This document is a briefing slide presentation regarding the Defense Health Agency's (DHA) Reliability Centered Maintenance (RCM) program for military medical facilities. The key details are:
The DHA is implementing RCM programs at various military medical facilities, including larger sites like Walter Reed and smaller sites like Fort Irwin and Fort Novosel. The RCM program involves identifying and verifying critical facility equipment, establishing baseline measurements, scheduling RCM procedures, and deactivating standard preventive maintenance over time. The briefing covers the RCM implementation schedule, examples of RCM findings and cost savings at the USAMRIID facility, and DHA's plans to incorporate RCM requirements into MILCON project purchase specifications and acceptance testing. The document also mentions an upcoming DHA O&M Industry Day event on August 13-15, 2024 in San Antonio, TX where the DHA will discuss business opportunities related to medical facility operations and maintenance, including RCM experience.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MST RCM Briefing – 13 Aug 2024
Charles Prince DHA / NIKA Solutions
Improving Health and Building Readiness. Anytime, Anywhere — Always
Introduction
CUI
• Brent Condrey – RCM SME
ASNT Level 2A – 2B Level III Vibration Analysis Certifications.
ISO Level II and III Advanced Vibration Analysis Certifications.
ASNT Level I and II Infrared Thermography Certification.
ASNT Level I Mechanical/Airborne Ultrasound Certification.
20+ Years of RCM/PdM experience.
Former turbine specialist on Westinghouse 501B team
Former Georgia-Pacific Reliability Lead holding multiple OPEX certifications
Introduction
CUI
• Charles Prince – RCM SME, Mechanical Engineer
ASNT Level 2A Vibration Analysis Certification.
ISO Level II Vibration Analysis Certification.
ANST Level I Infrared Thermography Certification.
ASNT Level 1 Ultrasound Certification.
Certifications in Engineered Sealing Systems, Multi-stage pumps, and Mechanical Gas Seals for Compressors.
10 years of RCM/PdM Experience.
Former petrochemical industry pump, compressor and seals SME
DHA O&M Organization Chart
CUI
Deputy Branch Chief -
Marvin Hsie
AOR 1-6
O&M Program Manager - Mark Kerr
AOR 1 & 6
Kevin Cox
John Acierno Technical Advisor
O&M Program Manager -
Jim Blackman
AOR 2 & 4
Kevin Cox
Dave Duvall Technical Advisor
O&M Program Manager –
Federico Aguilar
AOR 3 & 5
Curtis Barr
Technical Advisor
Brent Condrey Charles Prince
DHA RCM
Bob Sachuk
Policy & Procedures
RCM/CBM Site Selection Criteria
• Initially implemented at larger facilities (Walter Reed 2M sq ft)
• As contract end dates align, both large and smaller facilities will get a CBM program (examples below)
• Fort Bliss – 1.2M sq ft
• Fort Irwin – 250K sq ft – CBM program RPIE identified/verified
• Fort Novosel - 249K sq ft -CBM program RPIE identified/verified
• Business occupancies will be case by case – Best ROI when combined with GTO or limited RCM scope
RCM awarded at the following sites
CUI
Award Date RCM StatusScope Type Site
Feb 2022Contract AwardedNew RCM ProgramKeesler
July 2022Contract AwardedLegacy Program, Refine RCM ScopeBAMC Fort Sam
Sept 2022Contract AwardedNew RCM ProgramWalter Reed
Mar 2023Contract AwardedNew RCM ProgramWright Patterson
May 2023Contract AwardedLegacy Program, Refine RCM ScopeFort Liberty (Bragg) Aug 2023Contract AwardedNew RCM ProgramBalboa Naval Hospital Nov 2023Contract AwardedLegacy Program, Refine RCM ScopeFort Campbell, KY Dec 2023Contract AwardedNew RCM ProgramFt Eisenhower Army Medical Center Dec 2023Contract AwardedLegacy Program, Refine RCM ScopeFort Cavazos (Hood) Feb 2024Contract AwardedNew RCM ProgramWeed Army Hospital, Fort Irwin
Mar 2024Contract AwardedLegacy Program, Refine RCM ScopeFort Johnson (Polk) Mar 2024Contract AwardedLegacy Program, Refine RCM ScopeFort Riley
Future RCM sites
CUI
Date RCM StatusScope Type Site
Jan 2024Contract AwardedNew RCM ProgramFort Belvoir Community Hospital Apr 2024Contract AwardedNew RCM ProgramFort Novosel (Rucker) Apr 2024RCM Scope CompletedLegacy Program, Refine RCM ScopeCONUS Apr 2024RCM Scope CompletedNew RCM ProgramCONUS
2024RCM Scope In ProgressNew RCM ProgramCONUS 2024RCM Scope In ProgressNew RCM ProgramOCONUS 2024RCM Scope In ProgressNew RCM ProgramOCONUS TBAPending ReviewNew RCM ProgramCONUS TBAPending ReviewNew RCM ProgramCONUS TBAPending ReviewNew RCM ProgramCONUS TBAPending ReviewNew RCM ProgramCONUS TBAPending ReviewNew RCM ProgramCONUS
Future RCM sites
CUI
Date RCM StatusScope Type Site TBAPending Review New RCM ProgramCONUS TBAPending ReviewNew RCM ProgramCONUS TBAPending ReviewLegacy Program, Refine RCM ScopeCONUS TBAPending ReviewNew RCM ProgramCONUS TBAPending ReviewNew RCM ProgramCONUS TBAPending ReviewNew RCM ProgramCONUS TBAPending ReviewNew RCM ProgramOCONUS TBAPending ReviewLegacy Program, Refine RCM ScopeCONUS TBAPending ReviewNew RCM ProgramCONUS TBAPending ReviewNew RCM ProgramCONUS TBAPending ReviewLegacy Program, Refine RCM ScopeCONUS TBAPending ReviewNew RCM ProgramOCONUS
Why RCM/CBM?
RCM PWS - Implementation Schedule
For implementation of the RCM program, the contractor shall utilize the following schedule.
RCM Phase and Required Completion Date:
• 1. Complete Verification of CBM-Eligible Equipment On-site contract start (OSCS) + 60 Calendar Days (CD).
• 2. Have qualified/certified personnel available to administer CBM program OSCS + 60 CD.
• **Installation of AHU remote vibration sensors, exterior junction box, and inspection ports where applicable
• 3. Complete Equipment Criticality RPSS Crosswalk OSCS + 90 CD.
• 4. Complete Verification of Baseline Measurement Requirements OSCS + 120 CD.
• 5. Complete Scheduling of CBM Procedures for RCM eligible equipment OSCS + 120 CD. DHA DSS function
• 6. Complete Final Draft of Contractor Implementation Plan for Gov’t Review OSCS + 120 CD.
• 7. Commence AEM Data Collection Period OSCS + 120 CD = Baseline report.
• 8. Complete AEM Data Collection Period OSCS + 485 CD = 12 Monthly Fault Reports.
• 9. Initiate De-Activation of Standard PM Procedures IAW Implementation Plan OSCS + 485 CD.
• 10. Complete De-Activation of Standard PM Procedures IAW Implementation Plan OSCS + 515 CD.
Fort Detrick – USAMRIID RCM Baseline UE & IRM
• Bearing defect - Fluting
• Mode - Rotor Capacitance due to excess VFD interference
• Mitigation - Inboard side electrostatic grounding ring
• AHU Exhaust for Logoff2 area
• Repair procedures provided
• Possible warranty claim if incorporated into design award
Fort Detrick – USAMRIID RCM Baseline UE, IRE, & IRM
• Coil/Tap Defect – Warranty claim candidate
• Mode – Internal looseness
• Mitigation – Acceptance testing before commissioning
• 4th floor transformer
Rm.4SA846
• Repair/inspection procedures provided
Fort Detrick – USAMRIID RCM Baseline UE, IRE, & IRM
• Defect – Sealed bearings with excessive red lithium grease flowing into the rotor/stator gap
• Mode – Improper lubrication
• Mitigation – A dedicated lubrication tech assigned in the maint. group
• DWBP-PP1.2-1M Rm. 1SA102
• Repair and mitigation procedures provided
USAMRIID – Cost Savings and Failure Avoidance Summary
• 38 Defects found during the first pass of UE, IRE, and 30% IRM
• 27 Defects involving improper lubrication maintenance practices from previous contractor. Greasing sealed bearings, incompatible lubricants, and lubricant contamination
• 10 Electrical transformer defects
• 1 Motor bearing advanced fluting defect found with ultrasound
• Vibration analysis visit in coming weeks will find more confirmed bearing defects in motors, pumps, and other rotating assets
USAMRIID – Cost Savings and Failure Avoidance Summary
• Cost of failure/risk avoidance is highly dependent on department and BSL level of area affected.
• 27 Defects involving improper lubrication maintenance practices from previous contractor. Motors installed range from $6K-$25K in the private sector.
• 10 Electrical transformer defects – average price each $89K-$190K
• 1 Motor bearing fluting defect found with ultrasound – price $3-5K
• Vibration analysis visit in coming weeks will find more confirmation of bearing defects in motors, pumps, and other rotating assets
RCM Purchase Specifications for MILCON projects
• A document providing examples of high reliability equipment configurations and their specifications for increased reliability in your facility.
• A great tool for planners or design engineers to get the most reliable equipment the first time.
• Example – AC Induction motors connected to a VFD:
These require electrostatic grounding protection to the motor shaft for reduction of bearing fluting. All specifications for motor and grounding ring are listed.
DHA Purchase Specs
MILCON Acceptance Testing and Warranty Period CBM
• Recommend CBM acceptance testing before commissioning
• Why commission a piece of equipment if it has an existing undetected defect?
• Greatly enhances TAB results due to increased reliability and confirmed free of defects
• Reduces warranty claim disputes due to minimal run time hours
• RCM team will coordinate with the MILCON team for timely performance
Baseline/Acceptance testing Report
• Lists each defect found during the first pass of CBM data collection.
• Provides details such as: Severity of defect, WO#, analysis comments, reason codes, technology, and repair recommendations.
• Report will have defects found using all applicable technologies in a single, highlighting all warranty claims recommended
• Report will have sufficient supporting data associated with each defect (FFT spectra, waveforms, trends, thermal images, ultrasound spectrums/waveforms, oil analysis results, and visible light images depending on technology used for each specific defect). Baseline report
File details come from the government source that posted it. Updated .