: (Boat Operators)
Boat Deckhand...............$ 38.72 27.98
Boat Operator...............$ 40.93 27.98
Master Boat Operator........$ 41.08 27.98
Dredging: (Clamshell or
Dipper Dredging)
GROUP 1.....................$ 41.44 27.98
GROUP 2.....................$ 40.78 27.98
GROUP 3.....................$ 40.38 27.98
GROUP 4.....................$ 38.72 27.98
Dredging: (Derricks)
GROUP 1.....................$ 41.44 27.98
GROUP 2.....................$ 40.78 27.98
GROUP 3.....................$ 40.38 27.98
GROUP 4.....................$ 38.72 27.98
Dredging: (Hydraulic Suction
Dredges)
GROUP 1.....................$ 41.08 27.98
GROUP 2.....................$ 40.93 27.98
GROUP 3.....................$ 40.78 27.98
GROUP 4.....................$ 40.72 27.98
GROUP 5.....................$ 37.88 26.76
Group 5.....................$ 40.38 27.98
GROUP 6.....................$ 37.77 26.76
Group 6.....................$ 40.27 27.98
GROUP 7.....................$ 36.22 26.76
Group 7.....................$ 38.72 27.98
CLAMSHELL OR DIPPER DREDGING CLASSIFICATIONS
GROUP 1: Clamshell or Dipper Operator.
GROUP 2: Mechanic or Welder; Watch Engineer.
GROUP 3: Barge Mate; Deckmate.
Section 00 72 00, Appendix A – Page 9
GROUP 4: Bargeman; Deckhand; Fireman; Oiler.
HYDRAULIC SUCTION DREDGING CLASSIFICATIONS
GROUP 1: Leverman.
GROUP 2: Watch Engineer (steam or electric).
GROUP 3: Mechanic or Welder.
GROUP 4: Dozer Operator.
GROUP 5: Deckmate.
GROUP 6: Winchman (Stern Winch on Dredge)
GROUP 7: Deckhand (can operate anchor scow under direction of
Deckmate); Fireman; Leveeman; Oiler.
DERRICK CLASSIFICATIONS
GROUP 1: Operators (Derricks, Piledrivers and Cranes).
GROUP 2: Saurman Type Dragline (over 5 cubic yards).
GROUP 3: Deckmate; Saurman Type Dragline (up to and including 5 yards).
GROUP 4: Deckhand, Fireman, Oiler.
ENGI0003-044 08/31/2015
Power Equipment Operators
(PAVING)
(10) Cold Planer............$ 40.25 27.87
(10)Loader (2 1/2 cu. yds.
and under)..................$ 39.42 27.87
(10)Soil Stabilizer.........$ 40.25 27.87
(11)Loader (over 2 1/2 cu.
yds. to and including 5
cu. yds.)...................$ 39.74 27.87
(3)Roller Operator (five tons and under).............$ 38.19 27.87
(5)Screed Person............$ 39.42 27.87
(6)Combination
Loader/Backhoe (up to 3/4 cu.yd.).....................$ 37.48 27.87
(6)Concrete Saws and/or
Grinder (self-propelled unit on streets, highways, airports and canals)........$ 39.42 27.87
(6)Roller Operator (over five tons)..................$ 39.62 27.87
(7)Combination
Loader/Backhoe (over 3/4 cu.yd.).....................$ 38.46 27.87
(8) Asphalt Plant Operator..$ 39.89 27.87
Asphalt Concrete Material
Transfer....................$ 39.42 27.87
Asphalt Raker...............$ 38.46 27.87
Asphalt Spreader Operator...$ 39.94 27.87
Grader......................$ 40.25 27.87
Laborer, Hand Roller........$ 37.96 27.87
Section 00 72 00, Appendix A – Page 10
IRON0625-001 09/01/2014
Ironworkers:.....................$ 35.75 29.01
a. Employees will be paid $.50 per hour more while working in tunnels and coffer dams; $1.00 per hour more when required to work under or are covered with water (submerged) and when they are required to work on the summit of Mauna Kea, Mauna Loa or
Haleakala.
LABO0368-001 08/31/2015
Laborers:
Driller.....................$ 35.35 17.51
Final Clean Up..............$ 25.75 13.34
Gunite/Shotcrete Operator and High Scaler.............$ 34.85 17.51
Laborer I...................$ 34.35 17.51
Laborer II..................$ 31.75 17.51
Mason Tender/Hod Carrier....$ 34.85 17.51
Powderman...................$ 35.35 17.51
Window Washer (bosun chair).$ 33.85 17.51
LABORERS CLASSIFICATIONS
Laborer I: Air Blasting run by electric or pneumatic compressor; Asphalt Laborer, Ironer, Raker, Luteman, and
Handroller, and all types of Asphalt Spreader Boxes;
Asphalt Shoveler; Assembly and Installation of Multiplates, Liner Plates, Rings, Mesh, Mats; Batching Plant (portable and temporary); Boring Machine Operator (under streets and sidewalks); Buggymobile; Burning and Welding; Chainsaw, Faller, Logloader, and Bucker; Compactors (Jackson Jumping
Jack and similar); Concrete Bucket Dumpman; Concrete
Chipping; Concrete Chuteman/Hoseman (pouring concrete) (the handling of the chute from ready-mix trucks for such jobs as walls, slabs, decks, floors, foundations, footings, curbs, gutters, and sidewalks); Concrete Core Cutter
(Walls, Floors, and Ceiling); Concrete Grinding or Sanding;
Concrete: Hooking on, signaling, dumping of concrete for extreme work over water on caissons, pilings, abutments, etc.; Concrete: Mixing, handling, conveying, pouring, vibrating, otherwise placing of concrete or aggregates or by any other process; Concrete: Operation of motorized wheelbarrows or buggies or machines of similar character, whether run by gas, diesel, or electric power; Concrete
Placement Machine Operator: operation of Somero Hammerhead, Copperheads, or similar machines; Concrete Pump Machine
(laying, coupling, uncoupling of all connections and cleaning of equipment); Concrete and/or Asphalt Saw
(Walking or Handtype) (cutting walls or flatwork) (scoring old or new concrete and/or asphalt) (cutting for expansion joints) (streets and ways for laying of pipe, cable or conduit for all purposes); Concrete Shovelers/Laborers (Wet
Section 00 72 00, Appendix A – Page 11 or Dry); Concrete Screeding for Rough Strike-Off: Rodding or striking-off, by hand or mechanical means prior to finishing; Concrete Vibrator Operator; Coring Holes: Walls, footings, piers or other obstructions for passage of pipes or conduits for any purpose and the pouring of concrete to secure the hole; Cribbers, Shorer, Lagging, Sheeting, and
Trench Jacking and Bracing, Hand-Guided Lagging Hammer
Whaling Bracing; Curbing (Concrete and Asphalt); Curing of
Concrete (impervious membrane and form oiler) mortar and other materials by any mode or method; Cut Granite Curb
Setter (setting, leveling and grouting of all precast concrete or stone curbs); Cutting and Burning Torch
(demolition); Dri Pak-It Machine; Environmental Abatement:
removal of asbestos, lead, and bio hazardous materials (EPA and/or OSHA certified); Falling, bucking, yarding, loading or burning of all trees or timber on construction site;
Forklift (9 ft. and under); Gas, Pneumatic, and Electric tools; Grating and Grill work for drains or other purposes;
Green Cutter of concrete or aggregate in any form, by hand, mechanical means, grindstone or air and/or water; Grout:
Spreading for any purpose; Guinea Chaser (Grade Checker) for general utility trenches, sitework, and excavation;
Headerboard Man (Asphalt or Concrete); Heat Welder of
Plastic (Laborers' AGC certified workers) (when work involves waterproofing for waterponds, artificial lakes and reservoir) heat welding for sewer pipes and fusion of HDPE pipes; Heavy Highway Laborer (Rigging, signaling, handling, and installation of pre-cast catch basins, manholes, curbs and gutters); High Pressure Nozzleman - Hydraulic Monitor
(over 100# pressure); Jackhammer Operator; Jacking of slip forms: All semi and unskilled work connected there within;
Laying of all multi-cell conduit or multi-purpose pipe;
Magnesite and Mastic Workers (Wet or Dry)(including mixer operator);Mortar Man; Mortar Mixer (Block, Brick, Masonry, and Plastering); Nozzleman (Sandblasting and/or Water
Blasting): handling, placing and operation of nozzle;
Operation, Manual or Hydraulic jacking of shields and the use of such other mechanical equipment as may be necessary;
Pavement Breakers; Paving, curbing and surfacing of streets, ways, courts, under and overpasses, bridges, approaches, slope walls, and all other labor connected therewith; Pilecutters; Pipe Accessment in place, bolting and lining up of sectional metal or other pipe including corrugated pipe; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in the ditch until completion of operation, including any and all forms of tubular material, whether pipe, HDPE, metallic or non-metallic, conduit, and any other stationary-type of tubular device used for conveying of any substance or element, whether water, sewage, solid, gas, air, or other product whatsoever and without regard to the nature of material from which tubular material is fabricated; No-joint pipe and stripping of same, Pipewrapper, Caulker, Bander, Kettlemen, and men applying asphalt, Laykold, treating Creosote and similar-type materials (6-inch) pipe and over); Piping: resurfacing and paving of all ditches in preparation for laying of all
Section 00 72 00, Appendix A – Page 12 pipes; Pipe laying of lateral sewer pipe from main or side sewer to buildings or structure (except Contactor may direct work be done under proper supervision); Pipe laying, leveling and marking of the joint used for main or side sewers and storm sewers; Laying of all clay, terra cotta, ironstone, vitrified concrete, HDPE or other pipe for drainage; Placing and setting of water mains, gas mains and all pipe including removal of skids; Plaster Mortar
Mixer/Pump; Pneumatic Impact Wrench; Portable Sawmill
Operation: Choker setters, off bearers, and lumber handlers connected with clearing; Posthole Digger (Hand Held, Gas, Air and Electric); Powderman's Tender; Power Broom Sweepers
(Small); Preparation and Compaction of roadbeds for railroad track laying, highway construction, and the preparation of trenches, footings, etc., for cross-country transmission by…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .